2.1.5 Philippines Visayas Port of Maasin

Total Page:16

File Type:pdf, Size:1020Kb

2.1.5 Philippines Visayas Port of Maasin 2.1.5 Philippines Visayas Port of Maasin Port Overview Port Picture Description and Contacts of Key Companies Port Performance Discharge Rates and Terminal Handling Charges Berthing Specifications Port Handling Equipment Container Facilities Terminal Information MULTIPURPOSE TERMINAL GRAIN AND BULK HANDLING MAIN STORAGE TERMINAL Stevedoring Hinterland Information Port Security Port Overview Maasin is the first chartered city in the Province of Southern Leyte, Region VIII. The port strategically faces Bohol Island and Canigao Channelin the northeast and opens up to the Mindanao Sea southward. This port serves vessels plying to Cebu City. Commercial consists mainly of agricultural products such as copra and other commercial and industrial products coming from Cebu and Mindanao such cement, feeds, flour, rice and some steel or construction products. Port website: www.ppa.com.ph Key port information may also be found at:http://www.maritime-database.com/port.php?pid=3948 Port Location and Contact Country Philippines Page 1 Region Region 8, Eastern Visayas Province Southern Leyte Nearest Town or City with Distance from Port Maasin Port's Complete Name Port of Maasin Latitude 10° 7'52.80"N Longitude 124°50'30.10"E Managing Company or Port Authority Philippines Ports Autorities (PPA) Under the supervision of the Port Management Office of Western Leyte / Biliran (PMOWLB) – Head Office in Ormoc Management Contact Person Me Joeniet M. Docena Officer-In-Charge / Sr. Terminal Operations Officer Phone: (053) 570-9812 [email protected] Nearest Airport and Airlines with Frequent National Tacloban Daniel Z. Romualdez Airport : 178 km Arrivals/Departures Airlines Destinations Cebu Pacific Manila Cebu Pacific Cebu,Davao operated byCebgo Philippine Airlines Cebu,Manila operated byPAL Express Philippines Air Asia Clark,Manila Port Picture Page 2 Description and Contacts of Key Companies Cargo Handling: Panaon Arrastre Service, Inc. (PASI-Maasin Branch) Alfredo O. Bantug, Jr. Branch Manager Phone: (053) 381-2973 Security: Lockheed Global Security and Investigation Services Inc. (LGSISI) Port Performance Seasonal Constraints Occurs Time Frame Rainy Season Yes Most frequent during December and January Major Import Campaigns No n/a Other Comments Rainfalls and typhoons are throughout the year with no pronounced dry seasons. Handling Figures for 2018 Vessel Calls 515 Container Traffic (TEUs) In-137.5 / Out-140.50 Handling Figures Bulk and Break Bulk for 2018 Bulk (MT) Inbound (aggregates) Outbound (copra) 23,601.18 MT 20,387.12 MT Break bulk (MT) Inbound (General Cargo) 68,976.55 MT Outbound (General Cargo) 1,698.38 MT Discharge Rates and Terminal Handling Charges Page 3 Berthing Specifications Type of Berth Quantity Length (m) Maximum Draft (m) Comments Conventional Berth 6 420 m 6 m Domestic cargoes only Berth details: Pier 1: 102m x 18m Pier 2 :105m x 15m Ro-Ro ramp: 15m x 15m Wharf: 102m Controlling draft along berth: 6m Port Handling Equipment The port cargoes are handled through duly authorized Cargo Handling Operator, PANAON ARRASTRE SERVICES, INC. (PASI-MAASIN) using forklift equipment with gang complement deployed by the cargo handling operator. Equipment Available Total Quantity and Capacity Available Comments on Current Condition and Actual Usage Dockside Crane No n/a n/a Container Gantries No n/a n/a Mobile Cranes No n/a n/a