Why We Pay Taxes

Total Page:16

File Type:pdf, Size:1020Kb

Why We Pay Taxes Multipurpose Block at the Uganda College of Commerce Kabale o Katende-Kamengo including: § Installation of electrical submersible pumps and electro-mechanical accessories; construction of pump houses and 50m3 pump; § Laying of 1200 m of transmission pipe and 8200m of distribution pipe • Through Urban Water Supply and Sanitation undertook Bukedea Town Water Supply and Sanitation Scheme (shs. 1.9 bn) - constructed 4km transmission mains and expanded distribution pipe network by 18km • Under Water for Production is setting up Nakakabala and Fourth Edition, October 2013 Nyamiringa valley tanks • Installed Kiboga monitoring station Mbarara-Masaka-Nyakahita junction Uganda Cooperative College Kigumba • Undertook the following projects: Fort Portal Regional Referral Hospital o Lake Victoria Environment Management Project (shs. 816 m); o National Wetland Project Phase II (shs. 1.98 bn); o Support to Water Resources Management (shs 8.6 bn); o Support to Small Town Water Sanitation Project (shs. 1 bn); o Urban Water Reform (shs. 583 m); Climate Change Project (shs 812 m); Heavy Earth Moving Equipment stationed at Namaleere Agricultural Mechanization Station in Wakiso district. o Kampala Water Lake Victoria Water & Sanitation Program (shs. 7.4 bn); HE budget for Financial Year 2012/13 was projected at o Ishaka-Kagamba (35 km) o Sawlog Production Grant Scheme Project § Lubiri P/S(Kyankwanzi) shs. 11,157 bn. Of this shs. 8,368 bn (75%) was collected o Atiak-Moyo-Afogi – bridges/drainage works completed (shs. 832 m); by Uganda Revenue Authority while shs. 2,789 bn was Secondary schools: T o Kampala-Entebbe express highway (51 km) o o Support to Nabyeya Forestry College Project funding from development partners. In line with the National § Paicho Seed SS (Gulu); • Removed accident black spots along Kampala-Jinja road (shs. 512 m); Development Plan, Government invested in Infrastructure § Nampunge Community H/S (Wakiso); • Is rehabilitating the following roads o Provision of Improved Water Sources of Returned IDP Development, Agricultural Production and Productivity, § St Gerald Nyakibaale SS (Rukungiri); Kampala-Masaka (114 km); 63 km already completed (shs. 460); Service Delivery, Macro Economic Stability and Improving o § Rubaya SS (Kabale); the Business Climate. Some of the areas where revenue was o Mbarara-Ntungamo-Katuna (152 km) o Protection of Lake Victoria-Kampala Sanitation o Tororo-Mbale-Soroti (152 km) § Kasawo SS (Mukono); Aringa SS (Yumbe) Program (shs. 11.4 bn); invested by government are indicated below: o Kawempe-Kafu (166 km) § Rubaare SS (Ntungamo) • Under Water and Sanitation Development Facility, INFRASTRUCTURE DEVELOPMENT o Malaba/Busia-Bugiri (82 km) o Technical institutes: Constructed flow schemes in Kiruhura and Lyantonde; o v Road transport • Under the interconnectivity Roads Improvement Project, § Uganda College of Commerce Pakwach; Kajodi dam; Substantially completed works on 845 km and designs for released shs 5.64 bn to among others upgrade: § Lira School of Nursing; Nagwere T/S (Pallisa); o Kanyampanga and Abim Gravity Flow Systems and 723 km of several national roads. Government in particular: Kakungulu Estate Road in Wakiso district § Mbale Community Polytechnic; Arechet dam (shs. 5 bn) o • Upgraded; o Kankamba-Kalungu (4.8km); Kiwanga-Kigaba (3.4km); § Olio Community Polytechnic (Serere); • Extended works at Kako Water Supply System: Masaka o Busega-Mityana road (57 km) § Kisoro TI (Kisoro); Kabale TI (Kabale) – Kampala, Samalia Village I and II, Kako – Kampala. This o Kyanukuzi-Ngereko-Kalungu (5.7km); o Masaka-Lyantonde-Mbarara road ( 158 km) § Kamurasi PTC (Masindi) among others included laying of Pumping