Road Traffic (Special Speed Limits) (County of Offaly) Bye- Laws 2017

Total Page:16

File Type:pdf, Size:1020Kb

Road Traffic (Special Speed Limits) (County of Offaly) Bye- Laws 2017 Road Traffic (Special Speed Limits) (County of Offaly) Bye- laws 2017 Offaly County Council in exercise of the powers conferred on them by Section 9 of the Road Traffic Act, 2004 (No. 44 of 2004), and with the consent of the National Roads Authority, hereby make the following bye-laws in respect of the area comprising the administrative County of Offaly. 1. These bye laws may be cited as the Road Traffic (Special Speed Limits) (County of Offaly) Bye Laws, 2017. 2. These bye-laws shall come into operation on the January 19th 2018. 3. In these byelaws. "the Act of 1993" means the Roads Act, 1993 (No. 14 of 1993); "the Act of 1994" means the Road Traffic Act, 1994 (No. 7 of 1994); “the Act of 2004” means the Road Traffic Act, 2004 (No.44 of 2004); "distance" means distance measured along the centre line of the road; "the Minister" means the Minister for Transport, Tourism and Sport; “motorway” has the meaning assigned to it by the Act of 1993: "national road" has the meaning assigned to it by the Act of 1993; "perimeter road" means a road on and along the roadway of which there runs the boundary of a built up area; "road" means a public road and includes a motorway; “special speed limit” as defined in Section 9 of the Act of 2004 shall be the speed limit for mechanically propelled vehicles on the roads specified in the schedule to these Bye-Laws. 4. Twenty kilometres per hour shall be the speed limit for mechanically propelled vehicles on roads specified in the First Schedule to these bye laws. 5. Thirty kilometres per hour shall be the speed limit for mechanically propelled vehicles on roads specified in the Second Schedule to these bye laws. 6. Forty kilometres per hour shall be the speed limit for mechanically propelled vehicles on roads specified in the Third Schedule to these bye laws. 1 7. Fifty kilometres per hour shall be the speed limit for mechanically propelled vehicles on roads specified in the Fourth Schedule to these bye-laws. 8. Sixty kilometres per hour shall be the speed limit for mechanically propelled vehicles on roads specified in the Fifth Schedule to these bye-laws. 9. Eighty kilometres per hour shall be the speed limit for mechanically propelled vehicles on roads specified in the Sixth Schedule to these bye laws. 10. One hundred kilometres per hour shall be the speed limit for mechanically propelled vehicles on roads specified in the Seventh schedule to these bye-laws. 11. One hundred and twenty kilometres per hour shall be the speed limit for mechanically propelled vehicles on roads specified in the Eighth schedule to these bye-laws. 12. Fifty kilometres per hour (for specified periods) shall be the speed limit for mechanically propelled vehicles on roads specified in the Ninth schedule to these bye-laws. This speed limit is a Periodic Speed Limit at schools and is prescribed during Term time at specific periods. 13. Any cul-de sac or housing estate (other than private roads and estates), which is accessed off a road with a special speed limit, will by default possess the same special speed limit, unless otherwise stated in one of the schedules above. 14. Exceptions: The following shall be excepted from the special speed limits prescribed in these Bye-Laws:- Ambulances. Fire brigade vehicles. Vehicles used by members of the Garda Síochana in the performance of their duties as such members. 15. The Road Traffic (Speed Limits) (County of Offaly) Regulations, 2011 with Amendments (2016) Housing Estates in County Offaly are hereby revoked with the following exceptions: Roads in the County of Offaly in respect of which a special speed limit of 50 kilometres per hour is prescribed. The following roads at Killeigh (Map (047):- a) The Tullamore road (N80) at Killeigh for a distance of 415 metres west of the junction with the Ballinagar road. The following roads at Ferbane (Map (039):- a) The Athlone – Birr road (N62) at Ferbane from a point 1055 metres north east of the junction with the Ferbane Relief road to a point 115 metres north of the junction with the Gallen View housing estate. 