Auction Notice & Annexture Format

Total Page:16

File Type:pdf, Size:1020Kb

Auction Notice & Annexture Format GOVERNMENT OF WEST BENGAL OFFICE OF THE EXECUTIVE ENGINEER PUBLIC WORKS DIRECTORATE DARJEELING DIVISION 8, Hooker Road , Post Box No. 59 Darjeeling- 7 3 4 1 0 1 . Phone: (0354) -22-54201 Memo. No- 1188 Dated :07/10/2020 OFF-LINE AUCTIONNOTICE NO.13/DJ OF 2020-2021OF THE EXECUTIVE ENGINEER, PWD., DARJEELING DIVISION, DARJEELING. Name of work:- Off-line Seal Bid / Auction of dismantled materials obtained from Emergent repair work for CRPF /SPF accommodation at Panighatta HS under Panighatta PP (under Mirik PS) for forth coming Lok Sabha Election 2019, under Darjeeling Division, PWD during the year 2020-2021. It is hereby notified for general information that some unserviceable materials will be sold through inviting Public Auction (Sealed Bid) on 06/11/2020 by the Executive Engineer, Darjeeling Division, PWD, Darjeeling from 1.30 p.m at the office of the Executive Engineer, PWD, Darjeeling Division, Darjeeling among the Outside Bonafide Contractors / Firmsfor the works as mentioned in Annexure “A”, The willing participants are requested to attend in the office of Executive Engineer, PWD, Darjeeling Division on 6th November 2020 before 1.30p.m to quote their rates for the works as mentioned above with valid Income Tax, Professional Tax, GST, Pan Card, Trade Licence certificates. The intending bidder shall have to furnish earnest money in the form of Bank draft/D.C.R in favour of the Executive Engineer PWD., Darjeeling Division @ Rs. 2.00% (Two point zero zero percent) of the total book value. The successful bidder shall have to execute formal tender after receiving acceptance –cum-work order from the Executive Engineer, P.W.D. Darjeeling Division in W.B.F No. 2908 in triplicate to be available in the office of the Executive Engineer P.W.D., Darjeeling Division during office hrs. on payment of the cost of tender papers and deposit the entire bid value in the form of Bank draft from any nationalized bank in favour of the Executive Engineer, P.W.D. Darjeeling Division, Darjeeling as per rule within 3 (three) days. In case failure of the same the earnest money will be forfeited and the materials will be resold through another public auction. The Executive Engineer, P.W.D., Darjeeling Division reserves the right to accept or reject any offer full or part without assigning any reason thereof. Details of work:- As per Annexure A. TERMS AND CONDITIONS:- 1 Only reputed authorized, bonafied outsidersqualified Civilfirms as will be decided by the undersigned may participate in the Auction (Seal Bid). 2 Intending bidders are requested to inspect the materials and its condition with the respective Junior Engineer along with Assistant Engineer, Darjeeling/ Kurseong Sub-Division, PWD, Darjeeling, In advance to satisfy themselves with actual condition of the materials “as is where is basis” before 06/11/2020. 3 Rates are to be quoted both in figure and word against each item of work in the only specific “Schedule of items” to be supplied only to civil firms from this office free of cost. 4 The quoted rates are to be inclusive of all taxes and charges. 5 The qualified quotationers will have to make sealed signature on every page of the “Schedule of items” and drop the same forwarded with their printed letterhead along with copies or papers as mentioned. 6 No conditional payment mode will be entertained. 7 No conditional auction will be entertained. 8 If the successful bidder fails to execute the contract then auction will be rejected. 9 The undersigned does not bind himself to accept the highestauction bidder and reserve the right to reject any or all auction bidders received without assigning any reasons whatsoever. 10 Time of completion of above item of work is within 15 days. The failure to lift materials within given time may cause panel action Sd/- C.K JHA Executive Engineer, PWD Darjeeling Division, Darjeeling. Memo. No- 1188 /(6) Dated :07/10/2020 Copy forwarded to :- i The Chief Engineer, PWD, North Zone, Jalpaiguri for his information please. ii The Superintending Engineer, P.W.D., Northern Circle/N.B.C.C-I/II / P.W. (Roads) North Bengal Highway/Northern highway Circle for information iii The Superintending of Police Darjeeling for information. iv The Executive Engineer, P.W.D., kalimpong Division/ /Teesta Bridge Construction Division /Jalpaiguri Construction Division/Cooch Bihar /Jalpaiguri / North Bengal Constn. Division / Darjeeling highway Division Siliguri / National Highway Division IX Siliguri for information and wide circulation. v The Assistant Engineer, P.W.D., Darjeeling /Kurseong Sub-Division Darjeeling for information . vi The Office Notice Board. Sd/- C.K JHA Executive Engineer, PWD Darjeeling Division, Darjeeling. ANNEXURE “A” OFF-LINE AUCTIONNOTICE NO.13/DJ OF 2020-2021OF THE EXECUTIVE ENGINEER, PWD., DARJEELING DIVISION, DARJEELING. Name of work:- Off-line Seal Bid / Auction of dismantled materials obtained from Emergent repair work for CRPF /SPF accommodation at Panighatta HS under Panighatta PP (under Mirik PS) for forth coming Lok Sabha Election 2019, under Darjeeling Division, PWD during the year 2020-2021. Date of Seal Bid :- 06/11/2020. Sl. Description of items Quantity Unit Rate Amount no. 1 Wooden battens 0.701 Cum 2 GCI sheet 25.500 Sqm 3 GCI sheet 56.880 Sqm 4 Bricks 20.000 Sqm Total Amount:- Rs Rupess ___________________________________________________________________ _______________________________________________________ Sd/- C.K JHA Signature of bidder in full. Executive Engineer, PWD Darjeeling Division, Darjeeling. .
Recommended publications
  • Darjeeling.Pdf
    0 CONTENT 1. INTRODUCTION............................................................................ Pg. 1-2 2. DISTRICT PROFILE ……………………………………………………………………….. Pg. 3- 4 3. HISTORY OF DISASTER ………………………………………………………………… Pg. 5 - 8 4. DO’S & DON’T’S ………………………………………………………………………….. Pg. 9 – 10 5. TYPES OF HAZARDS……………………………………………………………………… Pg. 11 6. DISTRICT LEVEL & LINE DEPTT. CONTACTS ………….……………………….. Pg. 12 -18 7. SUB-DIVISION, BLOCK LEVEL PROFILE & CONTACTS …………………….. Pg. 19 – 90 8. LIST OF SAR EQUIPMENTS.............................................................. Pg. 91 - 92 1 INTRODUCTION Nature offers every thing to man. It sustains his life. Man enjoys the beauties of nature and lives on them. But he also becomes a victim of the fury of nature. Natural calamities like famines and floods take a heavy toll of human life and property. Man seems to have little chance in fighting against natural forces. The topography of the district of Darjeeling is such that among the four sub-divisions, three sub-divisions are located in the hills where disasters like landslides, landslip, road blockade are often occurred during monsoon. On the other side, in the Siliguri Sub-Division which lies in the plain there is possibility of flood due to soil erosion/ embankment and flash flood. As district of Darjeeling falls under Seismic Zone IV the probability of earthquake cannot be denied. Flood/ cyclone/ landslide often trouble men. Heavy rains results in rivers and banks overflowing causing damage on a large scale. Unrelenting rains cause human loss. In a hilly region like Darjeeling district poor people do not have well constructed houses especially in rural areas. Because of incessant rains houses collapse and kill people. Rivers and streams overflow inundating large areas. Roads and footpaths are sub merged under water.
    [Show full text]
  • Chapters Water Resource of the Balason Basin 8.1
    CHAPTERS WATER RESOURCE OF THE BALASON BASIN 8.1 Introduction The river Balason, originating from Lepchajagat at an elevation of 2416 m, flows through the district of Darjeeling, is noteworthy for its erosional and depositional hazards, causing occasional flood in its lower catchment The discharge of the river at Matigara, varies from a negligible amount of 0.409 cumecs during the dry season (March - April) to a high of over 940 m^/second during the rainy season (July-August). The mean annual sediment discharge is very high and it was estimated to be 87365 metric tons. The mean annual rainfell in the catchment area is 3359.81 mm, based on long-term average data of 22 rainfall recording stations situated within the catchment area. The Balason basin is unable to hold back water due to excessive deforestation, overgrazing and extensive unscientific agricultural use of land in its catchment area. As a result, most of the precipitated water goes down the slope, giving rise to severe soil erosion and landslips. The amount of load transported not only provides an indication of the rate of mechanical denudation in a basin, but also has wider implications for the economic management of the fluvial system. The river is incompetent to cope with the enormous amount of debris load that is transported to its lower course during the monsoon months (June-September). All these processes themselves generate certain responses within the river channel. Flooding is thus, the result of the continuous set of possible responses within the fluvial system. On the other hand, during the non-monsoon months (November to April) negligible amount of water flows through the narrow braided channel and this paucity of water hinders the local people from reaping any benefit out of the soil in a)njunction to the river itself.
