London Development Building Opportunities East of City Autumn 2014
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Witness Statement of Stuart Sherbrooke Wortley Dated April 2021 Urbex Activity Since 21 September 2020
Party: Claimant Witness: SS Wortley Statement: First Exhibits: “SSW1” - “SSW7” Date: 27.04.21 Claim Number: IN THE HIGH COURT OF JUSTICE QUEEN’S BENCH DIVISION B E T W E E N (1) MULTIPLEX CONSTRUCTION EUROPE LIMITED (2) 30 GS NOMINEE 1 LIMITED (3) 30 GS NOMINEE 2 LIMITED Claimants and PERSONS UNKNOWN ENTERING IN OR REMAINING AT THE 30 GROSVENOR SQUARE CONSTRUCTION SITE WITHOUT THE CLAIMANTS’ PERMISSION Defendants ______________________________________ WITNESS STATEMENT OF STUART SHERBROOKE WORTLEY ________________________________________ I, STUART SHERBROOKE WORTLEY of One Wood Street, London, EC2V 7WS WILL SAY as follows:- 1. I am a partner of Eversheds Sutherland LLP, solicitors for the Claimants. 2. I make this witness statement in support of the Claimants’ application for an injunction to prevent the Defendants from trespassing on the 30 Grosvenor Square Construction Site (as defined in the Particulars of Claim). cam_1b\7357799\3 1 3. Where the facts referred to in this witness statement are within my own knowledge they are true; where the facts are not within my own knowledge, I believe them to be true and I have provided the source of my information. 4. I have read a copy of the witness statement of Martin Philip Wilshire. 5. In this witness statement, I provide the following evidence:- 5.1 in paragraphs 8-21, some recent videos and photographs of incidents of trespass uploaded to social media by urban explorers at construction sites in London; 5.2 in paragraphs 22-27, information concerning injunctions which my team has obtained -
Worthington Steel
Worthington Steel (Division of Worthington Industries) Historical Load Volume March - May, 2002 Carrier Weekly Estimated Truck ORIGIN DESTINATION DST Historical Load Volume Capacity BALTIMORE DECATUR AL 8 BALTIMORE BRISTOL CT 2 BALTIMORE FARMINGTON CT 1 BALTIMORE PLANTSVILLE CT 2 BALTIMORE SOUTHINGTON CT 7 BALTIMORE THOMASTON CT 5 BALTIMORE WATERBURY CT 6 BALTIMORE WATERTOWN CT 3 BALTIMORE WEST HAVEN CT 2 BALTIMORE WINSTED CT 2 BALTIMORE DOVER DE 1 BALTIMORE CARTERSVILLE GA 2 BALTIMORE COLUMBUS GA 1 BALTIMORE LAWRENCEVILL GA 1 BALTIMORE ROME GA 4 BALTIMORE ROYSTON GA 2 BALTIMORE ELK GROVE IL 3 BALTIMORE FRANKLIN IL 2 BALTIMORE FORT WAYNE IN 2 BALTIMORE GREENFIELD IN 0 BALTIMORE PORTER IN 1 BALTIMORE LOUISVILLE KY 2 BALTIMORE ATTLEBORO MA 3 BALTIMORE EAST MA 16 BALTIMORE FITCHBURG MA 1 BALTIMORE GARDNER MA 3 BALTIMORE S. ATTLEBORO MA 4 BALTIMORE SOUTH MA 4 BALTIMORE SOUTHWICK MA 2 BALTIMORE WORCESTER MA 26 BALTIMORE BALTIMORE MD 58 BALTIMORE COCKEYSVILLE MD 1 BALTIMORE CUMBERLAND MD 2 BALTIMORE HAMSTEAD MD 15 BALTIMORE JESSUP MD 29 BALTIMORE SEVERN MD 1 BALTIMORE SPARROWS MD 173 BALTIMORE TANEYTOWN MD 18 BALTIMORE WEST MD 35 BALTIMORE WESTMINISTER MD 6 BALTIMORE WESTMINSTER MD 56 BALTIMORE JACKSON MI 2 BALTIMORE KENTWOOD MI 5 BALTIMORE MONROE MI 3 BALTIMORE DENTON NC 2 Worthington Steel (Division of Worthington Industries) Historical Load Volume March - May, 2002 Carrier Weekly Estimated Truck ORIGIN DESTINATION DST Historical Load Volume Capacity BALTIMORE GASTONIA NC 23 BALTIMORE HAMILTON NC 4 BALTIMORE HIGH POINT NC 12 BALTIMORE NEWTON -
7.4 Report Of
Committee: Date:th Classification: Agenda Item No: Strategic Development 9 October 2008 Unrestricted 7.4 Report of: Title: Planning Application for Decision Corporate Director Development & Renewal Ref No: PA/08/1215 and PA/08/1217 Case Officer: (Duplicate Application) & Tim Porter PA/08/1218 and PA/08/1238 (Duplicate Application LBA) Ward(s): Blackwall and Cubitt Town 1. APPLICATION DETAILS Location: Wood Wharf, Preston’s Road, London Existing Use: Primarily light industrial, office and warehouse units. Also residential, indoor sporting facilities and a nursery. Proposal: PA/08/1215 and PA/08/1217(Duplicate Application) Hybrid application for comprehensive mixed-use redevelopment of Wood Wharf comprising: 1) Outline Application (all matters reserved, save for access & layout) • Demolition of dwellings at Lovegrove Walk; • Commercial floorspace (B1), up to 1668 residential units (C3), and hotel (C1) contained in fourteen buildings; • Retail (A1), financial services (A2), re staurants & cafes (A3), drinking establishments (A4) and takeaway establishments (A5); • Leisure & community uses (D1 & D2); • Associated infrastructure, including the creation of structures in Blackwall Basin and South Dock; • Principles of landscaping and public realm; • Means of access; • Bridge links; • Car, motorcycle and bicycle parking spaces, servicing; and • Electricity substation. 