2 Roads in the County of Offaly in respect of which a special speed limit of 60 kilometres per hour is prescribed. The following roads at Tullamore (Map (040):- a) The Portlaoise road (N80) for a distance of 295 metres south of the 50km/h limit. Roads in the County of Offaly in respect of which a special speed limit of 80 kilometres per hour is prescribed. The following roads at Fivealley (Map (040):- The N52 at Fivealley for a distance of 940 metres south west of the Galros road to a point 488 metres north east of the said junction. 3 INDEX OF SCHEDULES 1st Schedule: Roads in the County of Offaly in respect of which a special speed limit of 20 kilometres per hour is prescribed. Page 5 2nd Schedule: Roads in the County of Offaly in respect of which a special speed limit of 30 kilometres per hour is prescribed. Page 6-12 3rd Schedule: Roads in the County of Offaly in respect of which a special speed limit of 40 kilometres per hour is prescribed. Page 13 4th Schedule: Roads in the County of Offaly in respect of which a special speed limit of 50 kilometres per hour is prescribed. Page 14-39 5th Schedule: Roads in the County of Offaly in respect of which a special speed limit of 60 kilometres per hour is prescribed. Page 40-45 6th Schedule: Roads in the County of Offaly in respect of which a special speed limit of 80 kilometres per hour is prescribed. Page 46-47 7th Schedule: Roads in the County of Offaly in respect of which a special speed limit of 100 kilometres per hour is prescribed. Page 48 8th Schedule: Roads in the County of Offaly in respect of which a special speed limit of 120 kilometres per hour is prescribed. Page 49 4 FIRST SCHEDULE Roads in the County of Offaly in respect of which a special speed limit of 20 kilometres per hour is prescribed. NONE. 5 SECOND SCHEDULE Roads in the County of Offaly in respect of which a special speed limit of 30 kilometres per hour is prescribed. The following roads in the town of Ballinagar (Map 002): 1. Brookfield Rise. 2. Curragh Hill. 3. Pairc na hEornan. The following roads in the town of Ballycumber (Map 006): 1. Twickenham. 2. Sycamore Drive. The following roads in the town of Banagher (Map 008): 1. Ard Abhainn. 2. Birr Road Estate. 3. Church Street & Kylebeg. 4. Cluain Alainn. 5. Cluain Rynagh. 6. Cuba Ave. Estate. 7. Cuba Avenue (L-30101) & Cuba Cottages. 8. Middle Road Estate. 9. Shannonview. The following roads in the town of Belmont (Map 010): 1. Beechgrove. The following roads in the town of Birr (Map 011): 1. Ashbrook Drive. 2. Bengal Lodge. 3. Bulfin Park. 4. Burkes Hill. 5. Cappaneale Park. 6. Castlecourt. 7. Compton Gardens. 8. Demesne View. 9. Elm Park. 10. Fairview. 6 11. Forest View. 12. Highgate. 13. Hollypark Avenue. 14. Hollypark Drive. 15. McAuley Drive. 16. Meadow Brook. 17. Meadow Court. 18. Meadow Ville. 19. Parkrise. 20. Presentation Place. 21. Sandymount. 22. Sandymount Avenue. 23. Sandymount Crest. 24. Sandymount Haven. 25. Sandymount View. 26. Sandymount Way. 27. Scurragh. 28. Seffin (Liffeys site). 29. Westgate. 30. Woodlands Park. 31. Woodlane. 32. Woodlane Close. 33. Woods Row. The following roads in the town of Bracknagh (Map 015): 1. St.Broughans Park. 2. Beechwood Estate. The following roads in the town of Clara (Map 020): 1. Beechmount Avenue. 2. Cluain Fia. 3. Collinstown. 4. Cork Hill. 5. Erry Mill. 6. Esker Court. 7. L-60143. 8. L-60144. 9. L-6017. 10. L-60173. 11. Marian Square. 12. Oakview. 13. Railway View. 14. Silverdale Estate. 15. Station Road. 16. The Green. 7 The following roads in the town of Cloghan (Map 022): 1. Banagher Street. 2. Hill Road Estate. 3. Cluain na Spideoga. The following roads in the town of Clonbullogue (Map 023): 1. Woodlawn Estate. The following roads in the town of Cloneygowan (Map 024): 1. Ashmount View. 2. New houses (Serviced Sites). The following roads in the town of Crinkle (Map 030): 1. Cribben Terrace. 2. Grove Street. 3. Hawthorn Drive. 4. Hillbrook View. 5. Leinster Villas. The following roads in the town of Daingean (Map 032): 1. Castlecourt. 2. Chestnut Gardens. 3. Coologue. 4. Fortfield Drive. 5. Fr.Mullen Drive. 6. Meadow Court. 7. Snugborough. 8. St.Marys Terrace. The following roads in the town of Dernagun (Map 033): 1. Brosna View. 2. St.Manchans Estate. 