EASTERN COALFIELDS LIMITED. ( a Subsidiary of Coal India Limited) OFFICE of the GENERAL MANAGER, KENDA AREA, P.O.Haripur-713 378 DIST- BURDWAN (WEST BENGAL) Fax

Total Page:16

File Type:pdf, Size:1020Kb

EASTERN COALFIELDS LIMITED. ( a Subsidiary of Coal India Limited) OFFICE of the GENERAL MANAGER, KENDA AREA, P.O.Haripur-713 378 DIST- BURDWAN (WEST BENGAL) Fax EASTERN COALFIELDS LIMITED. ( A Subsidiary of Coal India Limited) OFFICE OF THE GENERAL MANAGER, KENDA AREA, P.O.Haripur-713 378 DIST- BURDWAN (WEST BENGAL) Fax. No:0341-2667176/ 2660068 e-mail: [email protected] REF.NO:-GM/KENDA/MM/PUR/ENQ/15-16/MCCB/67 DATE:- 30.06.2015. Due on- 22.07.2015, At 11.00 A.M. (Website Tender) Sealed Tenders are invited from the proven manufacturer or their authorized Dealer /distributors/sole selling agents (incase manufacturer not quoting directly) for the supply of following items :- S/N Description Thermal Release (A) Breaking Capacity Pole Apprx. Quantity (415V AC) 50Hz.(KA) (No) 1 MCCB 80 25 3 Pole 04 2 MCCB 160 70 4 Pole 10 3 MCCB 200 70 4 Pole 01 4 MCCB 320 70 4 Pole 01 5 MCCB 500 70 4 Pole 02 6 MCCB 630 70 4 Pole 03 7 MCCB 320 70 4 Pole 02 1/ Tenderer shall submit offer in duplicate, in 2(Two) bid system i.e. Techno Commercial Bid (Part I) and Price Bid (Part II) . On the date of opening of Tender, only Technical Commercial Bid (Part I) Will be opened . Price Bid ( Part II) will be opened of successful Tenderers who will fulfill the terms and conditions as per the following parameters. 2/ Envelpo no.1 containing Techno Commercial Bid i,e, Part-I and the Envelop No.2 containing Price Bid i,e, Part-II should be properly sealed and put inside the bigger Envelop No.3 . Both the envelop (1 & 2 ) should bear the tender no. and date and should also indicate the heading i,e, ‘Cover 1- Techno Commercial Bid/ Cover-II- Price Bid’. In case any one of the three envelopes submitted without proper sealing, offer shall not be considered. All the sealed envelopes must bear name and address of the tenderer. All the three envelopes shall be properly sealed ONLY with sealing wax embossed with logo or monogram of the tenderers. Envelopes sealed ONLY by gum or stapled shall not be accepted. 3/ Special Note :- Any other firm, apart from the above firms, who is either a manufacturer of the tendered item authorized dealer/distributor/sole selling agent (incase manufacturer of the tendered not quoting directly) willing to participate in this tender, comply all the parameters, terms and conditions of this tender may submit their offer with duly authenticated tender document down loaded from the website www.easterncoal.gov.in & www.tenders.gov.in , o therwise the offer will not be considered. Contd. Page-2 Page-2 REF.NO:-GM/KENDA/MM/PUR/ENQ/15-16/MCCB/67 DATE:- 30.06.2015. Due on- 22.07.2015 At 11.00 A.M. Detailed Parameters of Part - I:- 1. Pre-printed terms & conditions of the tender/offer shall not be considered. 2. Tenderers are requested to submit their offer complete in all respect upon going through all details furnished in tender (NIT) and confirm compliance to each point in Part I. All the pages of tender document / offer must be signed with company’s seal. Erased and over written quotations will be summarily rejected unless correction must be authenticated with the tenderes’ signature. 3. HAND WRITTEN OFFER WILL NOT BE ACCEPTED. IT MUST BE TYPED/PRINTED. 4. Inspection : Materials will be inspected at our site and if it is found with any defect or not up to the mark, same will be rejected. 5. Proven-ness criteria :- Tenderer who have supplied tendered item or similar nature of tendered item to any Area/ HQ of ECL or subsidiary of CIL, any public undertakings or any central / state govt. sector or their subsidiary will be considered as proven. To this effect, tenderer must submit with their quotation, self attested, legible and complete copy of the purchase order received from any of these Organizations. 6. Earnest Money of Rs. 12939.00 (Rupees Twelve Thousand Nine Hundred Thirty Nine only) to be deposited along with the Tender as EMD in form of Demand Draft of any Bank to be drawn in favour of “Eastern Coalfields Limited, Kenda Area.” payable at Asansol . EMD shall be refunded as per company’s rules. 7. Security Deposit : 10 % of Ordered value to be deposited as security deposit within 15(fifteen) days from the date of receipt of order in form of D.D. of any Bank to be drawn in favour of “Eastern Coalfields Limited, Kenda Area.” Payable at Asansol, which will be refunded within 30 days on satisfactory execution of the supply order. For unsatisfactory performance and/or contractual failures, the Security Deposit shall be forfeited. 