Reachstacker No n/a n/a RoRo Tugmaster (with Trailer) No n/a n/a Grain Elevator with Bagging Machines No n/a n/a Transtainer No n/a n/a Forklifts Yes 1 x 3 MT Good condition 1 x 5 MT Page 4 Container Facilities None. Terminal Information MULTIPURPOSE TERMINAL The terminal is suitable for bagged cargos. They are unloaded through a semi-mechanized scheme using vessel cranes with gang complement deployed by cargo handling operators Bulk cargoes such as copra are contained in boxes being loaded to the vessel through the its crane equipment. There is a RORO ramp, dimension: 15 X 15 meters and a marshalling area of 2,300 m2 for the vehicles. GRAIN AND BULK HANDLING Not available. MAIN STORAGE TERMINAL Storage Type Number of Storage Facilities Area (m2) Refrigerated Cargo None n/a General Cargo Open area 1904 Stevedoring Stevedoring services are also being provided through the same cargo handling operator, the Panaon Arrastre Services, Inc. (PASI) Hinterland Information Delivery of cargoes is also being undertaken by the Cargo Handling Operator (CHO)-PASI but most cargoes are being withdrawn by the cargo owners using their own/rented trucks or vehicles. Cargoes are being transferred from the port’s stacking area to tail end of truck using the forklift equipment provided by the CH operator. Port Security The port is fenced; there are security guards at the main gate and in the terminal building. The coastguards have an office outside the port and do regular patrol in the area. Manual and wheeled fire extinguisher are available, if needed, fire trucks can be called from the municipality. The port has also newly installed Baggage X-Ray Machine Equipment and a Walk-Thru Metal Detector. Security Page 5 ISPS Compliant Yes Current ISPS Level (Level 1 = Normal, Level 2 = Heightened, Level 3 = Exceptional) Level 1 Police Boats Yes Fire Engines No Page 6.
Recommended publications
  • Nd Drrm C Upd Date
    NDRRMC UPDATE Sitrep No. 15 re: Effects of Tropical Depression “AGATON” Releasing Officer: USEC EDUARDO D. DEL ROSARIO Executive Director, NDRRMC DATE : 19 January 2014, 6:00 AM Sources: PAGASA, OCDRCs V,VII, IX, X, XI, CARAGA, DPWH, PCG, MIAA, AFP, PRC, DOH and DSWD I. SITUATION OVERVIEW: Tropical Depression "AGATON" has moved southeastward while maintaining its strength. PAGASA Track as of 2 AM, 19 January 2014 Satellite Picture at 4:32 AM., 19 January 2014 Location of Center: 166 km East of Hinatuan, Surigao del Sur (as of 4:00 a.m.) Coordinates: 8.0°N 127.8°E Strength: Maximum sustained winds of 55 kph near the center Movement: Forecast to move South Southwest at 5 kph Monday morninng: 145 km Southeast of Hinatuan, Surigao del Sur Tuesday morninng: Forecast 87 km Southeast of Davao City Positions/Outlook: Wednesday morning: 190 km Southwest of Davao City or at 75 km West of General Santos City Areas Having Public Storm Warning Signal PSWS # Mindanao Signal No. 1 Surigao del Norte (30-60 kph winds may be expected in at Siargao Is. least 36 hours) Surigao del Sur Dinagat Province Agusan del Norte Agusan del Sur Davao Oriental Compostela Valley Estimated rainfall amount is from 5 - 15 mm per hour (moderate - heavy) within the 300 km diameter of the Tropical Depression Tropical Depression "AGATON" will bring moderate to occasionally heavy rains and thunderstorms over Visayas Sea travel is risky over the seaboards of Luzon and Visayas. The public and the disaster risk reduction and management councils concerned are advised to take appropriate actions II.
