A Novel Calendar-Based Method for Visualizing Water Quality Change: the Case of the Yangtze River 2006–2015
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Chapter 5 Sinicization and Indigenization: the Emergence of the Yunnanese
Between Winds and Clouds Bin Yang Chapter 5 Sinicization and Indigenization: The Emergence of the Yunnanese Introduction As the state began sending soldiers and their families, predominantly Han Chinese, to Yunnan, 1 the Ming military presence there became part of a project of colonization. Soldiers were joined by land-hungry farmers, exiled officials, and profit-driven merchants so that, by the end of the Ming period, the Han Chinese had become the largest ethnic population in Yunnan. Dramatically changing local demography, and consequently economic and cultural patterns, this massive and diverse influx laid the foundations for the social makeup of contemporary Yunnan. The interaction of the large numbers of Han immigrants with the indigenous peoples created a 2 new hybrid society, some members of which began to identify themselves as Yunnanese (yunnanren) for the first time. Previously, there had been no such concept of unity, since the indigenous peoples differentiated themselves by ethnicity or clan and tribal affiliations. This chapter will explore the process that led to this new identity and its reciprocal impact on the concept of Chineseness. Using primary sources, I will first introduce the indigenous peoples and their social customs 3 during the Yuan and early Ming period before the massive influx of Chinese immigrants. Second, I will review the migration waves during the Ming Dynasty and examine interactions between Han Chinese and the indigenous population. The giant and far-reaching impact of Han migrations on local society, or the process of sinicization, that has drawn a lot of scholarly attention, will be further examined here; the influence of the indigenous culture on Chinese migrants—a process that has won little attention—will also be scrutinized. -
Anhui Hefei Urban Environment Improvement Project
Major Change in Scope and Implementation Arrangements Project Number: 36595 Loan Number: 2328-PRC May 2009 People's Republic of China: Anhui Hefei Urban Environment Improvement Project CURRENCY EQUIVALENTS (as of 12 May 2009) Currency Unit - yuan (CNY) CNY1.00 = $0.1466 $1.00 = CNY6.8230 ABBREVIATIONS ADB – Asian Development Bank EA – executing agency HMG – Hefei municipal government HUCIC – Hefei Urban Construction Investment Company HXSAOC – Hefei Xincheng State Assets Operating Company Limited IA – implementing agency km – kilometer m3 – cubic meter PMO – project management office WWTP – wastewater treatment plant NOTE In this report, "$" refers to US dollars Vice-President C. Lawrence Greenwood, Jr., Operations Group 2 Director General K. Gerhaeusser, East Asia Department (EARD) Director A. Leung, Urban and Social Sectors Division, EARD Team leader R. Mamatkulov, Urban Development Specialist, EARD Team member C. Navarro, Project Officer (Portfolio Management), EARD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page MAPS I. INTRODUCTION 1 II. BACKGROUND 1 A. Scope of the Project 2 B. Original Cost Estimates and Financing Plan 3 C. Status of Project Implementation 4 III. THE PROPOSED CHANGES 5 A. Change in Project Scope 5 B. Change in Implementation Arrangements 6 C. Reallocation of Loan Proceeds 6 IV. ASSESSMENT 6 V. RECOMMENDATION 7 APPENDIXES 1. Original Design and Monitoring Framework 8 2. Summary Cost Estimates and Financing Plan 12 3. -
Analysis of Multiple Cyanobacteria in Chaohu Lake Xuan Hu
