Equivalent to Very Truly Yours, (ORIGINA

Total Page:16

File Type:pdf, Size:1020Kb

Equivalent to Very Truly Yours, (ORIGINA Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MR. LAURO M. UBIADAS KIT UBIADAS CONSTRUCTION CORP. Binangonan, Rizal Dear Mr. Ubiadas: This is to notify that the: Repair/Repainting of 1-storey, 8-rooms Ynares School Building at Carlos "Botong" Francisco Memorial High School, Brgy. Mahabang Parang, Angono, Rizal is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a equivalent to Php1,884,321.61 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: KIT UBIADAS CONSTRUCTION CORP. By: LAURO M. UBIADAS Date: 03/15/2021# 01 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 ENGR. PORFIRIO P. MINA JRD-D2 ENTERPRISES Tanay, Rizal Dear Engr. Mina: This is to notify that the: Asphalt Overlaying of Various Streets at Victoriaville Subd., Brgy. Sta. Cruz, Antipolo, City is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a equivalent to Php2,683,642.27 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: JRD-D2 ENTERPRISES By: PORFIRIO P. MINA Date: 03/15/2021# 02 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MS. LAURA L. MARRON L.L. MARRON CONSTRUCTION AND TRADING Binangonan, Rizal Dear Ms. Marron: This is to notify that the: Repair/Repainting of Ynares School Bldgs. at Lunsad Elem. Sch., Brgy. Lunsad, Binangonan, Rizal is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a equivalent to Php4,476,106.88 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: L.L. MARRON CONSTRUCTION AND TRADING By: LAURA L. MARRON Date: 03/15/2021# 03 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MR. LAURO M. UBIADAS KIT UBIADAS CONSTRUCTION CORP. Binangonan, Rizal Dear Mr. Ubiadas: This is to notify that the: Constn. of 1-Storey Ynares Multi-Purpose Bldg. at Meralco Village, Brgy. Palangoy, Binangonan, Rizal is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a Contract equivalent to Php2,154,611.49 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: KIT UBIADAS CONSTRUCTION CORP. By: LAURO M. UBIADAS Date: 03/15/2021# 04 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MR. DANILO C. MAGNO TRANCOM ENGINEERING CONSTRUCTION Taytay, Rizal Dear Mr. Magno: This is to notify that the: Constn.of 2-Storey Ynares Multi-Purpose Bldg. at Vocalan Compound, Brgy. Pag-Asa, Binangonan, Rizal is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a Contract equivalent to Php3,759,198.55 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: TRANCOM ENGINEERING CONSTRUCTION By: DANILO C. MAGNO Date: 03/15/2021# 05 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MR. DANILO C. MAGNO TRANCOM ENGINEERING CONSTRUCTION Taytay, Rizal Dear Mr. Magno: This is to notify that the: Construction of Ynares Multi-Purpose Building, Jalajala, Rizal is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a equivalent to Php3,994,129.91 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: TRANCOM ENGINEERING CONSTRUCTION By: DANILO C. MAGNO Date: 03/15/2021# 06 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MR. JUAN PAOLO MIGUEL E. MANLAPIT L. EUSEBIO ACE DEVELOPMENT CORP. Pasig City Dear Mr. Manlapit: This is to notify that the: Construction of Stone Masonry for Side Protection at Dalaga Creek (Boundary of Purok 2 & 3), Brgy. Bayugo, Jalajala, Rizal is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a equivalent to Php8,261,179.48 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: L. EUSEBIO ACE DEVELOPMENT CORP. By: JUAN PAOLO MIGUEL E. MANLAPIT Date: 03/15/2021# 07 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MR. JUAN PAOLO MIGUEL E. MANLAPIT L. EUSEBIO ACE DEVELOPMENT CORP. Pasig City Dear Mr. Manlapit: This is to notify that the: Asphalt Overlaying/Concrete Reblocking (portion) of J. Villegas St., Brgy. San Jose, Morong, Rizal is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a equivalent to Php4,177,905.67 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: L. EUSEBIO ACE DEVELOPMENT CORP. By: JUAN PAOLO MIGUEL E. MANLAPIT Date: 03/15/2021# 08 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MR. SIDNEY. B. SORIANO S.B. SORIANO CONSTRUCTION Morong, Rizal Dear Mr. Soriano: This is to notify that the: Repair/Repainting of Ynares School Building at Lagundi CCL National High School, Morong, Rizal is hereby awarded to you as the bidder with the Lowest Calculated Responsive Bid at a equivalent to Php1,823,364.74 You are therefore required, within ten (10) days from the receipt of this Notice of Award, to formally enter into contract with us, and to submit the Performance Security and Contractors All Risk Insurance in the form and the amount stipulated in the Instruction to Bidders. Failure to enter into the said contract or provide the Performance Security and Contractors All Risk Insurance shall constitute a sufficient ground for cancellation of this award and forfeiture of your Bid Security. Very truly yours, (ORIGINAL SIGNED) REBECCA A. YNARES Governor Conforme: S.B. SORIANO CONSTRUCTION By: SIDNEY. B. SORIANO Date: 03/15/2021# 09 Republic of the Philippines Provincial Government of Rizal OFFICE OF THE GOVERNOR NOTICE OF AWARD 08 April, 2021 MR.
