Planning Statement Planning Statement Faw Side Community Wind Farm May 2019 Ref: 377-190213-3037-B Faw Side Community Wind Farm Planning Statement This page has been intentionally left blank Page ii Faw Side Community Wind Farm Planning Statement Community Windpower Ltd Godscroft Lane Frodsham Cheshire WA6 6XU Tel: 01928 734544 Fax: 01928 734790 www.communitywindpower.co.uk Document History CONFIDENTIALITY (Confidential or not confidential): Not confidential Project Number: 377 Project Name Faw Side Community Wind Farm Report Title: Planning Statement Reference Number: 377-190213-3037-B Issued by: Community Windpower Limited Author Checked Approved Ben Stanley Tim Hollins Rod Wood The content of this document remains the property of Community Windpower Ltd and, unless agreed in writing by Community Windpower Ltd, no other party may use, make use of or rely on any contents of the report. Page iii Faw Side Community Wind Farm Planning Statement Glossary Term Definition Capacity Factor The capacity factor of any power plant is the percentage of generation of its actual generation against its theoretical maximum generation. Unit of electricity 1 KWh Abbreviations Abbreviation Description BEIS Department for Business, Energy and Industrial Strategy CO2 Carbon Dioxide DECC Department for Energy and Climate Change DGC Dumfries and Galloway Council DGWLCS Dumfries and Galloway Wind Farm Landscape Capacity Study DSPFL Dark Sky Park Friendly Lighting EC European Commission EIAR Environmental Impact Assessment Report EU European Union GW Gigawatt HBE Historic Built Environment IPCC Intergovernmental Panel on Climate Change kV Kilovolt KW Kilowatt KWh Kilowatt hour LDP Local Development Plan LDP2 Dumfries and Galloway Council Proposed Plan 2018 m/s Metres per second mph Miles per hour MW Megawatt MWh Megawatt hour NGR National Grid Reference NPF National Planning Framework OWPS Onshore Wind Policy Statement PAN Planning Advice Notes RO Renewables Obligation RPP3 Climate Change Plan: The Third Report on Proposals and Policies RSA Regional Scenic Area SBC Scottish Borders Council SBCLDP Scottish Borders Council Local Development Plan SES Scottish Energy Strategy SG Supplementary Guidance SNH Scottish Natural Heritage SPP Scottish Planning Policy SuDS Sustainable Drainage System ULEV Ultra-low emissions vehicle UNFCCC United Nations Framework Convention on Climate Change WED Wind Energy Development: Development Management Considerations Page iv Faw Side Community Wind Farm Planning Statement Contents Introduction 1 The Applicant/Developer 1 Site Location and Description 2 Project Description 2 Purpose and Structure of the Planning Statement 3 The Need for the Proposed Development 3 Potential Production and Benefits of Faw Side Community Wind Farm 9 Site Selection and Evolution 13 Policy and Guidance 14 Planning Policy Assessment 19 11. Supplementary Planning Guidance 40 12. Conclusion 41 Page v Faw Side Community Wind Farm Planning Statement This page has been intentionally left blank Page vi Faw Side Community Wind Farm Planning Statement Introduction 1.1 This Planning Statement accompanies the planning application for consent to construct Faw Side Community Wind Farm under Section 36 of the Electricity Act 1989. 1.2 In accordance with the requirements of the European Directives 2011/92/EU and 2014/52/EU as applied through The Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017; the environmental effects of the proposed development have been studied systematically through an iterative process, the results of which are presented in the Environmental Impact Assessment Report (EIAR). The findings of the EIAR have been used in order to assess the compliance of the proposed development against the relevant policies of the Development Plans. The EIAR accompanies this Planning Statement as part of the planning application to Scottish Ministers. 1.3 The application is a temporary application, for a period of 40 years, from the final commissioning of the proposed wind farm. The Applicant/Developer 2.1 The applicant is CWL Energy Limited, which is a sister company to Community Windpower Limited (CWL). CWL Energy Limited will be the company for which the Faw Side Community Wind Farm will be developed, constructed and operated by however for sake of clarity, CWL will be making the application on behalf of CWL Energy Limited. Therefore, the EIAR will subsequently reference CWL in its documentation. 