Domestic/Regional Travel – Jan 2019

Total Page:16

File Type:pdf, Size:1020Kb

Domestic/Regional Travel – Jan 2019 Domestic/Regional Travel – Jan 2019 Minister Wingard and Ministerial Staff No of Travel Itinerary1 Travel Destination Reasons for Travel Cost of Travel2 travellers Receipts3 2 Eyre Peninsula Site visits and meetings Attached $323.20 Attached 2 York Peninsula Site visits and meetings Attached $293.70 Attached Example disclaimer - Note: These details are correct as at the date approved for publication. Figures may be rounded and have not been audited. 1 Scanned copies of itineraries to be attached (where available). 2 Excludes salary costs. 3 Scanned copies of all receipts/invoices to be attached. This work is licensed under a Creative Commons Attribution (BY) 3.0 Australia Licence http://creativecommons.org/licenses/by/3.0/au/ To attribute this material, cite Government of South Australia Eyre Peninsula Regional Trip Tuesday 22 January & Wednesday 23 January 2019 Tuesday 22 January 2019 7.00am‐7.50am Flight REX – Adelaide to Port Lincoln (50 mins) Drive from Port Lincoln Airport to Tumby Bay (24 mins) 8.45am‐9.30am SAPOL visit – Tumby Bay Police Station ‐ 5 Tumby Terrace, Tumby Bay 9.45am – 10.15am SES visit – Tumby Bay SES Unit ‐ 11 Excell Road, Tumby Bay 10.15am‐11.00am Drive from Tumby Bay to Arno Bay (45 mins) 11.15am‐11.45am CFS visit – Arno Bay CFS Unit ‐Cnr Third Street and First Street, Arno Bay 11.45am‐1.00pm Drive from Arno Bay to Pt Lincoln (1 hr 15 mins) 1.00pm – 2.00pm 2.00pm‐2.30pm Sport ‐ Port Lincoln Leisure Centre Stadium ‐ Jubilee Drive, Port Lincoln 2.45pm‐3.15pm MFS visit – Port Lincoln MFS Unit ‐ 45 St Andrews Terrace, Port Lincoln 3.30pm‐4.00pm SES visit – Port Lincoln SES Unit and Western Operations & Support Unit 28‐32 Matthew Place, Port Lincoln 4.15pm‐5.00pm SAPOL visit – Port Lincoln Police Station ‐ 3‐5 Liverpool Street, Port Lincoln 5.15pm Check‐In Accommodation: Pt Lincoln Hotel ‐ 1 Lincoln Highway, Pt Lincoln 6:30pm Wednesday 23 January 2019 8.30am‐9.15am Drive from Pt Lincoln to Cummins (45 mins) 9.15am‐9.45am Cummins Skate Park ‐ Bruce Terrace, Cummins 9.45am‐10.15am CFS visit – Cummins CFS Unit ‐ Tod Highway, Cummins 10.15am‐11.00am Drive from Cummins to Coffin Bay (40 mins) 11.00am‐11.45am SAPOL visit – Coffin Bay Police Station ‐ 165 Esplanade, Coffin Bay 11.45am ‐ 1.15pm 1.15pm‐2.00pm Drive from Coffin Bay to Port Lincoln (40 mins) 2.15pm‐2.45pm Meeting ‐ Peter Treloar’s Office 3:00pm‐ 3:30pm Meeting ‐ Peter Treloar’s Office 4.00pm‐4.15pm Drive to Port Lincoln Airport (15 mins) 5.20pm‐6.10pm Flight REX – Port Lincoln to Adelaide (50 mins) Port Lincoln Hotel ABN: 57 519 972 982 PO Box 2517 Phone: 08 86212000 PORT LINCOLN SA 5606 Fax: 08 86826130 Email: [email protected] Website: www.portlincolnhotel.com.au Tax Invoice Date: 23 Jan 2019 11:01 AM REPRINT Adults: 2 Arrive Date: 22 Jan 2019 Depart Date: 23 Jan 2019 Hon. Corey Wingard Account No: 380686 5048 Reservation No: 258771 Australia Invoice No: 179043 Date Details GST Amount (Inc.GST) 22 Jan 2019 505: Govt Accommodation RO - (22-Jan-19). $14.55 $160.00 Hon. Corey Wingard 506: Govt Accommodation RO - (22-Jan-19). $14.55 $160.00 Sam Hooper 23 Jan 2019 EFTPOS Receipt #217246, VISA # 3004 $0.00 -$323.20 - EFTPOS Transaction Fee. $0.29 $3.20 GST $29.39 Powered by rms.com.au Total $0.00 Signature: _____________________________________ Thank you for choosing to stay at the Port Lincoln Hotel, we hope you enjoyed your stay. Your feedback is important to us - email us at [email protected] or review us at www.tripadvisor.com.au BOOK DIRECT FOR THE BEST PRICE GUARANTEED - www.portlincolnhotel.com.au and pay when you stay! Save even more with our advanced purchase saver rates A surcharge is applicable to all credit card payments 1% for Visa and Mastercard and 1.5% for AMEX and Diners Bank Account details for Direct Payments are as follows Bank SA Port Lincoln - Account Name Port Lincoln Hotel - BSB 105 036 - Account Number 101 260 640 NOTE: **PLEASE USE INVOICE NUMBERS AS DIRECT PAYMENT REFERENCE** REMIT TO: [email protected] Yorke Peninsula Regional Trip Tuesday January 15 & Wednesday January 16 2019 Tuesday 15th January 2019 7.30am ‐ 8.45am Drive from Home to Mallala ( 65 mins) 8.45am‐9.30am SAPOL visit ‐ Mallala Police Station ‐ 10 Balaklava Road, Mallala 9.30am‐10.00am Drive from Mallala to Balaklava (25 mins) 10.00am‐10.45am SAPOL visit ‐ Balaklava Police Station ‐ 2 Edith Terrace, Balaklava 10.45am‐11.15am Drive from Balaklava to Pt Wakefield (20 mins) 11.15am‐12.00am SAPOL visit ‐ Pt Wakefield Police Station ‐ 7 North Street, Pt Wakefield 12.00pm‐12.45pm Drive from Pt Wakefield to Ardrossan (35 min) 12.45pm‐1.30pm SAPOL visit ‐ Ardrossan Station ‐ 6 Fourth Street, Ardrossan 1.30pm ‐ 2.00pm 2.00pm‐2.45pm Drive from Ardrossan to Stansbury (41 mins) 2.45pm‐3.30pm SAPOL visit ‐ Stansbury Police Station ‐ 4 Weaver Street, Stansbury 3.30pm‐4.15pm Drive from Stansbury to Warooka (33 mins) 4.15pm‐5.00pm SES & CFS visit ‐ Warooka Unit ‐ Cnr Fifth Street & Sturt Bay Road, WAROOKA 5.00pm‐5.30pm Drive from Warooka to Minlaton (22 mins) 5.30pm‐6.15pm SAPOL visit ‐ Minlaton Police Station ‐ 20 Main Street, Minlaton 5:30pm‐6:15pm Check‐In Accommodation: Minlaton Hotel ‐ 26 Main Street, Minlaton Wednesday 16th January 2019 7.00am ‐ 7.30am Drive from Minlaton to Maitland ( 32 mins) 7.30am‐8.30am SAPOL visit ‐ Maitland Police Station ‐ 26 Elizabeth Street, Maitland 8.30am‐9.00am SES & CFS visit – Maitland Unit ‐ Rogers Terrace, MAITLAND 9.00am‐9.30am Drive from Maitland to Moonta (24 mins) 9.30am‐10.00am MFS visit – Moonta ‐ Cnr Hendry & Caroline Street, Moonta 10.00am‐10.30am Drive from Moonta to Kadina (15 mins) 10.30am‐11.30am Meeting with farmers ‐ Goyder Street Café, 4 Goyder Street, Kadina 11.30am‐12.00pm Meeting - Yorke Peninsula Starclub Goyder Street Café, 4 Goyder Street, Kadina 12.00pm ‐ 12.30pm 12.30pm‐1.00pm SAPOL visit ‐ Kadina Police Station ‐ 58 Graves Street, Kadina 1.00pm‐1.30pm MFS visit ‐ Kadina Unit ‐13 Ewing Street, Kadina 1.30pm‐2.00pm CFS visit ‐ Kadina Unit ‐ Port Road, Kadina 2.00pm‐2.30pm Sport ‐ Kadina Hockey Club ‐ Cnr Port Road and Drain Road, Kadina 2.30pm‐3.00pm Drive from Kadina to Paskeville (17 mins) 3.00pm‐3.45pm Agbyte ‐ Leighton Wilksch, Ag Technologist ‐ 817 Kainton Road, Paskeville 3.45pm‐4.15pm Drive