Initial West Area Information

Total Page:16

File Type:pdf, Size:1020Kb

Initial West Area Information 5393_W01.R3.1_Maidenhead 01/02/05 18:38 Page 1 W1.R3.1 Maidenhead Bridge The Maidenhead Bridge over the River As an example, electrification for the Thames at Maidenhead is a Grade II* listed Heathrow Express involved the provision structure. Overhead electrification on top of of overhead electrification over Wharncliffe the structure will be installed. The design is Viaduct in Ealing. being undertaken with advice from heritage specialists to help ensure that the impact on the structure is acceptable. Once installed, the gantries would be visible on the bridge from viewpoints along the river and nearby. Wharncliffe Viaduct at present Example of similar overhead electrification installations. Maidenhead Bridge at present Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_W02.R3.1_Maidenhead 01/02/05 18:39 Page 1 W2.R3.1 Maidenhead Maidenhead Stabling & Turnback A stabling facility will be provided for 6 The likely environmental effects of the Crossrail trains in the former goods yard west proposals will be: of Maidenhead station, immediately beyond ■ Operational noise from the use of the sidings the junction of the Bourne End Branch. ■ Lighting of the stabling area. (This will be Six tracks will be laid out as single sidings. designed to control light pollution into the Between alternate tracks, a platform will be sky or toward adjacent buildings in provided to allow access to the trains for accordance with best practice) drivers and other staff. The eastbound Relief line track will be realigned northwards (and re-routed through platform 5 at Maidenhead station). Two reversing sidings will be installed between the existing westbound Relief line and realigned eastbound line tracks. Staff facilities and car parking will be needed. Stabling site The road access from Silco Drive will be extended to the staff facilities building and car parking will be modified. THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. (GLA - 100032379) (2005). Maidenhead Stabling & Turnback Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_W03.R3.1_Maidenhead 01/02/05 18:41 Page 1 W3.R3.1 Maidenhead Station Improvements Improvements to ensure that efficient station facilities are The northern platform provided include opportunities to improve the integration of Silco Drive the station with other types of transport and: Shoppenhanger’s Road Improve passenger access from Shoppenhanger’s Road to the station ticket hall The southern station car park Provide a new ticket hall Some parking spaces will be temporarily lost during construction. Exact details will be subject to detailed Re-arrange forecourt design and discussions with Windsor and Maidenhead The existing platforms will be extended to cater for Crossrail Borough Council. 10-car trains. A modified layout has been designed to provide Lorries will route from the M4 and A4 to all five worksites a new terminating platform for Marlow Bourne End services via the A303 Braywick Road/Grenfell Place. (platform 6). Mitigation measures will be employed to limit construction There are 5 worksites for the works planned for the station noise impacts. These will include 3.6m high hoardings and and the turnback facilities. These are at: the provision of noise insulation if appropriate. The northern station car park THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. (GLA - 100032379) (2005). Maidenhead Station Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_W05.R3.1_Maidenhead 1/2/05 7:50 PM Page 1 W5.R3.1 Maidenhead Service Improvements Train services to and from Maidenhead will The diagram below highlights some of be improved by providing some journey the journey times that will be possible by time savings and a greater variety of passengers travelling on Crossrail services journey opportunities. to and from Maidenhead station. Crossrail Maidenhead station will provide: The Crossrail service pattern will be set by the relevant railway bodies in consultation ■ Direct journey opportunities to with the train operating company responsible central London for operating Crossrail services. ■ 4 trains per hour during peak periods to central London With Crossrail operational, the total number of seats available on trains to and from ■ Substantial new passenger capacity and Maidenhead will increase, as a result crowding relief into central London of longer, more frequent trains. Bourne End/Marlow services will terminate in a new bay platform at Maidenhead. Passengers wishing to travel beyond Maidenhead will need to interchange. One through train from Bourne End to Paddington could be provided in the morning peak. 35 60 Canary Wharf Maidenhead – From / To Canary Wharf 60 minutes Liverpool Street 52 minutes Farringdon 49 minutes Tottenham Court Road 46 