UPDATED FORM 1 for NEW 160 KLD MOLASSES BASED DISTILLERY By - M/s Gularia Chini Mills Distillery Unit (A unit of Balrampur Chini Mills Limited) at village Rudrapur Gularia, Block -Bijua, Tehsil-Gola, District-Lakhimpur Kheri, U.P. 262901.

(I)Basic Information:

Sl no Item Detail 1. Name of the Project “M/s Gularia Chini Mills Unit- Distillery (A unit of Balrampur Chini Mills Limited) has proposed to establish a 160 KLD (RS/ENA/AA), molasses based distillery along with 8.0 MW of Co- Generation Power Plant at village Rudrapur Gularia, Block -Bijua, Tehsil-Gola, District-Lakhimpur Kheri, U.P. 262901.” 2. Project Sector Industrial Projects 2 3. Location of the project Village – Rudrapur Gularia, P.O. Nausar Gularia, Tehsil- , District Lakhimpur Kheri, U.P. 4. Shape of the project land Attached. Uploaded GPS file Uploaded copy of survey of Toposheet 5. Brief summary of project Enclosed 6. State of the project Details of State of the project 7. State Name District name Tehsil name Uttar Pradesh Lakhimpur kheri Gola 8. Plot/Survey/Khasra No. 8.747 ha. 9. S. No. in the schedule 5(g) Distilleries 10. Proposed capacity/area/length/tonnage to The present proposal is be handled/command area/lease modification in previous TOR area/number or wells to be drilled granted: Unit has initially proposed 2 alternative modes of manufacturing alcohol (AA/RS/ENA) i.e. via molasses/grain, with recent policy on the Bio-Fuels as notified by Government of India, we are now, opting the manufacturing of RS/ENA/AA through molasses only. We have dropped the proposal of manufacturing alcohol (RS/ENA/AA) from grain. An amendment in TOR may kindly be made: The name of proposal may amend from: “M/s Gularia Chini Mills Unit- Distillery (A unit of Balrampur Chini Mills Limited) has proposed to establish a 160 KLD (RS/ENA/AA), molasses/grain based Distillery. Proposed 160 KLD distillery will be run either on Molasses or Grain but only on one mode at a time (based on availability of raw material) along with 8.0 MW of Co- Generation Power Plant at village Rudrapur Gularia, Block -Bijua,Tehsil-Gola, District-Lakhimpur Kheri, U.P. 262901. Now amended to as: “M/s Gularia Chini Mills Unit- Distillery (A unit of Balrampur Chini Mills Limited) has proposed to establish a 160 KLD (RS/ENA/AA), molasses based distillery along with 8.0 MW of Co- Generation Power Plant at village Rudrapur Gularia, Block -Bijua, Tehsil-Gola, District-Lakhimpur Kheri, U.P. 262901.” 11. New/Expansion/Modernization The present proposal is request for “M/s Gularia Chini Mills Unit- Distillery (A unit of Balrampur Chini Mills Limited) has proposed to establish a 160 KLD (RS/ENA/AA), molasses based distillery along with 8.0 MW of Co- Generation Power Plant at village Rudrapur Gularia, Block -Bijua, Tehsil-Gola, District-Lakhimpur Kheri, U.P. 262901.” 12. Category of project i.e. 'A' or 'B' ‘A’ 13. Does it attract the general condition? If No yes, please specify 14. Does it attract the specific condition? No 15. Is there any litigation pending against the No project? 16. Nearest railway station along with distance Gola Gokarannath Railway Station, in kms. 24.10 km 17. Nearest airport along with distance in kms Airport, 164 km 18. Nearest Town/City/District Headquarters Lakhimpur kheri , 33.80 km along with distance in kms 19. Details of alternative sites examined No shown on a toposheet 20. Whether part of interlinked projects? No 21. Whether the proposal involves No approval/clearance under the Forest (Conservation)Act,1980? 22. Whether the proposal involves No approval/clearance under the wildlife (Protection)Act,1972? 23. Whether the proposal involves No approval/clearance under the C.R.Z notification,2011? 24 Whether there is any Government No Order/Policy relevent/relating to the site? 25. Whether there is any litigation pending No against the project and/or land in which the project is proposed to be set up? 26 Project Cost (in lacs) Rs 20874.20 Lacs (Estimated)

Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes Open Land is available for proposed change in land use, land Establishment. (No work has been done till date on cover or topography proposed site.) including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No The site comprises of open land vegetation and buildings? 1.3 Creation of new land uses? No - 1.4 Preconstruction Yes Geo technical investigations have investigations e.g. bore been done. Raw Water houses, soil Characteristics: pH: 7.5; Total testing? dissolved solids (TDS): 380 mg/l. Total hardness 240 mg/l. Soil Bearing Capacity: 810 T/m2 1.5 Construction works? Yes Construction work shall be done for Distillery along with treatment systems. 1.6 Demolition works? No Proposed land is open for construction. 1.7 Temporary sites used for Yes Construction workers shall be construction works or housed temporarily at the housing of proposed site, for which temporary shelters shall be construction workers? created. 1.8 Above ground buildings, Yes Construction of various structures or earthworks structures/foundation work for including Distillery along with treatment linear structures,cut and fill systems. or excavations and fill or excavations 1.9 Underground works No Underground work only for civil including mining or foundation. tunneling? 1.10 Reclamation works? Yes Leveling and compaction of land prior to start the work. 1.11 Dredging? No - 1.12 Offshore structures? No - 1.13 Production and Yes Unit has proposed to establish a 160 KLD manufacturing processes? (RS/ENA/AA), molasses based distillery along with 8.0 MW of Co- Generation Power Plant 1.14 Facilities for storage of Yes Godown: Storage of maintenance equipments work. goods or materials? Warehouse for raw material and finished chemicals., molasses storage tanks. 1.15 Facilities for treatment or Yes For Spent wash : disposal of solid waste or MEE + Incineration liquid effluents? (Slop fired Boiler) will be installed. For Other effluent : Process Condensate Polishing Plant will be installed for treatment of various other effluents (Condensate, Lees, Floor washing, Blow downs). Unit will be based on zero liquid discharge. 1.16 Facilities for long term No - housing of operational workers? 1.17 New road, rail or sea traffic No Existing road will be utilized with some modification. during construction or operation? 1.18 New road, rail, air water No No Any borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No No Any existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No No Any transmission lines or pipelines? 1.21 Impoundment, damming, No No Any culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No Any 1.23 Abstraction or transfers of Yes 1228.0 KLD water from ground or (@ 7.8 KL/KL of product) surface ( Net fresh water requirement after recycling ) waters? Domestic Water Requirement:20.0 KLD 1.24 Changes in water bodies or No - the land surface affecting drainage or runoff? 1.25 Transport of personnel or Yes Transportation of Personnel, Construction material and materials for construction, raw materials for erection / operation will be carried operation or out. decommissioning? 1.26 Long term No No dismantling or decommissioning or restoration dismantling or works will be done. decommissioning or restoration works? 1.27 Ongoing activity during No - decommissioning which could have an impact on the environment? 1.28 Influx of people to an area Yes Direct employment:50 persons in either temporarily or Indirect employment: 110 persons permanently? 1.29 Introduction of alien No No Any species? 1.30 Loss of native species or No No genetic diversity? 1.31 Any other actions? No -

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply):

S.No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No Open land is available for the project. agricultural land (ha) The land is generally flat and does not come under flood zone. It does not have any human settlement. 2.2 Water (expected source & competing Yes 1228.0 KLD users) unit: KLD (@ 7.8 KL/KL of product) ( Net fresh water requirement after recycling ) Domestic Water Requirement:20.0 KLD 2.3 Minerals (MT) No No minerals will be needed in the manufacturing process 2.4 Construction material – stone, Yes Iron, Cement, Concrete, Brick etc. will aggregates, sand / soil be utilized. Will be procured mostly (expected source – MT) from local sources. 2.5 Forests and timber (source – MT) No - 2.6 Energy including electricity and fuels Yes 60.0 TPH slop fired boiler (source, competing Fuel Requirement users) Unit: fuel (MT),energy (MW) 576 KLD Slop along with Bagasse / Biomass : 204.0 TPD will be used as fuel during molasses based operation. 2.7 Any other natural resources (use No No any appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health

S.No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which No Distillery Industry is agro-based are hazardous (as and no use of hazardous per MSIHC rules) to human health or substances & material in the the environment process. (flora, fauna, and water supplies 3.2 Changes in occurrence of disease or No - affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No  Revenue will be generated changing living for the state government. conditions?  Foreign currency will be saved.  Import of foreign liquor will reduce.  Employment will be provided to nearby people, which will reduce poverty.  Increase in Local Business  Standard of Living of people will increase. 3.4 Vulnerable groups of people who No - could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes No -

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not applicable as it is a Distillery unit 4.2 Municipal waste (domestic and or No Commercial waste will commercial wastes) be sold to authentic Vendors. 4.3 Hazardous wastes (as per Hazardous Yes Waste insulating and lubricating Waste Management Rules oil, oil barrels shall be collected in dedicated drums. The same shall be provided to vendors authorized by MoEF /UPPCB for recycling and reusing. 4.4 Other industrial process wastes Yes Fly ash generation: 67.0 MT/Day: Will be used as manure.

4.5 Surplus product No - 4.6 Sewage sludge or other sludge from Yes Fermenter Sludge: 16.0 MT/DAY: effluent treatment Will be used as manure. 4.7 Construction or demolition wastes Yes Iron etc. will be recycled back. 4.8 Redundant machinery or equipment No - 4.9 Contaminated soils or other materials No - 4.10 Agricultural wastes No - 4.11 Other solid wastes No -

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil No Electro static precipitator will fuels from stationary or be provided with Stack of height mobile sources 72.0 meters in order to control dust emissions from 60 TPH Boiler. The emissions of particulate matters from the stacks will be limited to 150 mg/Nm3.