from Paskeville to South Hummocks (26 mins) 4.15pm‐4.45pm CFS Station ‐ South Hummocks ‐ 434 Gulfview Road, Nantawarra 4.45pm‐5.45pm Drive from South Hummocks to Lower Light (45 mins) 5.45pm‐6.15pm No 1 (Adelaide Plains) District Rifle Association Inc ‐ Light Beach Road, Lower Light 6.15pm‐7:15pm Drive from Lower Light to Home (60 mins) .,,1,' -·,•J -.Ci] , ·.:· ! '._ 'Jl '..' I Cafe Capella's Cafe Capella's 53 George Street Moonta SA 5558 63598736060 08 88251081 [email protected] https ://wi;io .cafecape 1 lasmoonta. com/ Sale#: SP-24 2019-01-16 09:56:07 Served by Amelia S Takeaway Description Amount Bacon Egg Burger x 2 . $32.00 Flat l!hite, - Medium ·_ Coffee Shot Flat Nhite. - Small . :i�i�$4.00 Sprite $4,00 - Bottle :,0.50 Subtotal: $45.70 Total $41.55 - GST ex tax: $4.15 rota1 Inc rax: Method Amount Card $45.70 Prices shown in AUD �, .sJ.A� Coffee T111 ---V--2frftl-01-16. 09:56:57 Sale JD: hykfbshw TRANSACTfoN ·Dalrymple Hotel 4 Anzac Parade Stansbury SA 5582 1,111,ne : (08) 08852 4029 ABN 84 142 797 505 15/1/2019 at 6:4:i I 'II Natural Oysters EA* $42 .00 Quantity: 12@ $3,50 each i'lasabi Sea llop EA* $72 .00 Quantity: 18 @ $4. 00 each Flathead* �A.JU �!hit ing* $2ll.uu l·lhit ing* ;�_\, .Gu \ -------·· SUBTOTAL $192.00 --·------ 33 TOTAL $192.00 --------.
Recommended publications
  • Draft Strategic Plan for the Eyre Peninsula Natural Resources Management Region 2017 - 2026
    EYRE PENINSULA NRM PLAN Draft Strategic Plan for the Eyre Peninsula Natural Resources Management Region 2017 - 2026 PAGE 1 MINISTER’S ENDORSEMENT I, Honourable Ian Hunter MLC, Minister for Sustainability, Environment and Conservation, after taking into account and in accordance with the requirements of Section 81 of the Natural Resources Management Act 2004 hereby approve the Strategic Plan of the Eyre Regional Natural Resources Management Region. n/a until adoption Honourable Ian Hunter MLC Date: Minister for Sustainability, Environment and Conservation Document control Document owner: Eyre Peninsula Natural Resources Management Board Name of document: Strategic Plan for the Eyre Peninsula Natural Resources Management Region 2017-2026 Authors: Anna Pannell, Nicole Halsey and Liam Sibly Version: 1 Last updated: Monday, 28 November, 2016 FOREWORD On behalf of the Eyre Peninsula Natural Resources Management Board (the Board), I am delighted to present our Strategic Plan for statutory consultation. The Strategic Plan is a second generation plan, building upon 2009 plan. Our vision remains - Natural resources managed to support ecological sustainability, vibrant communities and thriving enterprises in a changing climate The Strategic Plan is designed to be the “Region’s Plan”, where we have specifically included a range of interests and values in Natural Resources Management (NRM). The Board used a participatory approach to develop the plan, which allowed us to listen to and discuss with local communities, organisations and businesses about the places and issues of importance. This approach has built our shared understanding, broadened our perspectives and allowed us to capture a fair representation of the region’s interests and values.
