C-73 C.4 Figure C.4.1 Study Flow on the Programme of Measures For
Total Page:16
File Type:pdf, Size:1020Kb
The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C C.4 Analysis on the Present Condition 2. Estimation of Pollution 3. Refer to the Present 1. Refer to the Risk Load in the Present Water Quality Assessment Results Condition Condition of Surface for the Present 1) Domestic load + industrial Water Condition load into sewerage system. 1) Physico-chemical 1) Risk Assessment 2) Industrial load of directly water quality (BOD, Results for Surface discharge. TN and TP). Water Bodies 3) Point and non-point 2) Hydro-biological 2) Risk Assessment livestock load. water quality. Results for 4) Non-point fertilizer load. Groundwater Bodies 5) Estimate BOD, TN and TP (for Reference) loads. MIKE 11 Model and Simple Model 4. Analysis on Pollution Mechanism in the Present Condition Analysis on the Near Future Condition 5. Estimation of Pollution 6. Water Quality 7. Refer to the Risk Load in the Near Future Estimation under Assessment Results Condition Near Future (With under-constructed Condition or near future constructed (by the MIKE 11 and WWTPs.) Simple Models) 8. Estimate Pollution Conditions in the Near Future Condition 9. Identification of Problematic Areas and Zoning for Pollution Reduction Study on the Programme of Measures 10. Program of Measures with Rough Cost Estimation 11. Study on the Implementation Program with Some Scenarios 12. Comparison Table for Programme of Measures to the corresponding Water Bodies Figure C.4.1 Study Flow on the Programme of Measures for Water Quality Management JICA CTI Engineering International Co., Ltd. C-73 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria Figure C.4.2 Present BOD Load in EABD Figure C.4.3 Present BOD Load from Unit Area in EABD C-74 JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.4.4 Near Future BOD Load in EABD (with under-constructed and tendering WWTPs) Figure C.4.5 Near Future BOD Load from Unit Area in EABD (with under-constructed and tendering WWTPs) JICA CTI Engineering International Co., Ltd. C-75 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria Figure C.4.6 Present TN Load in EABD Figure C.4.7 Near Future TN Load in EABD C-76 JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.4.8 Present TP Load in EABD Figure C.4.9 Near Future TP Load in EABD JICA CTI Engineering International Co., Ltd. C-77 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria Figure C.4.10 Present BOD Loads in WABD Figure C.4.11 Present BOD Loads from Unit Area in WABD C-78 JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.4.12 Near Future BOD Loads in WABD with Under-constructed and Tendering WWTPs Figure C.4.13 Near Future BOD Loads from Unit Area in WABD JICA CTI Engineering International Co., Ltd. C-79 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria Figure C.4.14 Present TN Loads in WABD Figure C.4.15 Near Future TN Loads in WABD C-80 JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.4.16 Present TP Loads in WABD Figure C.4.17 Near Future TP Loads in WABD JICA CTI Engineering International Co., Ltd. C-81 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria Fig. A.3. 17 EABD: Co-relation between Present Catchment BOD Load and River BOD Load 45,000 40,000 Maritsa River: y = 0.3116x + 1902.7 R2 = 0.8908 35,000 30,000 25,000 20,000 Arda River: y = 1.3142x + 366.81 R2 = 0.9243 River BOD Load (kg/day) Load BOD River 15,000 10,000 5,000 Maritsa River Basin Tundza River: y = 0.3311x + 880.01 Tundza River Basin ME1 2 R = 0.7903 Arda River Basin 0 0 20,000 40,000 60,000 80,000 100,000 120,000 Catchment BOD Load (kg/day) Figure C.4.18 EABD: Co-relation between Present Catchment BOD Load and River BOD Load Table A.3-18 WABD: Co-relation between Present Catchment BOD Load and River BOD Load 14000 12000 Struma River: y = 0.3901x + 510.62 R2 = 0.8829 10000 8000 Mesta River: y = 0.5332x + 89.984 R2 = 0.9969 6000 River BOD Load (kg/day) 4000 2000 ME1 Struma River Basin Mesta River Basin 0 0 5000 10000 15000 20000 25000 30000 Catchment BOD Load (kg/day) Figure C.4.19 WABD: Co-relation between Present Catchment BOD Load and River BOD Load C-82 JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.4.20 Proposed High Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks in EABD JICA CTI Engineering International Co., Ltd. C-83 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria Figure