CODE RED EXTREME SEVERE Total Fire Ban (Northern Country District)

Total Page:16

File Type:pdf, Size:1020Kb

CODE RED EXTREME SEVERE Total Fire Ban (Northern Country District) Summer Preparedness Guide 2017 -2018 Council services during extreme weather Total Fire Ban CODE RED EXTREME SEVERE (Northern Country TFB District) Expect extremely hot, dry and windy conditions. If a fire starts and takes hold, it will be uncontrollable, Expect hot, dry and possibly windy conditions. unpredictable and fast moving. Spot fires will start, If a fire starts and takes hold, it may be These are the worst conditions for a bush or grass move quickly and come from many directions. uncontrollable. A Total Fire Ban sets legal restrictions on fire. Homes are not designed or constructed to Homes that are situated and constructed or modified Well prepared homes that are actively defended can what activities can or can not occur in a Definitions withstand fires in these conditions. The safest place to withstand a bushfire, that are well prepared and provide safety. particular district for that day. It aims to to be is away from high risk bushfire areas. actively defended, may provide safety. You must be physically and mentally prepared to reduce the activities that may start a fire. You must be physically and mentally prepared to defend in these conditions. defend in these conditions. There are 3 levels of warnings: “Advice” this means there is a fire in your area and you need to monitor. Warnings - Fire only “Watch and Act” means a fire is heading towards you and you need to start taking action to protect yourself. "Emergency Warning” means you are now in immediate danger and need to act now to protect yourself. You will be impacted by fire. Extreme Risk - all or parts of Bendigo, North Bendigo, Spring Gully, Lake Eppalock and Lake Eppalock Foreshore, Axedale, Long Gully, Junortoun, Maiden Gully, Myrtle Creek, Mia Mia, Redesdale, Heathcote, Huntly, Lockwood South, Big Hill, Eaglehawk, Kangaroo Flat, Pinpandoor, Costerfield, Heathcote and Heathcote North and Sedgwick. High Risk Fire Areas Very High Risk - is parts of Bendigo, North Bendigo and Huntly, Axedale, Heathcote, Eppalock, Marong, Big Hill, Spring Gully, Kennington, Junortoun, Huntly, Sebastian, Mandurang, Epsom, Epsom West, Strathfieldsaye, Jackass Flat, Strathdale interface, Golden Square, California Gully, Eaglehawk, Myers Flat, Big Hill, Redesdale and Spring Gully. Vic Emergency Information Council does not issue warnings. For latest information on emergencies (all hazards) refer to VicEmergency App or call VicEmergency Hotline 1800 226 226 Heat Health Alert (Heatwave) Department of Health and Human Services will issue a Heat Health Alert. Waste Services - Heathcote - Closed to the public - City and approved Heathcote landfill Heathcote – closed commercial vehicles accepted. Eaglehawk landfill Eaglehawk - closed to public - City and approved Before commencing any task staff will Eaglehawk - Closed to the public - City and approved Strathfieldsaye transfer station commercial vehicles accepted Normal service conduct a risk assessment and consider commercial vehicles accepted. Strathfieldsaye – Closed any potential fire hazard. Goornong Transfer station Strathfieldsaye - Closed Goornong – Closed Rural Garbage Collection Goornong – Closed No travelling on unsealed roads that: are no through roads. Services may be affected Rural Garbage, Recycling and have limited visibility. Collections will be at the driver's discretion Normal service Normal service Organics collections have no areas where a truck can easily turn around. based on local conditions are through state forest or areas of similar vegetation density. Summer Preparedness Chart 2017 - 2018 - Council services during extreme weather CODE RED EXTREME SEVERE Total Fire Ban (Northern Country District) In Home Assessment and Limited service prior to 1pm Normal service provided where appropriate cooling No service provided Limited service as deemed necessary Home Visits No service high risk areas is available. Limited service where appropriate cooling is Normal service. Normal service provided where appropriate cooling Personal Care No service provided available and as deemed necessary is available. Limited service where appropriate cooling is Normal service provided where appropriate cooling Respite Care No service provided available and as deemed necessary. In home only. In home respite only is available. In home only Limited service where appropriate cooling is Normal service. Normal service