Recommended publications
  • Table 3.1 Population Projection by City/Municipality up to 2025 (1/2)
    Table 3.1 Population Projection by City/Municipality Up to 2025 (1/2) Average Annual Historical Population Projected Population Growth Rate % to Region/Province 1995 2000 2000 2025 (Sep.) (May) 1995- 2000- 2010- Area Populatio Populatio Census Census 2005 2010 2015 2020 2025 2000 2010 2025 2000 2025 (sq. km) n Density n Density The Philippines 68,349 76,499 84,241 91,868 99,016 105,507 113,661 2.3% 1.8% 1.4% - - 294,454 260 386 Region IV 9,904 11,794 12,860 14,525 16,357 18,225 20,320 3.6% 2.1% 2.3% - - 46,844 252 434 NCR (MetroManila) Cities 1) Las Pinas 413 473 609 759 953 1,114 1,290 2.8% 4.8% 3.6% 4.8% 9.8% 41.5 11,398 31,094 2) Manila 1655 1581 1,473 1,345 1,286 1,146 1,011 -0.9% -1.6% -1.9% 15.9% 7.7% 38.3 41,279 26,387 3) Makati 484 445 443 432 426 391 356 -1.7% -0.3% -1.3% 4.5% 2.7% 29.9 14,883 11,905 4) Mandaluyong 287 278 281 277 280 264 246 -0.6% -0.1% -0.8% 2.8% 1.9% 26 10,692 9,473 5) Marikina 357 391 436 472 530 556 576 1.8% 1.9% 1.3% 3.9% 4.4% 38.9 10,051 14,819 6) Muntinlupa 400 379 468 558 639 682 720 -1.1% 3.9% 1.7% 3.8% 5.5% 46.7 8,116 15,416 7) Paranaque 391 450 507 554 637 683 725 2.9% 2.1% 1.8% 4.5% 5.5% 38.3 11,749 18,930 8) Pasig 471 505 555 595 658 679 694 1.4% 1.6% 1.0% 5.1% 5.3% 13 38,846 53,379 9) Valenzuela 437 485 560 624 719 773 823 2.1% 2.5% 1.9% 4.9% 6.3% 47 10,319 17,507 10) Caloocan 1023 1178 1,339 1,471 1,701 1,833 1,956 2.9% 2.2% 1.9% 11.9% 14.9% 55.8 21,111 35,045 11) Pasay 409 355 359 353 344 313 282 -2.8% -0.1% -1.5% 3.6% 2.1% 13.9 25,540 20,276 T3-1 12) Quezon 1989 2174 2,285 2,343 2,533 2,554
    [Show full text]
  • Muncipality Name of Establishment Address Contact Number
    RIZAL PROVINCE UPDATED LIST OF DINING ESTABLISHMENTS MUNCIPALITY NAME OF ESTABLISHMENT ADDRESS CONTACT NUMBER ANTIPOLO Alejandro's Grill Bar And Restaurant Circumferential Road, Brgy. San Roque, Antipolo ANTIPOLO Andalucia D'Coffee Place Circumferential Road, Brgy. San Jose, Antipolo 0927-613995 ANTIPOLO Bali Gulp Restaurant Sumulong Hi-Way Brgy. Mambugan, Antipolo 647-9931 Palm Square, M. L. Quezon Ext. Brgy. San Roque, ANTIPOLO Bamboo Asia Grill 534-5849 Antipolo Claveria Plaza, Circumferential Rd. Brgy. Dalig, ANTIPOLO Café Fulgencio Antipolo Penthouse Comoda Ville Bldg. Sumulong Highway, ANTIPOLO Café Lupe, Inc. 470-3201 Antipolo ANTIPOLO Calleza Grill Sumulong Memorial Circle Brgy. San Roque, Antipolo 470-9813 ANTIPOLO Casa Divina "Buffet & Restaurant" #149 San Jose St. Brgy. San Jose, Antipolo ANTIPOLO CH2 Restaurant #192 P. Oliveros St. Brgy. Dela Paz, Antipolo 407-4226 ANTIPOLO Crescent Moon Café Sapang Buho Rd. Ascension Rd. Brgy. Dalig, Antipolo 630-5854/ 0917-5232356 ANTIPOLO Café Cristina GFlr. Femar Bldg. M.L Quezon St. Brgy. Dalig, Antipolo 697-1721 ANTIPOLO Café Dozo