8 The following roads in the town of Edenderry (Map 038): 1. Assumption Road. 2. Blundell Wood. 3. Boyne Meadows. 4. Carraig Aoibhinn. 5. Carrick Esker. 6. Castleview Park. 7. Churchview Heights. 8. Clonmeen Rise. 9. Clonmullen Court. 10. Clonmullen Drive. 11. Cul de Sac Killane (L-10272). 12. Cul de Sac Marys Road (L-10049). 13. Derrycorris. 14. Fairgreen. 15. Fr.Killian Cresent. 16. Gilroy Avenue. 17. Glenn na Carraig. 18. Greenwood Park. 19. Kileden Lawns. 20. Killane Drive. 21. Killane View. 22. Sr.Senan Avenue. 23. St.Colmcilles Road. 24. The Manor. 25. The Sycamores. 26. Woodfield Park. The following roads in the town of Ferbane (Map 039): 1. Ballyvora Grove. 2. Cluny / Gallen Demesne. 3. Delvin Park. 4. Gallen View. 5. Knockaulin Drive. 6. St.Cynocs Terrace. 7. The Avenue, Ballyclare. The following roads in the town of Geashill (Map 042): 1. Ard Riada.
Recommended publications
  • Public-Private Partnerships Financed by the European Investment Bank from 1990 to 2020
    EUROPEAN PPP EXPERTISE CENTRE Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Public-private partnerships financed by the European Investment Bank from 1990 to 2020 March 2021 Terms of Use of this Publication The European PPP Expertise Centre (EPEC) is part of the Advisory Services of the European Investment Bank (EIB). It is an initiative that also involves the European Commission, Member States of the EU, Candidate States and certain other States. For more information about EPEC and its membership, please visit www.eib.org/epec. The findings, analyses, interpretations and conclusions contained in this publication do not necessarily reflect the views or policies of the EIB or any other EPEC member. No EPEC member, including the EIB, accepts any responsibility for the accuracy of the information contained in this publication or any liability for any consequences arising from its use. Reliance on the information provided in this publication is therefore at the sole risk of the user. EPEC authorises the users of this publication to access, download, display, reproduce and print its content subject to the following conditions: (i) when using the content of this document, users should attribute the source of the material and (ii) under no circumstances should there be commercial exploitation of this document or its content. Purpose and Methodology This report is part of EPEC’s work on monitoring developments in the public-private partnership (PPP) market. It is intended to provide an overview of the role played by the EIB in financing PPP projects inside and outside of Europe since 1990.
    [Show full text]
  • Inspector's Report ABP-302034-18
    Inspector’s Report ABP-302034-18 Development Photovoltaic Farm Location Toberoe, Caraunduff, Caherbriskaun & Rathmorrissy, Athenry Co Galway. Planning Authority Galway County Council Planning Authority Reg. Ref. 171538 Applicants Soleirtricity Ltd Type of Application Permission Planning Authority Decision Refuse Permission Type of Appeal First Party Appellants Soleirtricity Ltd Date of Site Inspection 28 September 2018 Inspector Dolores McCague ABP-302034-18 Inspector’s Report Page 1 of 39 1.0 Site Location and Description 1.1.1. The site is located at the townlands of Toberroe, Caraunduff, Caherbriskaun and Rathmorrissy c 4km west of Athenry, County Galway. The site is west of and adjoining the recently constructed M18 motorway and south of and adjoining the recently constructed M6 motorway. The site is south west of and adjoining the major grade separated interchange between the M17/M18 and M6 motorways at Rathmorrissy. Rathmorrissy junction is a three level motorway to motorway interchange with a 1km circulatory carriageway. The interchange comprises the M6 east-west, at the lowest level, the roundabout at the middle level and the north-south M17/M18 at the highest level. The M17/M18 is at a similar or lower level to the site at the southern end but is higher than the site at the northern end, where it is elevated to join the M6, the roundabout, and to cross above the junction. Along the north of the site the slip road joining the M6 is above the level of the site at the eastern end but the M6 is at a similar level to the site at the western end.