Main, setting up o Ngereko-Manja-Kigaba (2km); 3 • Is upgrading/constructing the following roads; • Through the Presidential Initiative among others under a booster station and guard house water Reservoir – 100m o Kaswa-Senya-Bisange and Nkoni-Kisansala-Mitimikalu took the following projects o Fort Portal-Bundibugyo-Lamia (104 km) - Government (5km) in Lwengo district BUDGET PRIORITIES FOR FY 2013/14 of Uganda and African Development Bank Army Boarding Primary School in Yumbe district • Released shs. 14 bn for construction of selected bridges o • Aggressively investing in Infrastructure Development o Nyakahita-Kazo-Kamwenge (143 km) § Constructed two dormitory blocks with bathrooms; • Completed the construction of the following bridges: particularly in Transport and Energy. o Kamwenge-Fortportal (66 km) – World Bank loan § 3-classroom block and 4-classroom block with an o Aswa (Gulu-Kitgum road); Nsongya (Kabarole); • Support Increased Agricultural Production and Enhancing repayable by GOU office Mpongo river (Kibaale) and Productivity. o Mbarara-Kikagati (75 km) Lt. Colonel Nasuru Technical Institute in Yumbe district o Kabundaire, Okor, Simu-Pondo, Nyanga river (Isingiro) o • Enhance Scientific Innovation for Industrialization and o Hoima-Kaiso-Tonya (85 km) § Constructed two dormitory blocks; two blocks of Private Sector Competitiveness. classrooms; o Vurra-Arua-Koboko-Oraba (92 km) v Water transport: • Improve the Quality and Access in Social Service Provision § Administration block and motor vehicle workshop; o Gulu-Atiak-Nimule (108 km) • Constructed: in Health, Water and Education. Lwampanga ferry (Nakasongola) • Enhance Transparency and Accountability to improve Value o Masaka-Mbarara road towards Lyantonde town. o Namasale ferry (Amolatar) v Water and sanitation: for Money and fight Corruption vigorously in Public Service o Marine Vessel Kaawa operating between Port Bell and • Constructed among other rural water systems: Delivery. Jjeza-Muduma (shs. 2.5 bn) Mwanza o o Laropi -Adjumani ferry o Landing sites for Obongi (Moyo) and Sinyanya (Adjumani) A Publication of UGANDA REVENUE AUTHORITY in conjunction with THE BUDGET MONITORING AND ACCOUNTABILITY UNIT, MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT Do you have any question? Web portal: http://ura.go.ug, Email: [email protected], TOLL FREE HELPLINE: 0800117000 WHY WE PAY TAXES Disclaimer: The content of this publication is intended to provide a general guide to the public and is subject to change How your tax shillings for FY 2012/13 were utilized Grid extension projects: Rakai-Sembabule; Lyantonde- processers (Mityana) placenta pit (Lukolo HCIII) in Jinja district Kaliro-Rwebitakuli; Rakai-Isingiro, Sembabule- • Set up banana, cassava and coffee pest and disease control o Staff house (Kasenda HCII) in Kabarole district Lwemiyaga centres in Kapchorwa, Sironko, Mbale, Manafwa and Kabale o General and maternity ward (Bufumira HCIV), OPD, o Under the Ruhiira Millennium Project is constructing districts staff house and latrines (Kachanga HCIII) and OPD and 106 km of HV, 49 loading centres and KVA • Gave agricultural mechanisation and irrigation equipment staff house (Lujjabwe HCIII) in Kalangala transformers in Rwizi and Nyichanga sub counties in to farmers of Kayunga, Apac, Kween and Hoima districts o Maternity ward at Kamulegu HCII in Masaka district Mbarara district and Nyakituda, Ruhiira, Kabuyanda • Through the Government of Japan, gave a USD 5 m grant to o Staff quarters (Pakanyi HCIII and Budongo HCII) and sub counties in Isingiro district Ministry of Agriculture for heavy earth moving equipment OPD (Alimugonza HCII and Kasongoire II), Pit latrine o Under Ntenjeru- Bule – Mpenja project is setting up among which; (Kyaimaso HCII in Masindi