Circumferential Road, Brgy. Dalig, Antipolo 630-3171 ANTIPOLO Eagle's Nest Restaurant Sumulong Hi-Way Brgy. Sta Cruz, Antipolo 994-8883 ANTIPOLO Gloria's Bahay-Handaan Brgy. San Roque, Circumferential Road, Antipolo 697 - 6103/ 0915-2575287 Grilla Bar & Grill (The Old Spaghetti Lot 1, Blk 1, Hollywood Hills Sumulong Hi-way, Brgy. ANTIPOLO 570-0499 House) Mambugan, Antipolo ANTIPOLO Hap Chan Restaurant Circumferential Road, Brgy Dalig, Antipolo 696-1261 ANTIPOLO Hillside Bar & Grill Sumulong Hi-way Brgy Sta. Cruz, Antipolo Lot 8 Palos Verdes Heights, Sumulong Hi-Way, Brgy. ANTIPOLO Hillstop Garden House Restaurant 906-5256 Sta.
    [Show full text]
  • Laguna Lake Development and Management
    LAGUNA LAKE DEVELOPMENT AUTHORITY Presentation for The Bi-Lateral Meeting with the Ministry of Environment Japan On LAGUNA DE BAY Laguna Lake Development Authority Programs, Projects and Initiatives Presented By: CESAR R. QUINTOS Division Chief III, Planning and Project Development Division October 23, 2007 LLDA Conference Room Basic Fac ts o n Lagu na de Bay “The Lake of Bay” Laguna de Bay . The largest and most vital inland water body in t he Philipp ines. 18th Member of the World’s Living Lakes Network. QUICK FACTS Surface Area: * 900 km2 Average Depth: ~ 2.5 m Maximum Depth: ~ 20m (Diablo Pass) AerageVolmeAverage Volume: 2,250,000,000 m3 Watershed Area: * 2,920 km2 Shoreline: * 285 km Biological Resources: fish, mollusks, plankton macrophytes (* At 10.5m Lake Elevation) The lake is life support system Lakeshore cities/municipalities = 29 to about 13 million people Non-lakeshore cities/municipalities= 32 Total no. of barangays = 2,656 3.5 million of whom live in 29 lakeshore municipalities and cities NAPINDAN CHANNEL Only Outlet Pasig River connects the lake to Manila Bay Sources of surface recharge 21 Major Tributaries 14% Pagsanjan-Lumban River 7% Sta. Cruz River 79% 19 remaining tributary rivers The Pasig River is an important component of the lake ecosystem. It is the only outlet of the lake but serves also as an inlet whenever the lake level is lower than Manila Bay. Salinity Intrusion Multiple Use Resource Fishing Transport Flood Water Route Industrial Reservoir Cooling Irrigation Hydro power generation Recreation Economic Benefits
    [Show full text]
  • DVSS Special Release
    Republic of the Philippines Philippine Statistics Authority Province of Rizal SPECIAL RELEASE DVSS APRIL 2019 (VITAL STATISTICS RIZAL INDICATORS) Date of Release: June 29, 2019 Reference No.: 2019-025 This report summarizes the data gathered from April 2019 documents submitted from the local civil registry off ices of the thirteen municipalities and a city in the province of Rizal. The numbe r of vital events in Rizal for reached a total of 6,807 registered documents. This represents 1.05 % decrease from th e 6,879 registered vital events