    [Show full text]
  • Revenue District : ALMORA Sub-Division: ALMORA Plantation District ALMORA
    Tea Board Of India Licensing Department New Registrations Granted To Tea - Manufacturing Units During From : 01/01/0984 To : 02/05/2008 Date : 02/05/2008 Page 1 of 116 Revenue District : ALMORA Sub-Division: ALMORA Plantation District ALMORA: Registration Registration Manufacturing Unit Company Name File Number Type of Unit Annual Central Number Date Name Capacity Excise Zone RC-1664 05/09/2002 UTTARANCHAL TEA UTTARANCHAL TEA 8(15)/LC/RC-16 Bought Leaf Factory 2,00,000.000 FACTORY COMPANY PVT.LTD. Revenue District : ANDHRA PRADESH Sub-Division: ANDHRA PRADESH Plantation District ANDHRA: PRADESH Registration Registration Manufacturing Unit Company Name File Number Type of Unit Annual Central Number Date Name Capacity Excise Zone RC-1865 08/05/2007 SOUTHERN CITRUS SOUTHERN CITRUS 8(15)/LC/RC-18 Instant Tea Factory 1,00,000.000 PRODUCTS (P) LTD. PRODUCTS PVT. LTD. (I.T.F.) Revenue District : ANDHRA PRADESH Sub-Division: Darjeeling Plantation District Darjeeling: Registration Registration Manufacturing Unit Company Name File Number Type of Unit Annual Central Number Date Name Capacity Excise Zone RC-742 01/08/1984 SOURENI TEA SOURENI PLANTATION 8(15)/LC/RC-74 Garden Factory 1,25,000.000 III ESTATE (P) LTD Revenue District : ARUNACHAL PRADESH Sub-Division: Arunachal Pradesh Plantation District Arunachal: Pradesh Registration Registration Manufacturing Unit Company Name File Number Type of Unit Annual Central Number Date Name Capacity Excise Zone RC-1765 24/01/2005 MOULING TEA MOULING TEA 8(15)/LC/RC-17 Bought Leaf Factory 1,00,000.000 FACTORY(B.L.F.) PROCESSORS. RC-1864 16/04/2007 SIRU RIJO TEA SIRU RIJO TEA CO.
    [Show full text]
  • Sjunn Siksumhiniii 2001-2002
    Sjunn siKsuMHiniii ANNUAL PLAN (FOR UPE COMPONENT) 2001-2002 DARJEELING GORKHA HILL COUNCIL STATE : WEST BENGAL NIEPA DC D11374 3 7 2 . ilBRARY & DOrUMiWTfiT'JOW CWlim Nalfionil ■ 2.«r!tu'c c f h.i;scatiauii| Wannuj)? . ad .Aaai:ni^triitiea. j 1 7 -B. Sci ^uror.indo Mar|, | New Dfclhi-llGCJ.6 k i r *) *2/. »oc, No.............PlIlJaSLi ^ D«te——— — — -JtL/-r-,fiu^iMiiirii^ ^ ^ DA»J££UNG GQKKHA M .5/ '■%{- "• ■ ■ y 0ARJC6MNG % m / ti & «r w,. M m . ^ . i'^f-' -' 't*:Ti,“!- . ' V'V u •V, • •-#*•>■ ••'•' - ’ -t ; ! . ' ^'’r •• • ^'' ■ "* ' ? / / }'i.m y' y ' .if:' v-' :.'K> :-i^* INTRODUCTION Daijeeling Gorkha Hill Council was established under the provisions of Darjeeling Gorkha Hill Council Act 1988 with the objective of total social, economic, cultural and educational upliftment of Gorkha and other communities of people living in the Hill areas of Daijeeling District under the jurisdiction of Daijeeling Gorkha Hill Council. The jurisdiction of the Hill Council covers an area of 2476 sq Km covering three Revenue subdivisions of Kalimpong, Kurseong and Daijeeling and 13 mouzas of Siliguri Revenue Subdivision. Hence, unlike a prototype district, Gorkha Hill Council is an autonomous body with 28 elected representatives as its Councillors from 28 Constituencies and 14 councillors are nominated. It has an Executive Cuncil consisting of 15 Executive Councillors of whom 13 are nominated amongst the elected councillors and the remaining two are nominated. The Chairman is also the Chief Executive Councillor of the Executive Council. Under the provisions of Daijeeling Gorkha Hill Council Act, the executive powers of the State Govt relating to the management, control and supervision of the important departments mainly covering developmental functions and activities have been transferred to the Hill Council.
