Hong Kong – Western Harbour Crossing

Total Page:16

File Type:pdf, Size:1020Kb

Hong Kong – Western Harbour Crossing Hong Kong – Western Harbour Crossing Preliminary Findings from HLR Interviews Frederik Pretorius, Rachel Ng, Billy Kwan The University of Hong Kong April 2009 Hong Kong: WHC – A Reminder • Proposed early 1990s, in the last few years of colonial government in HK pending return to PRC sovereignty in 1997. • Originally proposed as a stand-alone project, later identified as one of the 10 infrastructure project in the Airport Core Program (ACP) • 2 km dual three-lane immersed tube road tunnel, developed as a privatised tolled tunnel (BOT), controlled by Citic Pacific (also controls Eastern Harbour Tunnel, with Cross-Harbour Tunnel controlled by the HKSAR Government) • Part of HK’s “Strategic Road Network” (see next slide). Hong Kong: WHC – A Reminder • Hong Kong has an “executive-led government” (before and after 1997), tempered in an important way by the (partly representative) Legislative Council – FINANCING. • As a standalone BOT, WHC’s rights are contained in law, with its own Ordinance, containing a generous “toll adjustment mechanism”, ensuring beneficial toll adjustment flexibility. • WHC has underperformed since its opening, carrying around half its capacity and only turning an operating profit ten years after opening (1997). • Very important external shocks: Asian Financial Crisis (1997-1999) and SARS crisis (2003). HKSAR Government’s budgetary crisis, 1999-2004,5. WHC: Major Road Network in HK HK Western Harbour Crossing Connects western part of HK Island with West Kowloon Aerial View of WHC Overarching Questions - Q1: Project Success • Depends on definition of ‘success’ • Generic Criteria: - Meet objectives - Beneficial to & acceptable by the public - Clear “demand/necessity” for the MUTP - Affordable to & Accessible by the public - Accountability - Economically sustainable (“financial”) • WHC is successful in terms of: - Meeting its main objectives (strategic link: airport and network) - Congestion: alternative is/was the ‘do-nothing’ scenario, traffic congestion would be worse • WHC is not successful in terms of: - Financial feasibility (BOT), toll levels, competition between tunnels - Its potential to facilitate urban development is/was not (fully?) utilised - Reducing traffic congestion Overarching Questions - Q2: Project Appraisal and Evaluation The Most Important Appraisal and Evaluation WHC Criteria for a MUTP: Meeting objectives ü “Correct” traffic forecasts û Difference between having & not having the MUTP ü Environmental & social impacts ? Engineering/technical feasibility ü Financial viability û Sustainable development concerns ? Operational mechanisms (BOT & TAM) û Overarching Questions - Q3: Main ‘Sustainability’ Considerations • Sustainability important? YES! Sustainability considerations should play a major role in MUTPs • The term ‘sustainability’ was not used at the planning stage of WHC, but the principle was not ignored • The government did consider environmental, social and economic impacts of WHC, but not within today’s context of more comprehensive impact assessment • Public participation/involvement was absent Overarching Questions - Q4: Project Decision-making Process: Important Actors and Factors THE CRITICAL IMPORTANCE OF 1997: THE POLITICAL DIMENSION • Actors: - Government (both British Colonial & Chinese) - Legislators - The community - The operator of the MUTP • Factors: - The need for the MUTP – airport rail link and traffic congestion (public interest) - Power of the executive-led government - Public engagement - Competition – or lack of it Overarching Questions - Q5: Sources of Project Risk, Uncertainty & Complexity • Risk: - Traffic forecast (and all sorts of projections) - Financial risk - Political risk • Uncertainty: - Everything had an element of uncertainty about the future: e.g. the overall economy, the company’s profile, traffic flow, progress of other associated projects • Complexity: - Competition among the 3 cross-harbour tunnels - Integration with other infrastructure Overarching Questions - Q6: Important/influential aspects of Project Context • Generically important: political context and public participation/acceptance of process • For WHC: political context of HK - the use of public funds - obtaining consensus about the necessity for a MUTP - change of policy following transitional period was certainly not adequately considered • Influence of the Mega-event: transfer of sovereignty over HK back to PRC in 1997 drove everything Hypothesis 1: Privatisation at all costs • The economic rationale for WHC was driven by a narrow adherence to "New Public Sector Management" principles, with private sector provision of public infrastructure (with supporting planning, appraisal and financing mechanisms in government). Hypothesis 1: Findings • Nothing wrong with BOT because: - Fair: ‘users-pay’s’ principle - Functions to minimise the government’s financial burden - HK’s government encourages competition and market- driven development • Economic/financial risk transferred to private sector – and political development since then? (See Hypothesis 3). - Private Sector took the risk, and has to bear it; but some considered the risk to have been transferred in the opposite direction (expectation of a “buy-back”). • ∴ Projects should be privatised if possible but not at all cost Hypothesis 2: WHC A product of a compartmentalised government • WHC is not successful because the Government failed to plan and develop transport infrastructure and land uses strategically and in an integrated fashion; nor did the Government consider sustainability issues in planning this infrastructure investment. Hypothesis 2: Findings • Values of the society & the environment of HK changed over time - There was comprehensive planning of the strategic transportation network, but social and political values changed when it came to the implementation stage (see Hypothesis 3). • Sustainable development concerns and urban regeneration could have been, but were not considered a priority at the WHC planning stage Hypothesis 3: WHC - “Victim” of a politicizing society & challenges to government-led planning & development • The WHC project outcomes can be best explained by the social, economic, political and institutional forces and influences that were at work in HK pre-1997 at the time of planning and developing WHC, and how that context rapidly changed (and continues to change) to a set of circumstances reflecting more active community engagement in developmental issues and which is mounting significant challenges to the institution of “executive-led governance”. Hypothesis 3: Findings Pre-1997 era Post-1997 era Public Economic prosperity SD, political/civil rights, concerns cultural, conservation Decision- Same procedures, same decision-making making actors, same set of powers process Shorter period Longer period Public Less More involvement Impact More detailed and in Less detailed assessment wider perspective NOTE: This does not necessarily suggest the pre-1997 era government worked less effectively than the post-1997 era government The Four Tests – Test 1 Analysis of achievements of project against objectives • Objectives of WHC: – Alleviate traffic congestion – Divert traffic from the other 2 tunnels – Direct link to the airport • Project Time • Project Budget • Forecasts (finance + traffic flow) The Four Tests – Test 2 Analysis of achievements of project against identified visions, challenges & issues of sustainable development • Any contributions to SD in terms of: - economic - environmental - social - institutional The Four Tests – Test 3 Analysis of achievements of project against successful treatment of risk, uncertainty, complexity & context in decision-making • Identify RUC and Context of WHC • Treatment of RUC in WHC? • Are lessons learned in WHC generic or context- specific? The Four Tests – Test 4 Synthesis of findings of analysis of tests 1-3 • Extract decision-making lessons & guidelines for future MUTPs and for retrofitting existing MUTPs Hong Kong – Western Harbour Crossing Preliminary Findings from HLR Interviews Frederik Pretorius, Rachel Ng, Billy Kwan The University of Hong Kong April 2009 .