8. Exemption : State/ Central Govt. organization/ PSU and valid DGS&D / NSIC Registered (for Tendered Item) firm can be produce documentary evidence issued by Govt. Authority for Exemption towards submission of E M D / S D. Ancillary unit of E C L (for Tendered Item) will also be considered for exemption of E M D/ S D. They must submit of valid Ancillary certificate for the tendered item. All of above certificates and documentary evidences must be attested by Notary Public. 9 Payment :- 100 % within 30 days from the date of receipt & acceptance of consignment or Bill whichever is later. 10 Price certificate : The Tenderer have to certify on the body of their quotation that the rate offered by them is not higher than that is applicable to the DGS&D and other Govt. Organisation including C I L and its subsidiaries. 11 Guarantee / Warrantee : - You shall be fully responsible for the manufacturing guarantee/warranty in respect of proper design, quality and workmanship of the materials for a period of 12 months from date of commissioning or 18 months from date of receipt and acceptance of material whichever is earlier against any manufacturing defects/bad workmanship etc. You shall replace such consignment which may require replacement under the above condition free of cost.. 12 Delivery: - Within thirty (30) days from the date of Purchase Order. 13. FOR : Destination basis i.e. Area Stores, Kenda Area.T ransit insurance :- to be arranged by supplier. 14. Tenderer shall give declaration that they have not been banned or de-listed by Any Govt., Quasi- Govt or their undertaking or PSU. Contd. Page-3 Page-3 REF.NO:-GM/KENDA/MM/PUR/ENQ/15-16/MCCB/67 DATE:- 30.06.2015 . Due on- 22.07.2015, At 11.00 A.M. 15. All disputes are subject to Asansol jurisdiction. 16. Manufacturer identification mark should be provided. 17. Liquidated Damages : Delay in execution of order would entail imposition of liquidated damages as below:- In case of failure to deliver the material as per delivery period, Kenda Area reserves the right (a) To recover from the successful tenderer as agreed, liquidated damages, a sum not s than 0.5%(half percent) of the price of any stores which the successful tenderer has not been able to supply as aforesaid for each week or part of a week during which the delivery of such stores may be in arrears limited to 10%(Ten percent). Where felt necessary, the limit of 10%(Ten percent) can be increased to 15%(Fifteen percent).at the discretion of General Manager, Kenda Area. (b) To purchase elsewhere, after due notice to the successful tenderer on their account and at the risk of the defaulting supplier, the stores not supplied or other material of a similar description without cancelling the supply order in respect of the consignment not yet due for supply. OR (c) To Cancel the supply order or a portion thereof, and if so desired to purchase the stores at the risk and cost of the defaulting supplier and also- (d) To extend the delivery period with or without penalty as may be considered fit and proper, the penalty, if imposed shall not be more than the agreed liquidated damages referred to as clause(a) above. (e) To forfeit the security deposit full or in part. (f) Whenever under this contract a sum of money is recoverable from the supplier, KENDA Area shall be entitled to recover such sum by appropriating, in part or in whole by deducting any sum or which at any time thereafter may become due to the successful Tenderer in this or any other contract. Should this sum be not sufficient to cover full amount recoverable, the successful Tenderer shall have to pay to Kenda Area on its demand the remaining balance. The successful Tenderer shall however not be entitled to any gain on any such purchase. 18. Price fall clause: The price charged for the stores supplied under this contract by you (if concluded) shall in no event exceed the lowest price at which you sell these stores or offer to sell the stores of identical description to any other organization during the said period of the contract. If you, at any time during the said periods reduce the sale price of such stores or sell to any other organization or offer to sell to any other organization at a price lower than the price chargeable under this contract, you shall forthwith notify such reduction of sale or offer to sell to the this office and the price payable under the contract for the stores supplied after the date of coming into force of such reduction in sale price shall stand correspondingly reduced. 19. Tenderer must mention: Brand Name, name of the manufacturer. 20. Furnish the following details for payment through e-mode. a. Name of the payee.(in block letters). b. Address of the payee. c. Bank Account no. of the payee. d. Name of Bank. e.
