African Development Bank Annual Meetings - Lisbon, June 9-10, 2011 Business Opportunity Seminar
Total Page:16
File Type:pdf, Size:1020Kb
Experience of COBA with AfDB Projects African Development Bank Annual Meetings - Lisbon, June 9-10, 2011 Business Opportunity Seminar Experience of COBA with AfDB Projects Vitor Carneiro | COBA, S.A. June 2011 Experience of COBA with AfDB Projects • Founded in 1962, COBA is the largest company of consulting engineers in Portugal • 400 employees in COBA Group • Dam design was COBA’s first main field of activity. • Presently, COBA’s activity covers most of the fields associated with engineering activities and technical assistance during construction of large projects, namely: • DAMS AND HYDROPOWER PLANTS • WATER SUPPLY SYSTEMS AND WATER AND WASTEWATER TREATMENT PLANTS • IRRIGATION AND DRAINAGE SYSTEMS • ROADS, MOTORWAYS, RAILWAYS AND AIRPORTS • BRIDGES, VIADUCTS AND TUNNELS • ENVIRONMENTAL STUDIES • CARTOGRAPHY AND CADASTRE Experience of COBA with AfDB Projects PORTUGAL, BULGARIA, ALGERIA, ANGOLA, CAPE VERT, GREECE, HUNGARY, EQUATORIAL-GUINEA, GHANA, IRELAND, MACEDONIA, GUINEA-BISSAU, GUINEA-CONAKRY, SPAIN, TURKEY MOROCCO, MOZAMBIQUE, NAMIBIA, REPUBLIC OF CONGO, SENEGAL, SWAZILAND, TUNISIA ARGENTINA, BRAZIL, COSTA RICA, ECUADOR, HAITI, DOMINICAN REPUBLIC, CHINA (MACAU), VENEZUELA UNITED ARAB EMIRATES, IRAQ, OMAN, JORDAN Experience of COBA with AfDB Projects Long list of Projects in Africa Experience of COBA with AfDB Projects ALGERIAALGERIA CLIENT PROJECT DATE ALGIERS OUTSIDE RING MOTORWAY (4ÈME ROCADE D’ALGER). Section between the NR18 Interchange (Ain Delfa Wilaya) and the NR 1 (Médéa) (80 km) and Agence Nationale des Autoroutes (ANA) 2008/11 Section between the NR 1 (Medea Medea) and the NR8 interchange (East of Dirah)(90 km) COSIDER (leader of the G.R.A.K.M.O.F EAST-WEST MOTORWAY. SECTION OUED FODDA - KHEMIS MILIANA (73 km). 2005/07 Consortium) Final Design and Technical Assistance to Project Management EAST-WEST MOTORWAY. SECTION BETWEEN KHEMIS MILIANA AND ANA 2004/08 HOCEINIA (23 km). Final Design. Financed by the Algerian Government CONSTANTINE RING HIGHWAY. SECTION BETWEEN AIN SMARA AND AIN EL BEY (11 km, 4,8 km of secondary roads, 1 interchange with 5,8 km, 48 bridges ANA 1997/04 and viaducts and 20 retaining structures). Design Review and Supervision. Financed by the African Development Bank ZAGOPE (Portuguese Contractor) ORAN ES SENIA INTERNATIONAL AIRPORT 2006/09 Agence Nationale de l’Irrigation et du Drainage KRAMIS IRRIGATION PERIMETER (4 300 ha). Basic Design, Final Design and 2003/06 (AGID) Environmental Impact Assessment DAHMOUNI IRRIGATION PERIMETER (4 000 ha). Basic Design, Final Design and AGID 2003/06 Environmental Impact Assessment EAST-WEST MOTORWAY. CENTRAL LOT (169 km) and WESTERN LOT (359 km). Lusogroupe (lead by Mota-Engil) 2006 Design-and-Build Tender. Preliminary Design Agence Nationale des Barrages et Transferts BENI SLIMANE DAM In the Medea wilaya. Detailed Design and Tender Documents 2007/11 (ANBT) ANBT DERMOUN DAM. Detailed Design and Tender Documents 2005/09 ZAGOPE (Portuguese Contractor) BOUSSIABA DAM. Expertise Mission 2006 SEKLAFA DAM AT OUED M’ZI AND CONVEYANCE FROM THE CHARGUI (Wilaya ANBT 2004/11 de Laghouat). Detailed