International Symposium on Social Science (ISSS 2015) Analysis of Multiple Cyanobacteria in Chaohu Lake Xuan Hu School of Electrical Engineering, North China Electric Power University, Baoding 071003, China [email protected] Keywords: Chaohu Lake; algae; Cyanobacteria bloom; Eutrophication. Abstract. Cyanobacteria are the most simple and most primitive algae, which bloom in some serious eutrophicative lake. When they form a layer of blue-green bubbles which smell, they are called water blooms. The most typical lakes in China where the cyanobacterial blooms break out are Taihu Lake and Chao Lake. Of the "three rivers and three lakes" which are famous for water pollution, the Chaohu Lake area is the key area for water pollution control. This paper collects relevant data of the amount of algae and the area of water bloom in Chaohu Lake, summarizes the research on the outbreak of algae bloom in the lake, and puts forward feasible suggestions for dealing with cyanobacterial bloom in the lake. 1. Introduction Chaohu is located in the southeast of Anhui Province, is one of China's five major freshwater. The area of the lake is 752km2, the annual rainfall is 1100mm. Chaohu Lake Basin belongs to the subtropical and warm temperate transition of the subtropical monsoon climate zone, climate mild and humid, moderate rainfall, humidity, monsoon climate significantly. Chaohu Lake is known as "Yumizhixiang" reputation, rich in grain, oil, cotton, hemp, vegetables and fruit crops, depending on the lake and textile, food and other pillar industries. In twentieth Century 50 's, Chaohu water quality is fine, the mineralization degree is extremely low, the acid base is moderate, the aquatic plants flourish, the biodiversity is rich. -
A Historical Sedimentary Record of Mercury in a Shallow Eutrophic Lake
University of Kentucky UKnowledge Earth and Environmental Sciences Faculty Earth and Environmental Sciences Publications 4-2019 A Historical Sedimentary Record of Mercury in a Shallow Eutrophic Lake: Impacts of Human Activities and Climate Change Hanxiao Zhang Chinese Research Academy of Environmental Science, China Shouliang Huo Chinese Research Academy of Environmental Science, China Kevin M. Yeager University of Kentucky, [email protected] Beidou Xi Chinese Research Academy of Environmental Science, China Jingtian Zhang Chinese Research Academy of Environmental Science, China See next page for additional authors RFoigllohtw c licthiks t aond ope addn ait feionedalba wckork fosr mat :inh att nps://uknoew tab to lewtle usdg kne.ukowy .hedu/eow thies_fas documcpubent benefits oy u. Part of the Anthropology Commons, Earth Sciences Commons, Engineering Commons, and the Environmental Sciences Commons Repository Citation Zhang, Hanxiao; Huo, Shouliang; Yeager, Kevin M.; Xi, Beidou; Zhang, Jingtian; and Wu, Fengchang, "A Historical Sedimentary Record of Mercury in a Shallow Eutrophic Lake: Impacts of Human Activities and Climate Change" (2019). Earth and Environmental Sciences Faculty Publications. 18. https://uknowledge.uky.edu/ees_facpub/18 This Article is brought to you for free and open access by the Earth and Environmental Sciences at UKnowledge. It has been accepted for inclusion in Earth and Environmental Sciences Faculty Publications by an authorized administrator of UKnowledge. For more information, please contact [email protected]. Authors Hanxiao Zhang, Shouliang Huo, Kevin M. Yeager, Beidou Xi, Jingtian Zhang, and Fengchang Wu A Historical Sedimentary Record of Mercury in a Shallow Eutrophic Lake: Impacts of Human Activities and Climate Change Notes/Citation Information Published in Engineering, v. -
PRC: Anhui Chao Lake Environmental Rehabilitation Project
Due Diligence Report of Environment Project Number: 44036 September 2015 PRC: Anhui Chao Lake Environmental Rehabilitation Project Prepared by Anhui Provincial Project Management Office (APPMO) For Subproject H1 Hefei City Binhu New District Beilaowei Environment Improvement Subproject L1 Chao Lake Basin Lu’an Eastern New Town District Water Environment Improvement Subproject WW1 Wuwei County Wucheng Water Environment (Wuwei Section of Xi River) Integrated Improvement This due diligence report of environment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENT $1 = CNY6.3549 (on 3 September 2015) ABBREVIATIONS ADB - Asian Development Bank A2/0 - Anaerobic-anoxic-oxic AP - Affected Person APG - Anhui Provincial Government As - Arsenic BOD5 - 5-day biochemical oxygen demand Cd - Cadmium CLMA - Chao Lake Management Authority CNY - Chinese Yuan COD - Chemical oxygen demand Cr - Chromium DFR - Draft final report DMF - Design and Monitoring Framework DRC - Development and Reform Commission EA - Executing Agency EFS - Engineering Feasibility Study EHS - Environmental Health and Safety EIA - Environmental -