provided where appropriate cooling Domestic Assistance No service provided available and as deemed necessary is available. Property Maintenance (relating Limited service only – In home modifications only No service provided No service provided after 1 pm Normal service provided (i.e.. install smoke alarm, change battery, flexi hose, to home care) internal rails). No service provided. Normal delivery to clients. Clients may have meals Normal delivery to clients. Clients may have meals Normal service. Food Services Meals delivered prior to the day. delivered prior to the day. No volunteers after delivered prior to the day. No volunteers midday Limited service where appropriate cooling is Limited service where appropriate cooling is Social Support (formerly Service will be provided however “in” day only. No service, venue will be closed. available and as deemed necessary. Service in available and as deemed necessary. Service in No outings permitted. Planned Activity Group) centre only. centre only. No service. No service. Volunteer Visiting As deemed necessary As deemed necessary No Volunteers No Volunteers Open Open Open Open Bendigo – Lyttleton Terrace and other services/facilities Service will operate subject to staff availability Service will operate subject to staff availability Service will operate subject to staff availability Service will operate subject to staff availability located in Bendigo central business district Open Open Open Open Heathcote – administration and other services/facilities located Service will operate subject to staff availability Service will operate subject to staff availability Service will operate subject to staff availability Service will operate subject to staff availability in the Heathcote area Bendigo & Heathcote Visitor Centres The Heathcote Visitor Centre will be assessed on Normal service when no imminent danger in the the day prior to a code red day to determine if the Normal service Normal service local vicinity. centre will remain open. Bendigo & Heathcote Visitor Centres The Bendigo Visitor Centre will remain open. Visitors are advised to contact the VicEmergency Visitors are advised to contact the VicEmergency Visitors are advised to contact the VicEmergency Visitors are advised to contact the VicEmergency hotline on 1800 226 226 for travel advice. hotline on 1800 226 226 for travel advice. hotline on 1800 226 226 for travel advice. hotline on 1800 226 226 for travel advice. Swimming Pool Services Contact pool directly for more information Contact pool directly for more information Normal service Contact pool directly for more information Library Services: Bendigo Open - some services will be subject to staff Kangaroo Flat availability. Normal service Normal service Normal service Heathcote Eaglehawk.
Recommended publications
  • Faqs – Lake Eppalock December 2014
    FAQs – Lake Eppalock December 2014 Why was Lake Eppalock built? Lake Eppalock was constructed between 1960 and 1964 to supply irrigation and stock and domestic water to the Campaspe irrigation district, diverters from the Campaspe River and urban supplies to Bendigo and Heathcote. More recently it has provided urban supplies to Ballarat. In years of plentiful water resources, water from Lake Eppalock is used to supplement the Waranga Western Channel that supplies irrigation customers in the Rochester and Loddon Valley irrigation areas. Who “owns” the water in Lake Eppalock? Water entitlement holders (owners) include irrigators, environmental water holders and urban water corporations. For more information about how the water in Lake Eppalock is distributed to these owners, please visit http://www.nvrm.net.au/resources.aspx. What do each of those groups use the water for? GMW irrigators: Agriculture, stock and domestic water supply. Urban water corporations: Coliban Water - urban water supply to the City of Bendigo and other towns and supplement to Coliban Water irrigators; Central Highland Water - City of Ballarat and other towns. Victorian Environmental Water Holder/Commonwealth Environmental Water Office/The Living Murray: Meeting environmental objectives (eg improved bank vegetation, habitat for fish) in the Campaspe River. What’s GMW’s role at Lake Eppalock? GMW operates and maintains the structures at Lake Eppalock and manages the water held in the lake. The drop in the lake level is really noticeable this year - is there more water being delivered this year than previous years? The total volume of water released from Lake Eppalock this year is similar to previous years.