    [Show full text]
  • Province, City, Municipality Total and Barangay Population AURORA
    2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population AURORA 201,233 BALER (Capital) 36,010 Barangay I (Pob.) 717 Barangay II (Pob.) 374 Barangay III (Pob.) 434 Barangay IV (Pob.) 389 Barangay V (Pob.) 1,662 Buhangin 5,057 Calabuanan 3,221 Obligacion 1,135 Pingit 4,989 Reserva 4,064 Sabang 4,829 Suclayin 5,923 Zabali 3,216 CASIGURAN 23,865 Barangay 1 (Pob.) 799 Barangay 2 (Pob.) 665 Barangay 3 (Pob.) 257 Barangay 4 (Pob.) 302 Barangay 5 (Pob.) 432 Barangay 6 (Pob.) 310 Barangay 7 (Pob.) 278 Barangay 8 (Pob.) 601 Calabgan 496 Calangcuasan 1,099 Calantas 1,799 Culat 630 Dibet 971 Esperanza 458 Lual 1,482 Marikit 609 Tabas 1,007 Tinib 765 National Statistics Office 1 2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Bianuan 3,440 Cozo 1,618 Dibacong 2,374 Ditinagyan 587 Esteves 1,786 San Ildefonso 1,100 DILASAG 15,683 Diagyan 2,537 Dicabasan 677 Dilaguidi 1,015 Dimaseset 1,408 Diniog 2,331 Lawang 379 Maligaya (Pob.) 1,801 Manggitahan 1,760 Masagana (Pob.) 1,822 Ura 712 Esperanza 1,241 DINALUNGAN 10,988 Abuleg 1,190 Zone I (Pob.) 1,866 Zone II (Pob.) 1,653 Nipoo (Bulo) 896 Dibaraybay 1,283 Ditawini 686 Mapalad 812 Paleg 971 Simbahan 1,631 DINGALAN 23,554 Aplaya 1,619 Butas Na Bato 813 Cabog (Matawe) 3,090 Caragsacan 2,729 National Statistics Office 2 2010 Census of Population and
    [Show full text]
  • Philippine Port Authority Contracts Awarded for CY 2018
    Philippine Port Authority Contracts Awarded for CY 2018 Head Office Project Contractor Amount of Project Date of NOA Date of Contract Procurement of Security Services for PPA, Port Security Cluster - National Capital Region, Central and Northern Luzon Comprising PPA Head Office, Port Management Offices (PMOs) of NCR- Lockheed Global Security and Investigation Service, Inc. 90,258,364.20 27-Nov-19 23-Dec-19 North, NCR-South, Bataan/Aurora and Northern Luzon and Terminal Management Offices (TMO's) Ports Under their Respective Jurisdiction Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of JARZOE Builders, Inc./ DALEBO Construction and General. 328,013,357.76 27-Nov-19 06-Dec-19 Estancia, Iloilo; Culasi, Roxas City; and Dumaguit, New Washington, Aklan Merchandise/JV Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of Lipata, Goldridge Construction & Development Corporation / JARZOE 200,000,842.41 27-Nov-19 06-Dec-19 Culasi, Antique; San Jose de Buenavista, Antique and Sibunag, Guimaras Builders, Inc/JV Consultancy Services for the Conduct of Feasibility Studies and Formulation of Master Plans at Science & Vision for Technology, Inc./ Syconsult, INC./JV 26,046,800.00 12-Nov-19 16-Dec-19 Selected Ports Davila Port Development Project, Port of Davila, Davila, Pasuquin, Ilocos Norte RCE Global Construction, Inc. 103,511,759.47 24-Oct-19 09-Dec-19 Procurement of Security Services for PPA, Port Security Cluster - National Capital Region, Central and Northern Luzon Comprising PPA Head Office, Port Management Offices (PMOs) of NCR- Lockheed Global Security and Investigation Service, Inc. 90,258,364.20 23-Dec-19 North, NCR-South, Bataan/Aurora and Northern Luzon and Terminal Management Offices (TMO's) Ports Under their Respective Jurisdiction Rehabilitation of Existing RC Pier, Port of Baybay, Leyte A.