Recommended publications
  • Final Report
    Transport and Housing Bureau The Government of the Hong Kong SAR FINAL REPORT Consultancy Services for Providing Expert Advice on Rationalising the Utilization of Road Harbour Crossings In Association with September 2010 CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT September 2010 WILBUR SMITH ASSOCIATES LIMITED CONSULTANCY SERVICES FOR PROVIDING EXPERT ADVICE ON RATIONALISING THE UTILISATION OF ROAD HARBOUR CROSSINGS FINAL REPORT TABLE OF CONTENTS Chapter Title Page 1 BACKGROUND AND INTRODUCTION .......................................................................... 1-1 1.1 Background .................................................................................................................... 1-1 1.2 Introduction .................................................................................................................... 1-1 1.3 Report Structure ............................................................................................................. 1-3 2 STUDY METHODOLOGY .................................................................................................. 2-1 2.1 Overview of methodology ............................................................................................. 2-1 2.2 7-stage Study Methodology ........................................................................................... 2-2 3 IDENTIFICATION OF EXISTING PROBLEMS ............................................................. 3-1 3.1 Existing Problems
    [Show full text]
  • The Design of the Western Harbour Crossing, Hong Kong
    The design of the Western Harbour Crossing, Hong Kong Autor(en): Morris, Martin W. Objekttyp: Article Zeitschrift: IABSE reports = Rapports AIPC = IVBH Berichte Band (Jahr): 78 (1998) PDF erstellt am: 29.09.2021 Persistenter Link: http://doi.org/10.5169/seals-59041 Nutzungsbedingungen Die ETH-Bibliothek ist Anbieterin der digitalisierten Zeitschriften. Sie besitzt keine Urheberrechte an den Inhalten der Zeitschriften. Die Rechte liegen in der Regel bei den Herausgebern. Die auf der Plattform e-periodica veröffentlichten Dokumente stehen für nicht-kommerzielle Zwecke in Lehre und Forschung sowie für die private Nutzung frei zur Verfügung. Einzelne Dateien oder Ausdrucke aus diesem Angebot können zusammen mit diesen Nutzungsbedingungen und den korrekten Herkunftsbezeichnungen weitergegeben werden. Das Veröffentlichen von Bildern in Print- und Online-Publikationen ist nur mit vorheriger Genehmigung der Rechteinhaber erlaubt. Die systematische Speicherung von Teilen des elektronischen Angebots auf anderen Servern bedarf ebenfalls des schriftlichen Einverständnisses der Rechteinhaber. Haftungsausschluss Alle Angaben erfolgen ohne Gewähr für Vollständigkeit oder Richtigkeit. Es wird keine Haftung übernommen für Schäden durch die Verwendung von Informationen aus diesem Online-Angebot oder durch das Fehlen von Informationen. Dies gilt auch für Inhalte Dritter, die über dieses Angebot zugänglich sind. Ein Dienst der ETH-Bibliothek ETH Zürich, Rämistrasse 101, 8092 Zürich, Schweiz, www.library.ethz.ch http://www.e-periodica.ch M. W. MORRIS 203 The Design of the Western Harbour Crossing, Hong Kong Martin W Morris Martin Morris is a Fellow of the Institution Technical Director of Civil Engineers and a Technical Director Hyder Consulting Limited of Hyder Consulting Limited in UK. He was Guildford, United Kingdom resident in South East Asia for nearly 20 years where he was responsible for the company's immersed tube tunnel work in Hong Kong and Australia.
    [Show full text]
  • Legislative Council Brief Free-Flow Tolling
    File Ref.: THB(T)CR 1/4651/2019 LEGISLATIVE COUNCIL BRIEF Road Tunnels (Government) Ordinance (Chapter 368) Road Traffic Ordinance (Chapter 374) Tsing Sha Control Area Ordinance (Chapter 594) FREE-FLOW TOLLING (MISCELLANEOUS AMENDMENTS) BILL 2021 INTRODUCTION At the meeting of the Executive Council on 16 March 2021, the Council ADVISED and the Chief Executive ORDERED that the Free-Flow Tolling A (Miscellaneous Amendments) Bill 2021 (“the Bill”) , at Annex A, should be introduced into the Legislative Council (“LegCo”). JUSTIFICATIONS 2. At present, a motorist using a government tolled tunnel 1 or Tsing Sha Control Area (“TSCA”) (hereafter collectively referred to as “Tolled Tunnels”) may stop at a toll booth to pay the toll manually by tendering cash or prepaid toll tickets to a toll collector, or using the “stop-and-go” electronic payment facilities installed thereat. Alternatively, a motorist who drives a vehicle with an Autotoll tag issued by the Autotoll Limited (a private company) may pass through an Autotoll booth without stopping, with the toll payable deducted from a prepaid account. 3. The Hong Kong Smart City Blueprint published in December 2017 promulgated, among others, the development of toll tag (previously known as “in- vehicle unit”) for allowing motorists to pay tunnel tolls by remote means through an automatic tolling system, namely the “free-flow tolling system” (“FFTS”). In the Smart City Blueprint 2.0 published in December 2020, one of the Smart Mobility 1 Covering Cross-Harbour Tunnel, Eastern Harbour Crossing (“EHC”), Lion Rock Tunnel, Shing Mun Tunnels, Aberdeen Tunnel, Tate’s Cairn Tunnel and will cover the two Build-Operate- Transfer (“BOT”) tunnels, viz.