2) Full Application • Creation of canal and other engineering infrastructure. PA/08/1218 and PA/08/1238 (Duplicate Application LBA) Partial demolition of a small section of the s outhern dock wall to Blackwall B asin, for the creation of a new canal between South Dock and Blackwall Basin, and the introduction of piled foundations to anchor structures within the Basin, and othe r associated works as part of a comprehensive mixed use redevelopment of Wood Wharf. -
BPL2005AW Baltimore B XXZXX.Qxd:Layout 1 3/11/10 15:04 Page 1
BPL2005AW_Baltimore_B_XXZXX.qxd:Layout 1 3/11/10 15:04 Page 1 in the frame for a spectacular new Docklands residence and a new London icon. The fine art of waterfront living, a masterpiece of light, line and space. BPL2005AW_Baltimore_B_XXZXX.qxd:Layout 1 3/11/10 15:05 Page 2 part of the bigger picture The curtain is being raised on one of the most dynamic residential conceived for a private residence in Europe, and a much sought developments of the 21st century. Docklands’ newest star attraction after facility, its own Montessori Nursery. Be anywhere else you is more than just an apartment complex. This is a beautifully need to be with flawless, express connections to Canary Wharf, conceived future classic, created with exquisite attention to detail the West End, Paris and New York. This is the new heart of the city, and quality. Baltimore is a luxury lifestyle universe: a variety refracted through the lens of cutting-edge contemporary design of picture-perfect contemporary home designs, from the ultimate and impeccable construction, with a dramatic seven-storey pied à terre to a double-height duplex, set around a perfectly architectural aperture on the banks of one of the city’s most landscaped boulevard of clean lines and reflections within historic docks. Exciting, inspiring and serene, a home at Baltimore a sweeping curve of the Thames. Baltimore’s facilities include is the perfect investment and utmost convenience… the most ambitious and radical urban gym and leisure facility ever everything and anything you want it to be. BPL2005AW_Baltimore_B_XXZXX.qxd:Layout 1 3/11/10 15:05 Page 2 aatt thethe heheartart CCanaryanary Wh Wharf:arf: London London’s’s mos mostt iconic iconic financial difinancialstrict and districtone of the and world one’s of mo thest influentiworld’sal bumostsiness influential development business zones. -
Baltimore Tower
BALTIMORE TOWER CROSSHARBOUR LONDON E14 BALTIMORE TOWER An iconic new landmark for luxury living creating a new focus on Canary Wharf’s world famous skyline A JOINT DEVELOPMENT BY BALTIMORE TOWER Canary Wharf - a track record second to none BALTIMORE TOWER Canary Wharf is the hub of one of the most dynamic transport infrastructures in the world Residents at Baltimore Tower will connect within 2 minutes walk at Crossharbour connect from Crossharbour THE DLR JUBILEE LINE MAINLINE CROSSRAIL CABLE CAR THAMES RIVER BUS SOUTH QUAY HERON QUAYS CUTTY SARK CANARY WHARF This highly automated network London’s most advanced London Bridge handles over This new super highway across The new Emirates Airline links Canary Wharf south Canary Wharf central Greenwich and UNESCO Canary commerce, DLR, links the Capital’s financial tube line and service 54 million passengers a year the Capital will have an London’s largest entertainment and Plaza and shopping World Heritage Jubilee Line and Crossrail centres, Royal Greenwich and connects at Canary Wharf for with mainline and Thameslink interchange at Canary Wharf, venues - crossing the river in London City Airport in minutes. direct travel to Westminster services departing every 3 significantly cutting journey just 5 minutes with cars running and The West End. minutes. It is the fourth busiest times when operational from every 30 seconds. hub in the UK. 2017. Liverpool The Barbican Street Aldgate Canning Town Custom MINUTE MINUTES MINUTES MINUTES Limehouse 1 3 5 6 St Paul’s Cathedral House Fenchurch Tower Shadwell -