district 75 km of HV power line and transformers in Mbalala, o 3 drinking water tankers; 7 dump trucks; diesel engine o Staff house at Wabulungu HCIII in Mayuge district Seeta Nazigo, Kisoga, Ntenjeru, Mpata, trading cargo trucks; o Doctors house at Sekanyonyi HCIV in Mityana district Solar Water Heating Panels on Source of the centres and Bule landing site Three 30-32 tonne class tracked excavator, 5 double o Staff house (Katete HCII) and OPD (Katoogo HCIII) in Nile Hotel, Jinja. • Is constructing among others the following lines o cab pickups; Mukono district § Mubende-Kyegegwa-Kyenjojo (156 km HV, 108 km Three 10 tonne vibratory roller single drum; three o Staff house (Kadokolene and Chelekura), OPD LV Power lines and KVA transformers installed); Rakai- o Construction of Opeta-Achokola, Wheel loaders (Opwateta HCIII and Nasuleta HCII), general ward Lyantonde-Sembabule and Isingiro; powerlines in the districts of Oyam (Nagwere HCIII, Kasodo HCIII and Apopong HCIII) and Installed sprinkler system for one of the farmers in Busiisi Division in Hoima and Kole. § Kabale-Kisoro (145 Km of HV, 115 km of LV power line pit latrines (Kameke HCIII and Agule HCIII) in Pallisa and KVA transformers installed) district § Gulu-Adjumani-Moyo with tee off to Amuru (230 km o Maternity wards (Nicu HCIII, Ayivuni HCIII and Offaka of HV, 108.873 km of LV lines and KVA transformers HCIII), staff houses, kitchens and latrines (Aroi HCII, installed) Adumi HCIV, Ombidriondrea HCIII, Pajule HCII, Pawor • Connected1280 villages and trading centres with electricity HCII, Rhino Camp HCIV, Oreku HCII and Okollo HCIII), • Gave 50% subsidy to install solar water heaters in Jinja OPD/emergency maternity ward (Lazebu HCII), staff house and VIP latrine (Opia HCIII) in Arua AGRICULTURAL PRODUCTION AND PRODUCTIVITY o Maternity wards (Butiaba HCIII: phase II and III, • Rehabilitated irrigation schemes of Mubuku (Kasese), Doho Ruhumuro HCII) and placenta pit (Bugoigo HCII) in (Butaleja); Agoro (Lamwo) Buliisa district • Commenced construction of valley tanks of Nakakabala- o OPD (Shebeya HCIII and Kitanga HCII), staff house Waigodo
Recommended publications
  • Kamwenge District Local Government
    KAMWENGE DISTRICT LOCAL GOVERNMENT FIVE-YEAR DEVELOPMENT PLAN 2015/2016 – 2019/2020 Vision The vision of Kamwenge District is ‚Improved quality of life for all the people of Kamwenge by the year 2030‛. Theme Sustainable wealth creation through infrastructure development, food security and environment conservation for a healthy and productive population” Approved by the District Council under Minute 46/COU/2014/2015 REVISED EDITION 2016 i LIST OF ACRONYMS ACODEV Action for Community Development ADRA Adventist Relief Agency ARVs Anti Retroviral drugs BFP Budget Framework Programme BMUs Beach Management Units CAO Chief Administrative Officer CBO Community Based Organisation CBS Community Based Services CDD Community Driven Development CDO Community Development Officer CFO Chief Finance Officer CNDPF Comprehensive National Development Planning Framework CORPs Community Own Resource Persons CSO Civil Society Organisation DDP District Development plan DHO District Health Officer DISO District Internal Security Officer DLSP District Livelihoods Support Programme DNRO District Natural Resources Office DWSCC District Water and Sanitation Coordination Committee FAL Functional Adult Literacy GFS Gravity Flow Scheme HEWASA Health through Water and Sanitation HLG Higher Local Government HMIS Health Management Information System HSD Health Sub District IGAs Income Generating Activities IMCI Integrated Management of Child Illness JESE Joint Effort to Save the Environment KABECOS Kamwenge Bee keepers Association KRC Kabarole Research and Resource Centre
    [Show full text]