from the previous month. The province generated the following statistics: 4,616 for birth, 946 for marriage and 1,245 for death. Table A. Registered Documents by Municipality Civil registration is a Rizal, April 2019 continuous, permanent, and compulsory recording of vital MUNICIPALITY TIMELY AND LATE events occurring in the life of REGISTERED DOCUMENTS an individual such as birth, marriage, and death as well as BIRTH MARRIAGE DEATH court decrees, and legal ANGONO 306 35 88 instruments affecting his civil ANTIPOLO 1473 341 351 status in appropriate registers as mandated by Act No. 3753, BARAS 39 19 11 the Civil Registry Law. BINANGONAN 407 52 141 CAINTA 177 85 123 In this April 2019 issue, the Philippine Statistics CARDONA 115 7 24 Authority of Rizal presents the JALAJALA 38 7 13 number of births, marriages, MONTALBAN 535 85 139 and deaths registered by MORONG 295 36 58 municipalities in the province. PILILLA 51 23 19 The data are preliminary result from the Decentralized Vital SAN MATEO 309 50 67 Statistics System 2011 based TANAY 188 49 57 on the documents submitted TAYTAY 550 131 141 (Timely and Late Registered) TERESA 133 26 13 by the Local Civil Registry Offices in Rizal.
    [Show full text]
  • Pubbid082919ncr(Wd)
    Acquired Asset Management Group 7th Floor JELP Business Solutions Center Shaw Boulevard Mandaluyong City INVITATION TO BID July 27, 2019 The Pag-IBIG Fund Committee on Disposition of Acquired Assets shall conduct a second sealed public auction at Roof deck JELP Business Solutions Center, 409 Shaw Blvd. Mandaluyong City for the sale of acquired asset properties on: GENERAL GUIDELINES DATE AREAS NO. OF UNITS AUGUST 28, 2019 CAVITE 135 BULACAN, LAGUNA, RIZAL AND AUGUST 29, 2019 174 METRO MANILA TOTAL 309 1. Interested parties are required to secure copies of: (a) INSTRUCTION TO BIDDERS (HQP-AAF-104) and (b) OFFER TO BID (HQP-AAF-103) from the office of the Acquired Assets Management at 7th JELP Business Solutions Center, 409 Shaw Blvd. Mandaluyong City or may download the forms at www.pagibigfund.gov.ph (link Disposition of Acquired Assets for Public Auction). 2. Properties shall be sold on an “AS IS, WHERE IS” basis. 3. All interested buyers are encouraged to inspect the property/ies before tendering their offer/s. The list of the properties may be viewed at www.pagibigfund.gov.ph/aa/aa.aspxhttps://www.foreclosurephilippines.com (Other properties for sale-Disposition of Acquired Assets for Public Auction). 4. Bidders are also encouraged to visit our website, www.pagibigfund.gov.ph/aa/aa.aspx five (5) days prior the actual auction date, to check whether there are any erratum posted on the list of properties posted under the sealed public auction. 5. Bidders are advised to approach the Technical Working Group (TWG) for registration of their attendance on the system during the auction.