Asda Crossharbour District Centre
STRATEGIC DEVELOPMENT COMMITTEE 9th June 2021 Report of the Corporate Director of Place Classification: Unrestricted Application for Planning Permission Reference PA/19/02534 Site Asda – Crossharbour District Centre, 151 East Ferry Road, London, E14 3BT Ward Blackwall and Cubitt Town Proposal A hybrid planning application (part detailed, part outline) for the demolition of existing buildings and the comprehensive, mixed-use, re- development of the site, comprising a maximum of 218,991sqm (GEA) of floorspace. Full details are submitted for 526 residential units (Class C3), flexible commercial floorspace, including a new foodstore (17,087sqm GIA - A1-A4/B1), a primary school (D1), community uses (D1), public bus parking and a site wide basement, with associated uses as part of the development including car parking (up to 410 spaces), cycle parking, and an energy centre. Building heights would range between a maximum of 17.4m AOD (3 storeys above ground level) and 60m AOD (15 storeys above ground level). Creation of new vehicular and pedestrian access and public realm works, including all ground floor hard and soft landscaping and other works incidental to the proposals, including a programme of interim works (which include a temporary multi-storey car park with 349 car parking spaces and a temporary access lobby to the retail foodstore). Outline permission (with layout, scale, appearance and landscaping at upper levels being reserved) is sought for up to 111,137sqm GEA above podium level, comprising of between 1217 and 1446 residential units (C3), with associated private and communal podium amenity and landscaping, within four buildings with maximum heights ranging between up to 45.850m (AOD)/12 storeys and up to 115.50m (AOD)/32 storeys. -
REP-624580-007 Canary Wharf Group Hearing Statement Matter 10
Examination of the London Borough of Tower Hamlets Local Plan Schedule of Matters and Issues for the Examination Matter 10, Issue 10 Representor ID: 624580/Canary Wharf Group Plc 27 July 2018 Hearing Statement on behalf of Canary Wharf Group Plc (“CWG”) Matter 10: Site Allocations Issue 10: Are the Site Allocations justified by the evidence base and of sufficient detail so as to be effective in delivery? 1. This Hearing Statement relates to the North Quay Site Allocation (Site Allocation 4.9) and Wood Wharf Site Allocation (Site Allocation 4.13). The first part will consider North Quay against the Inspector’s questions, the second part Wood Wharf. NORTH QUAY 2. The North Quay site is owned by CWG has been subject to a recent (2017) planning application (LPA ref. PA/17/01193) for a mixed-use: office (up to 158,586m²), residential (up to 1,423 units), serviced apartments (up to 216 units), retail/restaurant (up to 25,213m²) and cultural/leisure (up to 2,391m²) development. This planning application was withdrawn in December 2017. 3. CWG have agreed a Statement of Common Ground (SoCG) with the London Borough of Tower Hamlets (LBTH) with respect to the North Quay site allocation text. There are however still certain outstanding issues, as set out in the SoCG, which we will expand upon in this Hearing Statement. We will present these in response to the questions that the Examiner has raised below. We will also respond to the other questions as necessary to help in the Examiner’s consideration of the site allocation. -
Iod Neighbourhood Basic Plan - Infrastructure Baseline Analysis V1 1St April 2019 Infrastructure Baseline Analysis for Planning Committee