minutes Paddington 41 minutes Heathrow Airport * 35 minutes *5 minutes interchange presumed & included Typical Crossrail journey times from Maidenhead Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_W06.R3.1_Taplow 01/02/05 18:43 Page 1 W6.R3.1 Taplow Station Improvements There will be a number of minor improvements There will be no major alterations to at Taplow, including new ticket machines and the station. platform extensions. Overhead electrification will be installed There will be extensions to platforms 3 and along the route between Maidenhead 4 at the western end to cater for 10-car and Airport Junction. Crossrail trains. THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. (GLA - 100032379) (2005). Station improvements at Taplow Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_W07.R3.1_Taplow 1/2/05 7:49 PM Page 1 W7.R3.1 Taplow Service Improvements Train services to and from Taplow station will be improved by providing direct journey opportunities, substantial new passenger capacity and crowding relief into central London. Crossrail Taplow station will provide: ■ Direct journey opportunities to central London ■ 4 trains per hour during peak times to central London The diagram below highlights some of the journey times that will be possible by travelling on Crossrail services to and from Taplow station. With Crossrail operational, the total number of seats available on trains to and from Taplow will increase as a result of the longer trains. The Crossrail service pattern will be set by the relevant railway bodies in consultation with the train operating company responsible for operating Crossrail services. Taplow Station at present 34 minutes to 37 minutes to 49 minutes 57 minutes to Heathrow Airport * Paddington to Canary Wharf *5 minutes interchange presumed & included Liverpool Street Canary Wharf Taplow – From / To Canary Wharf 57 minutes Liverpool Street 49 minutes Farringdon 46 minutes Tottenham Court Road 43 minutes Paddington 37 minutes Heathrow Airport * 32 minutes *5 minutes interchange presumed & included Typical Crossrail journey times from Taplow Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_W08.R3.1_Burnham 01/02/05 18:45 Page 1 W8.R3.1 Burnham Station Improvements Improvements at Burnham include new ticket A worksite is proposed adjacent to Burnham machines, customer information facilities and Lane on the northeast side of the station. platform extensions. No major alterations to the station are proposed. Burnham station has a single island platform Overhead line electrification would be between the Relief lines serving platforms installed along the route between Maidenhead 1 and 2. The station platform at the western and Airport Junction. These are relatively end will be extended to take new minor works. 10-car Crossrail trains. THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. (GLA - 100032379) (2005). Station improvements at Taplow Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_W09.R3.1_Burnham 1/2/05 7:51 PM Page 1 W9.R3.1 Burnham Service Improvements Train services to and from Burnham station will be improved by providing new direct journey opportunities to central London and substantial new transport capacity and crowding relief into central London. Crossrail Burnham station would provide:
Recommended publications
  • Finding Your Way to Oxford: a Guide for New International Students
    Finding Your Way to Oxford: Arriving at Terminal 1, 2 or 3: follow the signs in the arrival hall to the Central Bus A Guide for New International Station, then take the lift up to the bus station Students and you will arrive in the ticket hall. Arriving at Terminal 4: follow the signs in the arrival hall to ‘the trains’ and take the free Welcome to the UK. We hope you will settle in Heathrow Connect train service to ‘Heathrow comfortably during your first few days here. There Central’; a three-minute train journey. Follow are good public transport links to Oxford, and you the signs to the Central Bus Station, take the will be able to use public transport to get here from lift up to the bus station and you will arrive in wherever you arrive in the UK—services the ticket hall. generally run throughout the day and night. Arriving at Terminal 5: the bus service to Oxford also departs from Terminal 5 next to Below are details on bus services operating from the arrival area (stop 10), so you do not need Heathrow, Gatwick and Stansted airports, and to go to the Central Bus Station. details about Eurostar if you plan to come via rail. Gatwick Airport A similar bus service operates from Gatwick to Oxford (see the website below) with buses departing every hour. The bus journey is longer than the journey from Heathrow: between 2 hours and 2 hours 30 minutes. Arriving at Gatwick North Terminal: the bus leaves from Lower Forecourt stands 4 and 5.
