Submission of Form – I & Ia Towards Getting Prior Environmental Clearance
Total Page:16
File Type:pdf, Size:1020Kb
SUBMISSION OF FORM – I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For VELLORE INSTITUTE OF TECHNOLOGY – ANDHRA PRADESH (Construction of Residential & Academic Buildings) Site Address: Sy. No. 16, 14, 92, 95, 98, 99, 8, 15, 13, 10, 93, 94, 97, 100, 85, 12, 11, 176, 214, 182, 184, 179, 178, 197, 198, 199, 181, 180, 260 of INAVOLU, SAKHAMURU & VELAGAPUDI VILLAGES, NEAR AP SECRETARIAT, INAVOLU VILLAFE, TULLUR MANDAL, GUNTUR DISTRICT, ANDHRAPRADESH JUNE’ 2019 Prepared& Submitted by EnviroHouse, Block –B, B-1, IDA,Auto Nagar, Visakhapatnam – 530 012 Ph: 0891-2755528, Telex: 0891-2755529, E-mail: [email protected] Cell: 9440338628 QCI No –151& Recognized by MOE&F, New Delhi. FORM 1 (I) Basic Information S. No. Item Details 1. Name of the project(s) Vellore Institute of Technology - Andhra Pradesh 2. S. No. in the schedule 8 (b) 3. Proposed capacity/area/length/tonnage to be The project was commenced in the year handled/command area/lease area/number of 2017; the total site area of the project is wells to be drilled. 200 acres. So in the first phase it proposed to develop an area of 100 Acres for construction of Engineering College with Hostels & Executive Villas At present 43422.19 Sq. M built up area construction was completed & 103765.54 Sq. M built up area construction was under progress. Now they proposed to increase the built up area from 147187.73 Sq. M to 217510.40 Sq. M. So as per the MoEF & CC Notification with S.O. 3252 Educational Institutions with built up area greater 150000 requires EC. The water requirement, waste water generation, solid waste, hazardous waste generation is combined for all the projects i.e ( Constructed , Ongoing and to be constructed) to assess the loads. Considering the overall water requirement , waste water generation, solid waste generation to maintain the uniformity for the above we are applying for Terms of Reference for over all built- up area in 8 (b) though as per OM less than 1,50,000 Sq.mts of built-up area can be applied for EC. Area statement is detailed in Conceptual Plan. 4. New/Expansion/Modernization New Construction of Educational Institution 5. Existing Capacity/Area etc. The project was commenced in the year 2017 & the total site area of the project is 200 acres. So in the first phase it proposed to develop an area of 100 Acres. In this 43422.19 Sq. M built up area construction was completed & 103765.54 Sq. M built up area construction was under progress. So as per the MoEF & CC Notification with S.O. 3252 (E) Educational Institutions with built up area less than 150000 do not requires EC. Now they proposed to increase the built up area from 147187.73 Sq. M to 217510.40 Sq. M. (i.e. increase in the built up area by 70322.67). 6. Category of Project i.e. ‘A’ or ‘B’ Category – B 7. Does it attract the general condition? If yes, No please specify. The proposed project does not attract any general conditions specified in EIA Notification 2006 such as Protected area under Wild Life Protection Act 1972, Critically Polluted areas as per CPCB, Notified Eco sensitive area, Interstate boundaries. 8. Does it attract the specific condition? If yes, No please specify. The proposed project is not located within Industrial Estate / Complex/Export processing zone / SEZ etc and does not come under items 4(d),4(f),5(e),5(f). 9. Location The proposed project is located at Plot/Survey/Khasra No. 16, 14, 92, 95, 98, 99, 8, 15, 13, 10, 93, 94, 97, 100 85, 12, 11, 176, 214, 182, 184, 179, 178, 197, 198, 199 181, 180,260 of Inavolu, Sakhamuru & Vellagapudi Villages Village Inavolu, Tehsil Thullur, District Guntur, State Andhra Pradesh 10. Nearest Railway Station/Airport along with Managalagiri Railway Station at 8.95 distance in kms. kms 11. Nearest Town, City, District Headquarters along Near Thullur Mandal with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Andhra Pradesh Capital Region Corporation, Local body (complete postal Development Authority addresses with telephone nos. to be given) 13. Name of the applicant Dr. C.L.V. Siva Kumar Registrar (Authorized Person) VIT-AP, Near AP Secretariat, Inavolu, Thullur Mandal, Guntur District, Andhra Pradesh 14. Registered Address Dr. C.L.V. Siva Kumar, Registrar (Authorized Person) VIT-AP, Near AP Secreatariat, Inavolu Village, Thullur Mandal, Guntur District, Andhra Pradesh - 522237 15. Address for correspondence: Name Dr. C.L.V. Siva Kumar, Designation (Owner/Partner /CEO) Registrar (Authorized Person), Pin code 522237 E-mail [email protected] Telephone No. 7093062555 Fax No. -- 16. Details of Alternative Sites examined, if any. Government has allotted an area of 100 Location of these sites should be shown on a topo acres in the first phase to VIT on sale sheet. basis near Inavolu Village, Thullur Mandal, Guntur District for establishing the Educational Institution. So no alternative sites were examined. 