Estimates of Charged Expenditure and Demands for Grants (Development)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
National Assembly Polling Scheme
ELECTION COMMISSION OF PAKISTAN FORM-28 [see rule 50] LIST OF POLLING STATIONS FOR A CONSTITUENCY OF Election to the National Assembly of the NA-66 JHELUM-I Number of voters assigned to In Case of Rural Areas In Case of Urban Areas Number of polling booths polling station S. No. of voters on the Sr. No. No. and Name of Polling Station electoral roll in case electoral Name of Census Block Name of Census Block area is bifurcated Male Female Total Male Female Total Electoral Areas Code Electoral Areas Code 1 2 3 4 5 6 7 8 9 10 11 12 13 Govt Cap. Hasnat Ali Khan High School Moh Eid Gah 1 - - 125050101 1716 0 1716 4 0 4 Sohawa (M) (P) Sohawa 1 Total - - - 1716 0 1716 4 0 4 Govt Cap. Hasnat Ali Khan Shaheed High Moh Eid Gah 2 - - 125050101 0 1593 1593 0 4 4 School Sohawa (F) (P) Sohawa 2 Total - - - 0 1593 1593 0 4 4 Hydri Mohallah Govt Cap. Hasnat Ali Khan High School 3 - - High School 125050103 696 676 1372 2 2 4 Sohawa (C) (P) Sohawa 3 Total - - - 696 676 1372 2 2 4 Mohra Pari - - 125050102 407 0 407 Sohawa Moh Madni - - 125050104 679 0 679 Sohawa Govt. Cap. Hasnat Ali Khan Shaheed High Khurakha 4 4 0 4 School Sohawa (M) (P) - - Khengran 125050105 472 0 472 Sohawa Khurakha - - Khengran 125050106 226 0 226 Sohawa 4 Total - - - 1784 0 1784 4 0 4 Mohra Pari - - 125050102 0 413 413 Sohawa Moh Madni - - 125050104 0 680 680 Sohawa Govt. -
Information of Officers (Male) BS-17 Contract Employees Regarding Regularization of Their Services School Education Department
Information of Officers (Male) BS-17 contract employees regarding regularization of their services School Education Department Sr. Date of Date of Qualification of the Post as Qualification of the Overall Name of Contract Employee with Designation District No. Appointment Joining per service rule Contract employee Performance Shahid Ashraf Kalyar, SS(History/Pak Studies), 24-10-2014 1-Jun-15 M.A/MSc, B.Ed M.Sc (1st), M.Ed (1st) Good Attock 1 BPS-17 Muhammad Altaf, SS(History/Pak Studies), BPS- 24-12-2014 30-12-2014 M.A/MSc, B.Ed M.A (2nd), B.Ed (1st), Good Attock 2 17 M.Phil Hafeez Khattak, SS(History/Pak Studies), BPS-17 24-12-2014 1-Jun-15 M.A/MSc, B.Ed M.A (2nd), M.Ed (1st) Good Attock 3 4 Hassan Mehboob, SS (Math), BPS-17 28-01-2014 5-Mar-14 M.A/MSc, B.Ed M.Sc (2nd), B.Ed (1st) Good Attock 5 Muhammad Waqar, SS (Bio), BPS-17 28-05-2014 29-05-2014 M.A/MSc, B.Ed M.Sc (1st), B.Ed (1st) Good Attock 6 Mubashar Javed, HM, BPS-17 4.10.15 13-04-2015 M.A/MSc, B.Ed M.A (1st), B.Ed (1st) Good Attock 7 Irfan Ali Cheema, HM, BPS-17 4.10.15 18-04-2015 M.A/MSc, B.Ed M.A (2nd), M.Ed (1st) Good Attock Mujtaba Hussain, SS(History/Pak Studies), BPS- 2.4.16 9-May-16 M.A/MSc, B.Ed M.A (2nd), B.Ed (2nd) Good Attock 8 17 9 Fahad Aziz, SS (Physics), BPS-17 9.1.16 9-Mar-16 M.A/MSc, B.Ed M.Sc (1st), B.Ed (1st) Good Attock Saeed Asharf, HM, BPS-17 29-07-2016 8-Dec-16 M.A/MSc, B.Ed BS (Hons) IT (1st), B.Ed Good Attock 10 (1st) Muslim Khan, HM/Assistant Director (Admn), 29-07-2016 30-07-2016 M.A/MSc, B.Ed M.A (2nd), M.Ed (2nd), Good Attock 11 BPS-17 M.Phil 12 -
[Jan-Mar.'2006] Awareness / Disclosure