Recommended publications
  • Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
    HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 11 J-11015/245/2011-IA.II(M) FOR THE PERIOD OF OCTOBER 2018 TO MARCH 2019 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) Half Yearly EC Compliance report in respect of mines Area (Cluster 11), ECL Period:- October 2018 to March 2019 Specific Conditions Condition no.(i) The Maximum production from the mine at any given time shall not exceed the limit as prescribed in the EC. Compliance Kenda - Complied S.No Name of Mines Peak EC Production from(Oct ’18 to Capacity March ’19) (MTPA) (MT) 1 Krishnanagar 0.05 Temporarily closed. (U/G) 2 Haripur Group 2.30 0.565458 of Mines A Haripur(U/G + 0.75 Haripur UG is Temporarily OC ) closed & OCP Not yet started. B CBI(U/G) 0.10 0.029889 C Chora 7,9 & 10 0.15 0.07793 pit(U/G) D Bonbahal OC 0.5 0.102754 Patch(OCP) E Shankarpur/CL 0.8 0.354885 Jambad OC Patch/Mine(52 Ha) 3 New Kenda 2.00 0.119282 Group of Mines A New Kenda (UG) 0.05 0.015802 B West Kenda OC 0.75 Not yet started. Patch/Mines C New Kenda OC 1.2 0.10348 mine(240 Ha) 4 Bahula Group of 0.45 0.146471 Mines A Lower 0.15 0.035949 Kenda(U/G) B Bahula (U/G) 0.25 0.085078 C CL Jambad 0.05 0.025444 (U/G) 5 Siduli(U/G +OC) 1.2 0.054887, OCP not yet started.
    [Show full text]
  • List of Polling Station
    List of Polling Station 1 Assembly Name with No. : Kulti (257) Sl. No. Part No. Polling Station with No. 1 1 Sabanpur F.P.School (1) 2 2 Barira F.P.School (N) (2) 3 3 Barira F.P.School (S) (3) 4 4 Laxmanpur F.P.School (4) 5 5 Chalbalpur F.P.School (Room-1) (5) 6 6 Dedi F.P.School (6) 7 7 Kultora F.P.School (W) (7) 8 8 Kultora F.P.School (E) (8) 9 9 Neamatpur Dharmasala Room No.1 (9) 10 10 Jamuna Debi Bidyamandir Nayapara Room no.1 (10) 11 11 Jamuna Debi Bidyamandir , Nayapara Room no.2 (11) 12 12 Neamatpur F.P.School (12) 13 13 Neamatpur F.P.School (New bldg) (13) 14 14 Neamatpur F.P.School (Middle) (14) 15 15 Adarsha Janata Primary School Bamundiha, Lithuria Rd, R-1 (15) 16 16 Adarsha Janata Primary School Bamundiha, Lithuria Rd, R-2 (16) 17 17 Jaladhi Kumari Debi High School (R-1) (17) 18 17 Jaladhi Kumari Debi High School (R-2) (17A) 19 18 Belrui N.G.R. Institution (18) 20 19 Islamia Girls Jr High School, Neamatpur (R-1) (19) 21 20 Islamia Girls Jr High School , Neamatpur(R-2) (20) 22 21 Neamatpur Dharmasala (R-3) (21A) 23 21 Neamatpur Dharmasala (R-2) (21) 24 22 Sitarampur National F.P.School (22) 25 23 Eastern Railway Tagore Institute Room No.1 (23) 26 24 Eastern Railway Tagore Institute Room No.2 (24) 27 25 Belrui N.G.R. Institution Room (North) No.2 (25) 28 26 Belrui N.G.R.