    [Show full text]
  • Chapter 4 Pedogeomorphic Relations Within the Basin
    CHAPTER 4 PEDOGEOMORPHIC RELATIONS WITHIN THE BASIN 4.1. liitrodactioii Although Robinson (1949) had tried to establish a relationship between soil and landfbmn when he said 'the domain of pectology may come to engross a considerable amount of dynamic geolog/" the two have been frequently treated separately with only a token of awareness of one on the other and vice versa. The increasing awareness due to modem research has led to the understanding that soil and landfbrms are closely dependent upon one other as one influences the other. This has led to the evolution of a new discipline of 'pedo-geomorphology" or soil geomorphology (Conachar & Dalrymple, 1978). The drainage basin provides a convenient and ideal natural unit for the study of pedo-geomorphic parameters and their intenelationships. Within this unit the constituent parameters of landform, soil and drainage frequently show an organized relationship and without the knowledge of the basin in which they occur many of these evente become Incomprehensible (Sarkar, 1987,1994). A realistic correlation can only be drawn if the processes of soil formation are in equilibrium with the surface and sub-surface processes, acting on the slope (Norton & Smith, 1930; Furley, 1968 & 1969; Young, 1968; Jordan, 1974; Gen-ad, 1980;). It is often assumed that the meaningful relationship t}etween slope and soil properties becomes the result of any well-organised study. In the present work pedo-geomorphic study has been carried out to determine and assess the intricate inter-relationship among some of the parameters that include the slope, infiltration and soil properties, in the Balason basin of Darjeeling Himalaya.
    [Show full text]
  • 2020120213.Pdf
    ANNEXURE-A SCHEDULE OF CAMPS FOR DUARE SARKAR, DARJEELING DISTRICT Name of Sl block/muni Name of GP/Ward No. Location Dates No. cipality 01.12.2020, 15.12.2020, Pokhriabong I Selimbong T.E Pry School 04.01.2021, 18.01.2021 02.12.2020, 16.12.2020, Pokhriabong III Nagri Farm H.S School 05.01.2021, 19.01.2021 Yuwak Sangh Community 03.12.2020, 17.12.2020, Sukhia Simana Hall 06.01.2021, 20.01.2021 04.12.2020, 18.12.2020, Dhotrieah Gram Panchayat Office 07.01.2021, 21.01.2021 Yuwak Sangh Community 07.12.2020, 21.12.2020, Plungdung Hall 08.01.2021, 22.01.2021 08.12.2020, 22.12.2020, Lingia Marybong Gram Panchayat Office 09.01.2021, 25.01.2021 Pokhriabong Bazar 01.12.2020, 15.12.2020, Pokhriabong II Community Hall 04.01.2021, 18.01.2021 02.12.2020, 16.12.2020, Rangbhang 4thmile Community Hall Jorebungalow 05.01.2021, 19.01.2021 1 Sukhiapokhri 03.12.2020, 17.12.2020, Block Permaguri Mim T.E Pry School 06.01.2021, 20.01.2021 04.12.2020, 18.12.2020, Rangbull Gurashdara Community Hall 07.01.2021, 21.01.2021 Ghoom Bhanjyang 07.12.2020, 21.12.2020, Ghoom Community Hall 08.01.2021, 22.01.2021 08.12.2020, 22.12.2020, Upper Sonada Gram Panchayat Office 09.01.2021, 25.01.2021 09.12.2020, 23.12.2020, Lower Sonada I Scot Mission Jr Basic School 11.01.2021, 27.01.2021 10.12.2020, 24.12.2020, Mundakothi Gram Panchayat Office 12.01.2021, 28.01.2021 09.12.2020, 23.12.2020, Lower Sonada II Gram Panchayat Office 11.01.2021, 27.01.2021 Rasic Community Hall 10.12.2020, 24.12.2020, Gorabari Margarets Hope 12.01.2021, 28.01.2021 02.12.2020 15.12.2020 Badamtam Gram Panchayat Office 02.01.2021 18.01.2021 03.12.2020 16.12.2020 Bijanbari-Pulbazar Gram Panchayat Office 03.01.2021 19.01.2021 04.12.2020 17.12.2020 Chungtong Gram Panchayat Office Darjeeling 04.01.2021 2 Pul Bazar Dev.