    [Show full text]
  • Annual Report 2005/06 OUR MISSION
    goulburn-murray water annual report 2005/06 OUR MISSION To deliver sustainable water services that meet customer and stakeholder needs and support regional economic growth, while balancing social, economic and environmental considerations. OUR VALUES Human safety, the environment and customer service are our highest priorities Sustainability is our commitment to future generations Cooperation based on the involvement of people is the key to progress Openness builds trust, knowledge and understanding Integrity, respect and pride are valued characteristics of our people Continual improvement is essential and underpins our future Contents OUR PERFORMANCE AT A GLANCE - 2005/06 4 GOVERNANCE 9 ECONOMIC SUSTAINABILITY 13 SOCIAL SUSTAINABILITY 25 ENVIRONMENTAL SUSTAINABILITY 39 FINANCIAL STATEMENTS 59 GOULBURN-MURRA APPENDICES 83 Y W A TER Annual Repor t 2005/06 1 Report from the Chairperson scheme (which won the prestigious media reports the excellent work of National Salinity prize and diverts our farmers as they increase water use 22,000 tonnes of salt from the Murray efficiency. Our new information each year), are either finished or caravan, ‘Water Wheels’, now informs nearing completion. both our customers and the public of these changes. The new Water Storage Amenity Unit and our revised approach to leasing We accept our responsibilities to and maintenance of recreation and support regional development and will public use assets have won great use the reconfiguration plans already support from local government and piloted in the Pyramid-Boort irrigation local communities. Essentially, our area as a model in all irrigation policy is to offer longer leases and districts to allow a clear vision to security in return for more investment emerge in each community about the This Board is now in the last year of its by business owners to enhance the future of water use and associated three-year appointment and it is timely appearance and customer satisfaction land zoning and channel maintenance.
    [Show full text]
  • Chapter 3. Landscape, People and Economy
    Chapter 3. Landscape, people and economy Department of Environment, Land, Water and Planning 3. Landscape, people and economy This chapter provides a brief description of the landscape, people and economic drivers in the water resource plan areas. Working rivers The rivers of these water resource plan areas provide many environmental, economic, and social benefits for Victorian communities. Most of northern Victoria’s rivers have been modified from their natural state to varying degrees. These modifications have affected hydrologic regimes, physical form, riparian vegetation, water quality and instream ecology. Under the Basin Plan it is not intended that these rivers and streams be restored to a pre-development state, but that they are managed as ‘working rivers’ with agreed sustainable levels of modification and use and improved ecological values and functions. 3.1 Features of Victorian Murray water resource plan area The Victorian Murray water resource plan area covers a broad range of aquatic environments from the highlands streams in the far east, to the floodplains and wetlands of the Murray River in the far west of the state. There are several full river systems in the water resource plan area, including the Kiewa and Mitta Mitta rivers. Other rivers that begin in different water resource plan areas converge with the River Murray in the Victorian Murray water resource plan area. There are a significant number of wetlands in this area, these wetlands are managed by four catchment management authorities (CMAs): North East, Goulburn Broken, North Central and Mallee and their respective land managers. The Victorian Murray water resource plan area extends from Omeo in the far east of Victoria to the South Australian border in the north west of the state.