    [Show full text]
  • Environmental Statement in Form-V Cluster No
    ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986) (2018-2019) FOR CLUSTER NO. – 8 (GROUP OF MINES) Satgram Area and Sripur Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2015 Company Environmental Statement (Form-V) for Cluster No. 8 (Group of Mines) 2018-19 ENVIRONMENTAL STATEMENT FORM – V Environmental statement for the financial year ending 31st March, 2019 Cluster No. – 8 FOR THE YEAR: 2018-19 CONTENTS SL.NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-5 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 6-11 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY AND HEAVY METAL ANALYSIS 12-16 II NOISE LEVEL REPORT 17-18 III WATER QUALITY REPORT – MINE WATER QUALITY 19-22 AND GROUND WATER QUALITY IV WELL WATER LEVEL REPORT 23 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) for Cluster No. 8 (Group of Mines) 2018-19 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the Environment Clearance granted by MoEF&CC, the work of Environmental Statement for Cluster No.
    [Show full text]
  • ANSWERED ON:03.03.2010 ILLEGAL MINING in ASANSOL AREA Chowdhury Shri Bansagopal;Haque Shri Sk
    GOVERNMENT OF INDIA COAL LOK SABHA UNSTARRED QUESTION NO:947 ANSWERED ON:03.03.2010 ILLEGAL MINING IN ASANSOL AREA Chowdhury Shri Bansagopal;Haque Shri Sk. Saidul Will the Minister of COAL be pleased to state: (a) whether attention of the Government has been drawn to the on-going-large-scale illegal mining in Asansol-Raniganj- Jharia coal belt areas; (b) if so, the details thereof and the reasons therefor; (c) whether the Government has taken any preventive steps to stop illegal mining with the help from the State Government; (d) if so, the details thereof; and (e) if not, the reasons therefor ? Answer MINISTER OF STATE (IC) IN THE MINISTRY OF COAL AND MINISTER OF STATE (IC) IN THE MINISTRY O F STATISTICS & PROGRAMME IMPLEMENTATION (SHRI SRIPRAKASH JAISWAL) (a)& (b) : Yes, Sir. As per the information received from Coal India Ltd. (CIL), the details of illegal coal mining in Asansol-Raniganj- Jharia coal belt are as under: i) The areas of illegal coal mining activities within the leasehold of Eastern Coalfields Ltd. (ECL), but where the surface rights belong to others, are Sripur area, Sodepur area, Salanpur area, Satgram area, Kenda area, Kunustoria area, Bankola area and Kajora area. ii) In Jharia coal belt, areas of illegal mining activities are Barora, Govindpur, Katras, Sijua, Kusunda, Kustore, Bastacolla, Lodna, E.J. area, W.J. area and C.V. area. The following reasons are attributable to the menace of illegal coal mining: a) Socio-Economic−unemployment, poverty; b) Administrative−innumerable small pockets spread over vast coalfield area; c) Geological − easy access to coal with very low cover; d) Economic − demand from end-users, willing to pay good price; e) Legal action against offenders-time consuming; and f) Landlessness/marginal land holding.
    [Show full text]
  • Office Order
    Page 1 of 10 ईट셍न कोलफील्ड्स लललिटेड EASTERN COALFIELDS LIMITED (कोल इंडिया का एक अंग) (A Subsidiary of Coal India Limited) Office of the Chairman-Cum-Managing Director, अध्यक्ष- सह प्रबन्धक निर्देशक का कायाालय, Sanctoria, PO: Dishergarh, सं啍टोरिया, पो-दर्दशेिगढ़, जिला-वधामाि, Dist. Burdwan. West Bengal - 713333. पजचिम बंगाल-713333 Office of the General Manager (P&IR). महाप्रबंधक(का/औ.स.) का कायाालय CIN-U10101WB1975GOI030295. CIN-U10101WB1975GOI030295. E-mail - [email protected] [email protected] Telefax- 0341-2523586. फ़ै啍स- 0341-2523586. ______________________________________________________________________________________ Ref. NO. ECL/CMD/C-6/Rectt/14/ 586 Date: 06th Nov, 2014 Office Order Consequent upon the recommendation of the Departmental Selection Committee the Competent Authority has accorded approval for selection of the following employees as Clerk Grade-III. They are hereby posted in the Areas/Units/Estb. as given against their names. List of GEN candidates Place of Posting on SL. Designati Present Area Roll Name of Employee UM No. CAT PH selection of Clerk NO on Name No Grade-III ARPITA DALAL General ECL Sales 1 193772 OBC 10338 ECL Sales Office,Kolkata CHOWDHURY Mazdoor Office Security 2 Santanu Roy 189967 GEN ECL.HQ. 10002 ECL,HQ. Guard Smt. Soma 3 194444 Gen.Maz. GEN ECL.HQ. 10021 ECL,HQ. Bhowmick BRAJANATH T.R,U.G. 4 189781 GEN Sodepur Area 10217 ECL,HQ. BANERJEE MAZ. Samp.Ma 5 Arun Kr Singh 190524 GEN Kenda Area 10914 Kenda Area z 6 ANINDYA MANDAL 116419 T/R GEN Satgram Area 10523 ECL,HQ.