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PREFACE The report in hand is the Final (updated October 2006) of the Integrated Social & Environmental Assessment (ISEA) for proposed Water Sector Improvement Project (WSIP). This report encompasses the research, investigations, analysis and conclusions of a study carried out by Mls Osmani & Co. (Pvt.) Ltd., Consulting Engineers for the Institutional Reforms Consultant (IRC) of Sindh Irrigation & Drainage Authority (SIDA). The Proposed Water Sector Improvement Project (WSIP) Phase-I, being negotiated between Government of Sindh and the World Bank entails a number of interventions aimed at improving the water management and institutional reforms in the province of Sindh. The second largest province in Pakistan, Sindh has approx. 5.0 Million Ha of farm area irrigated through three barrages and 14 canals. The canal command areas of Sindh are planned to be converted into 14 Area Water Boards (AWBs) whereby the management, operations and maintenance would be carried out by elected bodies. Similarly the distributaries and watercourses are to be managed by Farmers Organizations (FOs) and Watercourse Associations (WCAs), respectively. The Project focuses on the three established Area Water Boards (AWBs) of Nara, Left Bank (Akram Wah & Phuleli Canal) & Ghotki Feeder. The major project interventions include the following targets:- * Improvement of 9 main canals (726 Km) and 37 branch canals (1,441 Km). This includes new lining of 50% length of the lined reach of Akram Wah. * Control of Direct Outlets * Replacement of APMs with agreed type of modules * Improvement of 173 distributaries and minor canals ( 1527 Krn) including 145 Km of geomembrane lining and 1 12 Km of concrete lining in 3 AWBs. -
Sindh Irrigation & Drainage Authority
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PREFACE The report in hand is the Final (updated October 2006) of the Integrated Social & Environmental Assessment (ISEA) for proposed Water Sector Improvement Project (WSIP). This report encompasses the research, investigations, analysis and conclusions of a study carried out by M/s Osmani & Co. (Pvt.) Ltd., Consulting Engineers for the Institutional Reforms Consultant (IRC) of Sindh Irrigation & Drainage Authority (SIDA). The Proposed Water Sector Improvement Project (WSIP) Phase-I, being negotiated between Government of Sindh and the World Bank entails a number of interventions aimed at improving the water management and institutional reforms in the province of Sindh. The second largest province in Pakistan, Sindh has approx. 5.0 Million Ha of farm area irrigated through three barrages and 14 canals. The canal command areas of Sindh are planned to be converted into 14 Area Water Boards (AWBs) whereby the management, operations and maintenance would be carried out by elected bodies. Similarly the distributaries and watercourses are to be managed by Farmers Organizations (FOs) and Watercourse Associations (WCAs), respectively. The Project focuses on the three established Area Water Boards (AWBs) of Nara, Left Bank (Akram Wah & Phuleli Canal) & Ghotki Feeder. The major project interventions include the following targets:- • Improvement of 9 main canals (726 Km) and 37 branch canals (1,441 Km). This includes new lining of 50% length of the lined reach of Akram Wah. • Control of Direct Outlets • Replacement of APMs with agreed type of modules • Improvement of 173 distributaries and minor canals (1527 Km) including 145 Km of geomembrane lining and 112 Km of concrete lining in 3 AWBs. -