    [Show full text]
  • N11 Bus Time Schedule & Line Route
    N11 bus time schedule & line map N11 Liverpool Street - Ealing Broadway View In Website Mode The N11 bus line (Liverpool Street - Ealing Broadway) has 2 routes. For regular weekdays, their operation hours are: (1) Ealing Broadway: 12:21 AM - 4:51 AM (2) Liverpool Street: 12:15 AM - 11:45 PM Use the Moovit App to ƒnd the closest N11 bus station near you and ƒnd out when is the next N11 bus arriving. Direction: Ealing Broadway N11 bus Time Schedule 81 stops Ealing Broadway Route Timetable: VIEW LINE SCHEDULE Sunday 12:21 AM - 4:51 AM Monday 12:21 AM - 4:51 AM Liverpool Street Station (L) 192 Bishopsgate, London Tuesday 12:21 AM - 4:51 AM Wormwood Street (Y) Wednesday 12:21 AM - 4:51 AM 99 Bishopsgate, London Thursday 12:21 AM - 4:51 AM Old Broad Street (LL) Friday 12:21 AM - 4:51 AM 5 Old Broad Street, London Saturday 12:21 AM - 4:51 AM Bank Station / Queen Victoria Street 1 Poultry, London St Paul's Churchyard (SH) Old Change Court, London N11 bus Info Direction: Ealing Broadway St Paul's Cathedral (SJ) Stops: 81 10 Saint Paul's Church Yard, London Trip Duration: 83 min Line Summary: Liverpool Street Station (L), City Thameslink Stn / Ludgate Circus (F) Wormwood Street (Y), Old Broad Street (LL), Bank 65 Ludgate Hill, London Station / Queen Victoria Street, St Paul's Churchyard (SH), St Paul's Cathedral (SJ), City Thameslink Stn / Shoe Lane (H) Ludgate Circus (F), Shoe Lane (H), Fetter Lane (W), Fleet Street, London Chancery Lane (W), The Royal Courts Of Justice (P), Aldwych / Drury Lane (R), Savoy Street (U), Bedford Fetter Lane (W) Street
    [Show full text]
  • Neighbourhood Governance Note of Ealing Broadway Ward Forum Meeting ______
    Neighbourhood Governance Note of Ealing Broadway Ward Forum Meeting ______________________________________________________________________________________ Ealing Broadway Ward Forum meeting – held at 8pm until 9.30pm on Wednesday 8 October 2008 in the hall of St Stephen’s Church Centre, W5. Present: Councillors Young (Chairman), Potts and Scott Attendees: over 83 people attended with 65 people signing the attendance sheet. Note taker: Evelyn Gloyn (EG) - Neighbourhood Co-ordinator South Item Notes Actions/Information 1/2 Chairman’s Introduction and the Role of the Ward Forums People were offered light refreshments as they arrived and the meeting started promptly at 8 pm in the hall of St Stephen’s Church Centre. Councillor Anthony Young (Chairman) opened the meeting with introductions and explained the purpose of ward forums; the old area committees had been reviewed and were not effective as few attended. Ward forums were proposed in their place. Their purpose is so people could find out more about what is happening in their local and their concerns about the local (ward) area could be raised; and they could also discuss how they would like to spend £40,000 within the ward on capital projects. The Neighbourhood Co-ordinator explained her role; she To contact your 1 Item Notes Actions/Information will post notes from the meetings with action points on the Neighbourhood Co-ordinator council’s website, then be working with both Councillors Evelyn Gloyn and council colleagues to address the concerns raised and Email:[email protected] attend a further 2/3 ward meetings ward per year. She will Tel: (020) 8825 8021 also be producing 2 ward newsletters over the year.
    [Show full text]
  • Rail Accident Report
    Rail Accident Report Derailment of a passenger train at Ealing Broadway 2 March 2016 Report 24/2016 December 2016 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2016 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.gov.uk/raib DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Preface Preface The purpose of a Rail Accident Investigation Branch (RAIB) investigation is to improve railway safety by preventing future railway accidents or by mitigating their consequences. It is not the purpose of such an investigation to establish blame or liability. Accordingly, it is inappropriate that RAIB reports should be used to assign fault or blame, or determine liability, since neither the investigation nor the reporting process has been undertaken for that purpose. The RAIB’s findings are based on its own evaluation of the evidence that was available at the time of the investigation and are intended to explain what happened, and why, in a fair and unbiased manner.