    [Show full text]
  • MTR Penny's Bay Rail Link
    File Ref: ETWB(T) CR 3/5/511/98 Pt.4 Legislative Council Panel on Transport Subcommittee on matters relating to the implementation of railway development projects MTR Penny’s Bay Rail Link – Project Agreement INTRODUCTON At the special meeting of this subcommittee held on 22 July 2002, Members requested MTR Corporation Limited (MTRCL) to provide additional information on the fare level of PBRL rail service, and the estimated additional revenue induced by the Penny's Bay Rail Link (PBRL) to the rest of the MTR network. A letter dated 24 July 2002 from the Project Director of the MTRCL to the Acting Secretary for the Environment, Transport and Works is attached at the Annex. PROJECTED CAPITAL COST OF THE PBRL 2. The capital cost is estimated to be $2 Billion. This represents a 23% reduction from the original capital cost estimate of $2.6 Billion. As we have informed this Subcommittee earlier, the estimate has taken into account the current economic situation, the recent deflationary trend, various cost-saving measures initiated by MTRCL and we believe that it is a realistic estimate of the construction cost. - 2 - 3. The construction costs of different railway projects are subject to various varying factors such as length, design, physical constraints etc, and are therefore not completely comparable. Nevertheless, a comparison between the PBRL and Tseung Kwan O Extension shows that the PBRL cost estimate is within reasonable range, bearing in mind that the design, construction and material used in the PBRL project must be commensurate with the standards of the Hong Kong Disneyland : Comparison between Tseung Kwan O Extension (TKO) and Penny’s Bay Rail Link (PBRL) TKO Extension PBRL Length 12.5 km 3.5 km Number of 5 2 stations $18 Billion $2 Billion Cost ESTIMATED INTERNAL RATE OF RETURN 4.
    [Show full text]
  • I the Arup Journal
    I THE ARUP JOURNAL 2/1995 Front cover: Lille TGV station roof and fa<;:ade (Copyright SNCF - Direction de THEARUP l'AmenagemenVMichel Denance) Back cover: Satellite image of the Thames and London (Photo: Department of JOURNAL Transport/Engineering Surveys) Vol. 30 No. 2 Editor: 2/1995 David J . Brown Art Editor: Published by Desmond Wyeth FCSD Ove Arup Partnership Deputy Editor: 13 Fitzroy Street Helene Murphy London W1P 680 Editorial: Tel: 0171 636 1531 Tel: 01714653828 Fax : 0171 580 3924 Fax : 0171 465 3716 Eura Iii le: Euralille is a massive trade centre at Lille in north east France, the TGV station roof 3 whose construction was brought about by the selection of that city Sophie Le Bourva as the hub of the Paris-London and Paris-Brussels TGV rail lines. Jane Wernick Amongst several Arup commissions connected with Euralille, the firm was appointed to design the structure and cladding for the roof and fa9ades of the new TGV station constructed as a central component of the complex. The Tees Ove Arup & Partners Newcastle designed the structure for this Barrage Bridge 7 eight-span tubular steel arch bridge, conceived as the visual focus Neil Carstairs of the new tidal barrage which is a key feature in the regeneration David Stevens of a derelict former engineering works at Stockton-on-Tees. The design deliberately recalls and celebrates the area's importance in the history of iron and steel engineering. A strategy for the Arups were asked by the Government Office for London to River Thames 11 undertake a detailed study of SOkm of the Thames, from Hampton Michael Lowe Court to Greenwich, in order to make recommendations for Corinne Swain enhancing the riverfront environment, protecting areas of historic importance, promoting high quality new buildings and landscaping, and generally improving access and amenity.