Design and Tender Documents Studies for MONITORING AND REINFORCEMENT OF THE BAKKADDA, OUED ANBT 2003/11 FODDA, BOUGHZOUL AND GRIB DAMS currently under operation KERRADA DAM AND CHELIFF-KERRADDA WATER CONVEYANCE SYSTEM. ANBT 1998/01 Detailed Design and Tende Documents Experience of COBA with AfDB Projects ALGERIAALGERIA CLIENT PROJECT DATE MONITORING AND EXPERT ASSESSMENT OF ALGERIAN DAMS (ABOUT 50) ANBT 1992/97 ANBT KOUDIAT-ACERDOUNE DAM. Detailed Design and Tender Documents 1991/93 REINFORCEMENT OF THE DRINKING WATER SUPPLY SYSTEM TO THE TIZI Agence Nationale de l’Eau Potable et Industrielle et OUZOU – ALGIERS CORRIDOR from the Taksebt and Souk Tleta Dams. Study of 1994/98 de l’Assainissement (AGEP) Alternatives, Preliminary Design, Tender Design and Specifications. Financed by the World Bank URBAN LAKE OF THE NEW BOUGHZOUL TOWN – Characterisation of the Agence Nationale des Barrages et Transferts, Boughzoul reservoir in view of its integration in the urban area to be assigned to the New Town of Boughzoul (300 000 inhabitants). TAKSEBT-FREHA-AZZAZGA CONVEYANCE PIPELINE (Wilaya de Tizi Ouzou) ANBT 2006/08 serving a population of 240.000 inhabitants OUED DJER WATER TRANSFER, 21 M m3/year from the Oued Djer to the El 2006/10 Office National de l’irrigation et du Drainage (ONID) Mostakbel dam, for increasing the irrigation capacity of the West Mitidja Perimeter. Teixeira Duarte (Owner: ONA – Office National de SOUF VALLEY SANITATION SYSTEM. Lagoon Aerated Waste Water Treatment 2006/09 d’Assainissement) Stations (Guemmar, Magrane and Reguiba) WATER TRANSFER FROM THE CHELIFF INTAKE TO THE SIDI-HADJEL Teixeira Duarte (Contractors) RESERVOIR AND WATER SUPPLY PIPELINE TO THE MOSTAGNEM-ARZEW- 1990/96 ORAN CORRIDOR. Detailed Design and Specifications. Financed by the World Bank DIAGNOSIS AND REHABILITATION STUDIES FOR THE DRINKING WATER Algérienne des Eaux (AdE) SYSTEMS of the following towns: Lot B – BÉJAÏA (235.200 inhabitants), TIZI-OUZOU 2006/10 (122.000 inhabitants), and CHLEF (307.000 inhabitants). Studies for CONNECTION OF THE SKIKDA SEAWATER DESALINATION PLANT AdE 2005/07 TO THE SKIKDA DRINKING WATER SUPPLY NETWORK Studies for the CONNECTION OF THE HAMMA SEAWATER DESALINATION AdE PLANT (200.000 M3) TO THE GREATER ALGIERS DRINKING WATER SUPPLY 2004/05 NETWORK Experience of COBA with AfDB Projects ANGOLAANGOLA CLIENT PROJECT DATE HUAMBO-BENGUELA ROAD. CAÁLA/GANDA SECTION (Provinces of Huambo and ODEBRECHT 2007/.. Benguela) (130 km). Preliminary Study and Final Design REHABILITATION OF FOUR SECTIONS OF THE ROAD NETWORK in the area of INEA - Instituto Nacional de Estradas de Angola / Luanda, financing from de World Bank: Luanda - Barra do Kwanza, Luanda - Viana, 1996/97 Financiamento: Banco Mundial Viana - Catete and Catete - Kifangondo (117 km). Final Design and Construction 1998/00 Supervision. Financed by the World Bank Rehabilitation of the BITCHEQUETE / MASSABI Road Section, in the Cabinda INEA - Instituto de Estradas de Angola 2003/05 Province. Studies and Design. CACOMBO HYDROPOWER PROJECT. Feasibility Study and Detailed Design and 2008/ ENE - Empresa Nacional de Electricidade, EP Tender Documents underway REHABILITATION OF THE GOVE DAM AND HYDROPOWER II (60 MW). Detailed 2003/05 GABHIC – Gabinete de Administração da Bacia do Design and Tender Documents 2006 Rio Cunene Technical Assistance for Tenders Evaluation, Final Design, Project Management and Construction Supervision 2007/.. LUACHIMO HYDROELECTRIC UNDERTAKING. Economic Feasibility Study. 