Draft Renewable Energy Coordination Framework
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Folklore & History of the Heritage Highway
Folklore & History of the Heritage Highway Keep an eye out between Tunbridge and Kemton for sixteen silhouettes. Some are quite close to road, some are high on the hilltops. What stories can they tell us about the history of this intriguing region. Page 2 Two hundred years on there’s still plenty of ways to get held up on the Heritage Highway The Silhouette sculpture trail along the Southern half of the Midland Highway is completed, nine years after it was started by locals Folko Kooper and Maureen Craig. The trail between Tunbridge and Kempton, has become an enjoyable feature of the journey along the highway. Installation of four coaching-related sculptures at Kempton earlier this year marked completion of a trail which now has 16 pieces. Page 3 Leaving Oatlands towards the North, on the right side of the Heritage Highway. Troop Of Soldiers—St Peters Pass Van Diemen’s Land was first and foremost a British military outpost. Soldiers accompanied the convicts on the transport ships, supervised the rationing of supplies, and guarded the chain gangs, They also supervised construction of bridges public and private buildings– as well as watching out for the French! Most didn’t stay long. There were other British interests around the world to defend. Many of the convicts they guarded had also been soldiers, but were reduced to committing crime once the wars they were fighting ended and they were out of a job. Chain Gang—North off York Plains Turn-off There was a lot to do to build the colony of Van Diemen’s Land. -
Cattle Hill Wind Farm Collision Avoidanceanddetectionplan (CADP)
1 Joule Logic Renewable Energy and Environment Specialists Cattle Hill Wind Farm Collision Avoidance and Detection Plan (CADP) Developed to satisfy the requirements of Condition 6A of the Commonwealth Approval EPBC 2009/4839 for the Cattle Hill Wind Farm Date Revision Prepared Reviewed Approved 22/05/2018 5 Cindy Hull Sue Marsh Jeff Bembrick Joule Logic Joule Logic Goldwind Australia 2 Disclaimer Reports produced by Joule Logic Pty Ltd are prepared based on the Client’s objective and are based on a specific scope, conditions and limitations, as agreed between Joule Logic and the Client. Information and/or report(s) prepared by Joule Logic may not be suitable for uses other than the original intended objective. No parties other than the Client should use any information and/or report(s) without first conferring with Joule Logic. Although Joule Logic has taken all necessary steps to ensure that an accurate report has been prepared, the Company accepts no liability for any damages or loss incurred as a result of reliance placed upon the report and its contents. Copyright The concepts and information contained in this document are the property of Joule Logic. Use or copying of this document in whole or in part without the written permission of Joule Logic constitutes an infringement of copyright. Information shall not be assigned to a third party without prior consent. 3 Definitions In this Collision Avoidance and Detection Plan the following definitions apply: Cattle Hill Wind Farm Comprising 48 wind turbines and 150 MW capacity Central Highlands Region Is that described in Environment Protection Notice No. -
GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000
GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000 www.goldwindaustralia.com 11 September 2020 The Hon. Guy Barnett, MP Minister for Energy Department of State Growth 4 Salamanca Pl Hobart TAS 7000 Dear Minister Barnett Re: Response to the Draft Tasmanian Renewable Energy Action Plan Goldwind Australia (Goldwind) is pleased to present this response to the Tasmanian Governments Draft Renewable Energy Action Plan. Goldwind has over ten years’ experience of building renewable energy projects across Australia, with 562MW operating including the 144MW Cattle Hill Wind Farm in Tasmania, 960MW of wind farms currently under construction and a further 1.3 GW in the immediate development pipeline. As an experienced renewable energy developer, Goldwind shares the vision expressed in the Tasmanian Renewable Energy Action Plan and applauds the goal of achieving a 200% renewable energy target by 2040. We consider this long-term vision will bring substantial economic, social and environmental benefits for Tasmanian. We have made several suggestions that Goldwind considers would help achieve the stated goals in an efficient and effective manner. These are detailed in our submission, which is attached as Attachment A. We will continue to pursue opportunities for further renewable energy generation in Tasmania. John Titchen Managing Director, Goldwind Australia Goldwind Australia Pty Ltd (ABN 32 140 108 390) GOLDWIND AUSTRALIA PTY LTD Level 25, Tower 1, International Towers Sydney 100 Barangaroo Ave, Barangaroo NSW 2000 www.goldwindaustralia.com Attachment A Goldwind Australia Response to the Draft Renewable Energy Action Plan (Action Plan) 1. Introduction Goldwind supports the vision for Tasmania to become a powerhouse of sustainable, low cost and reliable energy production. -
Implications for Tasmanian Electricity System of The