    [Show full text]
  • DSWD DROMIC Report #33 on the Taal Volcano Eruption As of 31 January 2020, 6PM
    DSWD DROMIC Report #33 on the Taal Volcano Eruption as of 31 January 2020, 6PM Situation Overview At 5:30 PM, 12 January 2020, the Philippine Institute of Volcanology and Seismology (PHIVOLCS) has raised alert level 4 over Taal Volcano, indicating that hazardous eruption is possible within hours to days. In its 8:00 AM, 26 January 2020 advisory, the agency has lowered the alert status of Taal Volcano from Alert Level 4 to Alert Level 3 (decreased tendency towards hazardous Eruption), recommending that entry into Taal’s Permanent Danger Zone within seven 7-kilometer radius from the Main Crater is strictly prohibited. Source: Philippine Institute of Volcanology and Seismology (PHIVOLCS) I. Status of Affected Families / Persons A total of 126,952 families or 473,332 persons were affected by the Taal Volcano eruption in Region CALABARZON (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons GRAND TOTAL - 126,952 473,332 NCR - 1,599 6,208 Caloocan City** - 51 210 Makati City - 20 78 Malabon City** - 32 141 Mandaluyong City - 72 273 Manila City** - 210 814 Marikina city - 1 5 Muntinlupa City** - 367 1406 Navotas - 12 48 Paranaque City** - 123 446 Taguig City** - 590 2257 Quezon City** - 61 262 San Juan City** - 17 56 Valenzuela City** - 43 212 REGION III - 99 353 Bataan - 3 11 Hermosa** - 3 11 Bulacan - 14 44 Baliuag** - 2 11 Calumpit** - 1 7 Guiguinto** - 2 4 Hagonoy** - 1 4 City of Malolos (capital)** - 7 14 Plaridel** - 1 4 Nueva Ecija - 10 30 Cabanatuan
    [Show full text]
  • The Land of Heroes and Festivities Calabarzon
    Calabarzon The land of heroes and festivities is an acronym for the provinces comprising Getting There the region – CAvite, LAguna, BAtangas, Rizal Travelers can take air-conditioned buses going to southern and QueZON. It is situated immediately Luzon from among the multitudes of bus terminals within Calabarzon Metro Manila. Travel time to Cavite and Rizal usually takes south and east of Metro Manila, and is the an hour while Batangas, Laguna and Quezon may be complementary hideaway for anyone reached within two to four hours. looking to escape the hustle and bustle of Hotels and Resorts the capital. The region has a good collection of accommodation facilities that offer rest and recreation at stunningly-low Calabarzon is rich with stories relating to prices. From classy deluxe resort hotels to rental apartment options, one will find rooms, apartments and evens the country’s colonial past, of heroes and mansions that are suitable for every group of any size. revolutionaries standing up for the ideals of Spa resorts in Laguna and elsewhere are particularly popular, as individual homes with private springs are freedom and self-rule. Many monuments offered for day use, or longer. still stand as powerful reminders of days Sports Activities and Exploration gone by, but the region hurtles on as one of The region is blessed with an extensive selection the most economically-progressive areas of sport-related activities, such as golf in world-class for tourism, investments and trade. championship courses in Cavite, or volcano-trekking around Taal Lake, or diving off the magnificent coasts and Its future is bright and the way clear, thanks islands of Batangas, among others.
    [Show full text]
  • House of Representatives
    Congress of the Philippines Seventeenth Congress First Regular Session } HOUSE OF REPRESENTATIVES H. No. 5003 By Representatives A cop, Roa-Puno, Duavtt, Rodriguez (I.) and Lobregat, per Committee Report N o. 105 AN ACT RENAMING THE ROAD TRAVERSING BARANGAY DOLORES IN THE MUNICIPALITY OF TAYTAY AND BARANGAY BAGUMBONG IN THE MUNICIPALITY OF JALA-JALA, ALL IN THli PROVINCE OF RIZAL, AS JOSE RIZAL HIGHWAY Be it enacted by the Senate and House of Representatives of the Philippines in Congress assembled: 1 Section 1. The national road stretching from Barangay Dolores in the 2 Municipality of Taytay, up to Barangay Bagumbong in the Municipality of 3 Jala-Jala, traversing the following points, all in the Province of RizaL is hereby 4 renamed Jose Rizal Highway: 5 (a) From Kay Tikling Junction to Taytay Diversion Road up to the 6 Manila East Road in the Municipality of Taytay; 7 (b) From the Manila East Road, Taytay to Barangay Muzon in the 8 Municipality of Taytay; 9 (c) From Barangay Muzon to Angono Diversion Road and up to the 10 Manila East Road, Barangay Pag-asa in the Municipality of Binangonan; 11 (d) From the Manila East Road, Barangay Pag-asa to Binangonan 12 Diversion Road up to the Binangonan-Cardona boundary; 1 (e) From Binangonan-Cardona boundary to Looc-Calahan Diversion 2 Road up to the Manila East Road going to Morong and up to die Sagbat 3 Junction in the Municipality of Morong; 4 (0 I'rom Sagbat Junction to Sagbat-Pililia Road up to the Halayhayin 5 Junction, Manila East Road in the Municipality of Pililia; and 6 (g) From Halayhayin Junction to Pililia-Jala-Jala Road up to the 7 Rizal-Laguna boundary.