The Flow Field Simulation on Dianchi Lake
View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Elsevier - Publisher Connector Available online at www.sciencedirect.com Procedia Engineering 31 (2012) 696 – 702 International Conference on Advances in Computational Modeling and Simulation The flow field simulation on Dianchi Lake Haoliang Cheng, Jurui Yang , Zhen¶ai Lu, Luo Zhang College of Electric Power Engineering, Kunming University of Science and Technology, Kunming 650500ˈChina Abstract According to the hydro-G\QDPLFVPRGHOV¶SULQFLSOH and the comprehensive roughness of the wetland determined by flume experiment, as well as some available information about Dianchi Lake, such as ecological environment construction plan, previous studies, wetland plants and the change of Lake water conditions, a vertical-averaged 2-D hydrodynamic model is established. The model is applied to simulate the flow field under 3 situations: present lake water, lake waters after breakwater removal and wetland build. Wetland plants and the change of the water boundary conditions influencing on the flow field are analyzed. The simulation results show that, removal of the breakwater to expand water have a faint effect on Dianchi Lake, however, it changes the boundary conditions and the part direction of wind-driven current, thus the part flow field is addition. The average flow velocity increases from 0.73cm/s to 1.18cm/s in the area between Fubao and Xishan in the north of Dianchi, increasing by 61.6%. The average flow velocity increases from 0.34cm/s to 0.57cm/s, increasing by 67.6%, in Kun-yang in the portion area of the north of Dianchi. -
A Liveable Water Town for All - Wulongpu Project, Kunming
A Liveable Water Town for All - Wulongpu project, Kunming Wenying Ma Original site infomation EXISTING PROBLEMS City transforming Modern city Tourist city Ghost town WHAT WHY At present, Chinese cities are developing rapidly, and most It is necessary to find a sustainable way of development for people yearn for a fast pace urban life. Some small towns are these small places. gradually abandoned, and those towns with good natural environment have become tourist cities to support the economy. This kind of cities has the possibility to have their own characteristics, which can attract different age groups to gather and live there. Under this environment, young people tended to seek for study or job opportunities in big cities. Only old people who were reluctant to move remained in old cities. In order to achieve sustainable development, how to balance urban development and natural environmental protection is also one of the important issues. The solution should be based on the local conditions and background as well. Both the expansion of big cities and tourism cities bring great burden to the surrounding environment. It is difficult to maintain the balance between cities and nature. In the process of urban development, the natural environment were destroyed, and pollution can be seen everywhere. RESEARCH PART LOCATION Train station Train station China Yunnan 1,370,536,875 48,005,000 Metro Line 1 Metro Line 4 Kunming 5,600,000 University town Highway Chenggong Gudian city 195,000 SURROUNDINGS The main road Area condition This small town seems Wasterland along the main road like that it is separated Connection by a highway. -
Potential Housing Bubble with Chinese Characteristics: Analysis and Policy Design Through an Operational Model by Xin Zhang