Backroad Connections Pty Ltd ABN: 64 090 245 382 [email protected] (0407) 486-651 www.backroad.com.au Implications for the Tasmanian electricity system of the proposal to restore Lake Pedder July 2019 Overview The paper analyses the implication for the Tasmanian electricity system of the proposal by the Lake Pedder Restoration Committee (LPRC) to restore the original Lake Pedder. It provides information on the current contribution of the Gordon Scheme to Tasmanian electricity generation and energy storage and provides some information and estimates on alternatives to replace this generation if the original Lake Pedder was restored. Background The original Lake Pedder was flooded in 1972 as part of an expansion of the Tasmanian hydro-electric scheme. The flooded area created is still officially known as Lake Pedder although the LPRC prefer the name Huon- Serpentine Impoundment. In this paper we will use the term ‘new Lake Pedder’. The new Lake Pedder at 242 sq km is vastly bigger than the original Lake Pedder at 10 sq km. The new Lake Pedder does not have its own hydro-electric generation. Its purpose is to trap and raise the level of the water that would otherwise flow down the Huon and Serpentine rivers. The water is raised to the level where it flows through a channel created at McPartlan Pass into the Gordon Dam and contributes to the storage and generation of the Gordon Scheme. As a result the level of the new Lake Pedder does not vary more than a few metres. This makes it more visually attractive and more suitable for recreational use than the adjacent Gordon Reservoir. -
Welcome to the Southern Midlands
Welcome to the Southern Midlands SOUTHERN MIDLANDS COUNCIL Page 1 of 30 New Residents Information As Mayor of the Southern Midlands Council and on behalf of my fellow Councillors, I wish to extend a warm welcome and thank you for choosing to live in the Southern Midlands. Kind Regards Alex Green MAYOR SOUTHERN MIDLANDS COUNCIL Page 2 of 30 New Residents Information Contents About our Council ............................................................................................................. 4 Council Offices .................................................................................................................................................................... 5 Municipal Map ................................................................................................................................................................... 5 Councillors............................................................................................................................................................................ 7 Council Meetings ................................................................................................................................................................ 9 Services ............................................................................................................................. 10 Development & Environmental Services ................................................................................................................... 10 Community & Corporate Development -
Annual Planning Report 2020
ANNUAL PLANNING REPORT 2020 Feedback and enquiries We welcome feedback and enquiries on our 2020 APR, particularly from anyone interested in discussing opportunities for demand management or other innovative solutions to manage limitations. Please send feedback and enquiries to: [email protected] Potential demand management solution providers can also register with us via our demand management register on our website at https://www.tasnetworks.com.au/demand-management-engagement-register 1. Introduction 2 2. Network transformation 12 3. Transmission network development 22 4. Area planning constraints and developments 36 5. Network performance 66 6. Tasmanian power system 82 7. Information for new transmission network connections 96 Glossary 106 Abbreviations 109 Appendix A Regulatory framework and planning process 110 Appendix B Incentive Schemes 117 Appendix C Generator information 118 Appendix D Distribution network reliability performance measures and results 120 Appendix E Power quality planning levels 123 TASNETWORKS ANNUAL PLANNING REPORT 2020 1 1. Introduction Tasmania is increasing its contribution to a This transition, with the move to increased low cost, renewable energy based electricity interconnection and variable renewable energy sector and being a major contributor to generation, is fundamentally changing how the firming electricity supply across the National power system operates. We, in conjunction with Electricity Market (NEM). As a key part of this the broader Tasmanian electricity industry, have objective, we present the Tasmanian Networks Pty managed this situation well to date, however the Ltd (TasNetworks) Annual Planning Report (APR). diligence must continue and solutions to new As the Tasmanian jurisdictional Transmission and challenges identified to keep pace with change. -
Review of Rural Tree Decline in a Changing Australian Climate ( Pdf )
