Prezentacja Programu Powerpoint
Total Page:16
File Type:pdf, Size:1020Kb
Group of Experts on Benchmarking Transport Infrastructure Construction Costs - rail Geneva, 30-31 January 2020 Answers received Country/organisation Projects Elements of infrastructure Bulgaria V V Croatia V Finland V Poland V Turkey V V UNECE TER V 2 Bulgaria V<120 120<V≤160 km/h new construction - - upgrade - 5 renewal - - 3 Bulgaria – renewal (US$/km) 4 Bulgaria – renewal (US$/m or US$/m2) 5 Bulgaria – renewal (US$/unit) 6 Bulgaria – upgrade (US$/km) 7 Bulgaria – upgrade (US$/m or US$/m2) 8 Bulgaria – upgrade (US$/unit) 9 Croatia V<120 120<V≤160 km/h new construction 1 - upgrade 1 3 renewal 4 5 10 Croatia – new construction new construction 35,000,000.00 30,000,000.00 25,000,000.00 20,000,000.00 Costs of stations Costs of level crossings 15,000,000.00 Costs of bridges/viaducts Others 10,000,000.00 5,000,000.00 0.00 Construction of a new railway line for suburban traffic on section Gradec – Sveti Ivan Žabno 11 Croatia – renewal renewal 80,000,000.00 70,000,000.00 60,000,000.00 50,000,000.00 40,000,000.00 Costs of stations 30,000,000.00 Costs of level crossings 20,000,000.00 Costs of tunnels Others 10,000,000.00 0.00 Vinkovci to Section Section Section Section Section Section Section Section Tovarnik to renewal renewal Ogulinrenewal Lokve- renewal renewal renewal renewal Velika renewal Klara - State Border Moravice - - (Moravice), (Drivenik), Koprivnica - (Križevci)- Zagreb Gorica - (Zagreb MS), Railway (Skrad), Zagreb Zagreb Main Zagreb Main Botovo - State (Koprivnica), Borongaj - (Turopolje), Zagreb Main Rehabilitation Main Station - Station - Rijeka Station - Rijeka Border, State State Border - (Dugo Selo), Zagreb Main Station - Sisak - Rijeka line line line Border - Botovo - Dugo Zagreb Main Station - Sisak - Novska line Botovo - Dugo Selo line Station - Dugo Novska line Selo line Selo line 12 Croatia – upgrade upgrade 300,000,000.00 250,000,000.00 200,000,000.00 150,000,000.00 Costs of over/underpasses Costs of stations Costs of level crossings 100,000,000.00 Costs of bridges/viaducts Others 50,000,000.00 0.00 Okučani to Novska Railway Zagreb Main Railway Station - Reconstruction of existing and Modernisation and section Rehabilitation and Upgrade reconstruction (modernisation) construction of second track on upgrade of Oštarije - Knin - Split of signalling and interlocking section Dugo Selo - Križevci, line system, in scope of IPA Fund State Border - Botovo - Dugo Selo line 13 Finland V<120 120<V≤160 km/h new construction 2 - upgrade 2 1 renewal - - 14 Finland – new construction 15 Finland – upgrade 16 Poland – upgrade (US$/km) 17 Poland – upgrade (US$/m or US$/m2) 18 Poland – upgrade (US$/unit) 19 Turkey V<120 120<V≤160 km/h new construction 1 2 upgrade - - renewal - - 20 Turkey – new construction (US$/km) 21 Turkey – new construction (US$/m or US$/m2) 22 Turkey – new construction (US$/unit) 23 Bulgaria, Poland – upgrade (US$/km) 24 Bulgaria, Poland – upgrade (US$/m) 25 Bulgaria, Poland – upgrade (US$/unit) 26 Croatia, Turkey, Finland – new construction, V<120 27 TER database Bulgaria Project Project Length Construc Note ID+type description (km) - tion cost New (according to the Rehabilitation,mo revised Master Plan 6 dernization (EURx10 Final Report) Electrification ) BG-R-1 Electrification and upgrading of 38 159 Plovdiv – Svilengrad line, Phase I Krumovo – Parvomay railway section BG-R-1 Electrification and upgrading of 103 208 Plovdiv – Svilengrad line, Phase II Parvomay – Svilengrad railway section BG-R-3 Electrification and upgrading of 18 43 Svilengrad – Turkish border line BG-R-5 Phase I Rehabilitation of