Introduction
Geological Bulletin Univ. Peshawar Vol. 35, pp. 139-150,2002 FALAK NAWAZ National Centre of Excellence in Geology, University of Peshawar, Pakistan ABSTRACT: This study attempts tofind out the humanperceptions and their responses about the flood hazard in districtfielum. DistrictJhelurnis one oftheseverelyfIood-affected areas in Pakistan, worstly affected during thePoods of 1992,1995 and 1997. The study found that the government machinery was mostly engaged inpost disaster activities. Concentrating more on the evacuation and rehabilitation measures instead of long-term sustainable solutions. Due to negligence by the implementingagencies, thepeople are becoming more susceptible tofIood hazard. Keepingin view the importance of the problem, an intensive study has been carried out, to find out the human perceptions and responses towardsflood hazard; A standard questionnaire was designed, and a survey was conducted in nine selected villages. INTRODUCTION Flood in the study area are caused mainly by heavy rainfall combined with snowrnelt in the upper District Jhelum is situated in the northern part catchment areas of river Jhelum and its tributaries of Punjab province, and is comprised of three Sub- during the monsoon season i.e. from July to Septem- divisions: namely Jhelum, Pind Dadan Khan and ber, when tropical cyclones move inland from the Bay Sohawa. River Jhelum forms a natural boundary with of Bengal. Generally, floods are restricted to these Gujrat, Mandi Bahauddin and Sargodha districts on three months but early and late floods have also been the east and south side, whereas on the west, experienced in the month of June and October, which Rawalpindi and Chakwal districts and in are relatively dry months (Ahmed and Qureshi 1995). -
Tender Notice
TENDER NOTICE Sealed tenders based on percentage rates/Market rate (MRS period 2nd BI-Annaual 1st July, 2017 to 31st December 2017) & (MRS period 1st BI-Annaual 1st January, 2018 to 30th June 2018 in Tender No.2) in regard of District Jhelum are hereby invited for the works mentioned below from the Contractors/Firms enlisted in Local Government (Engineering Wing) Jhelum for the year 2017-18. Tender document can be obtained from the office of the undersigned against written request accompanied original document of enlistment/ upto date renewal letter and fee receipt. PEC license for the year 2017-18, Identity Card of original Contractor/ Managing Partner of the firm along with registered Partnership deed and on payment on prescribed tender fee in term of CDR/Bank Draft of any schedule Bank. No tender should be issued to any representative of a Firm until & unless he possesses the registered power of attorney. Simple authority on company’s pad will not be entertained. Tendered rate and amount should be filled in figure as well as in word and tender should be signed as per general directions given in the tender document. No rebate on tendered rates will be acceptable. Tender will be issued up to 04-06-2018 till 9:30 AM To 3:00 PM and received on in the office of the undersigned up to 1:00 PM and will be opened at 2:00 PM as per PPRA Rule 30(i)of 2014 by the tender opening committee in the presence of intending contractors. Conditional tenders and the tenders not accompanied with earnest money in shape of deposit at call receipt from schedule bank (along with telephone numbers for its confirmation) and attested copies of registered partnership deed in case of firms will not be entertained. -