Review of rural tree decline in a changing Australian climate D.C. Close1,2,3* and N.J. Davidson1,3 1Cooperative Research Centre for Sustainable Production Forestry, Private Bag 12, Hobart 7001 2Schools of Agricultural Science and Zoology, Private Bag 54, Hobart 7001 3School of Plant Science, University of Tasmania, Private Bag 55, Hobart 7001 Abstract native animals. Superimposed on these factors are below-average rainfall and above-average Rural tree decline (RTD) in Australia is a temperatures over the past three decades, complex biological issue involving dieback of phenomena that are associated with climate native trees following the removal of native change. Climate change has been linked to vegetation, the introduction of improved eucalypt decline in landscapes with little or no pasture species, soil fertilisation and the rural land use, and to tree decline across Europe. grazing of livestock. The extent and severity The contributions of climate change and rural of RTD has reached historically high levels in land use to RTD are considered in this review and the past two to three decades. As this period recommendations for management are discussed. has coincided with an unprecedented increase in atmospheric carbon dioxide concentration, it may be speculated that climate change, a Introduction result of the Greenhouse Effect, has played a signifi cant role in RTD. Ecological similarities Rural tree decline (RTD) and dieback in between two geographically and climatically Australia have long been observed (Norton distinct Australian case studies (the Midlands 1886) but in the past three decades have of Tasmania and the New England Tablelands of reached historically high levels (Williams New South Wales), both characterised by severe and Nadolny 1981; Rees 2000). -
Cattle Hill Connection Agreement
MEDIA RELEASE Tuesday, 14 November 2017 Cattle Hill Wind Farm Connection Agreement finalised TasNetworks and Goldwind have today signed the Connection Agreement for the Cattle Hill wind farm project in Tasmania’s central highlands. The Connection Agreement sets out the terms and conditions through which the wind farm is able to successfully connect to TasNetworks’ transmission network and is another key step in paving the way for the construction of the 144MW wind farm. The agreement represents a significant commitment from TasNetworks and Goldwind. In addition to delivering local benefits to business and the community, the construction of the large-scale wind farm will also contribute to Tasmania’s energy security and increases the State’s on-island renewable energy generation capacity by more than 5 per cent. “This is a key milestone for the project and highlights the strong working relationship that exists between TasNetworks and Goldwind” said TasNetworks Chief Executive Officer, Lance Balcombe. “We’re very excited to be involved with such a great project and look forward to working with Goldwind during the construction phase over the coming months” Mr Balcombe said. “Goldwind is pleased to be partnering with TasNetworks to successfully achieve the Connection Agreement for Cattle Hill. We have found the TasNetworks team to be very professional and capable.” said Goldwind’s Managing Director, John Titchen. “The project is located adjacent to TasNetworks’ large Waddamana Substation, it will deliver a significant addition to the Tasmanian power supply and provide significant opportunities for Tasmanian businesses and the community. We are aiming to complete construction in 2019” Mr Titchen said. -
Conservation in Tasmania's Biodiversity Hotspot
Conservation in Tasmania’s biodiversity hotspot Photo: Matthew Newton “Beaufront” near Ross in the Tasmanian midlands We are pleased to announce seed The land between Tasmania’s Great Issue 20 Autumn 09 funding for a new and very important Western Tiers and the east coast range midlands conservation initiative with represents one of Australia’s handful Protecting the midlands partners Bush Heritage Australia of national biodiversity hotspots, the TLC revolving fund update (BHA) and the Tasmanian Government grassy lowland plains of the Tasmanian Official launch of the Vale of Belvoir Department of Primary Industries and midlands. The region was defined as a TLC bequests Water (DPIW). hotspot due to the large number of species The life of Lindsay Whitham that are endemic (unique) to the area, Drought-ravaged landscapes, dust storms and because it is a refuge for a number and plans for grand irrigation schemes, it of marsupials that are endangered on the all sounds like the Murray–Darling basin, Board Members mainland, such as the spotted-tailed quoll but surprisingly, these images describe (Dasyurus maculatus) and the eastern the current situation in Tasmania’s Mr Peter Bosworth (President) barred bandicoot (Perameles gunnii). midlands. Dr Geoff Couser (Vice President) There is also significant pressure on these Dr Karina Potter (Secretary) Whether it is climate change at work or natural features from a range of land-uses Ms Jane Hutchinson just a blip in the weather patterns, drought that has altered habitat over the years. Ms Sophie Underwood is not the only issue. Land managers in Dr Wendy Potts the region are also concerned about the Although federal funding has been Mr Matt Newton long-term viability of farming systems, invested in a system of protected areas on Mr John Ramsay their impact on the environment and the private land in recent years, there are still Mr Roderic O’Connor potential social and cultural effects on large gaps. -