  • Uganda National Roads Authority Road Sector
    THE REPUBLIC OF UGANDA UGANDA NATIONAL ROADS AUTHORITY ROAD SECTOR SUPPORT PROJECT 3 (RSSP 3) REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS FOR THE FINANCIAL YEAR ENDED 30TH JUNE 2013 OFFICE OF THE AUDITOR GENERAL UGANDA TABLE OF CONTENTS Item Page No. Report of the Auditor General on the financial statements for the year iii-iv ended 30th June 2013 REPORT 1. Introduction 1 2. Project Background 1 3. Project Objectives 2 4. Audit Objectives 2 5. Audit Procedures 3 6. FINDINGS 6.1 Compliance with Financing Agreements and GoU Financial Regulations 4 6.2 General Standard of Accounting and Internal Control 6 6.3 Status of Prior Year Audit Recommendations 7 Appendix 1: Financial Statements ii ROAD SECTOR SUPPORT PROJECT 3 (RSSP 3) PROJECT ID NO.P-UG-DB0-020 AND LOAN NO. 2100150020793 REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS FOR THE YEAR ENDED 30th JUNE 2013 THE RT. HON. SPEAKER OF PARLIAMENT I have audited the financial statements of Road Sector Support Project 3 (RSSP 3) for the year ended 30th June 2013. The financial statements are set out on pages 17 to 24 in Appendix 1 and comprise of; Statement of receipts and payments; Statement of fund balances; Notes to the financial statements, including a summary of significant accounting policies used. Project Management’s responsibility for the financial statements The Management of UNRA, (the RSSP-3 implementing agency) are responsible for the preparation of the financial statements. This responsibility includes: designing, implementing and maintaining internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatements, whether due to fraud or error; selecting and applying appropriate accounting policies; and making accounting estimates that are reasonable in the circumstances.
    [Show full text]
  • UGANDA: PLANNING MAP (Details)
    IMU, UNOCHA Uganda http://www.ugandaclusters.ug http://ochaonline.un.org UGANDA: PLANNING MAP (Details) SUDAN NARENGEPAK KARENGA KATHILE KIDEPO NP !( NGACINO !( LOPULINGI KATHILE AGORO AGU FR PABAR AGORO !( !( KAMION !( Apoka TULIA PAMUJO !( KAWALAKOL RANGELAND ! KEI FR DIBOLYEC !( KERWA !( RUDI LOKWAKARAMOE !( POTIKA !( !( PAWACH METU LELAPWOT LAWIYE West PAWOR KALAPATA MIDIGO NYAPEA FR LOKORI KAABONG Moyo KAPALATA LODIKO ELENDEREA PAJAKIRI (! KAPEDO Dodoth !( PAMERI LAMWO FR LOTIM MOYO TC LICWAR KAPEDO (! WANDI EBWEA VUURA !( CHAKULYA KEI ! !( !( !( !( PARACELE !( KAMACHARIKOL INGILE Moyo AYUU POBURA NARIAMAOI !( !( LOKUNG Madi RANGELAND LEFORI ALALI OKUTI LOYORO AYIPE ORAA PAWAJA Opei MADI NAPORE MORUKORI GWERE MOYO PAMOYI PARAPONO ! MOROTO Nimule OPEI PALAJA !( ALURU ! !( LOKERUI PAMODO MIGO PAKALABULE KULUBA YUMBE PANGIRA LOKOLIA !( !( PANYANGA ELEGU PADWAT PALUGA !( !( KARENGA !( KOCHI LAMA KAL LOKIAL KAABONG TEUSO Laropi !( !( LIMIDIA POBEL LOPEDO DUFILE !( !( PALOGA LOMERIS/KABONG KOBOKO MASALOA LAROPI ! OLEBE MOCHA KATUM LOSONGOLO AWOBA !( !( !( DUFILE !( ORABA LIRI PALABEK KITENY SANGAR MONODU LUDARA OMBACHI LAROPI ELEGU OKOL !( (! !( !( !( KAL AKURUMOU KOMURIA MOYO LAROPI OMI Lamwo !( KULUBA Koboko PODO LIRI KAL PALORINYA DUFILE (! PADIBE Kaabong LOBONGIA !( LUDARA !( !( PANYANGA !( !( NYOKE ABAKADYAK BUNGU !( OROM KAABONG! TC !( GIMERE LAROPI PADWAT EAST !( KERILA BIAFRA !( LONGIRA PENA MINIKI Aringa!( ROMOGI PALORINYA JIHWA !( LAMWO KULUYE KATATWO !( PIRE BAMURE ORINJI (! BARINGA PALABEK WANGTIT OKOL KINGABA !( LEGU MINIKI
    [Show full text]
  • Registered Refugees and Asylum-Seekers | 28 February 2016