District Development B
District Development B o P R O F I L E l a n 2 0 1 1 - D i s t Kachhi r i c t D e v e l o p m e n t P r o f i l e 2 0 1 0 Planning & Development Department United Nations Children’s Fund Government of Balochistan, Quetta Provincial Office Balochistan, Quetta Planning & Development Department, Government of Balochistan in Collaboration with UNICEF District Development P R O F I L E 2 0 1 1 K a c h h i Prepared by Planning & Development Department, Government of Balochistan, Quetta in Collaboration with United Nations Children’s Fund Provincial Office Balochistan, Quetta July 18, 2011 Message Foreword In this age of knowledge economy, reliance on every possible tool The Balochistan District Development Profiles 2010 is a landmark exercise of Planning and available for decision making is crucial for improving public resource Development Department, Government of Balochistan, to update the district profile data management, brining parity in resource distribution and maximizing that was first compiled in 1998. The profiles have been updated to provide a concise impact of development interventions. These District Development landmark intended for development planning, monitoring and management purposes. Profiles are vivid views of Balochistan in key development areas. The These districts profiles would be serving as a tool for experts, development practitioners Planning and Development Department, Government of Balochistan and decision-makers/specialists by giving them vast information wrapping more than 18 is highly thankful to UNICEF Balochistan for the technical and dimensions from Balochistans' advancement extent. -
Government of the Punjab
GOVERNMENT OF THE PUNJAB ESTIMATES OF CHARGED EXPENDITURE AND DEMANDS FOR GRANTS (DEVELOPMENT) VOL - II (Fund No. PC12037 – PC12043) FOR 2015 - 2016 TABLE OF CONTENTS Demand # Description Pages VOLUME-I PC22036 Development 1 - 1053 VOLUME-II PC12037 Irrigation Works 1 - 58 PC12038 Agricultural Improvement and Research 59 - 62 PC12040 Town Development 63 - 67 PC12041 Roads and Bridges 69 - 274 PC12042 Government Buildings 275 - 644 PC12043 Loans to Municipalities / Autonomous Bodies, etc. 645 - 658 GOVERNMENT OF THE PUNJAB GENERAL ABSTRACT OF DISBURSEMENT (GROSS) (Amount in million) Budget Revised Budget Estimates Estimates Estimates 2014-2015 2014-2015 2015-2016 PC22036 Development 216,595.841 193,548.096 220,715.467 PC12037 Irrigation Works 47,975.188 35,470.869 48,681.493 PC12038 Agricultural Improvement and Research 190.551 194.776 58.150 PC12040 Town Development 500.000 408.228 500.000 PC12041 Roads and Bridges 31,710.000 40,836.883 69,491.707 PC12042 Government Buildings 48,028.420 19,903.878 60,553.183 PC12043 Loans to Municipalities/Autonomous Bodies etc. 13,546.444 16,058.201 11,350.590 TOTAL 358,546.444 306,420.931 411,350.590 Current / Capital Expenditure detailed below: Punjab Education Foundation (PEF) (7,500.000) - (10,500.000) Daanish School System (2,000.000) - (3,000.000) Punjab Education Endowment Fund (PEEF) (2,000.000) - (2,000.000) Lahore Knowledge Park (500.000) - (1,000.000) Health Insurance Card etc (4,000.000) - (2,500.000) Population Welfare (500.000) - (150.000) PMDGP/PHSRP WB, DFID Sponsored (2,000.000) - (1,000.000) -