    [Show full text]
  • CHAPTER-4 Nature and Extent of Environmental Degradation In
    CHAPTER-4 Nature and Extent of Environmental Degradation in Darjeeling Hills 4:1lntroduction Environmental degradation and its consequently deepening crisis of sheer magnitude have of late, altered many within this country. Thus, there is a serious concern for finding the right mitigative measures especially in dealing with the hilly environment. Whether, through ignorance or not, the fragile hill ecosystem has often been violated outrageously, impairing its delicate sub-systems which have a long term effects, jeopardizing the life-sustaining processes. The growing consciousness about the worsening situation compels the society today to make a rethinking, for halting the causes of grave injuries to the environment. While, it is admitted that the environment cannot be reverted to its original form, nor can it be intended to, it may not be beyond our conscious efforts to check or control such practices for arresting further deterioration, followed by protective measures for seeding-up the restorative processes in this fragile environment. The Darjeeling Himalayan region is noteworthy for its wide variety of renewable and non-renewable resources. Of late, this repository of natural wealth has been subjected to virtual plunder. In consequence, the watershed ecosystems are fast loosing their resilience and regenerative capacity. Since the British occupation, the physico-cultural set-up of this regwn has been seriously disturbed. Extensive heedless deforestation, tea plantation, haphazard construction, huge population influx induced illogical slope cultivation, inadequate drainage, in other words, unscientific and unplanned use of land has led to the establishment of vicious cycle of degradation. As a result, during heavy and concentrated rainfall, catastrophic soil erosion and innumerable landslips are caused, contributing huge sediment load to the rivers which are incapable of transporting the load efficiently under the existing hydrological conditions especially along their lower courses beyond the foothills.
    [Show full text]
  • Download Mwia Global Projects Booklet 2021
    2021 Global Projects Global Projects Contents About MWIA 2 UN Sustainable Development Goals 3 Special Purpose Pandemic Grant Program 5 Australia 6 Bourke Men’s Centre | CatholicCare 8 Right Bite | House of Welcome 9 Eliminating Forced Marriage with Education | ACRATH 10 India 11 Brickfield Schools 12 Ethical Enterprise Initiative for Young Women 13 Collective Voices 14 Kenya 15 Termination of Female Genital Mutilation 16 Nyumbani Village Scholarships 17 Peru 18 Tailoring Workshop - Jicarmarca 19 South Sudan 20 Health Care Support Project 21 Timor-Leste 22 Loreto Ostico Building Project 23 Vietnam 24 Education for Change 25 JohnXXIII Teacher Training Scholarships 26 IBVM Hostel Scholarships 27 Zambia 28 Lukulu Teacher Scholarship and Mary Ward International Australia (MWIA) Community School Support 29 Vehicle Support | Integrated Health is a registered charity and is the Australian and international development organisation Care Program 30 of the Loreto Sisters. Lunch Feeding Program 31 PO Box 4082 Baby Milk Program 32 Auburn South VIC 3122 Tel: 03 9813 4023 About MWIA Four hundred years ago, the founder of the Loreto Sisters, Mary Ward, laid down firm foundations, believing that girls should be educated and women empowered to ‘seek truth and do justice’. MWIA proudly continues her vision today by supporting OUR VISION the development works of the Loreto Sisters based in A just world where women share leadership, children many impoverished pockets of our world, striving to thrive, and communities live in harmony with each create justice and development for all. other and the earth. MWIA is part of the global Mary Ward International network across 23 countries which focus on: OUR MISSION In the spirit of Mary Ward, we support Loreto Sisters • Empowering women and children and their colleagues as we work with women and • Community development communities to transform unjust structures and reduce poverty and oppression.
    [Show full text]
  • (Plantation) Total : 40.02 112.13 Tea Board of India Licensing Department
    Tea Board of India Licensing Department List of New Registration of Tea Estate during :from 01/01/1930 To 02/05/2008 Date: 02/05/2008 Page 1 of 121 Registration Date Name of the Company Area Applied Grant Area Mode of Leaf File No No Tea -Estate Processing Revenue District : AGARTALA Sub Division : AGARTALA Plantation Dist : AGARTALA 2659 14/12/1979 Tachi Tea Estate TEA PLANTATION CO-OPERATIVE SOCIETY LTD. 40.02 112.13 NC/PART-361/LC (Plantation) Total : 40.02 112.13 Tea Board of India Licensing Department List of New Registration of Tea Estate during :from 01/01/1930 To 02/05/2008 Date: 02/05/2008 Page 2 of 121 Registration Date Name of the Company Area Applied Grant Area Mode of Leaf File No No Tea -Estate Processing Revenue District : AGARTALA Sub Division : AGARTALA Plantation Dist : Tripura 693 01/04/1953 ADARINI TEA ESTATE MR.M.K.CHOWDHURY 65 131.5 A-501/LC 188 01/04/1953 BRAHMAKUNDU TEA ESTATE BRAHMAKUNDU TEA INDUSTRIES (PVT) LTD 75 150.24 B-788/LC 170 18/02/1958 DURGABARI TEA ESTATE (T-2) DURGABARI TEA ESTATE WORKERS CO-OPERATIVE 44.53 68.01 N-8/LC/57(VOL-2) SOCIETY LTD. 135 18/06/1965 GOLOKPUR TEA ESTATE GOLOKPUR TEA CO. LTD 175 420 G-18/LC 116 01/04/1953 HARENDRANAGAR TEA ESTATE BORGANG TEA CO. (P) LTD., 203 264 H-789/LC 2567 20/04/1953 HARIDASPUR TEA ESTATE TRIPURA PRODUCE CO. 21.67 38.45 H-601/LC 308 11/03/1961 LEELAGARH TEA ESTATE LEELAGARH CHA BAGAN SRAMIK SAMABAYA SAMITY 36.43 137.4 L-16/LC LTD.
    [Show full text]
  • Chapter 6 the Views of the People
    272 Chapter 6 The Views of the People To obtain the views of the people ofDatjeeling Hills on the working of the District Administration and DGHC a cross section of the people were interviewed who comprised offour categories: the (I) Politicians, (2) Administrators, (3) Professionals and (4) People from various associations and organizations. The first category were the prominent .leaders of the. rulingparty of DGHC (i.e. the ·GNLF) as well 'as the prominent leaders of the opposition parties of the hills (i.e. the AIGL, CPRM, GNLF(C),.CPM, Congress, BJP, etc). They included the M.P, ex- M.P., M.L.A.s, ex-M.L.A.s, ex-Councillors of DGHC, and Councillors and ex-Councillors of Municipalities. The second category included the administrators and retired administrators of both District Administration and DGHC. The th[rd category comprised of professionals like lawyers, doctors, teachers, former headmaster/principal of school/college, journalists, freelance writers and business people. The fourth category were members of different Associations and Organisations like Sherpa Association, Pradhan Association, Tamang Anila Association, British Gorkha Army, (former members of) Pranta Parishad, Gorkha National Women's Organisation, INTUC, Shramik Sangha (Trade Union Wing of AIGL), Darjeeling District Kissan and Khet Mazdoor (Congress) Committee, National Union of Plantation Workers, Himalaya Plantation, Tea Board, Daijeeling Himalaya Railway, Bar Association, Indian Science . ' . Congress Association, Indian Medical Association, Rural Development Committee, Employment and Labour Committee, Rotary Club, Sai Samiti, Gorkha Dukha Niwarak Sangh, Sahitya Sammelay (a literary association), Gorkha Sangeet Academy, Splastic Society, T.V.Control Board, Bharat Scouts, Nehru Youth Kendra, Study Forum, Consumer Forum and various NGOs.
    [Show full text]
  • 1 Sl No. Company Name Garden Applicatio N Year Activity Date Of
    1 List of Beneficiaries under SPTF Scheme for the F.Y. 2012-13 & 2013-14 (upto 31-1-14) Sl No. Company Name Garden Applicatio Activity Date of Amount n Year release of relesed 1st 1stinst. Of installment Subsidy 1 Abhijit Tea Co. Pvt. Ltd. Raja 2010 - 11 Replanting 22/03/2013 1081276 Adarini Tea Estate Adarini 2011 - 12 Replacement 27/09/2013 30614 2 Planting Alipore Dooar Tea Co. Ltd. Turturi 2008 - 09 Replacement 22/03/2013 139920 3 Planting Amalgamated Plantations Private Ltd Borjan 2007 - 08 Replanting 30/08/2012 404884 4 Amalgamated Plantations Private Ltd Chubwa 2007 - 08 Replanting 24/01/2013 635077 5 Amalgamated Plantations Private Ltd Hathikhuli 2007 - 08 Replanting 30/08/2012 554555 6 Amalgamated Plantations Private Ltd Kellyden 2007 - 08 Replanting 24/01/2013 376224 7 Amalgamated Plantations Private Ltd Nonoi 2007 - 08 Replanting 26/03/2013 234742 8 Amalgamated Plantations Private Ltd Borjan 2008 - 09 Replanting 27/09/2013 363620 9 Amalgamated Plantations Private Ltd Chubwa 2008 - 09 Replanting 24/01/2013 468574 10 Amalgamated Plantations Private Ltd Chubwa 2008 - 09 Replanting 24/01/2013 890745 11 Amalgamated Plantations Private Ltd Kakajan 2008 - 09 Replanting 30/08/2012 383048 12 Amalgamated Plantations Private Ltd Lattakoojan 2008 - 09 Replanting 26/03/2013 457215 13 Amalgamated Plantations Private Ltd Lattakoojan 2008 - 09 Replanting 30/08/2012 467209 14 Amalgamated Plantations Private Ltd Nahorkutia 2008 - 09 Replanting 30/08/2012 453561 15 Amalgamated Plantations Private Ltd Lamabari 2008 - 09 Replanting 30/08/2012 258398
    [Show full text]
  • Development Programmes and Its Environmental Impact
    CHAPTER-S Development Programmes and its Environmental Impact 8.1 Introduction The early developer of Darjeeling identified appropriately that developing communication with rest of the country is the key to develop the newly annexed hitherto inaccessible te!Tain. The then Darjeeling hill area was mostly uninhabited only dotted with few settlements of Lepcha cmmnunity. The means of communication in Darjeeling hills up to 1835 were very rudimentary. A few narrow rough tracks through forests and occasional cane bridges over torrents were all that existed at the time of Grants memorandum of 1830 that mentioned only two routes then existing northward from the plains into Sikkim. One was the Nagree Pass and the other by the Sabbook Golah. A third route by the Mahananda was mentioned as having been deserted and over grown with jungle. The pioneers who came to poem up Darjeeling after it had been ceded in 1835 were confronted with an arduous journey from Calcutta before they reached the hills. The first step to introduce modern communication in the district was taken in Journey 183 8 when the trace of the Calcutta road to the east of the hill on which Jalapahar Cantonment stands now was completed by Lt. George Lloyd in 1839, Lt. Napier of the Royal Engineers was deputed to prepare a lay out of Darjeeling town and to constmct a road from Siliguri to Darjeeling. The project was ca1Tied out between 1839 and 1842, at an expenditure of rupees eight lakh and the road, latter known as the old military road. It is still seen winding its way from Pankhabari to Kurseong and then on to Dow Hill, Senchal and Ghum having 300 bridges and culverts.
    [Show full text]