IoD Neighbourhood Basic Plan - Infrastructure Baseline Analysis V1 1st April 2019 Infrastructure Baseline Analysis for Planning Committee Note negative numbers = gap to be filled. Positive numbers = No gap, excess capacity. tbc = to be added once up to date data sourced Demand = Current Population + Current Provision of Infrastructure Approved Planning Applications Gap to be Category / Type Measure Existing Consented Total Need filled % Gap Comments Education Nursery No. of forms of entry 15 9 24 63 (39) (62%) Number of nurseries 15 (0) 15 21 (6) (29%) Primary school No. of forms of entry 18 6 24 63 (39) (62%) Number of schools 10 3 13 21 (8) (38%) Secondary school No. of forms of entry 13 6 19 34 (16) (45%) Number of schools 2 1 3 6 (3) (47%) Special Education Provision No. of forms of entry 0 0 0 5 (5) (100%) Number of schools 0 0 0 2 (2) (100%) There are no Special Needs school in the area currently Health GP Surgery spaces Number of doctors 30 18 48 54 (6) (10%) NHS like new surgeries to be around 10 Doctors in size Pharmacy Number of pharmacy People 8 #VALUE!0 8 120 (4)8 (33%) Dentist Number of dentist 10 0 10 15 (5) (33%) Birthing centre Number of centre 1 0 1 1 (0) (33%) Proxy for other health services Open Space Publicly Accessible Open Space Hectares 21 6 27 116 (89) (77%) Playgrounds separate Square meters 580 tbc tbc 158,555 tbc up to date data to be sourced Library, Sports & Leisure Library ReQuirements Per square meter 1,382 0 1,382 2,893 (1,511)0 (52%) Does not include bigger Wood Wharf Idea store Swimming Pools Per square -
Wood Wharf London, United Kingdom
Wood Wharf London, United Kingdom Type of building: Office building, Residential building Clients and Developers: Canary Wharf Group, https://group.canarywharf.com/ Architect: Allies and Morrison Architects, http://www.alliesandmorrison.com/ Building contractor: O’Halloran & O’Brien Ltd, http://www.ohob.com/ Completion: Wood Wharf preview 2023 © CanaryWharfGroup, Wood Wharf SE Aerial preview 2014, CC BY-SA 4.0 Project link: MAX FRANK supplied Stremaform® concrete jointing system to Canary Wood Wharf Wharf’s new district. The use of Stremaform® enabled significant time and cost advantages to be achieved on-site. Extending to 23 acres, the Wood Wharf project represents one of central London’s largest privately owned development sites and is recognised as being of major importance on a local, national and international level. Project Architects include; Allies and Morrison, Darling Associates, KPF, Herzog & de Meuron, Stanton Williams Architects, Grid Architects, and Patel Taylor. Canary Wharf’s new district, Wood Wharf, has been designed by Allies and Morrison Architects and they have created a strong and complementary design, providing; mixed-use development, commercial offices, retail space, housing and inter-connected public space. The 1st phase includes Plot G3, constructed by O'Halloran & O'Brien, where MAX FRANK supplied Stremaform®. Stremaform® is a proven concrete to concrete jointing system which enables the Contractor to pour a sequence of concrete pours, whilst attaining an established concrete bond throughout the joint - ultimately -
One Park Drive Canary Wharf, London 1
One Park Drive Canary Wharf, London 1 One Park Drive, Canary Wharf, London The new residential district of Canary Wharf will be one of green garden spaces, riverside boardwalks and luxury waterfront living. The area is due to house 3,300 new homes, a school, parks and more. One Park Drive will be the signature building in this new destination located in the very heart of Canary Wharf, a vibrant, well-connected office, retail and nightlife area. The new district will be located just to the One Park Drive will begin as a freestanding east of the existing Canary Wharf Estate. landmark and is nothing short of an The expansion includes the redevelopment architectural triumph, designed by of 9.39 hectares of current brownfield sites. world-renowned architects Herzog & de When complete, it will incorporate Meuron. Eventually, it will form part of the 3.6 hectares of public space and gardens, streets, parks and wider urban area of this 2.7 million square feet of residential space new district in Canary Wharf. featuring 3,300 new homes, 2 million square feet of new office space and It is a unique building, designed to work 380,000 square feet of retail. on a human scale. One Park Drive is a singular building made up of three distinct zones. Each zone has its own characteristics but they work together to create an inimitable building. The three zones allow a sense of individuality in the larger development. West India Quay DLR North Dock Crossrail Place Elizabeth Line CYCLE HIRE CANADA Blackwall Basin WESTFERRY CABOT DLR ONE CANADA CHURCHILL CARTIER SQUARE SQUARE SQUARE PLACE CIRCLE CIRCUS Canary Wharf PARK DLR WOOD WHARF QUAY LOVEGROVE WALK BERNIERS Canary Wharf Canary Wharf PLACE Pier Jubilee Line Middle Dock UNION SQ. -