    [Show full text]
  • Annual Report 2013
    NationalNa Development Finance Agency NationalNa Development Finance Agency National Development Finance Agency Finance Development National Annual Report 2013 Annual ReportAnnual 2013 National Development Finance Agency Treasury Building Grand Canal Street Dublin 2 Ireland Tel: 353 1 283 4000 Email: [email protected] Web: www.ndfa.ie This report is printed on recycled paper. Contents NDFA – Role and Functions 4 Overview 2013 6 Infrastructure Debt Funding 10 Progress on Projects where NDFA Acts: As Procuring Authority, Financial Advisor & Contract Manager 12 As Financial Advisor 22 Governance 29 Appendices List of State Authorities 31 Financial Statements 32 Gníomhaireacht Náisiúnta d’Fhorbairt Airgeadais National Development Finance Agency 27 June 2014 28 June 2013 Mr. MichaelMr. Michael Noonan, Noonan, TD TD MinisterMinister for Finance for Finance GovernmentGovernment Buildings Buildings UpperUpper Merrion Merrion Street Street DublinDubin 2 2 Dear Minister,Dear Minister, I have Ithe have honour the honour to submit to submit to youto you the the Report Report and and AccountsAccounts of of the the National National DevelopmentDevelopment Finance Finance Agency Agency for for the the year year from from 1 1 January January 20122013 to to 31 31 December December 2012. 2013. Yours sincerely, Yours sincerely, John C. Corrigan Chairman John C. Corrigan Chairman Foirgneamh an Chisteáin, Sráid na Canálach Móire, Baile Átha Cliath 2, Éire Treasury Building Grand Canal Street, Dublin 2, Ireland Guthán 353 1 664 0800 Facs 353 1 676 6582 Telephone
    [Show full text]
  • Tullamore 29 Acres 14/06/2016 12:49:38 BALLYDUFF TULLAMORE, CO
    TULLAMORE, CO. OFFALY FOR SALE ‐ APPROX. 28.82 ACRES OF ZONED DEVELOPMENT LAND Tullamore 29 Acres 14/06/2016 12:49:38 BALLYDUFF TULLAMORE, CO. OFFALY For Sale ‐ Approx. 28.82 Acres of Zoned Development Land Location The subject lands are situated off the R420 Clara Road, approx. 2.5km north‐west of Tullamore Town Centre. Tullamore lies on the N52 national secondary road which connects the town with Birr ﴾southwest﴿ and Mullingar ﴾northeast﴿. Furthermore, the subject lands are approx. 9km from Junction 5 of the M6 Motorway which provides excellent access to both Dublin ﴾eastbound﴿ and .﴿Galway ﴾westbound Addtionally, the town enjoys excellent transport links being well serviced by both private and public bus companies while Tullamore Railway Station also provides convenient rail services with routes to Dublin, Galway, Westport and Ballina. Major employers in the town include Offaly County Council, Midlands Regional Hospital, Department of Agriculture, Food & Marine and the Department of Education & Skills. Tullamore Town Centre > 2.5km Tullamore Railway Station > 3km M6 Motorway > 9km Mullingar > 37km Portlaoise> 38km Tullamore 29 Acres 14/06/2016 12:49:38 BALLYDUFF TULLAMORE, CO. OFFALY For Sale ‐ Approx. 28.82 Acres of Zoned Development Land Description .The lands extend to approx. 28.82 acres ﴾Parcel 1 ‐ approx acres and Parcel 2 ‐ approx. 18.13 acres﴿ separated by a 10.69 local cul‐de‐sac road. The lands are flat in nature and the majority are divided by mature hedgerows and fencing. Parcel 1 benefits from approx. 260m of road frontage onto the R420 Clara Road and approx. 240m onto the cul‐de‐sac.
    [Show full text]
  • To Download Why You Should Do Business
    MIDLANDS LONGFORD, WESTMEATH, OFFALY, LAOIS Sligo within 90 mins 2 2 Dundalk within 90 mins 2 LONGFORD Maynooth within 90 mins 5 MULLINGAR Dublin City within 90 mins REGIONALREGIONAL ATHLONE CENTRECENTRE 2 9 TULLAMORE Galway City 10 within 90 mins PORTLAOISE Limerick City within 90 mins 3 Rosslare within 150 mins 3 9 Cork City within Waterford City 120 mins within 90 mins 2 2 10 WHO’S WITHIN REACH* 30 MIN 60 MIN 90 MIN LEGEND Key Town Research & Innovation Centre Population 472,610 2,106,011 3,725,208 National Roads IDA Business & Tech Park Motorways 3rd Level Institutions Labour Force 187,414 896,883 1,585,133 Railroad Midlands Region 3rd Level Qualified 66,081 370,194 706,603 Railway Station Drive time catchment REGIONAL International Airport CENTRE Athlone Regional Centre Students 37,952 186,953 335,702 International Sea Port Irish Manufacturing Research *Based on Resident Population of underlying Census 2016 Electoral Division data and assessed travel-time catchments by car from 5 major settlements. © Midlands Ireland 2020. Analysis and Design by Future Analytics Consulting GATEWAY CONNECTIVITY HUB IN THE NATIONAL HEARTLAND MIDLANDS Home to 292,301 people covering over 6,500 square 292,301 kilometres, the Midlands is centrally located in the heartland of the country, creating a dynamic and connected core. The LONGFORD Midlands is a key employment region containing many working 40,873 hubs in key towns; Longford, Athlone, Mullingar, Portlaoise and Tullamore. With Athlone town being the regional driver there is also a distribution of employment centres throughout WESTMEATH the neighbouring counties.
    [Show full text]
  • Transport Infrastructure Ireland
    Transport Infrastructure Ireland Annual Report and Financial Statements Annual Report and Financial Statements 2018 1 River Barrow Bridge, N25 New Ross Bypass PPP Scheme, Wexford, Ireland 2 Annual Report and Financial Statements 2018 Glossary CAD Computer Aided Design CAV Connected and Autonomous Vehicles CCMA County and City Management Association CEDR Conference of the European Directors of Roads DPER Department of Public Expenditure and Reform DTTaS Department of Transport, Tourism and Sport EIB European Investment Bank EIS Environmental Impact Statement NRA National Roads Authority NTA National Transport Authority MMaRC Motorway Maintenance & Renewals Contract (Contractors) PPP Public Private Partnership RPA Railway Procurement Agency SEAI Sustainable Energy Authority of Ireland TII Transport Infrastructure Ireland Annual Report and Financial Statements 2018 About this Report The Annual Report and Financial Statements for 2018 provides a brief overview of Transport Infrastructure Ireland (TII) and our strategy to provide, operate and maintain national road and light rail infrastructure. The report is intended to provide information to our stakeholders regarding TII’s financial statements, strategy and governance framework. Our reporting approach on our activities focuses on providing a clear view of TII’s accomplishments during 2018 and the goals set for 2019. The information in this report has been prepared in accordance with the Code of Practice for the Governance of State Bodies (2009). Annual Report and Financial Statements 2018
    [Show full text]
  • An Bord Pleanala
    An Bord Pleanála Ref.: PL07.246274 An Bord Pleanála Inspectors Report Development: Use of land as a burrow pit for the extraction of stone and gravel from a parcel of land measuring 1.1ha, for use as fill material on the adjoining N17/N18 Gort to Tuam motorway which is currently under construction. The depth of extraction is up to 4.2m. Access to the burrow pit will be directly off the N17/N18 Gort to Tuam motorway and the land will be remediated and returned to agricultural grassland upon completion of the works.at Greethill townland, Athenry, Co. Galway. Planning Application Planning Authority: Galway County Council Planning Authority Reg. Ref. 15/1546 Applicant: John Sisk & Son Type of Application: Permission Planning Authority Decision: Refuse Planning Appeal Appellant(s): John Sisk & Son Observers: An Taisce DAU of D.EH&G Type of Appeal: First Party Date of Site Inspection: 17/05/2016 and 18/05/2016 Inspector: Gillian Kane PL07.246274 An Bord Pleanála Page 1 of 32 1.0.0 SITE LOCATION AND DESCRIPTION 1.0.1 The subject site is an elevated, greenfield site, in a remote locate approx. 5km south-west of Athenry in Co. Galway. The site is not directly accessible from the public road, access is currently via a temporary construction road off the local country road running to the east of the subject site and linking the R347 with the R446. The subject site is approx. 100m to the east of the currently under construction N17/M18 Gort to Tuam Road project. 1.0.2 The site is currently in overgrown grassland, with dense patches of hedgerow, a sparse belt of trees along the southern boundary, a number of access dirt tracks throughout and sections of stone wall along the boundaries.