    [Show full text]
  • Access Points Car Park, Corner of Mcivor 5 Crossing, Replacing a Much in Action Beside the Scenic AXEDALE Endangered flora
    BENDIGO LONGLEA AXEDALE KNOWSLEY HEATHCOTE 13.4 km 8.1 km 11.4 km 16.1 km LAKE WEEROONA Length: 49km (one way) AXE CREEK LONGLEA AXEDALE Grade: Easy 1 BRIDGE RECREATION Axedale is the O'Keefe This 60 metre long structure RESERVE Surface: Gravel with asphalt in Rail Trail’s halfway point. is the third bridge to be Catch a local cricket or tennis Stop here for a bite to Axedale and Heathcote Weeroona Ave installed at the Axe Creek match, or see dog training eat and to discover 3 crossing, replacing a much in action beside the scenic Napier St some of the township’s Pratts Park Rd Pratts Park Rifle Range Rd smaller suspension bridge Axe Creek. Surrounded Barnard St historic buildings. in 2012. The pretty spot is by beautiful bushland, Rosalind Park Midland HwyMcIvor Hwy a favourite stop off this is a great spot Williamson St for picnics. for a breather. Mitchell St McLaren St LONGLEA 2 BENDIGO LONGLEA AXEDALE KNOWSLEY HEATHCOTE McIvor Hwy Wilkie Rd B280 AXEDALE Obriens Ln 13.4 km 8.1 km 11.4 km 16.1 km 4 BENDIGO McIvor LONGLEA AXEDALE KNOWSLEY HEATHCOTE Bennetts Rd Hwy Hodges Ln BENDIGO 5 Longlea Ln LAKE WEEROONA Crowes Rd 13.4 km 8.1 km 11.4 km 16.1 km BENDIGO Mitchell St B280 Length: 49km (one way) Kimbolton-Axedale Rd A proud cycling city, AXE CREEK Bendigo’s beautiful streets are LONGLEA AXEDALE Grade: Easy a legacy of one of the world’s 1 LAKE WEEROONA BRIDGE KNOWSLEY STATE FORESTRECREATION Axedale is the O'Keefe greatest gold rushes.
    [Show full text]
  • A Failed Lake Eppalock: a Dire Indicator for a Parched Murray Darling Basin 1-12- 2006 Dr John Russell 1 and Mr Kevin Long 2
    A Failed Lake Eppalock: a Dire Indicator for a Parched Murray Darling Basin 1-12- 2006 Dr John Russell 1 and Mr Kevin Long 2 1. Department of Civil Engineering and Physical Sciences La Trobe University, Bendigo, Victoria, Australia. 2. K. E. V. Engineering, Bendigo, Victoria, Australia ABSTRACT: This paper is about the impact climate change has and will have on the regional development of towns and cities in the Lower Murray Darling Basin of Australia. The case of climate change and its impact on available water for human communities is established in terms of existing and most probable loss of future water yields, together with the socio- economic implications for future regional development. The City of Bendigo, Campaspe Irrigation Area and Eppalock catchment are presented as an example and a dire warning for what could be in store for the Lower Murray Darling Basin. Short term responses to Bendigo’s and the region’s water shortages (State election year) are discussed together with a sustainable water supply strategy that will sustain long-term regional development in the Lower Murray Darling Basin for the foreseeable future. 1. INTRODUCTION This paper can be considered to be written in two parts. The first part presents data to support the proposition that a changing climate in the Bendigo region and changes to the characteristics of the Eppalock catchment are responsible for significant reductions in inflow to Lake Eppalock and these reductions cause community hardship. The second part identifies the inadequacies of existing water governance, identifies a fundamental flaw in the methodology of planning future water resources and discusses short and long term responses to the water crisis being experienced in the Bendigo region and possibly very soon in the Lower Murray Darling Basin.