    [Show full text]
  • The Report from Passenger Transport Magazine
    MAKinG TRAVEL SiMpLe apps Wide variations in journey planners quality of apps four stars Moovit For the first time, we have researched which apps are currently Combined rating: 4.5 (785k ratings) Operator: Moovit available to public transport users and how highly they are rated Developer: Moovit App Global LtD Why can’t using public which have been consistent table-toppers in CityMApper transport be as easy as Transport Focus’s National Rail Passenger Combined rating: 4.5 (78.6k ratings) ordering pizza? Speaking Survey, have not transferred their passion for Operator: Citymapper at an event in Glasgow customer service to their respective apps. Developer: Citymapper Limited earlier this year (PT208), First UK Bus was also among the 18 four-star robert jack Louise Coward, the acting rated bus operator apps, ahead of rivals Arriva trAinLine Managing Editor head of insight at passenger (which has different apps for information and Combined rating: 4.5 (69.4k ratings) watchdog Transport Focus, revealed research m-tickets) and Stagecoach. The 11 highest Operator: trainline which showed that young people want an rated bus operator apps were all developed Developer: trainline experience that is as easy to navigate as the one by Bournemouth-based Passenger, with provided by other retailers. Blackpool Transport, Warrington’s Own Buses, three stars She explained: “Young people challenged Borders Buses and Nottingham City Transport us with things like, ‘if I want to order a pizza all possessing apps with a 4.8-star rating - a trAveLine SW or I want to go and see a film, all I need to result that exceeds the 4.7-star rating achieved Combined rating: 3.4 (218 ratings) do is get my phone out go into an app’ ..
    [Show full text]
  • North West Region Cheshire and North Wales
    NATIONS, REGIONS & GROUPS NORTH WEST REGION LONDON REGION CHESHIRE AND NORTH WALES GROUPS HEATHROW GROUP Borderlands (Wrexham to Bidston) rail line Crossrail becomes Elizabeth Line full house greeted speaker John Goldsmith, Community A Relations Manager for Crossrail. Some 43km of new tunnelling is now complete under central London, and 65 million tonnes of material have been excavated. Building work on the whole line is now 87% complete. The first trains of the new Elizabeth Line are now in service between Liverpool Street and Shenfield where a new platform has been built for them, and the roof garden at the seven-storey Canary Wharf station has been open for some time. The 70 trains, built in Derby by Bombardier, are some 10–15% lighter than those now in use and will be in nine-car sets, 200m long, seating 450 passengers, with an estimated total capacity including standing passengers of 1,500 at peak times, most of The Borderlands line runs from Wrexham Central Station to Bidston Station whom are expected to be short-journey passengers. Seats will be sideways, forward facing and backward facing, giving plenty of his event was held in the strategic location of Chester, circulating space. The early trains now in service between T close to the border between England and Wales. The Liverpool Street and Shenfield are only seven cars long, because location chosen was apt, as the Borderlands line is a key the main line platforms at Liverpool Street will not accept nine-car strategic passenger route between North Wales and Merseyside. trains, but this is an interim measure until the lower level new John Allcock, Chairman, Wrexham–Bidston Rail Users’ Association station is operative.
    [Show full text]
  • Flying Into the Future Infrastructure for Business 2012 #4 Flying Into the Future
    Infrastructure for Business Flying into the Future Infrastructure for Business 2012 #4 Flying into the Future Flying into the Future têáííÉå=Äó=`çêáå=q~óäçêI=pÉåáçê=bÅçåçãáÅ=^ÇîáëÉê=~í=íÜÉ=fça aÉÅÉãÄÉê=OMNO P Infrastructure for Business 2012 #4 Contents EXECUTIVE SUMMARY ________________________________________ 5 1. GRowInG AVIATIon SUSTAInABlY ______________________ 27 2. ThE FoUR CRUnChES ______________________________ 35 3. ThE BUSInESS VIEw oF AIRpoRT CApACITY ______________ 55 4. A lonG-TERM plAn FoR GRowTh ____________________ 69 Q Flying into the Future Executive summary l Aviation provides significant benefits to the economy, and as the high growth markets continue to power ahead, flying will become even more important. “A holistic plan is nearly two thirds of IoD members think that direct flights to the high growth countries will be important to their own business over the next decade. needed to improve l Aviation is bad for the global and local environment, but quieter and cleaner aviation in the UK. ” aircraft and improved operational and ground procedures can allow aviation to grow in a sustainable way. l The UK faces four related crunches – hub capacity now; overall capacity in the South East by 2030; excessive taxation; and an unwelcoming visa and border set-up – reducing the UK’s connectivity and making it more difficult and more expensive to get here. l This report sets out a holistic aviation plan, with 25 recommendations to address six key areas: − Making the best use of existing capacity in the short term; − Making decisions about where new runways should be built as soon as possible, so they can open in the medium term; − Ensuring good surface access and integration with the wider transport network, in particular planning rail services together with airport capacity, not separately; − Dealing with noise and other local environment impacts; − Not raising taxes any further; − Improving the visa regime and operations at the UK border.