2006/07 ENE – Empresa Nacional de Energia Detailed Design and Tender Documents 2008/10 CHIUMBE–DALA HYDROELECTRIC DEVELOPMENT. Located on the Chiumbe ENE – Empresa Nacional de Electricidade river, it aims essentially at hydropower supply to the city of Luena, in the Moxico 2002/04 province . Final Design WATER SUPPLY AND SANITATION MASTER PLANS FOR THE CITIES OF DNA - Direcção Nacional de Águas 2001/05 HUAMBO, N’DALATANDO, KUITO, ONDJIVA, MALANJE WATER SUPPLY AND SANITATION MASTER PLANS FOR THE CITIES OF DNA - Direcção Nacional de Águas 2003/08 DUNDO, SAURIMO AND MENONGUE, Ministério da Agricultura e Desenvolvimento BOM JESUS AND CALENGA HYDRO-AGRICULTURAL PROJECT. Detailed 2007/09 Rural Design and Tender Documents ALDEIA NOVA PROJECT DEVELOPMENT. Expansion of project to other Projecto Aldeia Nova development poles, including the provinces of Bié, Kwanza Norte, Malanje, Uige e 2006/.. Zaire. Ministério da Agricultura e Desenvolvimento Rural ANGOLA IRRIGATION PLAN 2007/10 Experience of COBA with AfDB Projects REPUBLICREPUBLIC OFOF CONGOCONGO CLIENT PROJECT DATE Rehabilitation and Upgrading and Concreting of Road Section OKOYO-LEKETY- ESCOM (Grupo Espírito Santo) / Ministère de Gabon Border (90 km and 2 bridges) and Bridges of the LEKANA-AMPAKA-LEKETY 2001/03 l’Equipement et des Travaux Publics road axis (2 with 80 m each and 5 with 20 m each). Feasibility Study and Final Design PROGEST/ESCOM Brige over the Djiri River (60 m) 2006 EQUATORIALEQUATORIAL GUINEAGUINEA CLIENT PROJECT DATE Ministério das Obras Públicas, Habitação e WATER SUPPLY MASTER PLANS. Drinking Water Supply to the City of Bata. 2002/06 Urbanismo Detailed Design and Tender Documents 2007/08 GHANAGHANA CLIENT PROJECT DATE Mota & Cª, S.A. ASANKRAGUA – ENCHI ROAD. Final Design 2000/02 GUINEAGUINEA--BISSAUBISSAU CLIENT PROJECT DATE SALTINHO DAM. Environmental Impact Study. Financed by the African 1984 Banque Africaine de Développement (BAD) Development Bank 1985 PNUD – Prog. das Nações Unidas para o SALTINHO HYDROELECTRIC UNDERTAKING (18 MW). Design. Financed by 1985 Desenvolv. UNDP (United Nations) PNUD – Prog. das Nações Unidas para o SALTINHO HYDROELECTRIC UNDERTAKING (18 MW). Environmental Studies. 1992/94 Desenvolv. Financed by the African Development Bank Experience of COBA with AfDB Projects MOROCCOMOROCCO CLIENT PROJECT DATE RABAT–TANGER MOTORWAY. ASILAH–TANGER SECTION (30 km). Final Société Nationale des Autoroutes du Maroc (ADM) 2000/02 Design. Co-financed by the Portuguese Cooperation RABAT–TANGER MOTORWAY. SIDI EL YAMANI – ASILAH SECTION (15 km). Société Nationale des Autoroutes du Maroc (ADM) 1999/02 Final Design. Co-financed by the Portuguese Cooperation GHARB HYDRO-AGRICULTURAL DEVELOPMENT. Study for Reconversion of the Office Régional de Mise en Valeur de la Région du 2009/ Sprinkler Irrigation System into Localized Irrigation (19.356 ha). Rehabilitation and Gharb (ORMVAG) underway Modernization of the Existing Infrastructures Office Régional de Mise