    [Show full text]
  • Eastern Coalfields Limited (A Subsidiary of Coal India Ltd.)
    HALF YEARLY ENVIRONMENT CLEARANCE COMPLIANCE REPORT OF CLUSTER 12 J-11015/76/2011-IA.II(M) FOR THE PERIOD OF OCTOBER 2018 TO MARCH 2019 Eastern Coalfields Limited (A subsidiary of Coal India Ltd.) \ Eastern Coalfields Limited (A Subsidiary of Coal India Limited) Office of the Agent Jhanjra Project Colliery P.O.: Laudoha (8.O.), PIN: 713385 Dist.: Burdwano W.B. Ph: 0341- 2670618,, Fax: 0341-2672352 UNDERTAKING lnformation provided in Half yearly EC compliance report for the period September 2018 to March 2019 in respect of Jhanjra UGP of Cluster no. 12 is true to the best of my knowledge: S. No. Name of the mine Name of the Manager Signature of the Manager 1. Jhanjra UG P, K. Mondal V. a\\ <->551 c\ \el"dr\ G.M. (M)y'A$ent Project CollierY W.^U" Phone: (034 l) 2667 481(O) Fax: (03 4I) 2667274(O) BASTERN COALFIELDS LIMITED (A Subsidiary of Coal India Limited) O/o The Agent, Sonepur Bazari project PO: Sonepur-7L3378, Dist.: Paschim Bardhaman UNDERTAKING Information provided in half yearly EC compliance report for the period Oct,1g to March'19 in respect of the following mines of Cluster no. !2 is true to the best of my knowledge: sL. MINES NAME OF THE AGENT SIGNATURE OF THE NO. AGENT t Sonepur Bazari OCP ShriAmitanjan Nandi rl Agent/ oponent Half Yearly EC Compliance report in respect of mines under (Cluster 12), ECL Period:- October 2018 to March 2019 SPECIFIC CONDITIONS Grant of EC is only for the non-forest area plus the forest area within the mining lease for which FC is available.
    [Show full text]
  • A Demographic Survey and Socio- Economic Study for the Project Affected People
    DRAFT REPORT 288888222222225 A Demographic Survey and Socio- economic Study for the Project Affected People (PAP) and NON- PAP People of New Kenda OCP, WEST Burdwan District SUBMITTED BY: Dr. Amitabh Pandey Dr. Parul Rishi Dr. Bal Krishna Upadhyay Dr. Ujjal Sarma SUBMITTED TO: EASTERN COALFIELDS LIMITED, KENDA AREA WEST BURDWAN DISTRICT Indian Institute of Forest Management, P.O. Box 357, Nehru Nagar Bhopal (MP) 462003 1 AKNOWLEDGEMENTS Our team would like to express its sincere gratitude towards the General Manager Kenda area Mr. S.K. Singh, for providing us an opportunity to work with their prestigious institution and also for providing us with all the necessary help, support and guidance for the consultancy project. we would like to express our sincere thanks to the Director, IIFM for his kind support throughout the project. We would like to thank Mr. Uday Shankar Choubey (Agent, Kenda Area), Mr. Indranath Chatterjee (Manager, Kenda Area), Mr. Ashish Kumar (Assistant Manager, Environment officer, Kenda Area) and Mr. Monoj Bhattacharjee for supporting me throughout the field visits and facilitating smooth and productive field work. We are highly indebted to the people of Kenda village for their cooperation and support throughout the study. Amitabh Pandey Parul Rishi B K Upadhyay U K Sarma 2 TABLE OF CONTENTS Contents LIST OF ABBREVIATONS4 ................................................................................................................. 4 EXECUTIVE SUMMARY5 ..................................................................................................................