Clean Energy Australia Report 2021
CLEAN ENERGY AUSTRALIA REPORT 2021 AUSTRALIA CLEAN ENERGY CLEAN ENERGY AUSTRALIA REPORT 2021 CONTENTS 4 Introduction 6 2020 snapshot 12 Jobs and investment in renewable energy by state 16 Industry outlook: small-scale renewable energy 20 Industry outlook: large-scale renewable energy 22 Federal politics 24 State policies 26 Australian Capital Territory 28 New South Wales 30 Northern Territory 32 Queensland 34 South Australia 36 Tasmania 38 Victoria 40 Western Australia 42 Employment 46 Renewables for business 50 International update 52 Electricity prices 54 Transmission 56 Energy reliability 58 Technology profiles 60 Battery storage 64 Bioenergy 66 Hydro and pumped hydro 68 Hydrogen 70 Solar: Small-scale systems up to 100 kW 78 Solar: Medium-scale systems between 100 kW and 5 MW 80 Solar: Large-scale systems larger than 5 MW 84 Wind Cover image: Wind turbine blade installation, Collector Wind Farm, New South Wales INTRODUCTION Kane Thornton Chief Executive, Clean Energy Council Australia’s clean energy came from clean energy sources, territories’ progressive energy policies transition accelerated with wind and rooftop solar leading only served to highlight the ongoing again in 2020 as wind the way. This represents a massive failures at the federal level, where transformation that makes Australia’s arguments about government support and rooftop solar set new electricity system cheaper, more for gas and coal overshadowed some records, battery storage reliable and, most importantly, cleaner. genuinely positive developments. came of age, and the But the best news is that the shift is These included the continued showing no sign of slowing down. hydrogen sector continued growth of clean energy jobs, with the its rapid development. -
Catchments and Local Government Areas
Threatened Species Section Department of Primary Industries, Parks, Water and Environment Threatened plants within the Local Government Area: Central Highlands Tas LGA Species Common name Endemic TSP Act EPBC Act LGA % Count Count Acacia axillaris midlands wattle end v VU 541 64 11.8 Acacia siculiformis dagger wattle r 76 27 35.5 Agrostis australiensis southern bent r 11 4 36.4 Agrostis diemenica flatleaf southern bent end r 11 7 63.6 Amphibromus fluitans floating swampgrass i? VU 2 1 50.0 Amphibromus neesii southern swampgrass r 30 2 6.7 Anogramma leptophylla annual fern v 17 2 11.8 Aphelia pumilio dwarf fanwort r 140 1 0.7 Argyrotegium fordianum soft cottonleaf r 7 6 85.7 Argyrotegium nitidulum shining cottonleaf VU 2 1 50.0 Argyrotegium poliochlorum greygreen cottonleaf r 31 1 3.2 Arthropodium strictum chocolate lily r 969 5 0.5 Asperula minima mossy woodruff r 56 7 12.5 Asperula scoparia subsp. scoparia prickly woodruff r 158 45 28.5 Asperula subsimplex water woodruff r 47 10 21.3 Australopyrum velutinum velvet wheatgrass r 10 4 40.0 Austrostipa bigeniculata doublejointed speargrass r 114 2 1.8 Austrostipa nodosa knotty speargrass r 621 19 3.1 Austrostipa scabra rough speargrass r 171 10 5.8 Austrostipa scabra subsp. falcata sickle speargrass r* 317 18 5.7 Austrostipa scabra subsp. scabra rough speargrass r* 42 4 9.5 Barbarea australis riverbed wintercress end e CR 127 78 61.4 Baumea gunnii slender twigsedge r 77 26 33.8 Botrychium australe parsley fern x 1 1 100.0 Brachyscome radicata spreading daisy tas r 14 5 35.7 Brachyscome rigidula -
Project Updates Week Ending 20 October 2017
PROJECT TALLY (October) Number of projects = 451 - 210 Generating - 241 In Development Total Capacity = 60,821.7 MW - 21,450.97 MW Generating - 39,370.73 MW In Development Project Updates Week ending 20 October 2017 Cattle Hill Wind Farm local closely with the main contractors and major subcontractors, once appointed, to facilitate business participation program opportunities for local subcontractors and launched suppliers to participate in the project,’ said 13 October Laura. Goldwind Australia has launched the Local Business Participation Program for Cattle Hill Cattle Hill Wind Farm is now listed as a project Wind Farm. The Program will be a key on the Industry Capability Network (ICN) initiative to identify capability and capacity in Gateway. This is an independent business the local community and maximise network providing an online tool to connect opportunities for local subcontractors and subcontractors and suppliers with projects. suppliers to participate in the project. Businesses with an ABN can submit Expressions of Interest for over 30 different Developer for the project, Goldwind Australia work packages ranging from fencing to civil Managing Director John Titchen, said the construction of on-site roads and local partnership with Aurora Energy secured the accommodation providers. construction of the Cattle Hill Wind Farm project. Following the appointment of the main contractor, an information forum will be held ‘We’re pleased to partner with Aurora Energy to provide local businesses with additional who is clearly supportive of renewable energy information about the available work development in Tasmania and strengthening packages and the process of bidding for Tasmania’s energy security,’ said John.