    UGANDA: Registered refugees and asylum-seekers | 28 February 2016 SOUTH SUDAN $ Yumbe Kaabong Koboko Moyo Lamwo Nyumanzi TC Lobule Settlement Kitgum Settlements Adjumani 509,077 120,208 Ocea Adjumani Kotido registered refugees RC Amuru Rhino Settlement Pader and asylum-seekers Gulu Agago Moroto AAruaua / Koboko Abim Nwoya Zombo 32,1N6eb7bi Otuke Napak Kole KiryandonOgyamo Lira Alebtong 51Ki,ry0an0don2go Buliisa Amuria Kiryandongo RC Dokolo DEMOCRATIC Katakwi Nakapiripirit Kiryandongo Apac Kaberamaido Soroti t REPUBLIC er Amudat lb Settlement A Kyakengwali Amolatar OF THE CONGO a L Masindi Ngora Kumi Serere Bulambuli 42,244 Kween Hoima Bukedea Nakasongola Kapchorwa Kyangwali Settlement Bukwo Buyende Pallisa Sironko Kyankwanzi Nakaseke Kaliro Budaka Kibuku Mbale Bududa Ntoroko Kamuli Kibaale Kayunga Butaleja Manafwa Bubukwanga TC Kyaka II Kiboga Luwero Namutumba Kampala Luuka Tororo KRyewnjaojmo wanja Iganga Kabarole 27,447 SettlemKeynegtegwa Mubende 76,182 Jinja RwBuandmibugwyo anja Bugiri KyakaII Settlement Busia Mityana 47,514 Mayuge KENYA Buikwe Gomba Butambala Kasese Kamwenge Ssembabule Wakiso Mpigi Mukono Bukomansimbi Kalungu Lyantonde Ibanda Katerere Kiruhura Nsiika Namiyango Buvuma Lake Bushenyi NakLiwvenagole Edward Masaka Kalangala Mitooma Kibingo 104,463 Isingiro Matanda TC OrchMibnargaraa Rukungiri Ntungamo Nakivale Kanungu 6,377 Rakai LEGEND Settlement Capital Orchinga Kisoro Kabale Settlement Urban refugee location Nyakabande TC UNITED Lake Victoria Refugee settlement REPUBLIC OF Refugee transit centre RWANDA TANZANIA International boudary District boundary Source countries of refugees Kigali DR Congo [38%] South Sudan [41%] Somalia [7%] Burundi [7%] Rwanda [3%] Others [4%] BURUNDI 20km Source: Uganda Government, Office of the Prime Minister (OPM), Refugee Information Management System (RIMS). For Feedback// Contact: Abdelrahman JABER, Associate Information Management Officer, [email protected] | Web-portal: http://data.unhcr.org Charles Yaxley, Associate External Relations Officer, [email protected].
    [Show full text]
  • Nyakahita-Ibanda-Kamwenge Road Upgrading Project
    ENVIRONMENTAL AND SOCIAL IMPACT ASSESSENT SUMMARY Project Name: Road Sector Support Project 3: Nyakahita-Ibanda-Kamwenge Road Upgrading Project Country: Uganda Project Number: P-UG-DB0-020 1.0 Introduction Following a request by the Government of Uganda to the African Development Bank (AfDB) to finance the upgrading of the Nyakahita-Ibanda-Kamwenge road from gravel to bitumen standard an Environmental and Social Impact Assessment had to be carried out by the project proponent (Uganda National Roads Authority – UNRA). UNRA in contracted the services of Consulting Engineering Services (India) Private Limited in Association with KOM Consult Limited to carry out the ESIA which was completed in January 2009, and the National Environment Management Authority (NEMA) reviewed and approved the report on 13 March 2009. The ESIA Summary is being posted on the AfDB website for pubic information as is required by the Bank policy on public disclosure. The summary covers: i) Project description and justification, ii) Policy legal and administrative framework, iii) Description of the project environment, iv) Project alternatives, v) potential impacts and mitigation/enhancement measures, vi) environmental and social management plan, vii) monitoring program, viii) public consultations and disclosure, ix) ESMP and cost estimates, x) conclusion and recommendations, xi) reference and contacts, and xii) an annex “resettlement action plan” (RAP). 2.0 Project Description and Justification The project is in Western Uganda and the project road traverses three districts of Kirihura, Ibanda and Kamwenge which have an estimated population of 0.7 million people. The rest of the road continues to Fort Portal in Kabalore district. The project shall upgrade the road from gravel to paved standards and is 153 km long and it has a 6 m wide carriageway and 1.5 m shoulders on either side.