    [Show full text]
  • 2005 Great Britain National Rail Passenger Operators
    Thurso Wick 2005 Great Britain National Rail Dingwall Passenger Operators Inverness Kyle of Lochalsh Second edition Aberdeen Arriva Trains Wales (Arriva P.L.C.) Mallaig Heathrow Express (BAA) Eurostar (Eurostar (U.K.) Ltd.) First Great Western (First Group P.L.C.) Fort William First Great Western Link (First Group P.L.C.) ScotRail (First Group P.L.C.) TransPennine Express (First Group P.L.C./Keolis) Hull Trains (G.B. Railways Group/Renaissance Railways) Dundee Oban Crianlarich Great North Eastern (G.N.E.R. Holdings/Sea Containers P.L.C.) Perth Southern (GOVIA) Thameslink (GOVIA) Chiltern Railways (M40 Trains) Cardenden Stirling Kirkcaldy North Berwick ‘One’ (National Express P.L.C.) Balloch Gourock Milngavie Central Trains (National Express P.L.C.) Cumbernauld Gatwick Express (National Express P.L.C.) Bathgate Wemyss Bay Glasgow Drumgelloch Edinburgh Midland Mainline (National Express P.L.C.) Largs Berwick upon Tweed Silverlink Trains (National Express P.L.C.) Neilston East Kilbride Carstairs Ardrossan c2c (National Express P.L.C.) Harbour Lanark Wessex Trains (National Express P.L.C.) Chathill Wagn Railway (National Express P.L.C.) Merseyrail (Ned-Serco) Northern Rail (Ned-Serco) South Eastern Trains (SRA) Island Line (Stagecoach Holdings P.L.C.) South West Trains (Stagecoach Holdings P.L.C.) Virgin CrossCountry (Virgin Rail Group) Newcastle Virgin West Coast (Virgin Rail Group) Stranraer Carlisle Sunderland Hartlepool Bishop Auckland Workington Saltburn Darlington Middlesbrough Whitby Windermere Battersby Scarborough Barrow-in-Furness
    [Show full text]
  • Crossrail Act 2008 Page 1
    Crossrail Act 2008 Page 1 Crossrail Act 2008 2008 CHAPTER 18 Thomson Reuters (Legal) Limited. UK Statutes Crown Copyright. Reproduced by permission of the Controller of Her Majesty©s Stationery Of®ce. An Act to make provision for a railway transport system running from Maidenhead, in the County of Berkshire, and Heathrow Airport, in the London Borough of Hillingdon, through central London to Shen®eld, in the County of Essex, and Abbey Wood, in the London Borough of Greenwich; and for connected purposes. [22nd July 2008] BE IT ENACTED by the Queen©s most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and Temporal, and Commons, in this present Parliament assembled, and by the authority of the same, as follows:± Extent Preamble: England, Wales, Scotland Works Law In Force 1 Construction and maintenance of scheduled works (1) The nominated undertaker may construct and maintain the works speci®ed in Schedule 1 (ªthe scheduled worksº), being± (a) works for the construction of an underground railway between, in the west, a tunnel portal at Royal Oak in the City of Westminster and, in the east, tunnel portals at Custom House and Pudding Mill Lane in the London Borough of Newham, (b) works for the construction of other railways in the London Boroughs of Barking & Dagenham, Bexley, Ealing, Greenwich, Hammersmith and Fulham, Havering, Hillingdon, Newham, Redbridge and Tower Hamlets, the City of Westminster, the Royal Borough of Kensington & Chelsea, the District of Basildon and the Borough of Brentwood in the County of Essex, the Royal Borough of Windsor & Maidenhead and the Borough of Slough in the County of Berkshire and the District of South Bucks in the County of Buckinghamshire, (c) works consequent on, or incidental to, the construction of the works mentioned in paragraph (a) or (b).