Punjab Tourism for Economic Growth Final Report Consortium for Development Policy Research
Punjab Tourism for Economic Growth Final Report Consortium for Development Policy Research ABSTRACT This report documents the technical support provided by the Design Team, deployed by CDPR, and covers the recommendations for institutional and regulatory reforms as well as a proposed private sector participation framework for tourism sector in Punjab, in the context of religious tourism, to stimulate investment and economic growth. Pakistan: Cultural and Heritage Tourism Project ---------------------- (Back of the title page) ---------------------- This page is intentionally left blank. 2 Consortium for Development Policy Research Pakistan: Cultural and Heritage Tourism Project TABLE OF CONTENTS LIST OF ACRONYMS & ABBREVIATIONS 56 LIST OF FIGURES 78 LIST OF TABLES 89 LIST OF BOXES 910 ACKNOWLEDGMENTS 1011 EXECUTIVE SUMMARY 1112 1 BACKGROUND AND CONTEXT 1819 1.1 INTRODUCTION 1819 1.2 PAKISTAN’S TOURISM SECTOR 1819 1.3 TRAVEL AND TOURISM COMPETITIVENESS 2324 1.4 ECONOMIC POTENTIAL OF TOURISM SECTOR 2526 1.4.1 INTERNATIONAL TOURISM 2526 1.4.2 DOMESTIC TOURISM 2627 1.5 ECONOMIC POTENTIAL HERITAGE / RELIGIOUS TOURISM 2728 1.5.1 SIKH TOURISM - A CASE STUDY 2930 1.5.2 BUDDHIST TOURISM - A CASE STUDY 3536 1.6 DEVELOPING TOURISM - KEY ISSUES & CHALLENGES 3738 1.6.1 CHALLENGES FACED BY TOURISM SECTOR IN PUNJAB 3738 1.6.2 CHALLENGES SPECIFIC TO HERITAGE TOURISM 3940 2 EXISTING INSTITUTIONAL ARRANGEMENTS & REGULATORY FRAMEWORK FOR TOURISM SECTOR 4344 2.1 CURRENT INSTITUTIONAL ARRANGEMENTS 4344 2.1.1 YOUTH AFFAIRS, SPORTS, ARCHAEOLOGY AND TOURISM -
Name CNIC Date of Birth (Dd/Mm/Yyyy) Amount Submission
LIST OF CATEGORY -III MEMBERS REGISTERED IN MEMBERSHIP DRIVE-II(Part-4th) Date of Birth Name CNIC Amount Submission Date (dd/mm/yyyy) A SATTAR UMERANI 4200036095311 1-Feb-70 25000 25-Mar-19 Aaber Farooq 33301-4817637-3 03/09/1986 25,000 25-Mar-19 Aabis Raza Kazmi 34101-7982643-3 14/9/1990 25,000 6-Mar-19 Aamir Ali 31101-3366151-7 9/9/1991 25,000 21-Mar-19 AAMIR SHAHZAD 3310007107175 25-Sep-72 25000 21-Mar-19 AASHIQ ALI MEMON 4330329942951 21-Aug-69 25000 22-Mar-19 AASIM BASHIR 3740567745419 20-Oct-70 25000 11-Mar-19 Abaid Ullah 32103-2518976-5 1/6/1966 25,000 25-Mar-19 ABDUL ALEEM KHAN 3520230658047 9-Mar-65 25000 25-Mar-19 ABDUL AZEEM JATOI 4230177451543 1-Apr-78 25000 25-Mar-19 ABDUL AZIZ 6110142134913 1-May-64 25000 22-Mar-19 Abdul Bari 32402-5221299-9 10/9/1965 25,000 25-Mar-19 ABDUL BASIT 3740540476955 24-Mar-88 25000 21-Mar-19 ABDUL GHAFFAR 3550102289413 1-Apr-89 25000 25-Mar-19 ABDUL GHAFFAR 5210105714535 17-Jul-80 25000 14-Mar-19 ABDUL GHAFFAR 4220102855149 4-Mar-60 25000 14-Mar-19 ABDUL GHAFFFAR KHAN 8210299699793 18-Dec-71 25000 25-Mar-19 ABDUL GHAFOOR 4230109573757 6-Mar-75 25000 25-Mar-19 Date of Birth Name CNIC Amount Submission Date (dd/mm/yyyy) ABDUL GHAFOOR 3740615687037 22-Oct-63 25000 22-Mar-19 ABDUL GHAFOOR SANJRANI 4230103641849 30-May-57 25000 18-Mar-19 ABDUL HAFEEZ 4130381796287 2-Mar-85 25000 18-Mar-19 Abdul Hameed 35202-5798517-7 13/11/1951 25,000 13-Mar-19 ABDUL HAMEED 4240116994783 20-Sep-62 25000 25-Mar-19 ABDUL HAMID 4210178803863 12-Mar-63 25000 22-Mar-19 ABDUL HAMID KHAN 4210115977797 12-Jan-64 25000 25-Mar-19 -
Ehsaas Emergency Cash Payments