    [Show full text]
  • Dairy Development in Uganda
    DAIRY DEVELOPMENT IN UGANDA MinistryThe Republic of Agriculture of Uganda Animal Industry and Fisheries (MAAIF) Food and Agriculture A Review of Uganda’s Dairy Industry Organization of the United Nations Dairy Development Authority (DDA) Author: David Balikowa National Consultant, GOU/FAO Dairy Project, TCP/UGA/3202(D); Senior Business Advisor, TechnoServe/East Africa Dairy Development Project (EADD) March 2011 i TABLE OF CONTENTS LIST OF TABLES .................................................................................................................................. v LIST OF FIGURES ................................................................................................................................ v ACRONYMS AND ABBREVIATIONS .....................................................................................................vi EXECUTIVE SUMMARY ...................................................................................................................... vii CHAPTER 1 ........................................................................................................................................ 1 1. INTRODUCTION ......................................................................................................................... 1 1.1 Geographical Location of Uganda ....................................................................................... 1 1.2 Contribution of Agriculture to the National Economy ......................................................... 1 1.3 Historical Overview of
    [Show full text]
  • Uganda National Roads Network
    UGANDA NATIONAL ROADS NETWORK REPUBLIC OF SOUTH SUDAN Musingo #" !P Kidepo a w K ± r i P !P e t Apoka gu a K m #" lo - g - L a o u k - #" g u P i #" n d Moyo!P g o i #"#" - t #"#" N i k #" KOBOKO M e g a #" #" #" l Nimule o #"!P a YUMBE #" u!P m ng m o #" e #" Laropi i #" ro ar KAABONG #" !P N m K #" (! - o - te o e om Kaabong#"!P g MOYO T c n o #" o #" L be Padibe !P - b K m !P LAMWO #" a oboko - Yu Yumbe #" om r K #" #" #" O #" Koboko #" #" - !P !P o Naam REGIONS AND STATIONS Moy n #" Lodonga Adjumani#" Atiak - #" Okora a #" Obongi #" !P #" #" a Loyoro #" p #" Ob #" KITGUM !P !P #" #" ong !P #" #" m A i o #" - #" - K #" Or u - o lik #" m L Omugo ul #" !P u d #" in itg o i g Kitgum t Maracha !P !P#" a K k #" !P #" #"#" a o !P p #" #" #" Atiak K #" e #" (!(! #" Kitgum Matidi l MARACHA P e - a #" A #"#" e #" #" ke d #" le G d #" #" i A l u a - Kitgum - P l n #" #" !P u ADJUMANI #" g n a Moyo e !P ei Terego b - r #" ot Kotido vu #" b A e Acholibur - K o Arua e g tr t u #" i r W #" o - O a a #" o n L m fe di - k Atanga KOTIDO eli #" ilia #" Rh #" l p N o r t h #"#" B ino Rhino !P o Ka Gulu !P ca #" #"#" aim ARUA mp - P #" #" !P Kotido Arua #" Camp Pajule go #" !P GULU on #" !P al im #" !PNariwo #" u #" - K b A ul r A r G de - i Lira a - Pa o a Bondo #" Amuru Jun w id m Moroto Aru #" ctio AMURU s ot !P #" n - A o #" !P A K i !P #" #" PADER N o r t h E a s t #" Inde w Kilak #" - #" e #" e AGAGO K #"#" !P a #" #" #" y #" a N o #" #" !P #" l w a Soroti e #"#" N Abim b - Gulu #" - K d ilak o b u !P #" Masindi !P i um !P Adilang n - n a O e #"
    [Show full text]
  • KIRUHURA BFP.Pdf
    Local Government Budget Framework Paper Vote: 562 Kiruhura District Structure of Budget Framework Paper Foreword Executive Summary A: Revenue Performance and Plans B: Summary of Department Performance and Plans by Workplan C: Draft Annual Workplan Outputs for 2014/15 Page 1 Local Government Budget Framework Paper Vote: 562 Kiruhura District Foreword The Local Government Act, as amended requires Local Goverments to prepare the Annual Workplan and the Budget. This Annual Workplan and the Budget for the FY 2014/15 is an integration and consolidation of the departmental Annual workplans and the Budget . The Annual Work Plan and the Budget for FY 2014/15 was mainly based on Indicative Planning Figures provided by Ministry of Finance and Economic Planning . The format for this Annual Work-Plan and the Budget is based on the Output Budgeting Tool in which intended activities are linked to expected outputs and locations. The District Budget Desk with consultations from the District Executive Committee