    [Show full text]
  • Annual Report & Accounts 2019-20
    Eastern Coalfields Limited (A subsidiary of Coal India Limited) ANNUAL REPORT & ACCOUNTS 2019-20 EASTERN COALFIELDS LIMITED (A subsidiary of Coal India Limited) www.easterncoal.nic.in Mission To produce and market the planned quantity of coal and coal products efficiently and economically in an eco-friendly manner with due regard to safety, conservation and quality. Vision To emerge as a global player in the primary energy sector committed to provide energy security to the country by attaining environmentally & socially sustainable growth through best practices from mine to market. CONTENTS Sl.No. Contents Page No. 1. Management ............................................................................................ 04 2. Bankers/Auditors .................................................................................... 06 3. Notice of Annual General Meeting ........................................................... 08 4. Chairman’s Statement ............................................................................. 11 5. Operational Statistics/Financial Position ................................................. 15 6. Profile of Directors ................................................................................... 33 7. Boards’ Report ......................................................................................... 37 8. Comments of the Comptroller and Auditor General of India .................... 128 9. Auditors Report and Management’s Reply ............................................... 130 10. Balance Sheet
    [Show full text]
  • Annual Report & Accounts 2018-19
    ANNUAL REPORT & ACCOUNTS 2018-19 EASTERN COALFIELDS LIMITED (A subsidiary of Coal India Limited) CIN-U10101WB1975GOI030295 www.easterncoal.nic.in 3 3 CONTENTS Sl.No. Contents Page No. 1. Mission/Vision Statement .......................................................................... 01 2. Management ........................................................................................... 02 3. Bankers/Auditors ...................................................................................... 04 4. Notice of Annual General Meeting .............................................................. 07 5. Chairman’s Statement ............................................................................... 11 6. Operational Statistics/Financial Position ...................................................... 21 7. Profile of Directors .................................................................................... 23 8. Boards’ Report ......................................................................................... 26 9. Comments of the Comptroller and Auditor General of India ............................ 108 10. Auditors Report and Management’s Reply ................................................... 110 11. Balance Sheet as on 31st March, 2019 ..................................................... 125 12. Statement of Profit & Loss for the year ended 31st March, 2019 ................... 127 13. Statement of Changes in Equity for the year ended 31st March, 2019 ........... 129 14. Cash Flow Statement for the year ended 31st
    [Show full text]
  • Of 3 OFFICEORDER Consequent Upon the Recommendation of the Departmental Selection Committee, the Competent Au
    Page 1 of 3 ईट셍न कोलफील्ड्स लललिटेड EASTERN COALFIELDS LIMITED कोल इंडिया का एक अंग (A Subsidiary of Coal India Limited) अध्यक्ष- सह प्रबन्धक निर्देशक का कायाालय, Office of the Chairman-Cum-Managing Director, सं啍टोरिया, पो-दर्दशेिगढ़, जिला-वधामाि, Sanctoria, PO: Dishergarh, Dist. Burdwan. West Bengal - 713333. पजचिम बंगाल-713333 Office of the General Manager (P&IR). महाप्रबंधक(का/औ.स.) का कायाालय CIN-U10101WB1975GOI030295. CIN-U10101WB1975GOI030295. Telefax- 0341-2523586. फ़ै啍स- 0341-2523586. Website: www.easterncoal.gov.in Website: www.easterncoal.gov.in Ref. NO. ECL/CMD/Rectt/SRD/Clerk-17/32/240 Date: 29th May, 2017. O F F I C E O R D E R Consequent upon the recommendation of the Departmental Selection Committee, the Competent Authority has accorded approval for selection of the following employees as “Clerk” Grade-III from amongst the SC/ST eligible departmental candidates of ECL who applied against the notification no: ECL/CMD/Rectt/SRD/Clerk-17/32/2102 dated 07.02.2017 under special drive. On being selected, they are hereby posted in the Areas/Units/Estb. as given against their names: List of SC category candidates Sl. Previous Father’s U. Man ROLL New place of N Name place of Unit Name Caste Name No. NO posting o posting Samiran Lt. Sukumar 1 192231 Jhanjra MIC SC 50521 Jhanjra Area Mondal Monday Lt-Dilip Raju Narsamuda 2 Kumar 190649 Sodepur SC 50612 Sodepur Area Paswan Colliery Paswan Raghunath Lt. Fela Ram 3 132604 Satgram Nimcha SC 50591 ECL,Hq.