    [Show full text]
  • Solent Connectivity May 2020
    Solent Connectivity May 2020 Continuous Modular Strategic Planning Page | 1 Page | 2 Table of Contents 1.0 Executive Summary .......................................................................................................................................... 6 2.0 The Solent CMSP Study ................................................................................................................................... 10 2.1 Scope and Geography....................................................................................................................... 10 2.2 Fit with wider rail industry strategy ................................................................................................. 11 2.3 Governance and process .................................................................................................................. 12 3.0 Context and Strategic Questions ............................................................................................................ 15 3.1 Strategic Questions .......................................................................................................................... 15 3.2 Economic context ............................................................................................................................. 16 3.3 Travel patterns and changes over time ............................................................................................ 18 3.4 Dual-city region aspirations and city to city connectivity ................................................................
    [Show full text]
  • Members and Parish/Neighbourhood Councils RAIL UPDATE
    ITEM 1 TRANSPORT COMMITTEE NEWS 07 MARCH 2000 This report may be of interest to: All Members and Parish/Neighbourhood Councils RAIL UPDATE Accountable Officer: John Inman Author: Stephen Mortimer 1. Purpose 1.1 To advise the Committee of developments relating to Milton Keynes’ rail services. 2. Summary 2.1 West Coast Main Line Modernisation and Upgrade is now in the active planning stage. It will result in faster and more frequent train services between Milton Keynes Central and London, and between Milton Keynes Central and points north. Bletchley and Wolverton will also have improved services to London. 2.2 Funding for East-West Rail is now being sought from the Shadow Strategic Rail Authority (SSRA) for the western end of the line (Oxford-Bedford). Though the SSRA have permitted a bid only for a 60 m.p.h. single-track railway, excluding the Aylesbury branch and upgrade of the Marston Vale (Bedford-Bletchley) line, other Railtrack investment and possible developer contributions (yet to be investigated) may allow these elements to be included, as well as perhaps a 90 m.p.h. double- track railway. As this part of East-West Rail already exists, no form of planning permission is required; however, Transport and Works Act procedures are to be started to build the missing parts of the eastern end of the line. 2.3 New trains were introduced on the Marston Vale line, Autumn 1999. A study of the passenger accessibility of Marston Vale stations identified various desirable improvements, for which a contribution of £10,000 is required from this Council.
    [Show full text]
  • Brunel's Dream
    Global Foresights | Global Trends and Hitachi’s Involvement Brunel’s Dream Kenji Kato Industrial Policy Division, Achieving Comfortable Mobility Government and External Relations Group, Hitachi, Ltd. The design of Paddington Station’s glass roof was infl u- Renowned Engineer Isambard enced by the Crystal Palace building erected as the venue for Kingdom Brunel London’s fi rst Great Exhibition held in 1851. Brunel was also involved in the planning for Crystal Palace, serving on the The resigned sigh that passed my lips on arriving at Heathrow building committee of the Great Exhibition, and acclaimed Airport was prompted by the long queues at immigration. the resulting structure of glass and iron. Being the gateway to London, a city known as a melting pot Rather than pursuing effi ciency in isolation, Brunel’s of races, the arrivals processing area was jammed with travel- approach to constructing the Great Western Railway was to ers from all corners of the world; from Europe of course, but make the railway lines as fl at as possible so that passengers also from the Middle East, Africa, Asia, and North and South could enjoy a pleasant journey while taking in Britain’s won- America. What is normally a one-hour wait can stretch to derful rural scenery. He employed a variety of techniques to two or more hours if you are unfortunate enough to catch a overcome the constraints of the terrain, constructing bridges, busy time of overlapping fl ight arrivals. While this only adds cuttings, and tunnels to achieve this purpose. to the weariness of a long journey, the prospect of comfort Rain, Steam and Speed – The Great Western Railway, a famous awaits you on the other side.
    [Show full text]