    [Show full text]
  • LTFRB-MC-2020-051B.Pdf
    Republic of the Philippines Department of Transportation LAND TRANSPORTATION FRANCHISING & REGULATORY BOARD East Avenue, Quezon City MEMORANDUM CIRCULAR NO. 2020-051-B SUBJECT : ADDITIONAL ROUTES ALLOWED FOR THE OPERATION OF PROVINCIAL BUSESENTERING METRO MANILA DURING THE PERIOD OF GCQ/MGCQ WHEREAS, pursuant to the guidelines of the Department of Transportation (DOTr) for a calibrated and gradual opening of public transportation in Metro Manila and those in nearby provinces, the Board has since then made the necessary monitoring on the daily operations of the initial routes allowed to operate; WHEREAS, on 25 September 2020, the Board issued Memorandum Circular No. 2020- 051which allowed the resumption of operations of select Provincial Bus routes entering Metro Manila; WHEREAS, under Item IIof MC 2020-051, the Board may issue additional routes to resume operations upon approval and coordination with the concerned Local Government Unit (LGU); WHEREAS, based on the monitoring and coordination with local government units across the country, the concerned LGUs of Ormoc, Palompon, Tacloban, Maasin, Catarman, and Laoang have allowed the resumption of operations of PUBs travelling to and from Metro Manila; NOW THEREFORE, for and in consideration of the foregoing, the Board hereby allows the additional routes (attached as ANNEX “A”) for Provincial Buses to operate to and from Metro Manila starting 02 November 2020or as may be allowed by the Inter-Agency Task Force on Emerging Infectious Diseases (IATF-EIF). The provisions of MC 2020-051 shall be applicable herein. In lieu of the Special Permit, the corresponding QR CODE shall be issued to the operator prior to operation. Said QR Code shall be downloaded at www.ltfrb.gov.ph and which must be printed by the operator (size : 8.5”x 11” short bond paper) and displayed conspicuously by the operator in the front windshield of authorized unit (without affecting view of the driver).
    [Show full text]
  • Construction-Of-The-Proposed-Covered-Basketball-Court-EVSU-OCC.Pdf
    Republic of the Philippines EASTERN VISAYAS STATE UNIVERSITY Tacloban City CONSTRUCTION OF THE PROPOSED COVERED BASKETBALL COURT EVSU – Ormoc City Campus 1. The EASTERN VISAYAS STATE UNIVERSITY, intends to apply the sum of Php 3,450,776.90 being the Approved Budget for the Contract (ABC) to payments under the contract for the CONSTRUCTION OF THE PROPOSED COVERED BASKETBALL COURT of EVSU-Ormoc City Campus. Bids received in excess of the ABC shall be automatically rejected at bid opening. 2. The EASTERN VISAYAS STATE UNIVERSITY now invites bids for CONSTRUCTION OF THE PROPOSED COVERED BASKETBALL COURT of EVSU-Ormoc Campus. Completion of the Works is required 90 Calendar Days. Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment (listed in the Eligibility Forms) available for the prosecution of the contract. Bidding will be conducted through open competitive bidding procedures using non-discretionary pass/fail criterion. All particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-Bidding Conference, Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulation (IRR). 3. Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least seventy five percent (75%) interest or outstanding capital stock belonging to citizens of the Philippines. The BAC will conduct post qualification of the lowest calculated bid. 4. Interested bidders may obtain further information from EASTERN VISAYAS STATE UNIVERSITY and inspect the Bidding Documents at the address given below.
    [Show full text]
  • List of Ecpay Cash-In Or Loading Outlets and Branches