    [Show full text]
  • Some Aspects of the Ppp Approach to Transport Infrastructure Development in Hong Kong
    SOME ASPECTS OF THE PPP APPROACH TO TRANSPORT INFRASTRUCTURE DEVELOPMENT IN HONG KONG Mak, C.K. and Mo, S. Highways Department, Government of the Hong Kong Special Administrative Region, Hong Kong, People's Republic of China. Abstract This paper discusses Hong Kong’s experience in the delivery of transport infrastructure projects with particular emphasis on the use of non-government funds. It also discusses the increasing role of the private sector in highway maintenance. Keywords: PPP, BOT, BOO, railway, highway, Hong Kong 1. Introduction With over 1900 km of public roads and freeways, and a railway network of some 200 km, Hong Kong has one of the most effective transport infrastructure systems amongst major cities in the world. Hong Kong embarked on a major expansion of her railway network in the last twenty years. The new railway lines were built, owned, operated and managed by two railway corporations with the Hong Kong Government as the major/sole shareholder. These two corporations operate according to prudent commercial principles. With revenue from fares, and income from commercial and property development, the railway projects are basically financially viable projects. In 2004, the railway system carried an average daily patronage of about 3.2 million, which was 30% of the total daily domestic public transport trips and 70% of the land-based cross-boundary passenger travel. Whilst Hong Kong’s highway network is predominantly built by public funding using the conventional re-measurement form of contract, the Build-Operate-Transfer (BOT) approach was adopted in the construction of Hong Kong’s first cross harbour tunnel as early as 1969.
    [Show full text]
  • Regional and Hong Kong's Transport Network Planning Framework
    This subject paper is intended to be a research paper on the results of studies or surveys from government land private sectors that are pertinent to the subject on Regional and Hong Kong's Transport Network Planning Framework. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not imply endorsement of the HKSARG. WORKING PAPER NO. 21 REGIONAL AND HONG KONG'S TRANSPORT NETWORK PLANNING FRAMEWORK Introduction 1. Railways and expressways are the main arteries of cities. They are the backbones to facilitate movements of goods and people. The prosperity and growth of a city depend very much on the efficient operation and development of its circulation systems. 2. This paper gives an overview of the existing and future strategic transport network in particular road and railway infrastructure in the Guangdong Province of the Mainland China 1. It also examines the present and future development of our Hong Kong's transport network in order to set the basic framework for planning an integrated transport system in the next stage of the study. Regional Transport Network I. Guangdong Province A. Road Infrastructure Exisitng Road Infrastrucutre 3. To accelerate the modernisation of transportation in China, in the early 1990s, the Ministry of Transportation put forward a strategic and ambitious distribution plan for the national trunk road system. Highways in China can be classified into 6 technical categories. They are expressway, Class I to IV Highways and others. According to the Guangdong Statistical Bureau (Table 1), there were a total of about 95,610km of roads covering the Guangdong Province in 1999, of which 953 km (1%) were expressway and 17,199km (18%) were Classes I and II highways.