and Chief Administrative Officer prepared this Budget and has been approved by the Executive Committee. On behalf of Kiruhura Local Government and on my own behalf I wish to extend my sincere gratituted to Ministry of Finance , all line ministries , all development partners for their continued support to Kiruhura Local Government which has enabled us to implement development programs. I therefore take this honour to present the 2014/15 Annual Workplan and the Budget to Government of Uganda, Political Leaders and stake-holders in the name of the people of Kiruhura District. I say this "For God and my country" k6 Rev.SAMUEL MUGISHA KATUGUNDA.
    [Show full text]
  • Financial Inclusion for Refugees (FI4R) Results of Baseline Survey
    Financial Inclusion for Refugees (FI4R) Results of baseline survey March 2020 Project Overview The Financial Inclusion for Refugees Project (FI4R) was launched by FSD Uganda and FSD Africa to support financial service providers (FSPs) to oer financial services to refugees and host communities. In addition, the project in collaboration with BFA Global will conduct refugee financial diaries in Uganda and provide insights into the financial strategies employed by refugees over time to build their livelihoods and manage their finances. The FSP partners in the project are Equity Bank Uganda Limited (EBUL), VisionFund Uganda (VFU) and Rural Finance Initiative (RUFI). They will oer bank accounts services for savings, remittances, transactions etc, loans to entrepreneurs, farmers and businesses as well as create jobs by recruiting agents and field sta. This is expected to build resilience, drive access to and use of basic financial services for refugees and host communities. Baseline Objectives • Provide the financial service providers in the FI4R project details of the relevant customer base they are targeting. • Provide other stakeholders one of the few in-depth surveys that covers financial tools, as well as income, expenditures and physical assets of a diverse set of refugees. Map of Settlements Covered Bidibidi SOUTH SUDAN Moyo Kaabong Lamwo *160,000 UGX Koboko Yumbe Obongi Kitgum Maracha Adjumani Arua Amuru Palorinya Kotido Gulu *90,417 UGXPader Agago Moroto Omoro Abim Nwoya Zombo Pakwach Otuke Nebbi Napak DEMOCRATIC Kole Oyam REPUBLIC Kapelebyong
    [Show full text]
  • Plasmodium Falciparium Transmission Intensity in Nyabushozi County, Kiruhura District, Uganda
    Journal of Parasitology and Vector Biology Vol. 2(3), pp. 35-43, November 2010 Available online at http://www.academicjournals.org/JPVB @ 2010 Academic Journals Full Length Research Paper Plasmodium falciparium transmission intensity in Nyabushozi County, Kiruhura district, Uganda R. Echodu1,2, J. Okello-Onen2*, J. J. Lutwama3, J. Enyaru4, R. Ocan5, R. B. Asaba5, F. Ajuga6, R. Akikii6, D. Bradley7, C. Mutero8, C. Kabonesa9 and J. Olobo10 1Molecular Biology Programme, Makerere University, Uganda. 2Faculty of Science, Gulu University, Uganda. 3Uganda Virus Research Institute Entebbe, Uganda. 4 Faculty of Science, Makerere University, Uganda. 5Institute of Environment and Natural Resources, Makerere University, Uganda. 6Faculty of Veterinary Medicine, Makerere University, Uganda. 7London School of Hygiene and Tropical Medicine, UK. 8International Water Management Institute (SIMA), Uganda. 9Department of Women and Gender Studies, Faculty of Social Sciences, Makerere University, Uganda. 10Department of Microbiology, Medical School, Makerere University, Uganda. Accepted 28 July, 2010 The prevalence of malaria in human beings and Plasmodium falciparum sporozoite infection in Anopheles mosquitoes were studied for seven months in eight villages in Nyabushozi County, Kiruhura District, Uganda. The aim of the research work was to assess Plasmodium sporozoite infection rates using enzyme-linked immunosorbent assay and link this with malaria prevalence. A total of 2566 female Anopheles gambiae s.l. and 270 Anopheles funestus group were collected in 24 households using pyrethrum spray catches, and from goats and cattle housing (kraals), using CDC light traps. The densities of female An. gambiae s.l. and An. funestus group in all the eight villages studied were significantly influenced by rainfall. P. falciparum sporozoite rate for An.