2.2 Formed in 2001, CWL is a Scottish focused independent UK company working closely with host communities to build wind farms that provide tangible economic, educational and environmental benefits for whole communities. 2.3 CWL believes in an open and consultative approach with our host communities during the development stage of a wind farm project and prior to the submission of a planning application. By learning from our development and construction of medium scale wind farms in Scotland, we are able to use our extensive knowledge and experience to design sites that are sympathetic to local landscapes and can provide generation to meet local and Scottish energy needs. 2.4 CWL have seven operational wind farms totalling 221.25 MW: • Dalry Community Wind Farm in North Ayrshire which has a generating capacity of 18 MW and became operational in June 2006; • Aikengall Community Wind Farm in East Lothian which has a generating capacity of 48 MW and became operational in March 2009; • Millour Hill Community Wind Farm in North Ayrshire which has a generating capacity of 18 MW and became operational in the summer of 2012; • Calder Water Community Wind Farm in South Lanarkshire which has a generating capacity of 39 MW and became operational in December 2013; • Millour Hill Extension in North Ayrshire which has a generating capacity of 6.4 MW and became operational in January 2016; Page 1 Faw Side Community Wind Farm Planning Statement • Aikengall II (Wester Dod) Community Wind Farm in East Lothian which has a generating capacity of 60.8 MW and became operational in November 2017; • Sanquhar Community Wind Farm in Dumfries and Galloway which has a generating capacity of 31.05 MW, completed construction in December 2017 and became operational in March 2018; 2.5 CWL has a further three consented wind farms in Scotland totalling 123.5 MW: Sneddon Law Community Wind Farm in East Ayrshire with a generating capacity of 45 MW, consented in October 2014; Aikengall IIa Community Wind Farm in East Lothian with a generating capacity of 75.5 MW, consented in October 2016; and Sanquhar ‘Six’ Community Wind Farm in Dumfries and Galloway with a generating capacity of 19.8 MW, consented in November 2017. 2.6 CWL have also recently submitted a planning application under Section 36 of The Electricity Act 1989 for Sanquhar II Community Wind Farm located on the border of Dumfries and Galloway and East Ayrshire. The proposal comprises of 50 turbines and a generating capacity of 350MW. Site Location and Description 3.1 The proposed Faw Side Community Wind Farm is located within the administrative areas of Dumfries and Galloway Council and Scottish Borders Council. The site is located approximately 6.7 km north of Langholm and 17.8 km south west of Hawick, as calculated to the nearest turbine. The site is centred on National Grid Reference (NGR) NY350958. 3.2 The proposed development site lies within two main land classifications ‘upland moor’ and ‘commercial forestry’ which primarily constitute a distinctive land cover of heather patches and rough grassland vegetation types. 3.3 The closest operational third-party wind farm to the proposed Faw Side scheme is Craig Wind Farm, which is located to the south west of the proposed site. Craig Wind Farm comprises a line of four Nordex N80 operational turbines, with an overall installed capacity of 10 MW. A number of third party operational and consented schemes are located within 10 km of the proposed Faw Side site, including: Hopsrig, Loganhead, Crossdykes and Ewe Hill. 3.4 Several concentrations of forestry are situated within the development area, primarily along the western boundary of the site. There is also forestry land to the southern boundary of the site. 3.5 The eastern site boundary of the proposed site runs almost adjacent to the A7 in the north which is where the site entrance will be located. The eastern site boundary then runs parallel to the A7 however set back on the hillside. Project Description 4.1 Development of Faw Side Community Wind Farm will consist of the following: • 45 wind turbines and associated foundations; • Crane hardstands; • On-site access tracks; • Construction of ancillary infrastructure including substation/control room buildings and compound, underground cabling, a 125m meteorological mast; Page 2 Faw Side Community Wind Farm Planning Statement • Up to 10 temporary borrow pits to extract stone which would be reinstated post construction; • Temporary construction/storage compound(s) which would be reinstated post construction; • An energy storage facility; and • 132 kilovolt (kV) connection to a grid supply point. 