    [Show full text]
  • Road Crash Register Department of Planning, Transport and Infrastructure Detail Crash History
    Department of Planning, Transport and Infrastructure Road Crash Register Detail Crash History Report: TR0680 Report Date: 12/06/2018 10:35 Distribute To: BOGANKAT Total Pages: 45 Parameter Values Key Road Cross Road 1 Cross Road 2 LGA Regions Stats Areas 577 Crashes between : 01/01/2013 and 31/12/2017 RRD between : and Severity : Fatal + All Injuries Show AR Number ? Y Crash Types : Unit Types : Postcodes : Suburbs : DCA Codes Road Moisture Road Surfaces Lighting condition BOGANKAT Department of Planning, Transport and Infrastructure Page 1 of 45 TR0680 Road Crash Register 12/06/2018 10:35 VERSION 10.06 Detailed Crash History LGA 577 : DC LOWER EYRE PENINSULA Key Road 0002600A LINCOLN HIGHWAY Region NORTHERN AND WESTERN Suburb BOSTON (5607) Stats Area 003 : Country MID-BLOCK BETWEEN 5770062M RICHARDSON ROAD BOSTON 5710159M KURLA STREET PORT LINCOLN Date Time Severity Damage Crash Type Road Road Lighting Traffic Controls Locn Type Report No. Surface Moisture 16/05/2014 09:00 Fri Injury $25,000 Right Angle Sealed Dry Daylight No Control Not Divided VC14230669 DCA Code Sub DCA Code(s) 149 Other Manoeuvring Event Code Evt Seq Unit 1 Unit 1 Object Unit 1 Col pt Unit 2 Unit 2 Object Unit 2 Col Pt COLLISION E RIGID TRUCK LGE GE 4.5T FRONT Motor Cars FRONT RRD: 0312.38 Motor Cars - Sedan - Stopped on Carriageway in North West direction(Towed From Scene) Hits a RIGID TRUCK LGE GE 4.5T - Straight Ahead in North East direction (Driver Rider resp)(Towed From Scene) Apparent Error Inattention Total Casualties 1 ( 1 inj minor, 0 inj serious, 0 fatals) MID-BLOCK BETWEEN 5770158M GLEDSTANES TERRACE BOSTON 5770063M HAIGH DRIVE BOSTON Date Time Severity Damage Crash Type Road Road Lighting Traffic Controls Locn Type Report No.
    [Show full text]
  • Extract from the National Native Title Register
    Extract from the National Native Title Register Determination Information: Determination Reference: Federal Court Number(s): SAD6011/1998 NNTT Number: SCD2016/001 Determination Name: Croft on behalf of the Barngarla Native Title Claim Group v State of South Australia Date(s) of Effect: 6/04/2018 Determination Outcome: Native title exists in parts of the determination area Register Extract (pursuant to s. 193 of the Native Title Act 1993) Determination Date: 23/06/2016 Determining Body: Federal Court of Australia ADDITIONAL INFORMATION: Note 1: On 6 April 2018 Justice White of the Federal Court of Australia (the Court) ordered that: 1. The Determination of native title made on 23 June 2017 [sic] in Croft on behalf of the Barngarla Native Title Claim Group v State of South Australia (No 2) [2016] FCA 724 be amended in accordance with the Amended Determination attached as Annexure A to this order, noting that because of the size of the Determination Annexure A comprises only: a. pages i to xv inclusive of the Amended Determination; b. the first page of any Schedule which is amended; and c. the particular pages within each Schedule which are amended. 2. Order 2 made on 23 June 2016 be vacated. 3. In its place there be an order that the Determination as amended take effect from the date of this order. Note 2: In the Determination orders of 23 June 2016, Order 22 deals with the nomination of a prescribed body corporate. On 19 December 2016 the applicant nominated to the Court in accordance with sections 56 and 57 of the Native Title Act 1993 (Cth) that: (a) native title is not to be held in trust; National Native Title Tribunal Page 1 of 20 Extract from the National Native Title Register SCD2016/001 and, accordingly, pursuant to Order 22(b) of 23 June 2016: (b) the Barngarla Determination Aboriginal Corporation is nominated as the prescribed body corporate for the purpose of section 57(2) of the Native Title Act 1993 (Cth).
    [Show full text]
  • Musgrave Subregional Description
    Musgrave Subregional Description Landscape Plan for Eyre Peninsula - Appendix D The Musgrave subregion extends from Mount Camel Beach in the north inland to the Tod Highway, and then south to Lock and then west across to Lake Hamilton in the south. It includes the Southern Ocean including the Investigator Group, Flinders Island and Pearson Isles. QUICK STATS Population: Approximately 1,050 Major towns (population): Elliston (300), Lock (340) Traditional Owners: Nauo and Wirangu nations Local Governments: District Council of Elliston, District Council of Lower Eyre Peninsula and Wudinna District Council Land Area: Approximately 5,600 square kilometres Main land uses (% of land area): Grazing (30% of total land area), conservation (20% of land area), cropping (18% of land area) Main industries: Agriculture, health care, education Annual Rainfall: 380 - 430mm Highest Elevation: Mount Wedge (249 metres AHD) Coastline length: 130 kilometres (excludes islands) Number of Islands: 12 2 Musgrave Subregional Description Musgrave What’s valued in Musgrave Pearson Island is a spectacular The landscapes and natural resources of the Musgrave unspoilt island with abundant and subregion are integral to the community’s livelihoods and curious wildlife. lifestyles. The Musgrave subregion values landscapes include large The coast is enjoyed by locals and visitors for its beautiful patches of remnant bush and big farms. Native vegetation landscapes, open space and clean environment. Many is valued by many in the farming community and many local residents particularly value the solitude, remoteness recognise its contribution to ecosystem services, and and scenic beauty of places including Sheringa Beach, that it provides habitat for birds and reptiles.