    LIST OF ECPAY CASH-IN OR LOADING OUTLETS AND BRANCHES # Account Name Branch Name Branch Address 1 ECPAY-IBM PLAZA ECPAY- IBM PLAZA 11TH FLOOR IBM PLAZA EASTWOOD QC 2 TRAVELTIME TRAVEL & TOURS TRAVELTIME #812 EMERALD TOWER JP RIZAL COR. P.TUAZON PROJECT 4 QC 3 ABONIFACIO BUSINESS CENTER A Bonifacio Stopover LOT 1-BLK 61 A. BONIFACIO AVENUE AFP OFFICERS VILLAGE PHASE4, FORT BONIFACIO TAGUIG 4 TIWALA SA PADALA TSP_HEAD OFFICE 170 SALCEDO ST. LEGASPI VILLAGE MAKATI 5 TIWALA SA PADALA TSP_BF HOMES 43 PRESIDENTS AVE. BF HOMES, PARANAQUE CITY 6 TIWALA SA PADALA TSP_BETTER LIVING 82 BETTERLIVING SUBD.PARANAQUE CITY 7 TIWALA SA PADALA TSP_COUNTRYSIDE 19 COUNTRYSIDE AVE., STA. LUCIA PASIG CITY 8 TIWALA SA PADALA TSP_GUADALUPE NUEVO TANHOCK BUILDING COR. EDSA GUADALUPE MAKATI CITY 9 TIWALA SA PADALA TSP_HERRAN 111 P. GIL STREET, PACO MANILA 10 TIWALA SA PADALA TSP_JUNCTION STAR VALLEY PLAZA MALL JUNCTION, CAINTA RIZAL 11 TIWALA SA PADALA TSP_RETIRO 27 N.S. AMORANTO ST. RETIRO QUEZON CITY 12 TIWALA SA PADALA TSP_SUMULONG 24 SUMULONG HI-WAY, STO. NINO MARIKINA CITY 13 TIWALA SA PADALA TSP 10TH 245- B 1TH AVE. BRGY.6 ZONE 6, CALOOCAN CITY 14 TIWALA SA PADALA TSP B. BARRIO 35 MALOLOS AVE, B. BARRIO CALOOCAN CITY 15 TIWALA SA PADALA TSP BUSTILLOS TIWALA SA PADALA L2522- 28 ROAD 216, EARNSHAW BUSTILLOS MANILA 16 TIWALA SA PADALA TSP CALOOCAN 43 A. MABINI ST. CALOOCAN CITY 17 TIWALA SA PADALA TSP CONCEPCION 19 BAYAN-BAYANAN AVE. CONCEPCION, MARIKINA CITY 18 TIWALA SA PADALA TSP JP RIZAL 529 OLYMPIA ST. JP RIZAL QUEZON CITY 19 TIWALA SA PADALA TSP LALOMA 67 CALAVITE ST.
    [Show full text]
  • Updates on the Development Plans for Eastern Visayas BUSINESS
    Philippine Chamber of Commerce and Industry Tacloban-Leyte BUSINESS RESILIENCE CENTER Updates on the Development Plans for Eastern Visayas Rebuilding Yolanda-affected Areas Presented by: OLIVER CAM VP External Affairs Consultant, BRC Overview Part 1: Eastern Visayas Economic Profile Part 2: New Regional Development Plan 2017-2022 Part 3: Flagship Investment Priorities and Opportunities per sector Manufacturing/Processing: Leyte Ecological Industrial Zone Agriculture/Fisheries: Rice Revolution Services: Tourism • Part 4: Yolanda funds update Part 1: Overview of Eastern Visayas Regional Economy Source: State of the Region Address (SORA), 2017 3rd Qtr Regional Development Council, Full Council Meeting Sept. 29, 2017, NEDA VIII, Palo, Leyte Philippine Chamber of Commerce and Industry Tacloban-Leyte BUSINESS RESILIENCE CENTER Eastern Visayas: Fastest growing economy in 2016 15 Broad-based growth 10 2.4% AHFF 5 12.4% twice the annual 20.2% Industry 0 target 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 -5 8.6% Services -10 Vibrant demand 14 Fastest growth in per capita household expenditure and 12 construction investments 10 8 10.1% Household Expenditures 6 4 9.5% Government Expenditures 2 0 48.6% Public and Private Construction 4 Lowest inflation rate in at least two decades 14 12 Lower inflation rate in all provinces 10 Provinces Inflation Rate 8 Biliran 0.7% 6 4 Leyte 1.8% 2 Southern Leyte 3.5% 0 Samar -0.7% Eastern Samar 1.5% Northern Samar 0.4% 1.3% Purchasing power 2016 headline inflation rate of peso is 0.65 5
    [Show full text]
  • LEYTE Mineral Profile
    Republic of the Philippines Department of Environment and Natural Resources MINES AND GEOSCIENCES BUREAU Region: Eastern Visayas (Region VIII) Leyte Municipality:40 MINERAL PROFILE Barangays: 1,503 Land Area and Mineral Potential Population: 1,966,768 (as of 2015) The Philippine government promotes 578,382 hectares Income classification: 1st Class Province the rational exploration, development, Total land area of Leyte in hectares. Major economic activities: mixed utilization and conservation of mineral agriculture, fishing, industrial, energy, 32.38% or 7,935.12 hectares resources guided by its commitment to mining Percentage of Leyte’s total land area responsible minerals development covered by operating mines out of Economic Growth 24,502.11 approved mining rights. The Philippine government commits to provide a competitive Environment Protection and investment climate and adequate Management protection of the rights and privileges of mining investors. The Philippine government ensures the adequate protection Mineral Statistics of the environment, before, PhP31,777,457.55 during, mining operations and Estimated amount contributed by the beyond the life of the mine. operating mines in the province in the form of taxes and fees Social Development and Management PhP31,645,000.00 Mining Investments Amount committed by operating mines for US$125,000 or PhP6,500,000.00 million the development of their host and (as of December 2016) neighboring communities through their Total reported investments of mining approved Social Development and projects