Potential Housing Bubble with Chinese Characteristics: Analysis and Policy Design through an Operational Model By Xin Zhang B.S in Electronics Engineering, Fudan University, 2003 Diplôme d'ingénieur in Conception Engineering, École des Mines de Paris, 2006 M.S. in Urban Studies and Planning and M.S. in Real Estate Development, MIT, 2008 M.S. in Civil Engineering, MIT, 2009 Submitted to the Institute for Data, Systems, and Society in partial fulfillment of the requirements for the degree of Doctor of Philosophy in Engineering Systems at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2018 © 2018 Massachusetts Institute of Technology. All Rights Reserved Signature of Author…………………………………………………………………………………………………… Engineering Systems Institute for Data, Systems, and Society December 31, 2017 Certified by………………………………...……………………………………………………………………………………... Prof. Richard de Neufville Professor of Engineering Systems Institute for Data, Systems, and Society Thesis Committee Chair Certified by…………………...…………………………………………………………………………………………………... Prof. David Geltner George Macomber Professor of Real Estate Finance Dept. of Urban Studies and Planning Thesis Committee Member Certified by……………………………………………………………………………………………………………................. Prof. Siqi Zheng Dept. of Urban Studies and Planning Thesis Committee Member Accepted by……………………………………………………………………………………………………………………….. Prof. Stephen C. Graves Professor, Mechanical Engineering and Engineering Systems Abraham J. Siegel Professor, Management Science Graduate Officer, IDSS 2 Potential Housing -
50164-001: Integrated Wastewater Management Project
Initial Environment and Social Examination Project Number: 50164-001 October 2018 China Water Environment Group Investment Limited and Xinkai Water Environment Investment Limited Integrated Wastewater Management Project (People’s Republic of China) Prepared by China Water Environment Group Limited This Initial Environment and Social Examination is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Dali Erhai Lake Basin Wastewater Interception Project Initial Environmental and Social Examination October 2018 China Water Environment Group Limited Table of Content EXECUTIVE SUMMARY ....................................................................................................... I A. Introduction ....................................................................................................................................... i B. The Project ........................................................................................................................................ i C. Baseline Environment and Social Conditions ...................................................................................ii -
8D Yunnan Chinese New Year Dongchuan/Luopin/Jiaozi Snow Mountain Tour Code: YKNY8 Tour Highlights : Dongchuan Red Soil Land –Luoxia Trench View Unique Scenery
Wef: Aug 2018 8D Yunnan Chinese New Year Dongchuan/Luopin/Jiaozi Snow Mountain Tour Code: YKNY8 Tour Highlights : Dongchuan Red Soil land –Luoxia Trench view Unique Scenery Luopin - 20 contiguous acres canola flowers Jiaozi Snow Mountian - Enchanting lakes, magnificent waterfalls, attractive cloud sea, charming sunset, exuberant meadows Jiuxiang Karst Caves - magnificent caves, waterfalls and beautiful landscape. DAY 01: Singapore / Kunming (L/D) Assemble at Singapore Changi Airport for our flight to Kunming , capital of Yunnan Province. Upon arrival, proceed visit Golden Horse and Green Cock Archway . Thereafter, visit Nanping Shopping Street for free at leisure.. DAY 02: Kunming/Jiaozi Snow Mountian/Dongchuan (B/L/D) After Breakfast, proceed to Jiaozi Snow Mountain . It should be hard to find a snow mountain in Kunming which is renowned as "Spring City". But the miraculous Jiaozi Snow Mountain is an exception. The snow- capped mountain got its name because it looks like a sedan chair (Jiaozi). In winter and spring, the mountain is covered with pure white snow, with beautiful icefalls hanging from cliffs . In one word, scenery in the Jiaozi Snow Mountain is extraordinary. Enchanting lakes, magnificent waterfalls, attractive cloud sea, charming sunset, exuberant meadows, and beautiful azalea flowers will make you feel like you are stepping into a fairy tale world. Next, proceed to Dongchuan. DAY 03: Dongchun/Kunming (B/L/D) Moring visit Dongchuan, brilliant red soil, the yellow buckwheat and the dramatic skies, all make the region around Dongchuan a paradise for photographers, rural place in the Wumeng Mountainous area, becomes very famous among photographers worldwide for its red soil. -