    [Show full text]
  • How the West Was One
    How the West Was One N17N18 Gort to Tuam PPP Scheme Project Background And Pavement Aspects Outline of Presentation Overview of Project John Crowley DirectRoute Tuam (Construction) Ltd. Design and Construction Eamon Daly Challenges CH2M Barry Pavement Aspects David Fanthorpe CH2M Barry N17/N18 Gort To Tuam PPP Scheme N17 Tuam Bypass CPO 2005 M17 Galway Tuam CPO 2007 Combined as one PPP Scheme -N17 Tuam Bypass 4km M18 Oranmore Gort -M17 Galway-Tuam 26km CPO 2006 -M18 Oranmore-Gort 27km 57km N17/N18 – History of Project - 1 • 3 Separate Projects • 3 Separate Statutory Process Approvals • N18 D&B Tender Process 2008 • D&B Tender Process not completed due to economic downturn N17/N18 – History of Project - 2 • 3 Projects combined into single PPP Project • Procurement commenced Spring 2009 • 4 PPP Consortia Prequalified • Stage 1 Submissions November 2009 • Stage 2 BAFO Submission August 2010 - Preferred Bidder No 1 • Second BAFO Submission August 2011 - Preferred Bidder No 2 • Procurement Suspended and Reopened • Financial Close - April 2014 N17/N18 Delivery Programme • Financial Close April 2014 • Mobilisation, Advance Work & April–Dec 2014 Detailed Design • Construction Start January 2015 • N17/N18 Motorway Opening Q4 2017 • Operation & Maintenance 2017 - 2042 N17/N18 – PPP Model • 25 year concession period (2017-2042) • Private sector designs, builds, finances and operates (incl. maintenance) the Project Road • Private sector funds construction • PPP Co. receives availability payments over 25 years • Road returns to public sector with prescribed
    [Show full text]
  • And Residential Tenancies Act 2016 Inspector's
    S. 4(1) of Planning and Development (Housing) and Residential Tenancies Act 2016 Inspector’s Report ABP-309253-21 Strategic Housing Development 104 no. houses and associated site works. Location Cosmona, Loughrea, Co. Galway. (www.cosmonaloughreashd.com) Planning Authority Galway County Council Applicant Rocktop Asset Management Ltd. Prescribed Bodies Irish Water Observer(s) Aidan McCurtin Alan Docherty Angeline Ryan Ann Beirne Anne Scott and Others ABP-309253-21 Inspector’s Report Page 1 of 121 Anthony Ryan and Maureen Lynch Cois Furain Residents Group Colm Flannery Diane Charleton Donnellan Drive Residents Committee Evelyn Doyle Evelyn O’Donnell and John Howard Finbarr and Anne O’Shea Fiona and Paul Duane Gaelscoil Riabhach Galway Cycling Campaign, c/o Neil O’Leary James and Deirdre McDonnell James and Eimear Regan Linda and James Sheil Louise Reynolds Mark Foster and Sharon Cunningham Michael and Marie Kelly Michelle and Colm Doherty Mile Casey Mona Monahan Oliver and Meabhdh Foudy Paul Cunningham Thomas Hepworth and Oriana O’Reilly TJ Coyle Tom Murtagh and Felizardo Galura Tony Ryan Date of Site Inspection 17th April 2021 ABP-309253-21 Inspector’s Report Page 2 of 121 Inspector Una O'Neill ABP-309253-21 Inspector’s Report Page 3 of 121 Contents 1.0 Introduction .......................................................................................................... 5 2.0 Site Location and Description .............................................................................. 5 3.0 Proposed Strategic Housing Development .........................................................