C.4.21 Proposed High Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks in EABD C-84 JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.4.22 Proposed High and Medium Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks in EABD JICA CTI Engineering International Co., Ltd. C-85 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria Figure C.4.23 Proposed High and Medium Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks in EABD C-86 JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.4.24 Implementation Schedule: Practical Scenario JICA CTI Engineering International Co., Ltd. C-87 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria Figure C.4.25 Surveillance and Operational Monitoring Network C-88 JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.4.26 Proposed Key and Important Monitoring Zones in EABD and WABD JICA CTI Engineering International Co., Ltd. C-89 Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria C-90 JICA CTI Engineering International Co., Ltd. Annex C.1 List of Major Industries and Livestock farms in Bulgaria based on NSI’s Data Annex C.1- 1 Annex C.1- 2 Annex C.1.1 Main Industries and Animal Breeding Farms in DRBD Group ID acc. to acc. to the the Name Region Municipality Settlement prod. - NCIA* 2005 A 01.2 Animal Breeding 01.21 Breeding of cattle 1 "AGROHOLDING LOVIKO" JSCo Gabrovo Sevlievo Sevlievo 2 2 "SORTOVI SEMENA ELIT-2001" Ltd. Veliko Tarnovo Svishtov Svishtov 2 3 "TUS" Ltd. Targovishte Omurtag Kamburovo village 1 4 FARMING COOPERATION "DAMYANOVO" Gabrovo Sevlievo Damyanovo village 1 5 FARMING COOPERATION "ROSITSA" Gabrovo Sevlievo Sevlievo 1 6 "ALEKSIYA 2002" PLC Vratsa Vratsa Vratsa 1 7 "BOILA AGRO" PLC Montana Montana Montana 1 8 "SIMA-NUKLEUS" PLC Pleven Pleven Pleven 1 9 "CHEMERNIK" PLC Sofia Sofia Sofia 1 10 "CHEH&P" PLC Veliko Tarnovo Veliko Tarnovo Veliko Tarnovo 1 11 FARMING COOPERATION "SAGLASIE" Veliko Tarnovo Svishtov Dragomirovo village 1 01.23 Breeding of pigs 1 "AGROSPEKTAR INVEST" JSCo Sofia Sofia Sofia 5 2 "BRATYA TOMOVI" JSCo Targovishte Popovo Popovo 2 3 "KREMONINI" JSCo Sofia Sofia Sofia 4 4 "SVINEKOMPLEKS BRASHLYAN" JSCo Ruse Slivo Pole Brashlen village 7 5 "SVINEKOMPLEKS NIKOLOVO" JSCo Ruse Ruse Nikolovo village 7 6 "SVINEKOMPLEKS SAMUIL" JSCo Ruse Slivo Pole Brashlen village 7 7 "SVINEKOMPLEKS GOLYAMO VRANOVO" JSCo Ruse Slivo Pole Golyamo Vranovo village 9 8 "AGRO-2000" Ltd. Veliko Tarnovo Strazhitsa Strazhitsa 3 9 "ADAN-N" Ltd. Vidin Vidin Vidin 1 10 "VALDINI TREYDING" Ltd. Sofia Sofia Sofia 5 11 "PLANETA" Ltd. Veliko Tarnovo Gorna Oryahovitsa Pisarevo village 2 12 "BELSUIN" PLC Sofia Sofia Sofia 6 13 "BILYANA" PLC Veliko Tarnovo Svishtov Balgarsko Slivovo village 3 14 "GERAN 99" PLC Veliko Tarnovo Veliko Tarnovo Veliko Tarnovo 3 15 "RONEKS 2000" PLC Sofia Sofia Sofia 6 16 "SVINEKOMPLEKS-STAMBOLOVO" PLC Veliko Tarnovo Pavlikeni Stambolovo village 4 17 "SVINEKOMPLEKS-YUDELNIK" PLC Ruse Slivo Pole Yudelnik village 4 18 "SILISTRA-HIBRID" PLC Sofia Sofia Sofia 2 19 "TROYAINVEST" PLC Lovech Troyan Troyan 3 20 "TROYAMEKS" PLC Lovech Troyan Dalbok Dol village 7 01.24 Poultry breeding 1 "BULAGRO" JSCo Sofia Kostinbrod Kostinbrod 2 2 "DZHIEV" JSCo Sofia Kostinbrod Kostinbrod 7 3 "OVOBIZNES" JSCo Pleven Pleven Bohot village 1 4 "SIKONKO AGROTEHNIK" JSCo Veliko Tarnovo Polski Trambesh Polski Trambesh 1 5 "SLAVYANA" JSCo Pleven Pleven Pleven 5 6 "YAITSA I PTITSI" JSCo Vratsa Miziya Miziya 5 7 "AVIS" Ltd. Razgrad Zavet Zavet 2 8 "VEKTOR 91" Ltd. Sofia Sofia Sofia 1 9 "EMBRIO" Ltd. Vratsa Byala Slatina Byala Slatina 1 10 "PEGEMEKS TREYD" Ltd. Lovech Lovech Lovech 2 11 "PILIGRIM 67" Ltd. Pleven Dolna Mitropoliya Dolna Mitropoliya 2 12 "PRO AGRO 2000" Ltd. Sofia Sofia Sofia 7 13 "AMON-RA" PLC Silistra Tutrakan Tutrakan 7 14 "VATO" PLC Ruse Ruse Chrvena Voda village 2 15 "GALUS KAMPANI" PLC Sofia Kostinbrod Kostinbrod 2 16 "DITRONIKS" PLC Pleven Pleven Pleven 1 17 "IGAL" PLC Montana Montana Montana 1 18 "INOT AGRO" PLC Lovech Apriltsi Apriltsi 1 19 "KENTAVAR" PLC Veliko Tarnovo Pavlikeni Pavlikeni 2 20 "KOKO TREYD" PLC Sofia Sofia Sofia 1 21 "MAR-KRAFT" PLC Sofia Sofia Sofia 3 22 "NEDIFUUD" PLC Silistra Tutrakan Tutrakan 3 23 "PLAMEN-EN" PLC Ruse Ivanovo Krasen village 1 24 "POLTRI" PLC Lovech Lovech Lovech 1 25 "TELEKOM" PLC Sofia Sofia Podgumer village 1 26 "HAYPRO BULGARIA" PLC Veliko Tarnovo Pavlikeni Pavlikeni 7 27 "YAYTSA I PTITSI-LOMTSI" PLC Targovishte Popovo Lomtsi village 2 01.25.