Dashboards for data based decisions

Jenő Csanaki Szentgotthard Ltd. Unit manager, Machining Content

About OPEL Szentgotthard

Planning - Tool set - Execution • Business environment • Data – Measure - KPI • Data processing, forums • Reports

Results

Layout & capacity

1. Family1 engine plant 7 2. Flex engine plant 2 22,500 m 2 5 8 65,426 m 630,000 unit per year 4 645,000 unit per year

9 6 1 12 2 14 11 10

13

3 13. 4-5. Offices Remanufacturing 6. Outbound 1,100 m2 Transportation Hall 7. Warehouse 3. Cylinder-head plant 11,700 unit per year 8. Energy centre 2 9. Truck gate 15,500 m 10. Personal Entrance 2 625,000 unit per year 11. Social Building 12. Main Entrance / Offices 13. Reman 14. Knowledge Center with Family1engines

Chevrolet Aveo/Sonic Cruze

Opel Corsa NB

5 5 X Cars with Flex engines

Opel Mokka X

Opel Insignia Opel Zafira Opel Astra

Chevrolet6 Cruze Opel Cascada 6 Flex machining lines & capacity

Indirect store Coolant Block

CRK1 CRK2 CBL1 CBL2 CBL3 MDE MDE/SG SGE MGE SGE 275 K/Y E (Alu) MGE (Cast MDE 280 K/Y 275 K/Y Iron) (Alu) 100 K/Y 180 K/Y

Hot Test

CHM1 Existing AssyAssy1

Plant crank SGE / MDE MGE/SGE

180 K/Y 285 K/Y (+ 85 K/Y)

Head Sub Coolant Logistic CHM2 AssyAssy2

CH2 Fam1 SGE / head MGE MDE MDE

100 K/Y 280 K/Y 275 K/Y (+95 K/Y)

Head Sub Coolant

New Plant/ Extension Example: Cylinder block machining line 3 Throughput- Planning

As a function…

Throughput  f a,b,c,d,...,t

a: # of characteristics, b: # of machines, c: # of spindles(stations),

d: fd(share of characteristics between operations), e: fe(conveyance), f: ff(cycle time), g: fg(measurings), h: fh(planned, unplanned tool change), i: fi(interventions by operators), j: fj(breakdown), k: fk(impact of other machines, gantries, conveyors, adapters,…), l: fl(types, type changes), … Data Information Manufacturing process visualisation

Component Process production

Measure Produced parts

Uptime KPI

Layered reporting

Visualisation Processes KPIs

Uptime=NetOutput/(ScheduledHours/CycleTimepurch) [%]

SAT=Output/(RunningTime+Downtime) [JPH]

Supply chain& Logistics IT systems

Uptime

Energy & Supplier quality Utilities

Maintenance

SAT: Standalone Throughput Uptime Cost

Uptime Regular auto-identification Bottleneck Quantity losses Downtime, duration & frequency

By operation Cycle time By type During type change

Material Scrap Production

Rework Touch Suspect Data management, BI

DATA - DATA PROCESSING – REPORTS

Requirements • Proper data quality in time • One data once entered • Tracking changes in time (target changes) • Be capable to • aggregate • identically defined measures • Fast response • Layered reports • Shared BI • Sharing Business intelligence and OLAP

„Business Intelligence is a set of methodologies, processes, architectures, and technologies that transform raw data into meaningful and useful information used to enable more effective strategic, tactical, and operational insights and decision-making.” Evelson, Boris (21/11/2008) Multidimensional data structure OLAP cube

Machines

Time

Product type Data sources, systems

PMC TL, SL

CMM report Flexnet Qs-Stat OLAP Tabular System structure

Data Measures, KPIs, BI Reports

Special Browser OLTP Data reports OLAP Database Warehouse Shiftreports Cubes

Scheduling PMC MGO Flexnet PAS Dashboards Shared BI

ME MySQL FACS Schneider AVL Data (Flex Assy) Energy (Hottest) Collection Mgmt Report structure

Production area

Shared BI Frequency ReportingShared BI –examplesnew report

Web based reports Weekly report

Shared BI – new Production report dashboard Systematic forums & reports PMC Daily production Daily meeting TIP BN (SAT) ranking

Weekly Weekly production Shift meeting TIP Reports Weekly

Uptime action report plan update

Weekly production TIP meeting Monthly Monthly Cost management BPD review review report

Manuf Staff Mtg, >Monthly, LRP, CIP plan Cost Annual PPRM TIP: Throughput Improvement Process report BN: Bottleneck SAT: Standalone Throughput=Output / (RunningTime+Downtime) LRP: Loss Reduction Project WEB interface shiftly, manual supported by PM&C on-line

PM&C bottleneck (SAT) ranking ReportingWeb basedexamples

Web based reports Weekly report

Shared BI – new Production report dashboard Shared BI, database connections Daily reports ReportingProductionexamplesdashboard

Web based reports Weekly report

Shared BI – new Production report dashboard Weekly reports ReportingWeekly reportexamples

Web based reports Weekly report

Shared BI – new Production report dashboard Monthly reports

Action plans Other reports

Time from operator call to maintenance arrival Uptime improvement result Cost developement 2015 vs. 2016

Scrap cost THANK YOU FOR YOUR ATTENTION!