The Building Is Also in Close Proximity to Canary Wharf and Heron Quay (DLR) Stations with Crossrail Place Providing Elizabeth Line Services Later This Year
Exceptional opportunity 32,000 sq ft on one floor Fully fitted “plug and play” Best in class fit out designed by TP Bennett. Full FM support available Any length of lease up to 2030. Boardrooms and fine dining, by arrangement. Roof terrace for events, by arrangement. 01 Main reception Entrance Dramatic reception, with opportunity for dedicated subtenant desk position. Reception desk 02 Specification The high specification fitted out space offers forward thinking companies the perfect environment in which to perform and thrive. Ultimate flexibility on offer - from traditional lease to fully serviced. Leases available from 1 to 10 years. Meeting area Breakout area 03 Office area 389 adjustable Highly resilient Beautifully furnished One of the largest height workstations. services with break out, support displays of biophilia diverse, dual feed and staff amenity in a commercial power and standby spaces with workplace in generators. exposed services. the country. BREEAM rated 2.85m floor Occupancy: Full IT ‘Outstanding’. to ceiling height. 1:8 sq m. capability ready. 04 05 Open plan workstations 06 Accommodation / Amenities Wellness of staff has been considered at every point – with a light, spacious and bright workspace, along with a range of amenities expected by today’s occupiers. _ Far reaching City and river views. _ Cycle spaces. _ Changing room, showers and lockers. 2 person office Breakout area 07 0808 M R N / 1 1 / N R M B5 B4 B3 B2 B1 CRAC/SER/06/2/001CRAC/SER/06/2/002 FUTURE PDU PDU A FUTURE PDU PDU B CAB 4 CAB 3 CAB 2 CAB 1 1 / N MR M 1 / R N N/ R 1 M MR N / 1 MRN/1 MRN/1 1 / N R M M R N / 1 CAB 1 CAB 2 CAB 3 CAB 4 PDU PDUA FUTURE PDU PDUB FUTURE GL1 GL2 CRAC/SER/06/1/001 CRAC/SER/06/1/002 FD FD FL 1 / N MR /1 N R M 2 3 7 8 6 3 4 1 398 Core North Floor For indicative purposes only. -
London Offices Crane Survey Sentiment Remains Positive
London Offices Crane Survey Sentiment remains positive Winter 2012 To start a new section, hold down the apple+shift keys and click to release this object and type the section title in the box below. Market overview This latest Crane Survey records a pause in the large increases in construction activity we have been reporting over the last eighteen months. However, whilst lower than the last survey, the volume of new starts over the last six months suggests that developers and investors still have confidence in the returns available in the London office market. 2012 Winter – Office space under construction Total U/C (sq ft) Let U/C (sq ft) Available U/C (sq ft) City 4,081,000 1,020,000 3,061,000 Docklands 540,000 250,000 290,000 King’s Cross 474,000 272,000 202,000 Midtown 607,000 45,000 562,000 Paddington 31,000 31,000 0 Southbank 994,000 106,000 888,000 West End 2,308,000 476,000 1,832,000 Total 9,035,000 2,200,000 6,835,000 Office space under construction Million sq ft 4.5 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 City Docklands King’s Cross Midtown Paddington Southbank West End 12 months ago (Winter 2011) 6 months ago (Summer 2012) Today (Winter 2012) 2 To start a new section, hold down the apple+shift keys and click to release this object and type the section title in the box below. With the volume of new starts matching the completion Helping sustain confidence in the development market levels recorded since the last survey the total amount of is the continued flow of encouraging news detailing space under construction has remained relatively flat; leasing activity at the schemes under construction.