Anhui Environmental Improvement Project for Municipal Wastewater Treatment/Industrial Pollution Abatement
Performance Evaluation Report PPE: PRC 28241 Anhui Environmental Improvement Project for Municipal Wastewater Treatment/Industrial Pollution Abatement (Loans 1490/1491-PRC) in the People’s Republic of China December 2005 Operations Evaluation Department Asian Development Bank CURRENCY EQUIVALENTS Currency Unit – yuan (CNY) At Appraisal At Project Completion At Operations Evaluation (October 1996) (January 2003) (June 2005) CNY1.00 = $0.1200 = $0.1210 = $0.1208 $1.00 = CNY8.3364 = CNY8.2770 = CNY8.2765 ABBREVIATIONS ADB – Asian Development Bank AEPB – Anhui Environmental Protection Bureau APG – Anhui Provincial Government AVP – Anhui Vinylon Plant BOD – Biological Oxygen Demand (BOD) CDCC – Chaohu Dongya Cement Company COD – chemical oxygen demand CWTEC – Chaohu Wastewater Treatment Engineering Company DO – dissolved oxygen EA – Executing Agency EIRR – economic internal rate of return FIRR – financial internal rate of return HCFP – Hefei Chemical Fertilizer Plant HCW – Hefei Chemical Works HISC – Hefei Iron and Steel Corporation HSTC – Hefei Sewage Treatment Company ICB – international competitive bidding IS – international shopping NOx – nitrogen oxides O&M – operation and maintenance OEM – Operations Evaluation Mission PCR – project completion report PIA – project implementing agency PMO – Project Management Office PPER Project Performance Evaluation Report PRC – People’s Republic of China RRP – Report and Recommendation of the President SCADA – Supervisory Control and Data Acquisition SOE – state-owned enterprise SS – suspended solid TA – technical assistance TCR – technical assistance completion report TOT – Transfer-Operate-Transfer WACC – weighted average cost of capital WWTP – wastewater treatment plants WEIGHTS AND MEASURES kg – kilogram km – kilometer l – liter m – meter m3 – cubic meter mg – milligram mm – millimeter NOTE In this report, "$" refers to US dollars. Director : D. -
People's Republic of China: Anhui Huainan Urban Water Systems
Project Administration Manual Project Number: 46078 Loan Number: LXXXX-PRC October 2013 People’s Republic of China: Anhui Huainan Urban Water Systems Integrated Rehabilitation Project 2 Contents PROJECT ADMINISTRATION MANUAL PURPOSE AND PROCESS 4 I. PROJECT DESCRIPTION 6 A. Rationale 6 B. Impact and Outcome 7 C. Outputs 8 II. IMPLEMENTATION PLANS 12 A. Project Readiness Activities 12 B. Overall Project Implementation Plan 13 III. PROJECT MANAGEMENT ARRANGEMENTS 14 A. Project Implementation Organizations – Roles and Responsibilities 14 B. Key Persons Involved in Implementation 15 C. Project Organization Structure 17 IV. COSTS AND FINANCING 19 A. Investment and Financing Plans 19 B. Detailed Cost Estimates by Expenditure Category 21 C. Allocation and Withdrawal of Loan Proceeds 22 D. Detailed Cost Estimates by Financier 23 E. Detailed Cost Estimates by Outputs/Components 24 F. Detailed Cost Estimates by Year 25 G. Contract and Disbursement S-curve 26 H. Fund Flow Diagram 27 V. FINANCIAL MANAGEMENT 28 A. Financial Management Assessment 28 B. Disbursement 29 C. Accounting 32 D. Auditing and Public Disclosure 32 VI. PROCUREMENT AND CONSULTING SERVICES 34 A. Advance Contracting and Retroactive Financing 34 B. Procurement of Goods, Works and Consulting Services 34 C. Procurement Plan 35 VII. SAFEGUARDS 40 A. Environment 40 B. Land Acquisition and Resettlement 42 C. Local Grievance Redress Mechanism 48 VIII. GENDER AND SOCIAL DIMENSIONS 51 A. Summary Poverty Reduction and Strategy Policy 51 B. Gender and Development 51 IX. PERFORMANCE MONITORING, EVALUATION, REPORTING AND COMMUNICATION 58 A. Project Design and Monitoring Framework 58 B. Monitoring 61 C. Evaluation 63 D. Reporting 63 3 E.