17. Interlinked Projects NA 18. Whether separate application of interlinked NA project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? NA ii. The Wildlife (Protection) Act, 1972? NA iii. The C.R.Z. Notification, 1991? NA 22. Whether there is any Government Order/Policy Yes relevant /relating to the site? Government of AP through G.O. Ms. No. 171, MA & UD (CRDA-2) Dept. Dated 04.07.2016 with Lr. No. 6925/EC/A2 /2015-3 has allotted a land of 100 acres to VIT in the first phase on sale basis. 23. Forest land involved (hectares) No 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Nil a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Details thereof (with approximate quantities /rates, wherever possible) Yes/No with source of information data 1.1 Permanent or temporary change in Yes The land earmarked for Construction of land use, land cover or topography Educational Institution VIT for a site including increase in intensity of land area of 100 acres in the first phase. use (with respect to local land use The institution covers the construction of plan) Hostels, Academic Buildings, Executive villas & other Amenities which changes the land use from sparse scrub to construction of buildings 1.2 Clearance of existing land, vegetation No The land is designated as sparse scrub and buildings? and barren, rocky land with little or no vegetation. Mostly the existing vegetation will not be disturbed during the construction phase. Little clearance of vegetation will be required. 1.3 Creation of new land uses? Yes No extra new land will be used. The project is having 100 Acres of land and the total built up area is 217510.40 Sq m. In this land only the proposed project will be constructed. 1.4 Pre-Construction investigations e.g. Yes For the total area already ground water bore houses, soil testing? and soil testing carried. 1.5 Construction works? Yes The educational institution includes construction of Academic Buildings, Hostels, Executive Villas and Utilities Temporary labor hutments will be constructed for workers during construction phase. The construction was commenced in the year 2017 a built up area of 43422.17 sq. M construction was completed & 103765.54 Sq. M built up area is under progress & 70322.67 Sq. M built up area is proposed for construction. 1.6 Demolition works? No The site is leveled one and does not contain any temporary / permanent structures. Therefore no demolition work will be carried. 1.7 Temporary sites used for construction Yes Temporary structures within site for works Or housing of construction construction workers in order to rest workers? other sanitary facilities will be provided. 1.8 Above ground buildings, structures or Yes The project involves construction of earthworks including linear structures, educational institution buildings, cut and fill or excavations excavation will be carried out for laying foundation. The following buildings will be constructed: Academic Blocks Hostels Executive Villas Water Storage Tank DG Set Room 1.9 Underground works including mining No Excavation for laying the foundation will or tunneling? be carried out. No mining or tunneling activity. 1.10 Reclamation works? No No reclamation work is required 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No No production or manufacturing process processes? will be carried out. It is construction of Educational Institute 1.14 Facilities for storage of goods or Yes Temporary storage room/yards will materials? be constructed for storage of construction material during the construction phase 1.15 Facilities for treatment or disposal of Yes Construction Phase: solid waste or liquid effluents? During Construction phase mobile toilets will be provided for construction workers and the construction waste will be disposed accordingly. During Operation Phase Sewage: The project work has already started the in the year 2017 & construction of Academic blocks & Hostels was completed and waste water generated from these blocks has been collected in sumps, carried away by the vehicles and disposed off to the Municipal Authorities. After the completion of the construction the waste water generated would be of the sanitary waste which will be routed STP’s of Capacity 2 x 750 KLD for treating the effluents.