    [Show full text]
  • Binangonan Campus
    HISTORY OF URS BINANGONAN CAMPUS U R S B i n a n g o n a n c a m p u s s t a r t e d o u t a s a n e x t e n s i o n c a m p u s o f R i z a l S t a t e C o l l e g e ( R S C ) . T h e b u i l d i n g w h e r e i t i s n o w s i t u a t e d w a s i n i t i a l l y VISION c o n s t r u c t e d t o h o u s e t h e The leading University in human V i c e n t e M a d r i g a l N a t i o n a l resource development, knowledge H i g h S c h o o l a n d w a s i n a u g u r a t e d o n A u g u s t 2 6 , and technology generation and 1 9 9 8 . B u t t h r o u g h t h e e f f o r t s environmental stewardship o f D r . H e r a c l e o L a g r a d a , p r e s i d e n t o f R S C , a n d w i t h t h e a i d o f D r .
    [Show full text]
  • Page 8 of 12 Code Procurement Program/Project
    Republic of the Philippines Department of Public Works and Highways DPWH-Rizal First District Engineering Office Binangonan, Rizal INDICATIVE ANNUAL PROCUREMENT PLAN FOR FY 2021 CIVIL WORKS (based on NEP) page 8 of 12 Schedule for Each Procurement Activity Estimated Budget (PhP) Notice of Contract Source of Code Procurement Program/Project PMO/ Mode of Ads/Post of IB/REI Sub/Open of Bids Award Signing Fund Total MOOE CO Remarks (PAP) End-User Procurement (Brief description of Program/Project) Construction of Multi-Purpose Competitive Building, Nayong Silangan Rizal I Nov. 17, Nov. 23, Local Infrastructure Program, Public Oct. 16-22, 2020 Nov. 5, 2020 GOP 5,000,000.00 5,000,000.00 Subd., Barangay Dalig, Antipolo DEO/Local 2020 2020 Buildings and Other Structures Bidding City Construction of Multi-Purpose Competitive Rizal I Nov. 17, Nov. 23, Local Infrastructure Program, Building, So. Ligtasan, Barangay Public Oct. 16-22, 2020 Nov. 5, 2020 GOP 5,000,000.00 5,000,000.00 DEO/Local 2020 2020 Buildings and Other Structures San Roque, Antipolo City Bidding Construction of Slope Protection, Competitive Marcelino M. Santos NHS, Rizal I Nov. 17, Nov. 23, Local Infrastructure Program, Public Oct. 16-22, 2020 Nov. 5, 2020 GOP 5,000,000.00 5,000,000.00 Barangay San Jose, Antipolo DEO/Local 2020 2020 Flood Control Structures/Facilities Bidding City Rehabilitation of Homo Creek, Competitive Rizal I Nov. 17, Nov. 23, Local Infrastructure Program, Barangay San Roque, Antipolo Public Oct. 16-22, 2020 Nov. 5, 2020 GOP 10,000,000.00 10,000,000.00 DEO/Local 2020 2020 Flood Control Structures/Facilities City Bidding Rehabilitation of Pulong Banal Competitive Rizal I Nov.