4.2 The proposed wind farm will have an installed capacity of up to 315 megawatts (MW). Purpose and Structure of the Planning Statement 5.1 The purpose of this Planning Statement is to outline how the proposed development complies with relevant planning policy and guidance. 5.2 The structure of the remaining sections of this Planning Statement is set out as follows: • Section 6 – Need for wind energy development including the legislative and policy context for the application; •
Recommended publications
  • TOP 100 POWER PEOPLE 2016 the Movers and Shakers in Wind
    2016 Top 100 Power People 1 TOP 100 POWER PEOPLE 2016 The movers and shakers in wind Featuring interviews with Samuel Leupold from Dong Energy and Ian Mays from RES Group © A Word About Wind, 2016 2016 Top 100 Power People Contents 2 CONTENTS Compiling the Top 100: Advisory panel and ranking process 4 Interview: Dong Energy’s Samuel Leupold discusses offshore 6 Top 100 breakdown: Statistics on this year’s table 11 Profiles: Numbers 100 to 41 13 Interview: A Word About Wind meets RES Group’s Ian Mays 21 Profiles: Numbers 40 to 6 26 Top five profiles:The most influential people in global wind 30 Top 100 list: The full Top 100 Power People for 2016 32 Next year: Key dates for your diary in 2017 34 21 Facing the future: Ian Mays on RES Group’s plans after his retirement © A Word About Wind, 2016 2016 Top 100 Power People Editorial 3 EDITORIAL resident Donald Trump. It is one of The company’s success in driving down the Pthe biggest shocks in US presidential costs of offshore wind over the last year history but, in 2017, Trump is set to be the owes a great debt to Leupold’s background new incumbent in the White House. working for ABB and other big firms. Turn to page 6 now if you want to read the The prospect of operating under a climate- whole interview. change-denying serial wind farm objector will not fill the US wind sector with much And second, we went to meet Ian Mays joy.
    [Show full text]
  • Whitelee Wind Farm, Scotland 2010 – to Date
    CASE STUDY : Ref 292 Whitelee Wind Farm, Scotland 2010 – to date A Tensar TriAx® Mechanically Stabilised Layer is combined with site-won stone to form new access roads BENEFITS TO CLIENT A design and supply solution for stabilised access over difficult ground conditions using minimal quantities of site- won fill. THE PROBLEM There was a requirement to carry heavy loads over low bearing capacity soil conditions including peat bog for access roads and platforms in the development of a substantial extension to an existing wind farm. The access roads needed to support the trafficking from construction vehicles as well as from the turbine delivery vehicles and cranes. THE SOLUTION The use of single and multiple layers of Tensar TriAx® geogrids with site-won stone combined to form new access roads and to improve existing forestry roads to support increased trafficking. PROJECT DESCRIPTION Whitelee Wind Farm is Europe’s largest wind farm and is located on Eaglesham Moor just 20 minutes from central Glasgow. The wind farm has 140 turbines which can generate 322MW of electricity, enough to power 180,000 homes. Over the past ten years, Whitelee has been carefully planned and designed to work in harmony with the existing environment and after three years of construction the wind farm is fully operational and producing clean, green energy. In December 2010, Tensar were fortunate enough to be given the contract to design and supply TriAx® geogrids for the access roads for the main contractor Roadbridge/Sisk JV on this project at Whitelee wind farm phase 2. The second phase will be home to a further 36 turbines.