    [Show full text]
  • Eyre Peninsula
    RAA Regional Road Assessment Eyre Peninsula February 2015 Prepared By Chris Whisson Date 22 January 2015 Traffic and Road Safety Officer T: 08 8202 4743 E: [email protected] Ian Bishop Traffic Engineer T: 08 8202 4703 E: [email protected] Approved By Charles Mountain Date 13 February 2015 Senior Manager Road Safety T: 08 8202 4568 E: [email protected] Revision History Rev Date Author Approver Comment 0 24/12/2014 CW / IAB CM Draft. A 13/02/15 CW / IAB CM For Issue. B 02/03/15 CW / IAB CM Formatting corrections. Contents Executive Summary 1 1 Traffic Volumes 4 2 Crash Map 5 3 Lincoln Highway 7 3.1 Traffic Volumes 7 3.2 Crash History 7 3.3 Eyre Highway to Whyalla 9 3.3.1 Lane Widths and Lines 9 3.3.2 Signs and Delineation 9 3.3.3 Pavement Condition 9 3.3.4 Roadside Hazards 9 3.3.5 Recommendations 10 3.4 Whyalla to Cowell 10 3.4.1 Lane Widths and Lines 11 3.4.2 Signs and Delineation 11 3.4.3 Pavement Condition 11 3.4.4 Roadside Hazards 11 3.4.5 Recommendations 12 3.5 Cowell to Arno Bay 12 3.5.1 Lane Widths and Lines 12 3.5.2 Signs and Delineation 13 3.5.3 Pavement Condition 13 3.5.4 Roadside Hazards 13 3.5.5 Recommendations 13 3.6 Arno Bay to Port Lincoln 13 3.6.1 Lane Widths and Lines 14 3.6.2 Signs and Delineation 14 3.6.3 Pavement Condition 14 3.6.4 Roadside Hazards 14 3.6.5 Recommendations 15 4 Flinders Highway 16 4.1 Traffic Volumes 16 4.2 Crash History 16 4.3 Port Lincoln to Elliston 18 4.3.1 Lane Widths and Lines 18 4.3.2 Signs and Delineation 18 4.3.3 Pavement Condition 19 4.3.4 Roadside Hazards 19 4.3.5 Recommendations 20
    [Show full text]
  • Performance and Progress Reporting 2019-2020 July 2019 – Jun 2020
    Performance and Progress Reporting 2019-2020 July 2019 – Jun 2020 Contents Strategies Index ................................................................................................ 1 COMMUNITY AND SOCIAL DEVELOPMENT ................................................................ 4 1.1 Employment and Skills ............................................................................... 4 1.2 Indigenous Development .......................................................................... 19 1.3 Social and Community .............................................................................. 31 1.4 Education and Training ............................................................................ 33 1.5 Health ...................................................................................................... 36 ECONOMIC AND BUSINESS DEVELOPMENT .............................................................. 37 2.1 Infrastructure .......................................................................................... 37 2.2 Economic and Business Diversity ............................................................. 42 2.3 Visitor Economy ...................................................................................... 49 2.4 Water Resources ...................................................................................... 63 2.5 Energy .................................................................................................... 64 2.6 Mining and Resource Manufacturing ......................................................