    [Show full text]
  • Masaka Regional Referral Hospital
    Masaka Regional Referral Hospital Having started in 1927 as a treatment centre for World War I veterans, Masaka Regional Referral Hospital was elevated to regional referral status in 1996. Mugisha Ereazer, the principal Hospital Administrator says the hospital has a 330 bed capacity with an annual admission of 23,456 patients giving a bed occupancy rate of 90.6%. With the completion of a new mega hospital facility, the bed capacity is expected to increase to about 540 beds. The hospital's catchment is spread across eight districts ± Masaka, Rakai, Lyantonde, Lwengo, Ssembabule, Bukomamnsimbi, Kalungu and Kalagala, taking care of over two million people. The infrastructural capacity of Masaka regional referral hospital has been limited too. Masaka Regional Referral hospital offers all services expected of a regional referral health facility but also offers nutritional support for both children and adults. It also handles complicated paediatric and gynaecological cases including carrying out fistula repairs. It has also teamed up with MIFUMI ± a national NGO project ± to offer support to victims of gender-based violence from Burundi, Rwanda, the DR Congo and Tanzania. Being along the busy Mombasa - Kampala - Mbarara - Kigali Highway makes it the first point of call for patients mainly accident victims from Burundi, Rwanda, the DR Congo and Tanzania. Consequently , the hospital©s average daily contact with patients is about 2,000. At Masaka Hospital, the patients are very excited about how they are treated and now refer to the hospital as `Mulago'. The staff members are overstretched especially in the maternity ward. Up to 40 babies can be born in one night with 3 midwives on duty.
    [Show full text]
  • Bmau Briefing Paper (15/18) May2018
    BMAU BRIEFING PAPER (15/18) MAY 2018 Achievement of the NDPII targets for national roads. Is the Uganda National Roads Authority on track? Overview Key Issues The Government of Uganda (GoU) is implementing i) Budget allocation to the sector has the second National Development Plan (NDP II, persistently fallen short of the NDPII FY2015/16 – FY2019/20). This plan recognises projections. Worse still, not all infrastructure as one of the development appropriated funds are released. fundamentals required to attain middle income status target by 2040. The NDPII has four objectives but ii) More than 100 projects are earmarked the one directly applicable to the roads sub-sector is: under UNRA for implementation within increasing the stock and quality of strategic the NDPII period, but over 60% of the infrastructure to accelerate the country’s these are still at either design and competitiveness. procurement stages, so UNRA is unlikely As a result, a sizeable share of commitments are to achieve the NDPII targets. being directed to infrastructure investments with a iii) Allocations of resources between focus on reducing travel times between regions, new road development projects and integrating the national market and connecting it to maintenance is at a ratio of 80:20% hence other markets in the East African Community. creating a maintenance backlog. This briefing paper assesses the extent to which Uganda National Roads Authority (UNRA) is achieving the national roads NDPII targets over time. Introduction of paved and unpaved roads. The network also comprises of 10 ferries located at The Uganda National Roads Authority strategic points that link national roads (UNRA) aims to develop and maintain a across major water bodies.
    [Show full text]