    [Show full text]
  • District Survey Report, Paschim Bardhaman District, West Bengal
    DISTRICTISO 9001:2015 & ISO 14001:2015 Certified Company SURVEY REPORT (For mining of minor minerals) As perPASCHIM Notification BARDHAMANNo. S.O.3611 (E) New D DelhiISTRICT, dated 25 TH Of July 2018 Ministry of Environment, Forest and Climate Change (MoEFCC) PREPARED BY: RSP GREEN DEVELOPMENT AND LABORATORIES PVT. LTD. ISO 9001:2015 & ISO 14001:2015 Certified Company QCI-NABET ACCREDITED CONSULTANT AUGUST, 2021 DISTRICT SURVEY REPORT, PASCHIM BARDHAMAN DISTRICT, WEST BENGAL CONTENTS SL. TOPIC DETAILS PAGE NO. NO CONTENT I - II ABBREVIATIONS USED III - IV LIST OF TABLES V - VI LIST OF MAPS VII LIST OF ANNEXURES VIII CONFIDENTIALITY CLAUSE IX ACKNOWLEDGEMENT X FIELD PHOTOGRAPHS XXI 1 PREFACE 1 2 INTRODUCTION 2 - 4 3 GENERAL PROFILE OF THE DISTRICT 5 - 22 a. General information 5 - 7 b. Climate condition 7 - 9 c. Rain fall (month wise) and humidity 9 - 10 d. Topography and terrain 10 - 11 e. Water course and hydrology 11 - 12 f. Ground water development 12 - 15 g. Drainage system (general) 16 h. Demography 16 - 18 i. Cropping pattern 18 - 19 j. Landform and seismicity 19 k. Flora 20 - 21 l. Fauna 21 - 22 4 PHYSIOGRAPHY OF THE DISTRICT 23 - 26 o General landform 23 o Soil & Rock pattern 23 - 25 o Different geomorphological units 25 - 26 5 LAND USE PATTERN OF THE DISTRICT 27 - 33 . Introduction 27 - 29 a. Forest 30 b. Agriculture & Irrigation 31 c. Horticulture 32 d. Mining 32 - 33 6 GEOLOGY 34 - 36 Regional geology 34 - 35 Local geology 36 7 MINERAL WEALTH 37 - 39 Overview of the mineral resources (covering all minerals) 37 - 39 I PREPARED BY: RSP GREEN DEVELOPMENT AND LABORATORIES PVT.
    [Show full text]
  • सीएमपीडीआई Cmpdi a Mini Ratna Company
    सीएमपीडीआई cmpdi A Mini Ratna Company A REPORT ON CONSTRUCTION AND INSTALLATION OF PIEZOMETERS IN RANIGANJ, SAHARJURI AND RAJMAHAL COALFIELDS EASTERN COALFIELDS LIMITED FOR EASTERN COALFIELDS LIMITED (A SUBSIDIARY OF COAL INDIA LTD.) SANCTORIA (ASANSOL) FEBRUARY, 2019 Job No-111609 A REPORT ON CONSTRUCTION AND INSTALLATION OF PIEZOMETERS IN RANIGANJ, SAHARJURI AND RAJMAHAL COALFIELDS EASTERN COALFIELDS LIMITED Prepared by Hydrogeology Section Exploration Division CMPDI (HQ), Ranchi FOR EASTERN COALFIELDS LIMITED (A SUBSIDIARY OF COAL INDIA LTD.) SANCTORIA (ASANSOL) February, 2019 PERSONNEL ASSOCIATED Hydrogeological Documentation Prabhu Prasad Chief Manager (Geology) Afatab Alam Manager (Geology) Field Exertion Afatab Alam Manager (Geology) Overall Guidance A. K. Mohanti General Manager (Expl.) Prabhu Prasad Chief Manager (Geology) Construction and Installation of Piezometers in Raniganj, Saharjuri & Rajmahal Coalfields CMPDI CONTENT Chapters Page No. 1.0 Introduction 1 2.0 Location 2 3.0 Topography 3 4.0 Drainage 4 5.0 Geology of the Area 6-8 6.0 Construction and Installation of piezometers 9-26 6.1 Construction of piezometers 9-17 6.1.1 Construction of piezometers in Raniganj CF 11 6.1.2 Construction of piezometers in Saharjuri CF 12 6.1.3 Construction of piezometers in Rajmahal CF 13 6.2 Development of piezometers 17 6.3 Piezometer Testing 19 6.3.1 Piezometer Testing in Raniganj CF 20 6.3.2 Piezometer Testing in Saharjuri CF 21 6.3.3 Piezometer Testing in Rajmahal CF 21 7.0 Water Sample collection and quality analysis 27 LIST OF TABLES
    [Show full text]