    [Show full text]
  • Inspectors Report
    An Bord Pleanála Inspector’s Report PL07.240168 PROPOSED DEVELOPMENT: • Retention of use of site as a compound and loading bay for the storage and distribution of limestone blocks. • Retention and improvement of field access to form commercial access serving compound for retention. LOCATION: Curragh, Clonmacowen By, Aughrim, County Galway. PLANNING APPLICATION Planning Authority (P.A.): Galway County Council P.A. Reg. Ref.: 11/984 Applicants: Brendan Dervan & Donal McLoughlin Application Type: Permission P.A. Decision: Grant permission subject to conditions PLANNING APPEAL Appellant: An Taisce Type of Appeal: 3rd party – v – grant Site Inspection: 8 May 2012 Appendices: Photographs and Key Map; Site Location Sketch. ___________________________________________________________________________ PL07.240168 An Bord Pleanála Page 1 of 14 1.0 INTRODUCTION 1.1 This is a third party appeal against the decision of the Planning Authority, Galway County Council, to grant permission subject to conditions for retention of a “storage compound” in a rural area adjoining the main Ballinasloe-Aughrim Road (old N6), a short distance east of Aughrim. 1.2 There is a planning history to the site, associated initially with the construction of the M6 Motorway in the mid/late 2000’s. The history is set out in the relevant section (3.0) of my report, below. 1.3 The current planning application is stated to have been the subject of a formal pre- application consultation with Planning Authority personnel in May 2011. 1.4 During the course of processing the current planning application, there was an extension of time confirmed for the making of a decision (confirmed in September 2011: decision postponed to January 2012).
    [Show full text]
  • European Electronic Toll Service (EETS)
    Department of Transport, Ireland National Electronic Register for the European Electronic Toll Service National Electronic Register for the European Electronic Toll Service European Electronic Toll Service (EETS) The objective of EETS is to aims enable road users to use by means of a single contract and a single on-board unit, to pay in all EETS domains throughout the whole European Union where tolls are levied electronically. EETS is based on the 'Directive 2004/52/EC of the European Parliament and of the Council of 29 April 2004 on the interoperability of electronic road toll systems in the Community', the 'Commission Decision of 6 October 2009 on the definition of the European Electronic Toll Service and its technical elements' which further elaborates on the Directive, and ‘Directive (EU) 2019/520 of the European Parliament and of the Council of 19 March 2019 on the interoperability of electronic road toll systems and facilitating cross-border exchange of information on the failure to pay road fees in the Union’. EETS National Electronic Register In accordance with Article 21 of the Directive (EU) 2019/520, Member States are to keep a national electronic register containing information on the EETS domains within their territories as well as EETS providers to whom they have granted registry. This register was put in place from 16th January 2012 and will be updated as and when required. Last updated: 23/10/2020. The Department of Transport explicitly states that the information contained in this national register may be subject to change in the future. Entities identified as Toll Chargers in this register can be removed from the register.
    [Show full text]
  • Correspondence, Michael Nolan, CEO, Transport Infrastructure Ireland
    THBonneagar lompai r Eireann Ms Margaret Falsey Committee Secretariat Committee of Public Accounts Houses of the Oireachtas Kildare House Dublin 2 Data IDate Ar dTag I Our Ref. Bhur dTag IYour Ref. 25th July 2018 PAC32-l-769 Dear Ms Falsey, Circular 06/2018 from the Department of Public Expenditure & Reform allows for the publication of completion reports (post project reviews) which have been undertaken in respect of national roads PPP projects. Tll has completed these reports on ten PPP schemes and these consolidated reports are now being made available. A briefing note outlining the origins of Tll's PPP Programme, the scheme evaluation process undertaken and the main findings from the completion reports has been prepared and also included. Please note that the post project reviews represent internal Tll reports and as such, they were not prepared to a publication standard. These reports have now been checked with errata sheets inserted where required. For reasons of transparency the original completion reports have not been modified, save for redactions made for continuing commercial reasons. Tll has no objection to the publication of attached document on the Committee Oireachtas website. Yours sincerely, Michael Nolan Chief Executive eonneagar tompalr !:lreann Transpon Infrastructure Ireland lonad Ghn6 Gheata na Pairce Parkgate Business Centre cm [email protected] l) www.tii.ie g +353 (0)1 646 3600 ~ +353 (0)1 646 3601 Snlid Gheata na Pairce Parkgate Street Balle Atha Cliath 8 Dublin 8 D08DK10 D08DK10 Public Private Partnership Post Project Reviews 25th July 2018 Page 1 of 5 For Information Table of Contents 1.
    [Show full text]