    [Show full text]
  • Perspectives on Wind Turbine Safety
    Perspectives on Wind Turbine Safety Dr. Nat Janke-Gilman Meridian Energy Ltd. NZ Wind Energy Association 2 May 2018 Safety first! Wind Turbines are dangerous! Fatalities during Feb–July 2017 Date Location Event Ramnagar wind farm, 2 Feb 2017 Contractor electrocuted in substation India Kilgallioch wind farm, 15 Mar 2017 Contractor fell 5 m from yaw platform Scotland La Bufa wind farm, 27 Mar 2017 Contractor fell 25 m from tower platform Mexico Whitelee wind farm, 29 Mar 2017 Maintenance worker fell from nacelle to ground Scotland Rayala wind farm, 31 Mar 2017 Welding in turbine started a fire India Deerfield wind farm, 18 Apr 2017 Mobile crane contacted HV overhead line USA Jamnagar wind farm, 3 May 2017 Mobile crane contacted HV overhead line India Esbjerg harbour, 8 May 2017 Contractor pinned between blade and trailer Denmark Binhai North H2 17 Jul 2017 Fire in offshore substation, worker drowned (offshore), China Fatalities during Feb–July 2017 Date Event Key findings: 2 Feb 2017 Contractor electrocuted • Mostly contractors 15 Mar 2017 Contractor fell • Not all in-turbine (substation, cranes, etc) 27 Mar 2017 Contractor fell • Fall protection not applied 29 Mar 2017 Worker fell • Lock Out procedures not 31 Mar 2017 Welding fire applied 18 Apr 2017 Crane contacted HV • Hot Work procedures not applied 3 May 2017 Crane contacted HV • General violations of 8 May 2017 Contractor pinned existing procedures • Unplanned work 17 Jul 2017 Offshore substation fire BATHTUB CURVE OF HUMAN ERROR NEW GUY OLD GUY MISTAKES VIOLATIONS FAILURE RATE FAILURE
    [Show full text]
  • Industrial Impact the Power of Scotland's Renewables Sector
    Supported by Industrial impact the power of Scotland’s renewables sector Wind Service at E.ON INTRODUCTION Climate and Renewables Despite daily headlines on energy, climate change and the growth of renewables, few people appreciate the scale of the transformation which is steadily underway in our energy sector. In just eight years Scotland has almost tripled its Glasgow and Edinburgh are home to large power utilities renewable energy capacity, and made a massive dent in as well as some of our most cutting-edge science, the country’s carbon emissions as a result. research and innovation organisations – companies like Limpet Technologies and Neo Environmental are The industrial benefits of this strategic transformation developing unique products which are already being are as impressive as the environmental ones: exported across the globe. renewable energy is driving innovation and clean growth across Scotland. Research by Scottish Renewables in December 2016 showed Scottish renewable energy businesses like these The sector currently employs 21,000 people, from have been involved in projects worth £125.3 million in 43 entrepreneurs who’re designing new ways to capture countries in every continent bar Antarctica. energy from nature, consultants who make projects viable, E.ON in Scotland lawyers who negotiate contracts, a supply chain which In the south of Scotland, organisations like Natural Power builds wind farms, hydro plant and solar farms and an and Green Cat Group are nurturing workforces skilled army of highly-skilled engineers and technicians who in providing the development support that renewable E.ON, through its renewables arm E.ON Climate and multiple turbine manufacturers/types across Europe.
