(MOWRC/R/T/20/00187) िदनांक 11/09/2020 द्वारा मांग ी गई सूच Fi
Total Page:16
File Type:pdf, Size:1020Kb
File No.I-12011/74/2020-WPP Coord. 413 I/31084/2020(1) भारत सरकार Government of India जल शिक मंतालय Ministry of Jal Shakti जल संसाधन नदी िवकास एवं गंगा संरकण िवभाग केदीय जल आयोग Deptt. of Water Resources, RD&GR जल आयोजन एवं पिरयोजनासमनवय िनदेशालय Central Water Commission WP&P COORDINATION DIRECTORATE िवषय: सूचना का ᔧिधकार, 2005 के ᔧंतगर्गत Shri Rupesh Siddamshetty, 2-5-18, Gandhi Chowk, Banswada, Dist: Kamareddy, Telangana, Pin- 503187 Email: [email protected] के िदनांक 14-09-2020 का आवेदन CWCND/R/T/20/00084 (MOWRC/R/T/20/00187) िदनांक 11/09/2020 द्वारा मांगी गईसूचना केसंबंध मे। (Information sought under RTI Act by Shri Rupesh Siddamshetty, 2-5-18, Gandhi Chowk, Banswada, Dist: Kamareddy, Telangana, Pin- 503187 vide RTI application No CWCND/R/T/20/00084 (MOWRC/R/T/20/00187) Dt 11/09/2020 ±reg) With reference to above RTI Application, which is received in this office on dt 14-09-2020 on transfer from Under Secretary & Nodal for RTI, CWC, New Delhi, vide his email dt 14-09-2020 the point wise information, as available in WP&P Wing of CWC, is as under: S. Information asked Reply No. Needs details of Kaleshwaram Project 1 How many parts are there in The Project has no parts. But it consists of seven links as mentioned in this Project? the DPR : Link-I From Medigadda Barrage on Godavari River to Sripada Yellampally Project. Link-II From Sripada Yellampally Project to Mid Manair Reservoir (Package 6,7 &8). Link-III From Mid Manair Reservoir to Upper Manair Reservoir (Package 9). Link-IV From Mid Manair Reservoir to Konda Pochamma Reservoir (Package 10,11,12,13 & 14). Link-V From Anicut to Chityala (Package 15 & 16). Link-VI From Sri Komaravelly Mallana Sagar to Singur Reservoir (Package 17, 18, 19,23,24,25 & 26). Link-VII From SRSP Foreshore to Nizam Sagar Canals (Package 20&21) and to Dilwapur (Package 27) and Hangarga (Package 28) village for Nirmal and Mudhole Constituency. From Sri Komaravelly Mallana Sagar to Bhoompally Reservoir (Package 22). 2 How many dams and barrages? There are 5 existing online balancing reservoirs from other - Please name each of them. projects and 20 new online reservoirs as detailed below : Existing Online Balancing Reservoirs (other projects). 1. Sripada Yellampally Barrage. 2. Mid Manair Reservoir. 3. Upper Manair Reservoir. 4. Kadam Project. 5. Masani Tank. Proposed Online Reservoirs. 1. Barrage at Medigadda. 2. Barrage at Annaram. 3. Barrage at Sundilla. 4. Medaram Reservoir. 5. Ananthagiri Reservoir. 6. Sri Ranganayaka Sagar(Imamabad Reservoir) 7. Sri Komaravelly Mallana Sagar (Tadkapally). 8. Malkapet Reservoir. 9. Konda Pochamma Reservoir (Pamulaparthy). 10. Amarlabanda Reservoir. 11. Katchapur. 12. Thimmakka Palli. 13. Issaipet. File No.I-12011/74/2020-WPP Coord. 414 I/31084/2020(1) 14. Bhumpally Reservoir. 15. Gujjal Reservoir. 16. Katewadi Reservoir. 17. Mothe Reservoir. 18. Kondem Cheruvu. 19. Gandhamalla Reservoir. 20. Baswapuram Reservoir. 3 Where are each of these The project is spread over seven districts of the State of dams and barrages Telangana located in Southern peninsular India. It nvisages located? Please give construction of a barrage across Godavari River, just below names of Districts and the confluence of rivers Pranahita and Godavari. The Villages and Cities where proposed location is near Medigadda village, Mahadevpur each of these barrages Mandal, Karim Nagar District of Telangana. Two more are located barrages namely Annaram and Sundilla have also been proposed on the upstream of Medigadda barrage and downstream of Sripada Yellampally barrage. The project intake is located upstream of barrage on right bank of river Godavari near Majeedpur village 4 How much money is Information w.r.t. Sl No. 4 to 6 is not available in his office. spent on the project so Applicant is requested to applu/contact the information from far? Please name the Project Authority. engineers, contractors and However, it is submitted that Project Proposal was accepted companies involved in by the Advisory Committee of MoWR , RD & GR in its construction of this 136th Advisory Committee meeting on 6th June, 2018 with project. an estimated cost of Rs 80190.46 Cr at price level of 2015- 5 How much is the 16. estimated budget for the remainder of this project and what is estimated time of completion of this project? 6 How much is the estimated budget for the remainder of this project and what is estimated time of completion of this project? ] िनदेशक Director ज.आ.एवं प. स.िन. तथा मु奍य जनसूचना ᔧिधकारी WP&P (C) & CPIO 1. Shri Rupesh Siddamshetty, 2-5-18, Gandhi Chowk, Banswada, Dist: Kamareddy, Telangana, Pin- 503187 2. 2 Copy for information and necessary action to Under Secretary and Nodal Officer RTI with reference to his office email dt 14-09-2020. In case you are not satisfied with the information/ reply provided by this office, you may directly prefer an appeal within 30 days from the receipt of this letter to the first appellate authority whose address is given as under. Name, designation & address of Appellate Authority for WP&P wing of CWC is Chief Engineer (PAO), Central Water Commission, 7th Floor (S), Sewa Bhawan, R. K. Puram, New Delhi ± 110066. Phone No. 26103561 Fax No.26103561. [email protected] File No.I-12011/74/2020-WPP Coord. 415 I/31084/2020(1)तृतीय तल (द 0), सेवा भवन, रामकृषण पुरम 3rd FLOOR (S), SEWA BHAWAN, R.K.PURAM नई िदलली-110066 NEW DELHI-110066 दूरभाष : 011 29583225 , फैकस : 011 29583209 Tel.: 01129583225 ई मेल: [email protected] Fax: 011 29583209 जल संरकण - सुरिकत भिवषय Email :- [email protected] Conserve Water- Save Life.