railway 177 244 infrastructure along sections of the Plovdiv -Burgas railway line BG-R-5 Modernization of the railway 61 159 section Septemvri – Plovdiv – part of the TransEuropean railway network BG-R-7 Rehabilitation of railway 54 82 infrastructure along sections of the Sofia -Karlovo - Zimnitza railway line 28 TER database Czech Republic Project Project Length Construc- Note ID+type description (km) tion cost New (according to the (EURx106) Rehabilitation,m revised Master Plan odernization Final Report) Electrification CZ-R-4 Bystrice nad Olsi – Cesky Tesin, 2 62 phase II, station Cesky Tesin CZ-R-7 Beroun – Plzen –Cheb, introduction 185 21 of GSM-R system CZ-R-7 Modernization of line Praha – 282 72 Plzen, section Rokycany - Plzen CZ-R-9 Modernization of line Praha – 2 53 Česka Trebova, junction Usti nad Orlici CZ-R-10 Usti nad Orlici – Letohrad, 13 24 modernization CZ-R-11 Teplice nad Becvou – Hustopece 8 29 nad Becvou, modernization CZ-R-11 Valasske Mezirici – Vsetin – Horni 34 30 Lidec, modernization CZ-R-12 Brno Malomerice – Brno Zidenice, 3 35 modernization CZ-R-13 Praha Bubenec – Praha 3 46 Holesovice, modernization 29 TER database Lithuania Project Project Length Construc- Note ID+type description (km) tion cost New (according to the (EURx106 Rehabilitation,m revised Master Plan ) odernization Final Report) Electrification LT-R-5 Construction of second track on 50 61 Kyviskes – Valciunai line (Vilnius station bypass) 30 TER database Poland Project Project Length Construc- Note ID+type description (km) tion cost New (according to the (EURx106 Rehabilitation,m revised Master Plan odernization Final Report) ) Electrification PL-R-6 Modernization of E30 line 1 5 (Bielawa Dolna - Horka section), construction of bridge on Nysa Luzycka + electrification, phase II PL-R-8 Modernization of E30/CE30 139 700 line (Krakow - Rzeszow section), phase III phase I PL-R-10 Modernization of E59 line 32 80 Wroclaw - Poznan, phase III (Czempin - Poznan section) phase I PL-R-11 Modernization of E59 line 58 217 Wroclaw – Poznan, phase II (Wroclaw - Dolnoslaskie Voivodeship border section) 31 TER database Serbia Project Project Length Construc- Note ID+type description (km) tion cost New (according to the 6 revised Master Plan (EURx10 Rehabilitation,m ) odernization Final Report) Electrification SR-R-1 Reconstruction of the line 18 12 Beograd – Sid, section Golubinci – Ruma SR-R-3 Reconstruction of the single track 15 81 and construction of the second track on the line Pancevacki Most - Pancevo Glavna, reconstruction of stations Krnjaca, Ovca, Pancevo bridge, construction of the new bridge over Tamis river SR-R-4 Reconstruction of existing track 10 42 and construction of the second track with the construction of a new bridge on the Velika Morava river SR-R-4 Reconstruction of two sections of 48 24 rail line Beograd - Nis: Sopot Kosmajski - Kovacevac and Mala Krsna - Velika Plana SR-R-5 Reconstruction of three sections of 47 33 rail line Nis – Presevo – FYROM border: Vinarce – Dordevo, Vranjska Banja – Ristovac, Bujanovac - Bukarevac 32 TER database Slovakia Project Project Length Construc- Note ID+type description (km) tion cost New (according to the (EURx106 Rehabilitation,m revised Master Plan ) odernization Final Report) Electrification SL-R-5 Modernization of the section 9 87 Belusa - Puchov 33 TER database Turkey Project Project Length Construc- Note ID+type description (km) tion cost New (according to the (EURx106 Rehabilitation,m revised Master Plan ) odernization Final Report) Electrification TR-R-11 Irmak – Karabuk – Zonguldak, 415 220 rehabilitation and signalling 34 Thank you for your attention 35.