    [Show full text]
  • ITLUP Community Information Line Database
    ITLUP community information line database No. Region of Interest Theme of Interest Specific project interest Other interest, issue or eg Inner Adelaide, Far North eg roads, public transport eg tram revival, N-S corridor concern Other Comments 1 Greater Adelaide Cycling Cycling projects requested copy of plan 2 Greater Adelaide light rail tram Australian Electric Traction Association - SA Division www.electrictraction.org.au 3 Middle Adelaide (north east) park and ride Tea Tree Plaza park and ride seeking information on when the Tea Tree Plaza park and ride will be completed 4 N/A web link on media release not connecting to site - is link broken? 5 Residence already suffers from noise and air pollution, concern that tram will further negatively impact on amenity as well as Innerwest (port adelaide) noise, air emissions, tram, road space tram take up road space 6 Innerwest cycling Outer Harbor Greenway 7 Inner South (Blackwood / Belair) local impacts and overall strategy Prefers hard copy to online 8 Innerwest (port adelaide) consultation event community event table lists 17 Nov venue as Pt Adelaide shopping mall. Which mall? 9 N/A maps 10 Caller is from the Office of Member for Stuart who is wanting locations and times of the two Pt Augusta community events. Notes that the Pt Augusta and Pt Pirie events Far North (Pt Augusta) consultation event are very close to the closing date for submissions. 11 Caller is CEO of Mitcham Council. How concrete is closing date, as council's meeting schedule will make it a challenge to respond in time. Responded with "Following closing date team will be reviewing the plan in light of all submissions received.
    [Show full text]
  • Eyre Peninsula Local Government Association
    Tas Luttrell Principal Research Officer Standing Committee on Transport & Regional Services Parliament House CANBERRA ACT 2600 Dear Sir, Subject: Integration of Regional Rail & Road Freight Transport and their Interface with Ports Thank you for the opportunity to comment on the above Inquiry. As you may be aware, this issue is already high on this region’s economic development and local government agendas, as key stakeholders in the Eyre Peninsula Grain Transport Integration and Investment Strategy currently before the Commonwealth Department of Transport and Regional Services. Eyre Peninsula Snapshot: Eyre Peninsula is an enigma. It is an opportunity-rich region of considerable diversity. On a per capita basis, Eyre Peninsula is a highly productive region, generating in an average year: One third of South Australia’s grain harvest. Two thirds of the State’s catch of seafood. Higher levels of visitation than any other country tourist region in South Australia. Home to one in every six of South Australia’s sheep. Sitting on a bounty supply of mineral resources, ranging from gypsum to gold. One of the worlds top ten locations for the generation of wind power. One of Australia’s most aggressive/successful exporters, particularly grain and seafood. Yet as a direct result of its vast size (45,000km2), remote location (local road network of 13,798km) and sparse population (55,390 people), Eyre Peninsula is infrastructure challenged. It is infrastructure, both hard and soft, that is the glue that binds both the economic and community fabric of this vast peninsula region together. Everything from water resources to regional transport.
    [Show full text]
  • Appendix I: Traffic Impact Assessment
    Central Eyre Iron Project Mining Lease Proposal APPENDIX I TRAFFIC IMPACT ASSESSMENT COPYRIGHT Copyright © IRD Mining Operations Pty Ltd and Iron Road Limited, 2015 All rights reserved This document and any related documentation is protected by copyright owned by IRD Mining Operations Pty Ltd and Iron Road Limited. The content of this document and any related documentation may only be copied and distributed for purposes of section 35A of the Mining Act, 1971 (SA) and otherwise with the prior written consent of IRD Mining Operations Pty Ltd and Iron Road Limited. DISCLAIMER A declaration has been made on behalf of IRD Mining Operations Pty Ltd by its Managing Director that he has taken reasonable steps to review the information contained in this document and to ensure its accuracy as at 5 November 2015. Subject to that declaration: (a) in writing this document, Iron Road Limited has relied on information provided by specialist consultants, government agencies, and other third parties. Iron Road Limited has reviewed all information to the best of its ability but does not take responsibility for the accuracy or completeness; and (b) this document has been prepared for information purposes only and, to the full extent permitted by law, Iron Road Limited, in respect of all persons other than the relevant government departments, makes no representation and gives no warranty or undertaking, express or implied, in respect to the information contained herein, and does not accept responsibility and is not liable for any loss or liability whatsoever arising as a result of any person acting or refraining from acting on any information contained within it.