    [Show full text]
  • Community Investment Report
    COMMUNITY INVESTMENT REVIEW 2019/20 FOREWORD || CONTENTS FOREWORD 2019/20 has been an extraordinary year for SSE Renewables. We started construction on two new ground-breaking offshore wind farms – Dogger Bank, which will be the world’s largest wind farm once complete, and Seagreen, which will be Scotland’s largest. In January 2020 we greenlighted a first subsidy-free onshore wind farm in Scotland, an extension to the existing Gordonbush wind farm in Foreword 01 Funder’s Report 02 Regional Funds 06 Sutherland. Advancing these wind farms, and others in the development pipeline, are a critical part of the response to the climate emergency. Together, they will make a significant contribution to meeting the UK’s ambitious net zero carbon targets whilst making a positive economic contribution in their local areas. By March 2020, of course, everything helping to make things just that little penny of this funding has been Local Funds 10 Offshore Funds 14 NI and ROI Funds 18 became dominated by the bit easier. As we are emerging from allocated and showcases the strong coronavirus pandemic. Operationally, lockdown it is clear there are many funding decisions local people we adapted quickly to make sure that challenges ahead, but having seen the continue to make to ensure their FUNDS IN FOCUS power supplies from our renewable positive effects of the funding we’ve communities have what they need generators continued to flow at channelled towards the coronavirus now, and for the future. Highlands and Islands Beatrice Moray 29 Clyde Extension 36 the same time as making sure our response so far, our objective is Stronelairg 20 Community Fund South Lanarkshire Sustainable 36 Bhlaraidh 21 Development Fund employees and the wider public were that the funds will play a big part I know that awarding grants is the Dunmaglass 22 Perthshire safe.
    [Show full text]
  • Clyde Wind Farm Extension – Impact Analysis
    Clyde Wind Farm Extension – Impact Analysis June 2015 In association with: Clyde Wind Farmsiemens.co.uk Extension | 1 Siemens To be a truly sustainable business, Siemens creating more transparency on negatives has to be profitable, but we also have a such as the environmental cost of responsibility to understand the way we manufacturing, installing and operating the affect people’s lives, the environment and onshore wind farm. This greater depth of local communities. To do this we work hard information will help ourselves and our to better understand how the work that we customers make more informed decisions do as Siemens and with our customers on the true value that such a project delivers. impacts society. I believe that it is the duty of responsible This report details work that we have done businesses to look at the broader financial in association with SSE and PwC to and society impact measures when making understand the economic, environmental key business decisions. and social impacts of building an onshore wind farm. Whilst we have looked at the Juergen Maier positive benefits to the economy, jobs and Chief Executive, Siemens plc training we have not shied away from PwC Siemens has used selected elements of We commend Siemens for applying this PwC’s Total Impact Measurement and thinking to its contributions, as one Management framework to understand the constituent of the entire supply chain, to impacts it deemed the most material from the Clyde Extension and its collaboration its contribution to the Clyde Extension with SSE to better understand how their project covering manufacturing, installation impact fits into the broader impact of the and servicing.
    [Show full text]
  • Official Opening of John Ogilvie High
    John Ogilvie High School Issue No. 2 - October Session 2009/2010 Why not visit our web-site at www.johnogilvie.s-lanark.sch.uk In this Issue: Official Opening of John Ogilvie High School th 1 Official Opening 8 October 2009 2 Official Opening 3 Sonnet of Dedication 4 Pupil Achievements 5 ACT Programme 6 Excursion Pantomime Gideons’ Visit P.E. Dept. 7 Art & Design Modern Languages We were finally declared officially ‘open’ on Thursday October 8th when The Right 8 Modern Honourable Tommy McAvoy MP fulfilled the formal duty of opening our new school. It was a Languages day of celebration with Councillors from across the political spectrum being joined by Fundraising dignitaries from the Council as well as former staff, parents and Mrs. Anne Marie Fagan, our former Head Teacher. It was a special morning with fabulous contributions from our pupils. 9 H/S Partnership There was singing from our ‘Signing’ Choir, African Dancing, Samba Band and Senior Band Siesmology musical numbers, a poetry reading and it was all held together by our hugely entertaining Project comperes, Graham Wylie and Matthew Campbell. We also showcased our new JOS TV Station with a hilarious specially recorded interview with Tommy McAvoy by Connor Steven 10 Music Dept. and Jacklyn McConnachie from S6. Invited guests were absolutely thrilled by the event and Isobel MacDougall our Head of Learning Community, commented, ‘Fabulous event. A superb 11 Music Dept. blend of formality and fun. Well done, John Ogilvie High School!!’ Pictured above with myself at the Plaque of Dedication are Mary Smith, Chair of the Dates for your 12 Education Resources Committee and Tommy McAvoy MP.