    [Show full text]
  • Eastern Visayas
    ISSN 0116-4007 Eastern Visayas ISSN 0116-4007 Eastern Visayas REPUBLIC OF THE PHILIPPINES PRESIDENT RODRIGO ROA DUTERTE REPUBLIC OF THE PHILIPPINES PHILIPPINE STATISTICS AUTHORITY LISA GRACE S. BERSALES, Ph.D. National Statistician and Civil Registrar General Copyright © 2012 by Philippine Statistics Authority (PSA) PSA CVEA Building East Avenue, Diliman Quezon City, Philippines FOREWORD Over the years, the Census of Agriculture and Fisheries (CAF) has been the major source of comprehensive information on agriculture and fishery sectors in the country. The collected census data provide statistical information which can assist decision making for all sectors of society such as governments, businesses, academics, researchers, students, community organizations and individuals. The 2012 CAF was undertaken by the then National Statistics Office (NSO) in accordance with Executive Order (EO) 121, designating the said office as the "major statistical agency responsible for generating general purpose statistics" and Commonwealth Act 591 which authorized the NSO, "to prepare for and undertake all censuses of population, agriculture, industry and commerce". Moreover, EO 352, otherwise known as the Designation of Statistical Activities that will Generate Critical Data for Decision-Making of the Government and the Private Sector, provided for the conduct of census of agriculture every 10 years. Recently, Republic Act (RA) 10625 (Reorganizing and Strengthening the Philippine Statistical System and for Other Purposes) Section 6 stipulates that one function of the Philippine Statistics Authority (PSA) is "to prepare and conduct periodic censuses on population, housing, agriculture, fisheries, business, industry and other sectors of the economy". The 2012 CAF was the sixth in a series of decennial agriculture censuses and the fifth in the decennial censuses of fisheries in the country.
    [Show full text]
  • Non-Commercial Use Only
    Geospatial Health 2021; volume 16:957 Use of geographic information system as a tool for schistosomiasis surveillance in an endemic Municipality in Eastern Samar, The Philippines Vicente Y. Belizario, Jr.,1,2 John Paul Caesar R. delos Trinos,2,3 Nestor Lentejas,4 Allen J. Alonte,2 Agnes N. Cuayzon,5 Marian E. Isiderio,6 Rodel Delgado,6 Marilou Tejero,7 Victorio B. Molina1 1College of Public Health, University of the Philippines Manila, Manila, Philippines; 2Neglected Tropical Diseases Study Group, National Institutes of Health, University of the Philippines Manila, Manila, Philippines; 3Kirby Institute, University of New South Wales Sydney, Sydney, Australia; 4Plan International Philippines, Makati, Philippines; 5Department of Health Centre for Health Development, Eastern Visayas, Philippines; 6Provincial Health Office, Eastern Samar, Philippines; 7Municipal Health Office, Oras, Eastern Samar, Philippines modifiable (geography and climate) determinants for schistosomi- Abstract asis. Results showed that most barangays (villages) are character- This study aimed to demonstrate the use of geographic infor- ized by favourable conditions for schistosomiasis transmission mation systems (GIS) in identifying factors contributing to schis- which include being located in flood-prone areas, presence of tosomiasis endemicity and identifying high-risk areas in a schisto- vegetation, low sanitaryonly toilet coverage, presence of snail interme- somiasis-endemic municipality in the Philippines, which was dev- diate host, high carabao (water buffalo) population density, previ- astated by Typhoon Haiyan in 2013. Data on schistosomiasis ously reported ≥1% prevalence using Kato-Katz technique, and determinants, obtained through literature review, the Philippine low MDA coverage. Similarly, barangays not known to be endem- Department of Health, and concerned local government units, ic for schistosomiasisuse but also characterized by the same were standardized and incorporated into a GIS map using ArcGIS.