    [Show full text]
  • Hong Kong: the Facts
    Transport Every day, about 8.93 million passenger journeys are Public Light Buses (PLBs) are minibuses with not more made on a public transport system which includes railways, than 19 seats. Their number is fixed at a maximum of 4 350 trams, buses, minibuses, taxis and ferries in 2020. vehicles. Some PLBs are used for scheduled services (green There are about 373 licensed vehicles for every kilometre minibuses) and others for non-scheduled services (red of road, and the topography makes it increasingly difficult to minibuses). provide additional road capacity in the heavily built-up areas. Red minibuses are free to operate anywhere, except where special prohibitions apply, without fixed routes or fares. By end Buses and Minibuses: By end December 2020, the Kowloon December 2020, there are 1 009 red minibuses. Motor Bus Company (1933) Limited (KMB) operates 359 bus Green minibuses operate on fixed routes and frequencies routes in Kowloon and the New Territories and 65 cross- at fixed prices. By end December 2020, there are 67 main harbour routes. Fares range from $3.2 to $13.4 for urban green minibus routes on Hong Kong Island, 82 in Kowloon and routes, from $2 to $46.5 for the New Territories routes and 211 in the New Territories, employing a total of 3 341 vehicles. from $8.8 to $39.9 for the cross-harbour routes. Red minibuses carry about 183 300 passengers a day, while With a fleet of 3 997 licensed air-conditioned buses, mostly green minibuses carry about 1 116 200 passengers daily Note double-deckers, KMB is one of the largest road passenger 2.
    [Show full text]
  • LCQ4: Automatic Toll Collection System of Tolled Tunnels and Roads *************************************************
    LCQ4: Automatic toll collection system of tolled tunnels and roads ************************************************* Following is a question by the Hon Chan Kam-lam and a reply by the Secretary for Transport and Housing, Ms Eva Cheng, at the Legislative Council meeting today (June 29): Question: According to the information of the Transport Department, the overall utilisation rate in February 2011 of the Autotoll toll collection system (Autotoll) at tolled tunnels and roads was only 47%, and that the Autotoll utilisation rate at the Cross Harbour Tunnel in Hung Hom was only 39%. Quite a number of drivers have reflected that owing to insufficient provision of Autotoll lanes at the cross harbour tunnels, there are often long vehicle queues and some drivers who have already opened an account with Autotoll are therefore forced to give up using such lanes and switch to using manual toll booths where the queues are shorter, and thus the automatic toll collection system at the tunnels fails to achieve the effect of easing traffic flow. In this connection, will the Government inform this Council: (a) whether the authorities have conducted a review on the aforesaid situation, including re-assessing the number of Autotoll lanes available at various tunnels; if they have, of the situation; (b) whether the authorities have conducted a study on how to facilitate the enhancement of the Autotoll utilisation rate so that the automatic toll collection system can achieve a greater effect in easing traffic flow; and (c) given the serious traffic congestion
    [Show full text]
  • 2. Project Description
    West Kowloon Cultural District Environmental Impact Assessment 2. Project Description 2.1 Existing Site Conditions The West Kowloon Cultural District (WKCD) site is located on the West Kowloon Reclamation south of Austin Road West and the Western Harbour Crossing Toll Plaza as shown in Figure 1.1 . The site is currently zoned as “West Kowloon Cultural District Development Plan Area” under the approved South West Kowloon Outline Zoning Plan (No. S/K20/28) gazetted on 8 January 2013, and comprises approximately 40ha of land bordering the Jordan/Tsim Sha Tsui area. The site reserved for the WKCD development is currently occupied by works sites, local roads, temporary storage / parking facilities, a temporary promenade at the Waterfront and a number of existing infrastructure and utility facilities such as ventilation buildings for the Western Harbour Crossing and the MTR railway line, a sea water pumping station, etc. Parts of the WKCD site are also currently occupied by the Tsim Sha Tsui Fire Station and by the works site and temporary works areas for the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (XRL) project. 2.2 Project Components Following from recommendations by the Consultative Committee on the Core Arts and Cultural Facilities (CACF) of WKCD in 2006, a number of CACF were proposed, including both performing arts and visual arts venues. Other facilities including hotel, offices and residential (HOR) and Government, Institution or Community facilities (GIC) were also recommended. Plans to imbed sustainability into these core facilities and the WKCD area include adoption of green building designs, renewable energy technologies, water and energy conservation measures, and green transportation.