    [Show full text]
  • Aboriginal Acknowledgement
    Aboriginal acknowledgement The Victorian Government proudly acknowledges Victoria’s Aboriginal community and their rich culture and pays respect to their Elders past, present and emerging. We acknowledge Aboriginal people as Australia’s first peoples, and as the Traditional Owners and custodians of the land on which we work and live. We recognise the strength of Aboriginal people, Traditional Owners and their communities, and value the ongoing contribution of Aboriginal people to Victorian life, through their daily work, their application of Aboriginal knowledge and practice, and at key events; we recognise how this enriches us all. We recognise that Aboriginal cultures and communities are diverse and should be celebrated. We acknowledge that the land and water are of spiritual, cultural and economic importance to Aboriginal people. We embrace the spirit of reconciliation, guaranteeing equality of outcomes and ensuring an equal voice. We have distinct legislative obligations to Victorian Traditional Owner groups, related to cultural and natural heritage, that are paramount in our responsibilities in managing Victoria’s resources in partnership with Traditional Owners. Editors: Hui King Ho, John Douglas and Anthony Forster, Freshwater Fisheries Management, Victorian Fisheries Authority. Contact email: [email protected] Preferred way to cite this publication: ‘Ho, H.K., Douglas, J., & Forster, A., (eds) 2018, Vic Fish Stock 2018, Victorian Fisheries Authority’ Acknowledgements: The editors wish to thank the Victorian Fisheries Authority Communications team (Marc Ainsworth, Lauren Hall, Tillie French and Charley May), and Terry George and Matt Byrne for supplying the original text for inclusion. © The State of Victoria, Victorian Fisheries Authority, October 2018 This work is licenced under a Creative Commons Attribution 3.0 Australia licence.
    [Show full text]
  • GMW AR Map Final
    G o egion ulb ter R urn-Murray Wa Mildura Woorinen Weir Irrigation District Nyah Irrigation District Tresco Irrigation District Kerang River Murray Cobram Macorna Torrumbarry Yarrawonga er Channel Weir Br Yarrawonga Weir Riv oken Pyramid Hill KOW Main Channel Riv er Mur Victoria SWAMP ray National Hume G-MW Region Channel Dam Cr Western eek East Goulburn Main Channel Wangaratta Waranga Rochester Shepparton Campaspe Tatura Broken Ov Mitta Mitta Irrigation ens Riv District King Riv Kie er wa Riv er ChannelWaranga Riv Dartmouth don er Basin Stuart Murray Canal Riv Goldfields er Dam er Lod Goulburn Lake Riv Superpipe Cattanach Weir er Canal Bualo Laanecoorie Lake Lake Lake Reservoir Eppalock Nillahcootie William Cairn Curran Hovell Reservoir Goulburn Riv Tullaroop er Lake Eildon Reservoir Campaspe Sugarloaf Hepburns Pipeline Lagoon Newlyn Reservoir MAJOR STORAGES Great Dividing Range Lake Nillahcootie Dartmouth Dam* Lake Eildon Hume Dam*‡ Goulburn Weir Yarrawonga Weir* N DISTRICT SERVICES Waranga Basin Torrumbarry Weir* KEY SCALE OF KILOMETRES IRRIGATION AREAS WATER DISTRICTS Lake Eppalock Mildura Weir* Channel/Canal 0 50 100 150 Shepparton Tungamah Cairn Curran Reservoir Lake Bualo River Newlyn Reservoir Central Goulburn East Loddon Lake William Hovell Operations Centres Rochester-Campaspe West Loddon Hepburns Lagoon * Murray-Darling Basin Dams Operation Centres Tullaroop Reservoir Authority assets Pyramid-Boort Normanville Pipelines Managed by NSW Murray Valley FLOOD PROTECTION Laanecoorie Reservoir ‡ DISTRICT Constructing Authority (Not managed by G-MW) Torrumbarry Loch Garry.