    [Show full text]
  • Presentation of Lennie Santos-Borja (3.4
    RE-GREENING THE LAGUNA DE BAY WATERSHED: PARTNERSHIP THROUGH CDM AND N0N-CDM REFORESTATION PROJECTS Edgardo C. Manda General Manager and Lennie C. Santos-Borja Chief, Research and Development Division Head, Carbon Finance Unit Laguna Lake Development Authority, Philippines 12th Living Lakes Conference 25 September 2008 Castiglione del Lago, Regione Umbria Italy THE PHILIPPINE ARCHIPELAGO THE LAGUNA DE BAY BASIN 1 Laguna de Bay Features • Average Depth: ~2.5 m. • Average Volume: 2.25 MCM Mar ikina • Shoreline: 285 km. • Lake surface area: 900 km2 • Watershed area: ~2920 km2 Mang ahan Ba ras Mor on g Ta nay Ta guig • (24 sub-basins including many tributaries A ngon o Pililla St a. M aria + a floodway) Sin ilo an Pang il • 6 provinces, 12 cities, 49 municipalities Munt inlup a Jala -jala Sa n Pe dro • Of which 27 are lakeshore towns and 2 are Calir aya Biñan lakeshore cities Cab uyao Pa gsanja n Pila • One outlet: Napindan Channel – Pasig River San Cr ist oba l Los B año s (serves as inlet of saline water during C alauan St a. C ru z San Ju an Pasig River backflow) The Largest Lake in the Philippines and one of the largest in Southeast Asia 2 A THREATENED ECOSYSTEM Forests receded . 14% 5% 29% 52% Forest 19,100 has. Open 53,480 has Built- up/Industrial 110,780 has. Agricultural 198,640 has. Extensive built-up of agriculture areas. 3 4 sedimentation of the lake Delta formation 5 N TAYTAY ANGONO BINANGONAN PASIG CARDONA BARAS TAGUIG LUPANG ARENDA SUCAT TANAY PILILLA TAYTAY, RIZAL MUNTINLUPA SAN PEDRO SINILOAN BIÑAN MABITAC STA.
    [Show full text]
  • HGC) Now, Philippine Guarantee Corporation, Is Offering the Following Properties for Sale
    PHILIPPINE GUARANTEE CORPORATION NOTICE OF SALE As of September 17, 2020 The Home Guaranty Corporation (HGC) now, Philippine Guarantee Corporation, is offering the following properties for sale: AREA (in sq.m.) TCT / CCT NO. SELLING PRICE REMARKS ITEM LOCATION TYPE NO. LOT FLOOR CATEGORY A NCR Building C Unit 830, 8th Floor Cluster I, El Pueblo Condominium Vacant; Title in 1 - 15.80 002-2017008944 1,503,700.00 Condominium, Anonas Unit the name of HGC Street, Sta. Mesa, Manila Unit P-302, 3rd Floor, El Pueblo Condominium Condominium Vacant; Title in 2 Phase 4, King Christian - 13.00 004-2017015648 829,400.00 Unit the name of HGC Extension, Barangay Bagbag, Quezon City Unit 315, 3rd Floor (Mizu Building),The Redwoods Condominium Vacant; Title in 3 Condominium, Barangay - 56.50 004-2017017136 3,780,889.78 Unit the name of HGC Pasong Putik, Novaliches, Quezon City REGION I Lot 9913-A/ 27957, Lot 9913, Lot 9913-C/ 27959 Vacant; Title in 4 Ven-Flor Village, Barangay Lot only 1,099.00 - T-12465 5,198,600.00 the name of HGC Dalumpinas Oeste, San Fernando City, La Union REGION III Block 70 Lot 14, Rocka Vacant; Title in the 5 Village Brgy. Tabang, 1-storey H & L 171.00 64.00 039-2016013680 1,859,000.00 name of HGC Plaridel, Bulacan REGION IV-A Block 64 Lot 5 Cityhomes Resortville Subdivision With illegal 6 Phase 5, Barangay 1-storey H & L 35.00 30.00 057-2015044557 287,100.00 occupant; Title in Langkaan, Dasmariñas the name of HGC City, Cavite Block 4 Lot 1 Alfonso Village, Barangay Alapan Vacant; Title in 7 2-storey H & L 76.00 120.00 057-2016005818 1,567,500.00 1-B, Imus City, Cavite the name of HGC 2nd Floor Upper Building, Unit 58-C Cluster Kalaw Vista de Loro Heights, Condominium Vacant; Title in 8 - 81.86 057-2012000033 3,512,300.00 Puerto Azul Complex, Unit the name of HGC Barangay Sapang, Ternate, Cavite Block 17 Lot 5 Carissa Homes Subdivision Phase Vacant; Title in 9 III, Barangay Bagtas, Lot only 35.00 - T-980284 115,500.00 the name of AKPF Tanza, Cavite CATEGORY B NCR Blk 10 Lot 4, BF Martinville 10 Subd., Brgy.
    [Show full text]