    [Show full text]
  • Bushfire Report
    The recovery diary January-June 2005 65 The recovery diary January-June 2005 Date Event 11 January Tuesday State Emergency Operation Centre (SEOC) briefing. Fire danger rating for all of South Australia is extreme. Cummins Bowling Club provides a refuge for evacuees. Recovery officers unable to reach evacuees as arterial roads closed. At 4pm Children, Youth & Family Services (CYFS) establishes a recovery centre at the Port Lincoln High School in anticipation of the pending need. 4.30pm State Coordinator declares an identified major incident. State Coordinator, Commissioner Mal Hyde appoints Sue Vardon, Chief Executive, Department for Families and Communities as Assistant State Coordinator (Recovery) to lead and coordinate recovery operations. Vince Monterola, Chief Executive Officer, SA Fire and Emergency Services, to head the local recovery operation. 12 January Wednesday Hotline managed by Centrelink in operation at 9am. 12 noon State Coordinator declares a major emergency. Assistant State Coordinator (Recovery) convenes State Recovery Committee meeting at 4pm. Premier announces a relief operation to be mobilised for Eyre Peninsula victims, $2 million allocated. Premier promotes Hotline. Emergency Services Minister Conlon flies to Port Lincoln with Country Fire Services Chief Euan Ferguson to assess assistance required. Premier announces appointment of Duty Minister: “A Government Minister will be on duty on the Lower Eyre Peninsula until the immediate crisis has passed and recovery plans are in place. Minister for Emergency Services Patrick Conlon will be located on the Eyre Peninsula until the weekend when Minister for Agriculture Rory McEwen will take over”. Australian Red Cross (ARC) agrees to collect public donations on behalf of the Government.
    [Show full text]
  • The Secretary Standing Committee on Economics, Finance & Public Administration Committee House of Representatives Parliament
    The Secretary Standing Committee on Economics, Finance & Public Administration Committee House of Representatives Parliament House CANBERRA ACT 2600 Dear Sir/Madam, EPLGA Submission to the Commonwealth Inquiry into Local Government and Cost Shifting At the invitation last week of Mervyn Carter of Department of Transport and Regional Services, and subsequently confirmed by Vanessa Crimmins of the Committee Secretariat, the Eyre Peninsula Local Government Association wishes to make a late submission to the above inquiry. With regard to the general terms of reference relating cost shifting and the financial position of local government, this Association is in broad accord with the key issues raised by the August 2002 submission of the Local Government Association of South Australia and those Member Councils who have submitted individually. The general thrust of this submission addresses Term of Reference No. 6; namely the findings of the Commonwealth Grants Commission of the Local Government (Financial Assistance) Act, with a strong focus on road grant funding. RECENT HISTORY Eyre Peninsula Local Government Association and the Eyre Regional Development Board were invited to present at Commonwealth Regional Forum (RFAP) in Whyalla in December 1999. The central theme of our presentation was equity. Equity in regional infrastructure. Equity in regional services. Equity in regional funding. A copy of the notes of the EPLGA presentation is attached. (Attachment 2). However it was the opening remarks to that Forum of Minister for Regional Services, Territories & Local Government Hon Ian McDonald that galvanised our Association into action, namely: “I do acknowledge and have said this before, that South Australia has had a bad deal with both general purpose grants and road grants under the current system.
    [Show full text]
  • Appendix I: Traffic Impact Assessment
    Central Eyre Iron Project Mining Lease Proposal APPENDIX I TRAFFIC IMPACT ASSESSMENT COPYRIGHT Copyright © IRD Mining Operations Pty Ltd and Iron Road Limited, 2015 All rights reserved This document and any related documentation is protected by copyright owned by IRD Mining Operations Pty Ltd and Iron Road Limited. The content of this document and any related documentation may only be copied and distributed for purposes of section 35A of the Mining Act, 1971 (SA) and otherwise with the prior written consent of IRD Mining Operations Pty Ltd and Iron Road Limited. DISCLAIMER A declaration has been made on behalf of IRD Mining Operations Pty Ltd by its Managing Director that he has taken reasonable steps to review the information contained in this document and to ensure its accuracy as at 5 November 2015. Subject to that declaration: (a) in writing this document, Iron Road Limited has relied on information provided by specialist consultants, government agencies, and other third parties. Iron Road Limited has reviewed all information to the best of its ability but does not take responsibility for the accuracy or completeness; and (b) this document has been prepared for information purposes only and, to the full extent permitted by law, Iron Road Limited, in respect of all persons other than the relevant government departments, makes no representation and gives no warranty or undertaking, express or implied, in respect to the information contained herein, and does not accept responsibility and is not liable for any loss or liability whatsoever arising as a result of any person acting or refraining from acting on any information contained within it.
    [Show full text]