5.2 Emissions from production processes Yes PM ,NOX,SO2 5.3 Emissions from materials handling Yes Dust emissions and fugitive including storage or emissions shall arise from raw transport material storage, handling and transport. The control measures shall include concrete/asphalt road construction, water sprinkling, tarpaulin cover on trucks carrying raw materials and covered storage yard for fuel. 5.4 Emissions from construction activities Yes Emissions during construction including plant and phase shall be from operation of equipment DG set. The existing DG set of the Distillery shall be used, which has a chimney of adequate height with acoustic chambers. 5.5 Dust or odours from handling of Yes Dust shall be generated during civil materials including Construction and movement of construction materials, sewage and vehicles. waste These activities shall be for a short duration and their impact shall be minimized by taking the following measures:  Water sprinkling Use of dust arresting panels/ sheets  Regular removal of construction waste material  Proper storage of construction material  Use of cover on trucks Speed limit for vehicles  Sewage will be treated via septic tank and soak pit. 5.6 Emissions from incineration of waste No - 5.7 Emissions from burning of waste in No -- open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No --

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes Turbine/Machinery. Effective engines, ventilation control measures are inbuilt for plant, crushers the control of noise. Due to use of modern and sophisticated processing technology, noise level below 70 dB(A) is expected during operation of the proposed plant. 6.2 From industrial or similar processes Yes Due to plant operation. During operation phase, noise shall be generated by the operation of pumps, air compressors, boilers, TG set etc. Effective mitigation measures shall be built in. 6.3 From construction or demolition Yes The noise level(dB) generated from construction equipment at a distance of 50 ft from the source are given as below  Concrete mixer 85 dB  Mobile crane 81 dB  Hammering 86 dB  Loader 81dB 6.4 From blasting or piling Yes - 6.5 From construction or operational Yes The traffic during the construction traffic phase will not have any significant impact. Water is sprayed to control the dust etc. 6.6 From lighting or cooling systems No No equipment shall be permitted to be installed in proposed project which generates noise level exceeding the permissible standards. 6.7 From any other sources No -

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or No There is no use of hazardous spillage of hazardous material and substances. materials 7.2 From discharge of sewage or other No There is no impact on land and effluents to water or the water quality due to Zero land (expected mode and place of Discharge industry. discharge) Total treated effluent will be evaporated by multi-effect evaporation. There will be no discharge of any effluent outside the plant boundary. Treated effluent will be used in non-critical purposes within the plant. Domestic waste water will be treated in septic tank-soak pit system. UNIT IS ZERO LIQUID DISCHARGE BASED. 7.3 By deposition of pollutants emitted to No No impact on land or water quality. air into the land or Dust will be generated to some into water extent due to different project activities. Proper care will be taken to reduce dust emission, wherever possible. 7.4 From any other sources No - 7.5 Is there a risk of long term build up of No - pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S. No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No Adequate safety measures will be from storage, handling, followed to control of fire. As per use or production of hazardous applicable safety regulations. substances 8.2 From any other causes No All standard safety measure shall be taken during the expansion of Plant. 8.3 Could the project be affected by No Not reported till date The area falls natural disasters causing under Earthquake Zone IV as per environmental damage (e.g. floods, Indian Standard Seismic Zoning earthquakes, landslides, cloudburst Map. etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S.No Information/Checklist Yes/No Details there of (with confirmation approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of Yes The project shall lead to supporting.lities, ancillary development and prosperity of the development or development area by generating additional stimulated by the project employment opportunities. Green which could have impact on the belt development and other such environment e.g.: activities undertaken by project Supporting infrastructure (roads, proponents shall have a positive power supply,waste impact on the ecology of the area. or waste water treatment, etc.) The project will have insignificant housing development impact on the road network extractive industries around the project site. The supply industries project is not expected to have Other any foul impact of concern on the power supply system, housing and waste management system of the area. 9.2 Lead to after use No - of the site, which could have an impact on the environment 9.3 Set a precedent for later Yes Educating farmers regarding developments scientific cultivation for better production of cane. Establishment of Environment cell at unit. Recruitment of professional for incorporation of established system in the operation including EH&S aspects. 9.4 Have cumulative effects due to No - proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity

S.No Areas Name/ Aerial distance (within Identity 15km.) Proposed project location boundary 1. Areas protected under international No N.A. conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2. Areas which are important or sensitive No River Sharda : 6.6 kms in East for ecological reasons Wetlands, Direction watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3. Areas used by protected, important or No N.A. sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or underground No N.A. waters 5. State, National boundaries No N.A. 6. Routes or facilities used by the public No N.A. for access to recreation or other tourist, pilgrim areas 7. Defence installations No N.A. 8. Densely populated or builtup No N.A. area 9. Areas occupied by sensitive manmade Yes COMMUNITY HEALTH land uses (hospitals, schools, places of CENTRE, worship, community facilities) PRIMARY SCHOOLS, 10. Areas containing important, high No N.A. quality or scarce resources.(ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas already subjected to pollution or No N.A. environmental damage.(those where existing legal environmental standards are exceeded) 12. Areas susceptible to natural hazard No N.A. which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects