Mo Industrial Park
Total Page:16
File Type:pdf, Size:1020Kb
W E L C O M E T O Mo Industripark MO INDUSTRIAL PARK Jan I. Gabor VP Marketing MIP SUSTAINABILITY – ONGOING INITIATIVES ENERGY CIRCULAR REDUCTION IN EFFICIENCY ECONOMY EMISSIONS A total of approx. 350.000 m2 of floorspace owned by The industrial centre point in the north Within the process industry, engineering and service Mo Industripark AS sector BOOSTING COMPETITIVENESS THROUGH CIRCULAR ECONOMY – CROSS SECTORAL APPROACH We are exploring CCU opportunities in our region and are looking into a range of possible business cases linked to captured CO2: ▪ Replace fossil fuels in combustion processes ▪ Producing hydrogen ▪ Producing methanol ▪ Produce proteins for fish feed, replacing soy CO2-HUB NORDLAND PROCESS INDUSTRY TOWARDS ZERO EMISSIONS ● Application to Climit Demo granted April 17th 2018 ● Design of capture plants on selected cases/locations ● Site-specific evaluation of capture technologies ● Specification of CCS cluster solutions for the region a "CO2-hub" for capture, conditioning and intermittent storage connected to national infrastructure for geological storage ● Site-specific evaluation of CCU options and pathways HYDROGEN HUB MO INTENTION AGREEMENT WITH STATKRAFT, CELSA AND MO INDUSTRIPARK ▪ Build green industry in Mo ▪ Green steel – 10 to 40 MW, later expansion ▪ Represents the first step in an industrial development of new greenindustries based on green hydrogen. ▪ Potential 200-300 MW electrolysis production ▪ Other industries like fish fodder and transport VALUE CHAIN HEAVY TRANSPORT INDUSTRIAL H 2 I N M O CELSA/MIT 2 MW TRANSPORT 20 MW TRUCKS/FERRIES Storage Produksjon REUSE OF IRON Infrastructure 40 MW H2 CELSA H2 Piping/Distribution CCU 150-200 MW APPLICATIONS DEVELOPMENT 30 MW BIOCARBON Mo Industrial E-fuel AS HOW? Above 100 MILL EUR invested last decade – ready to roll out WHERE? In Nordland for Norway, the Nordics and the World, now Nordland hydropower conversion into H2 Nordland infrastructure local storage* and usage Nordland CO2 feedstock combined international shipment 1.2 Mio tons p.a. * All stored e-Methanol is intermediate stored electricity and CO2 and H2 storage for pressure- less hydrogen H2 Mo Industrial E-fuel NORDLAND PARTNERING SITE LICENSE TECH POWER CO2 OFFTAKE E-FUEL Partner for Brand Business Nordland Projects Feedstock Certificates Nordland Projects Know-how Consortium 100 k tons CO by 2022 FEASIBILITY 2019 2 * Most partners in contractual situation; some partners within negotiations 1.2 M tons CO2 by 2025 FREYR – EMERGING FAST TRACK OPTION The increasing market short in Europe coupled with FREYR’s increasing credibility creates a viable opportunity for a fast track approach at MIP FREYR*: ▪ Techno-economic feasibility confirmed ▪ Roadmap to <100 USD/KWh established ▪ Deep Interest Across The Value Chain MO INDUSTRIAL PARK ▪ 295 000 m2 available (regulated) acreage ▪ 150 000 m2 acreage ready in 6-12 months LEAD International ▪ 2 GWh production line: WHAT DO INDUSTRIAL CUSTOMERS NEED? • GREEN industrial solutions, energy recovery and circular economy. Resource optimisation. • Support from local and national authorities, including financial tools for risk motigation • Access to large amounts of green energy • Large brownfield plots – Plug and Play • Industrial competence and responsiveness from all suppliers such as power and grid, process water and sewage, formal application processes, roads and plots, buildings • Mo Industrial park is a one-stop-shop Visiting address: Halvor Heyerdahls vei 48, 8626 Mo i Rana Postal address: Postboks 500 8601 Mo i Rana + 4 7 75 13 61 00 m i p @ m i p . n o m i p . n o.