Consolidated List of Campsites and Bank Branches for Ehsaas Emergency Cash Payments Campsites Ehsaas Emergency Cash List of campsites for biometrically enabled payments in all 4 provinces including GB, AJK and Islamabad AZAD JAMMU & KASHMIR SR# District Name Tehsil Campsite 1 Bagh Bagh Boys High School Bagh 2 Bagh Bagh Boys High School Bagh 3 Bagh Bagh Boys inter college Rera Dhulli Bagh 4 Bagh Harighal BISP Tehsil Office Harigal 5 Bagh Dhirkot Boys Degree College Dhirkot 6 Bagh Dhirkot Boys Degree College Dhirkot 7 Hattain Hattian Girls Degree Collage Hattain 8 Hattain Hattian Boys High School Chakothi 9 Hattain Chakar Boys Middle School Chakar 10 Hattain Leepa Girls Degree Collage Leepa (Nakot) 11 Haveli Kahuta Boys Degree Collage Kahutta 12 Haveli Kahuta Boys Degree Collage Kahutta 13 Haveli Khurshidabad Boys Inter Collage Khurshidabad 14 Kotli Kotli Govt. Boys Post Graduate College Kotli 15 Kotli Kotli Inter Science College Gulhar 16 Kotli Kotli Govt. Girls High School No. 02 Kotli 17 Kotli Kotli Boys Pilot High School Kotli 18 Kotli Kotli Govt. Boys Middle School Tatta Pani 19 Kotli Sehnsa Govt. Girls High School Sehnsa 20 Kotli Sehnsa Govt. Boys High School Sehnsa 21 Kotli Fatehpur Thakyala Govt. Boys Degree College Fatehpur Thakyala 22 Kotli Fatehpur Thakyala Local Govt. Office 23 Kotli Charhoi Govt. Boys High School Charhoi 24 Kotli Charhoi Govt. Boys Middle School Gulpur 25 Kotli Charhoi Govt. Boys Higher Secondary School Rajdhani 26 Kotli Charhoi Govt. Boys High School Naar 27 Kotli Khuiratta Govt. Boys High School Khuiratta 28 Kotli Khuiratta Govt. Girls High School Khuiratta 29 Bhimber Bhimber Govt. -
The Musalman Races Found in Sindh
A SHORT SKETCH, HISTORICAL AND TRADITIONAL, OF THE MUSALMAN RACES FOUND IN SINDH, BALUCHISTAN AND AFGHANISTAN, THEIR GENEALOGICAL SUB-DIVISIONS AND SEPTS, TOGETHER WITH AN ETHNOLOGICAL AND ETHNOGRAPHICAL ACCOUNT, BY SHEIKH SADIK ALÍ SHER ALÍ, ANSÀRI, DEPUTY COLLECTOR IN SINDH. PRINTED AT THE COMMISSIONER’S PRESS. 1901. Reproduced By SANI HUSSAIN PANHWAR September 2010; The Musalman Races; Copyright © www.panhwar.com 1 DEDICATION. To ROBERT GILES, Esquire, MA., OLE., Commissioner in Sindh, This Volume is dedicated, As a humble token of the most sincere feelings of esteem for his private worth and public services, And his most kind and liberal treatment OF THE MUSALMAN LANDHOLDERS IN THE PROVINCE OF SINDH, ВY HIS OLD SUBORDINATE, THE COMPILER. The Musalman Races; Copyright © www.panhwar.com 2 PREFACE. In 1889, while I was Deputy Collector in the Frontier District of Upper Sindh, I was desired by B. Giles, Esquire, then Deputy Commissioner of that district, to prepare a Note on the Baloch and Birahoi tribes, showing their tribal connections and the feuds existing between their various branches, and other details. Accordingly, I prepared a Note on these two tribes and submitted it to him in May 1890. The Note was revised by me at the direction of C. E. S. Steele, Esquire, when he became Deputy Commissioner of the above district, and a copy of it was furnished to him. It was revised a third time in August 1895, and a copy was submitted to H. C. Mules, Esquire, after he took charge of the district, and at my request the revised Note was printed at the Commissioner-in-Sindh’s Press in 1896, and copies of it were supplied to all the District and Divisional officers.