    [Show full text]
  • Land Cover Change Analysis of Maasin Watershed Forest Reserve
    Ecosystems & Development Journal 5(2): 12‐22 April 2015 ISSN 2012‐3612 ABSTRACT The paper analyzed the land cover condition of Maasin Land Cover Change Analysis Watershed Forest Reserve (MWFR) through remote sensing and time change analysis. Remote sensing, the measurement of of Maasin Watershed Forest object properties on Earth’s surface using data acquired from aircraft and satellites, has revolutionized understanding of Reserve, Iloilo, Philippines dynamic environment. Researchers use remote sensing satellites to provide repetitive coverage of the earth for studying landscape dynamics, phenological variations of vegetation and 1* Emelyn A. S. Peñaranda , change detection analysis. By using land satellite imageries 2 2 Juan M. Pulhin , Enrique P. Pacardo , generated from remote sensing, the extent of change in land Leonardo M. Florece2, and Leni D. Camacho2 cover of Maasin Watershed Forest Reserve from 1993, 2001, and 2009 was analyzed. INTRODUCTION Land cover in MWFR was classified into forest, brush, grass, and bare areas. Results of the analysis revealed that land cover The Philippines has a land area of 30 million ha. In 1934, 57% of the said watershed has not been very stable from 1993 to or 17 million ha of these are still covered with forests. However, 2009. Time change detection analysis through cross tabulation in 1980, the forest cover was reduced to 7.4 million ha. Recent showed evident changes from one class to another over the estimates indicate that there are only about 5.33 million ha, years. The results of the study showed slight improvement in the roughly 18% of the total land area, still covered with forests.
    [Show full text]
  • List of Kalahi-CIDSS Sub-Projects - JFPR As of March 2018
    List of Kalahi-CIDSS sub-projects - JFPR as of March 2018 Physical Estimated Total Region Province Municipality Barangay Cycle Sub-Project Name Project Type No. Of HHs KC Grant LCC Amount Date StartedDate of CompletionAccomplish Status Project Cost ment (%) REGION VIII [Eastern Visayas] EASTERN SAMAR BALANGIGA SAN MIGUEL Cycle 1 Rehabilitation of One (1) Unit, Two (2) Class School Building 1,343 3,770,000.00 11,250.00 3,781,250.00 3/13/2015 6/24/2015 100 Completed Room School Building and One (1) Faculty Room, Brgy San Miguel Elementary School - One (1) Unit, Three (3) Class Room School Building, Brgy. Cansumankay Elementary School - One (1) Unit, Two (2) Class Room School Building, Brgy Sta. Rosa Elementary School and One (1) Class Room, Brgy. Sta. Rosa Elementary School and One (1) Class Room, Brgy. Cag-olango, Balangiga, Eastern Samar. REGION VIII [Eastern Visayas] EASTERN SAMAR BALANGIGA SAN MIGUEL Cycle 1 Provision of Basic Amenities to Enhance Other / For classification 1,343 919,000.00 919,000.00 11/4/2016 11/22/2016 100 Completed Functionality of Community Buildings in 4 (sq.m. for buildings, unit for Barangays in Balangiga equipment, workers for Cash for works) REGION VIII [Eastern Visayas] EASTERN SAMAR GUIUAN POBLACION WARD 8 Cycle 1 Rehabilitation of RHU 1 with Birthing Clinic Health Station 564 17,400,000.00 17,400,000.00 2/1/2016 2/10/2017 100 Completed and Provision of Amenities REGION VIII [Eastern Visayas] EASTERN SAMAR HERNANI BARANGAY 1 (POB.) Cycle 1 Reconstruction of Barangay Streetlights Electrification / Lighting
    [Show full text]