    [Show full text]
  • Chapter 3. Landscape, People and Economy
    Chapter 3. Landscape, people and economy Department of Environment, Land, Water and Planning 3. Landscape, people and economy Victoria’s North and Murray Water Resource Plan applies to surface water resources in the Northern Victoria and Victorian Murray water resource plan areas, and groundwater resources in Goulburn-Murray water resource plan area. This chapter provides a brief description of the landscape, people and economic drivers in the water resource plan areas. Working rivers The rivers of this water resource plan area provide many environmental, economic, and social benefits for Victorian communities. Most of northern Victoria’s rivers have been modified from their natural state to varying degrees. These modifications have affected hydrologic regimes, physical form, riparian vegetation, water quality and instream ecology. Under the Basin Plan it is not intended that these rivers and streams be restored to a pre-development state, but that they are managed as ‘working rivers’ with agreed sustainable levels of modification and use and improved ecological values and functions. 3.1 Features of Victorian Murray water resource plan area The Victorian Murray water resource plan area covers a broad range of aquatic environments from the highlands in the far east, to the Mallee region in the far west of the state. There are several full river systems in the water resource plan area, including the Kiewa and Mitta Mitta rivers. Other rivers that begin in different water resource plan areas converge with the River Murray in the Victorian Murray water resource plan area. There are a significant number of wetlands in this area, these wetlands are managed by four catchment management authorities (CMAs): Goulburn Broken, Mallee CMAs, North Central and North East and their respective land managers.
    [Show full text]
  • Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study
    Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study FINAL REPORT Final 1 23 November 2006 Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study FINAL REPORT Final 1 23 November 2006 Sinclair Knight Merz ABN 37 001 024 095 590 Orrong Road, Armadale 3143 PO Box 2500 Malvern VIC 3144 Australia Tel: +61 3 9248 3100 Fax: +61 3 9248 3400 Web: www.skmconsulting.com COPYRIGHT: Sinclair Knight Merz Pty Ltd has prepared this document in accordance with the instructions of the Goulburn Broken CMA for its specific use. The concepts and information contained in this document are the copyright of the Goulburn Broken CMA. Use or copying of the document in whole or in part without the written permission of the Goulburn Broken CMA constitutes an infringement of copyright. The Goulburn Broken CMA does not warrant this document is definitive nor free of errors and does not accept liability for any loss caused or arising form reliance upon information provided herein caused or arising from reliance upon information provided herein. This report has been prepared on behalf of and for the exclusive use of Goulburn Broken CMA, and is subject to and issued in connection with the provisions of the agreement between Sinclair Knight Merz and its Client. Sinclair Knight Merz accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this report by any third party. The SKM logo is a trade mark of Sinclair Knight Merz Pty Ltd. © Sinclair Knight Merz Pty Ltd, 2006 Final Report Contents Executive Summary 1 E.2 Environmental Flow Recommendations 2 E.3 Constraints to Delivery of Recommended Environmental Flow Regimes2 E.4 Options to Deliver Flow Regimes 3 E.5 Further Investigations and Monitoring 4 1.
    [Show full text]
  • Systems Analysis of Water Cycle Systems Analysis of Base Case Scenarios for the Living Ballarat Project
    Systems Analysis of Water Cycle Systems Analysis of base case scenarios for the Living Ballarat project April 2014 Dr Peter Coombes Chief Scientist and Dr Michael Barry About the authors Dr Peter Coombes is the Chief Scientist at the Office of Living Victoria and the managing director of Urban Water Cycle Solutions that operates as an independent research think tank. Dr Michael Barry is the supporting scientist for the Chief Scientist and the manager of catchment and waterways at BMT WBM. Acknowledgements The contribution and collaboration of many people to the Living Ballarat Project and this report are gratefully acknowledged. Central Highlands Water, the City of Ballarat and the Office of Living Victoria have made substantial contributions to this report. In particular, the contribution of the Strategy Development Team led by Dr Peter Coombes that include Libby Sampson, Ian Rossiter, Brendon Clarke, Phil Anstis, Robert Powell, Quenton Gay, Rob Steel and Rob Leeson has been pivotal to this report. In addition, discussions with Pat Russell from Central Highlands Water have assisted our thinking in seeking optimum operations of the regional water systems. Disclaimer This report was written under the jurisdiction and management of the Office of Living Victoria. Nevertheless, any unintended errors or potential misinterpretations of the data presented herein are only the authors’ and we would welcome further dialogue around alternative interpretations of our research. Analysis of base case scenarios for the Living Ballarat project 2 Content Content ………………………………………………………………………………………………………………… 3 Executive Summary .……………………………………………………………………………………………… 4 1 Introduction .……………………………………………………………………………………………… 8 2 The Systems Framework ……………………………………………………………………………. 21 3 Scenarios .……………….……………………………………………………………………………….. 24 4 Summary of Methods and Information ….…………………………………………………….