    [Show full text]
  • Western Harbour Crossing Hong Kong
    Project identification Western Harbour Crossing Hong Kong Type of project Immersed tunnel Client Western Harbour Crossing Company Ltd. In co-operation with Mott Connell Hong Kong Ministry of Transport and Public Works Tunnel Engineering Department Project assignment Tender design for Build-Operate-Transfer (B.O.T) proposal Country Location Hong Kong Hong Kong Island - Kowloon Project duration Project phase December 1991 - June 1992 Completed Construction cost Consultancy fee € 454.000,= (estimated) € 91.000,= (excl. VAT) (excl. VAT) Project identification Western Harbour Crossing Hong Kong Type of project Immersed tunnel Project description In the new 35 km long airport connection between Chek Lap Kok and Hong Kong Island several bridges and a tunnel have to be built. This tunnel, the Western Harbour Crossing crosses Victoria Harbour at the West Kowloon reclamation. The tunnel alignment has a total length of 2750 m. At Kowloon the tunnel starts with a 650 m long approach, followed by 1290 m long immersed tunnel elements and at Hong Kong Island a 810 m long approach with an interchange. The Kowloon approach will be an in situ built cut and cover tunnel in the new reclamation. At Hong Kong Island the approach is built as a top down structure with diaphragm walls reaching 50 m deep onto the bedrock. The interchange is needed due to the limited area available. The Western Harbour Crossing will be a privately financed BOT project. The Cross Harbour Tunnel Co. Ltd. was one of the competing franchises for this project. Together with Mott Connell Hong Kong TEC was invited to prepare a tender design for this tunnel project.
    [Show full text]
  • 2017 Annual Report 2 Chairman’S Statement
    Contents Corporate Information 1 Chairman’s Statement 2 Operation Review 6 Management Discussion and Analysis 13 Directors and Senior Management 17 Corporate Governance Report 19 Environmental, Social and Governance Report 32 Directors’ Report 45 Independent Auditor’s Report 53 Consolidated Statement of Profit or Loss 58 Consolidated Statement of Profit or Loss and Other Comprehensive Income 59 Consolidated Statement of Financial Position 60 Consolidated Statement of Changes in Equity 62 Consolidated Cash Flow Statement 63 Notes to the Consolidated Financial Statements 65 Five-year Summary 113 Corporate Information Board of Directors Company Secretary Executive Director Leung Shuk Mun, Phyllis Sylvia Cheung Chung Kiu (Chairman) Yeung Hin Chung, John, SBS, OBE, JP (Managing Director) Legal Adviser Yuen Wing Shing Wong Chi Keung Woo, Kwan, Lee & Lo Leung Wai Fai Tung Wai Lan, Iris Registered Office 3301-3307, China Resources Building Independent Non-executive Director 26 Harbour Road Ng Kwok Fu Wanchai Luk Yu King, James Hong Kong Leung Yu Ming, Steven Tel: (852) 2161 1888 Fax: (852) 2802 2080 Audit Committee Website: www.crossharbour.com.hk Luk Yu King, James (Chairman) Email: [email protected] Ng Kwok Fu Leung Yu Ming, Steven External Auditor KPMG Remuneration Committee Leung Yu Ming, Steven (Chairman) Registrar & Transfer Office Cheung Chung Kiu Tricor Tengis Limited Ng Kwok Fu Level 22, Hopewell Centre 183 Queen’s Road East Nomination Committee Wanchai Cheung Chung Kiu (Chairman) Hong Kong Ng Kwok Fu Tel: (852) 2980 1333 Leung Yu Ming, Steven Fax: (852) 2810 8185 Authorised Representative Principal Banker Yeung Hin Chung, John The Hongkong and Shanghai Banking Leung Wai Fai (Alternate to Yeung Hin Chung, John) Corporation Limited Yuen Wing Shing Wong Chi Keung (Alternate to Yuen Wing Shing) Share Listing The Stock Exchange of Hong Kong Limited Stock Code: 32 1 THE CROSS-HARBOUR (HOLDINGS) LIMITED Chairman’s Statement On behalf of the board of directors, I am pleased to present the annual results of the Group for the year ended 31 December 2017.
    [Show full text]