    [Show full text]
  • Re-Energising Manufacturing
    f RE-ENERGISING MANUFACTURING INDUSTRIAL POLICY FOR RENEWABLES MANUFACTURING IN SCOTLAND Written by: David Powell, Aidan Harper and Margaret Welsh November 2019 New Economics Foundation www.neweconomics.org [email protected] +44 (0)20 7820 6300 @NEF Registered charity number 1055254 © 2019 The New Economics Foundation 2 CONTENTS Summary ................................................................................................................................... 3 Recommendations ................................................................................................................ 4 1. Introduction .......................................................................................................................... 5 2. Scottish renewable energy ................................................................................................ 7 2.1 Growth in renewables .................................................................................................... 7 2.2 Job creation in renewables ............................................................................................. 9 2.3 Manufacturing and renewables ................................................................................... 10 3. Policies for bolstering renewables manufacturing in Scotland ............................... 15 3.1 Different types of intervention .................................................................................... 15 3.2 Demand: delivering long-term certainty ...................................................................
    [Show full text]
  • Annual Review 2006 Annual Review 2006
    Annual Review 2006 Annual Review 2006 BWEA Events 2007 15 March 2007: BWEA Marine 07 BWEA’s 4th Annual Wave and Tidal Energy Conference London, UK 7 June 2007: BWEA Offshore 07 BWEA’s 6th Annual UK Offshore Wind Conference Liverpool, UK 9-11 October 2007: BWEA29 The Industry’s 29th Annual Conference and Exhibition Glasgow, UK For further information on attending, sponsoring or speaking at BWEA events visit www.bwea.com 2 Annual Review 2006 Contents BWEA is the UK’s leading renewable energy Foreword from CEO 4-5 association. Established in 1978, BWEA now has 2006 Planning Review 6-7 Approaching the 2nd gigawatt over 330 companies in membership, active in the UK wind, wave and tidal stream industries. BWEA Record Year of Delivery 8-13 is at the forefront of the development of these Statistical overview of 14-15 wind farms sectors, protecting members’ interests and promoting their industries to Government, Onshore 16-19 business and the media. Wales 20-21 Wind energy has now started a major expansion Small Wind 22-25 in the UK and will be the single greatest Offshore 26-29 contributor to the Government’s 10% 2010 Marine 30-33 renewable energy target and 20% 2020 Grid and Technical 34-37 renewable aspiration. Together, wind, wave Health and Safety 38-40 and tidal power can supply 21% of the country’s projected electricity supplies by 2020, resulting in Communications 42-47 over £16 billion of investment in UK plc. Energy Review 48-50 Publications 51-57 Events 58-61 Finance Review 62-63 Front cover credits BWEA Staff 64 Burton Wold wind farm
    [Show full text]
  • Transmission Networks Connections Update
    Transmission Networks Connections Update May 2015 SHE-T–TO SPT–TO NG–TO/SO SHE-T–TO SPT–TO NG–TO/SO Back to Contents TNCU – May 2015 Page 01 Contents Foreword ////////////////////////////////////////////////////////////////// 02 1. Introduction /////////////////////////////////////////////////////////// 03 2. Connection timescales ///////////////////////////////////////////// 04 Illustrative connection timescales /////////////////////////////////////// 04 Connections by area /////////////////////////////////////////////////////// 05 3. GB projects by year ///////////////////////////////////////////////// 06 Contracted overall position /////////////////////////////////////////////// 08 Renewable projects status by year ///////////////////////////////////// 10 Non-Renewable projects status by year – Excluding Nuclear /// 11 Non-Renewable projects status by year – Nuclear only ////////// 12 Interconnector projects status by year //////////////////////////////// 13 4. Additional data by transmission owner ///////////////////////// 14 National Grid Electricity Transmission plc //////////////////////////// 16 Scottish Hydro Electricity Transmission plc ////////////////////////// 18 Scottish Power Transmission Limited ///////////////////////////////// 20 5. Connection locations /////////////////////////////////////////////// 22 Northern Scotland projects map //////////////////////////////////////// 25 Southern Scotland projects map /////////////////////////////////////// 28 Northern England projects map /////////////////////////////////////////