    [Show full text]
  • O'keefe Map A4 DRAFT V4
    BENDIGO LONGLEA AXEDALE KNOWSLEY HEATHCOTE 13.4 km 8.1 km 11.4 km 16.1 km LAKE WEEROONA Napier St AXE CREEK LONGLEA AXEDALE BRIDGE RECREATION Axedale is the O'Keefe This 60 metre long structure RESERVE Rail Trail’s halfway point. is the third bridge to be Catch a local cricket or tennis Stop here for a bite to installed at the Axe Creek match, or see dog training crossing, replacing a much eat and to discover Pratts Park Rd Pratts Park in action beside the scenic smaller suspension bridge Axe Creek. Surrounded some of the township’s in 2012. The pretty spot is by beautiful bushland, historic buildings. a favourite stop off this is a great spot for picnics. LONGLEA for a breather. BENDIGO Wilkie Rd B280 Obriens Ln AXEDALE Length: 49km (one way) Crowes Rd Grade: Easy B280 BENDIGO Longlea Ln A proud cycling city, PEPPERCORN Surface: Gravel with asphalt in Bendigo’s beautiful streets are PARK KNOWSLEY STATE FOREST Axedale and Heathcote a legacy of one of the world’s Peppercorn Park hosts a greatest gold rushes. Historic range of equestrian activities. buildings and idyllic bushland are With car parking available, CAMPASPE KNOWSLEY intertwined with contemporary this is the ideal place RIVER RESERVE to stagger your journey experiences around the arts, AXE CREEK Take a walk along the along the trail. B75 world class attractions, Campaspe River. It once wine, beer and local helped sustain various Indigenous groups along produce. its course. Today, the slow-moving water is BENDIGO FIELD a haven for platypus. CAMPASPE RIVER NATURALISTS CLUB Moorabbee Rd FLORA RESERVE Stop here for a dose of bush AXEDALE therapy.
    [Show full text]
  • Climate Change Impacts on Inflows Into Lake Eppalock Reservoir from Upper Campaspe Catchment
    hydrology Article Climate Change Impacts on Inflows into Lake Eppalock Reservoir from Upper Campaspe Catchment Abdullah Gokhan Yilmaz 1,* , Serter Atabay 2, Kimia Haji Amou Assar 2 and Monzur Alam Imteaz 3 1 Department of Engineering, School of Engineering and Mathematical Sciences, La Trobe University, Melbourne, VIC 3086, Australia 2 Department of Civil Engineering, American University of Sharjah, Sharjah 27272, United Arab Emirates; [email protected] (S.A.); [email protected] (K.H.A.A.) 3 Department of Civil and Construction Engineering, Swinburne University of Technology, Melbourne, VIC 3122, Australia; [email protected] * Correspondence: [email protected] Abstract: Climate change has significant effects on societies and ecosystems. Due to the strong link between climate and the hydrological cycle, water resources is one of the most affected fields by climate change. It is of great importance to investigate climate change effects on streamflows by producing future streamflow projections under different scenarios to create adaptation measures and mitigate potential impacts of climate change. The Upper Campaspe Catchment (UCC), located at North Central Victoria in Australia, is a significant catchment as it provides a large portion of total inflow to the Lake Eppalock Reservoir, which supplies irrigation to the Campaspe Irrigation district and urban water to Bendigo, Heathcote, and Ballarat cities. In this study, climate change effects on monthly streamflows in the UCC was investigated using high resolution future climate data from CSIRO and MIROC climate models in calibrated IHACRES hydrological model. The IHACRES model Citation: Yilmaz, A.G.; Atabay, S.; was found to be very successful to simulate monthly streamflow in UCC.
    [Show full text]