    [Show full text]
  • Renewable Energy
    Renewable energy Planning and Building Standards Services South Lanarkshire Local development plan supplementary guidance10 Community and Enterprise Resources Page 1 Supplementary Guidance 10: Renewable Energy Contents 1 Introduction 2 2 Policy Context 4 3 Wind energy context 8 4 Spatial framework for wind energy 13 5 Renewable energy developments 19 6 Development management considerations 26 7 Assessment checklist 58 8 Monitoring and review 66 Appendix 1 - Further sources of information 67 Appendix 2 - Glossary of terms 68 Appendix 3 - Community benefit contributions 71 Appendix 4 - Settlements in South Lanarkshire 73 Appendix 5 - Contacts 74 Chapter 1 Supplementary Guidance 10: Renewable Energy Page 2 Introduction 1.0 Introduction 1.1 This Supplementary Guidance was approved for consultation by South Lanarkshire Council at its meeting on 8th September 2015 and placed on public consultation for six weeks until 30 October 2015. Eighty five representations were received from eight contributing consultees. Background 1.2 This Supplementary Guidance (SG) has been prepared under the provisions of Section 22 of the Planning etc. (Scotland) Act 2006 and Regulation 27 of the Town and Country Planning (Development Planning) (Scotland) Regulations 2006. It forms part of the Development Plan for South Lanarkshire which consists of the Glasgow and the Clyde Valley Strategic Development Plan 2012 (SDP), the Minerals Local Development Plan 2012 (MLDP) and the South Lanarkshire Local Development Plan 2015 (SLLDP). 1.3 This SG supports Policy 19 Renewable Energy in the SLLDP by providing more detailed policy and guidance for developers on the requirements for wind energy and other renewable energy development. Assessments 1.4 A series of assessments informed the preparation of the SG.
    [Show full text]
  • 'C' Dumfries & Galloway Wind Farm Landscape Capacity Study
    Part 1 Wind Energy Development: Development Management Considerations Appendix ‘C’ Dumfries & Galloway Wind Farm Landscape Capacity DUMFRIES AND GALLOWAY COUNCIL Study Local Development Plan Supplementary Guidance Adopted 22nd June 2017 www.dumgal.gov.uk DUMFRIES AND GALLOWAY (turbines >150m) in selected upland landscapes already influence character and views, cumulative Executive Summary and considers scope for the repowering of issues likely to be associated with additional The Dumfries and Galloway Wind Farm Landscape existing wind farms involving replacement with development are identified and this informs the Capacity Study (DGWLCS) assesses the sensitivity substantially larger turbines. guidance set out for each landscape character type/ of landscape character types, and more locally area. Section C includes two supporting studies; a Detailed sensitivity assessments are based on defined character areas, to different sizes of wind review of the existing regional landscape character defined landscape character types/areas. However, turbine development. It also considers scope for assessment; and an assessment of opportunities for potential indirect effects on landscape character offshore wind energy developments, based on a repowering existing schemes with larger turbines and/or on views can extend over a wide area, regional coastal character assessment. The study and for introducing turbines in excess of 150m in including other nearby landscape character types/ was revised and updated in 2016 in response to the height. areas or in some cases adjacent authorities. As considerable amount of wind farm development a result, sensitivity assessments for individual Summary of Findings: The landscape of Dumfries in Dumfries and Galloway and the continuing proposals may need to consider both the ‘host’ and Galloway is notably diverse with the contrast demand for larger turbines.
    [Show full text]