Area of 1.600 Hectare
Total Page:16
File Type:pdf, Size:1020Kb
FOR ATALPUR STONE (CRUSHER) QUARRY AREA OF 1.600 HECTARE STRICTLY AS PER MOEF GUIDELINES DATED 3Oll2l2O1O, IN TERMS OF THE PROVISIONS OF EIA NOTIFICATION, 20,0,6 VILLAGE TEHSIL DISTRICT STATE MINERAL . BASALT STONE KHASARA NO. - 7341t3 PROJECT PROPONENT SMT. NEETA GOUR R/O VILL.JAGATPUR, THE. KOLARAS DISTT SHIVPURI MP INDEX S No. TITLE 1 EXCUTIVE SUMMARY L-2 (r) Salient features of the project 2 GENERAL 2-4 Identification of project and project (r) proponent (II) Brief Description of nature of project (rrr) Need for the project and its importance (IV) Demand - Supply (v) Import VS. Indigenous production (VI) Export possibility Employment Generation (Direct and (vrr) Indirect) due to the proiect 3 PROJECT DESCRIPTION 5-6 (r) 'IVpe of project (II) Location (rrr) Details of alternate site (IV) Size I Magnitude of operation, (v) Geologz (VI) Raw material required (vrI) Resource optimization (vrrr) Availabilitv of water (x) Equipments and Machineries 4 SITE ANALYSIS 7-a (r) Connectivity (II) Land form, and land ownership (rrr) Land Use Pattern (IV) Existing Infrastructure (v) S o cial- I nfrastru cture 5. PLANING BRIEF 8 (r) Planning Concept (II) Population Projection: (rrr) Land use Planning (IV) Assessment of Infrastructure demand (v) Amenities/ Facilities 6. PROJECT INFRASTRUCTURE 9 REHABILITATION AND RESATTLEMENT 7. 10 PLAN 8. PROJECT SCHEDULE 10 (r) Proposed Schedule (II) Project Cost Estimation Proposal (Final Analysis of 10 9. recommendationl (r) Financial and social benefits PRE. FEASIBILITY REPORT ATALPUR STONE ICRUSHERI OUARRY This Pre-Feasibility report has been prepared as per guidelines of MoEF and sample application available on website of the department of environment and forest. The contents of the report are geological, legal, operating, economic, social, environmental and other relevant factors associate with the activities and are considered in sufficient details in representative forms. We have tried to provide necessary information that it could be reasonably serve as the basic for the final decision by competent authority to issue environmental clearance to the proposed project. 1. EXECUTTVE SUMMARY The proposed stone quarry site is covering an area of 1.600 hect. at village Atalpur, tehsil Badarwas, Distt Shivpuri, M.P. Village Atalpur is well connected with tehsil headquarter Badarwas is about 12 krn from the lease hold area. The lease area is less that 25 hectare hence belonging to B2 category. The Mining Plan has been approved by Regional Head Directorate of Geologr and Mining, Regional Office Gwalior M.P. vide letter no. 1475 dated 2I.10.2016. There is TWo quarry lease falling within a radius of 500m covering an area of 4.000 hectare. (II SALIENT FEATURES OF THE PROJECT: Partlculars Details Name of project Atalpur Stone (Crusher) Quarry Village Atalpur Tehsil Badarwas District Shivpuri Quarry lease area 1.600 hectare Khasra No. 734 / 13 Geographical Co-ordinates Latitude N 24"54'5I.9" to N 24"54'57.6" Longitude E 77"3O'I7.8" to E 77"30'2302" Toposheet No. s4Hle River/ Nala No major riverf nala is located within the 100m of lease area. LlPage Forest (NP, Sanctuary, BIO Mining area does not fall within I O Km. Div.) from boundary of National Park, Sanctuary, BIO Diversity area. Mineral Basalt Stone Land Use Govt. Revenue Land Lease Validity 10 years Production capacity 8455cub. rneterf year Estimated Project Cost Rs. 2O lacs EMP Cost Rs. 1.25 lacs Man Power LO- 12 Skilled / Unskilled Machinery Crusher Unit, Jack Hammer Drill, JBC Machine, Truck, Dumper, Generator set. Water requirement and Drinking water 1.0kld, Plantation and supply environment management 3.00 kld. Thus total 4.00 Kld water will be required and will be arrange on personal and purchased basis. Nearest Habitation / Town Atalpur 700 M. Badarwas-I2 Krn. Nearest Dispensary PHC - Badarwas- 12 Km.. District Hospital - Shivpurt 62 Km. Nearest Airport Gwalior approx 170KM Nearest Railway Station Badarwas Railwav Station about 12 krn. Nearest Highway NH-3. Which is about 1.5 Km. from the mine site 2. GENERAL The proposed stone quarry area is 1.600 hectare. Stone production shall be 8455 cubic meters annually, mode of excavation will be opencast semi mechanized. Explosive and blasting parameters will be very simple and being carried out on contract basis by blasting contractor. Lease area is Govt. Revenue land. Mining project does not require any land acquisition nor other raw material. lPage (Il IpENTTFTCATION OF PROJECT AND PROJECT PROPONENT: Name Atalpur Stone ( Crusher) Quarry Location Village Atalpur, Tehsil Badarwas Distt. Shivpuri, M.P. Sanctioned Area 1.600 Hectare Proposed Production 8455 rn3 f year Proposed depth of mining 12.Om Address of Proponentl Lessee:- Name: Smt. Neeta Gour W/o Shri Bhagrvandas Gour R/o Vill.Jagatpur, The. Kolaras Distt Shivpuri MP (rr) BRIEF pESCRIPTION OF NATURE OF PROJECT: Area under consideration is fully covered with extrusive Basalt lava, which is jointed an highly fractured. Thin black cotton soil and thick weathered basalt form about 1.0m overburden. Lease area is barren Govt. land. Mining activity has to be done following all the security measures and according to the proposed manner of opencast semi mechanized method. Total available minable reserve is 146655m3. Proposed excavation (ROM) is 8900 m3 for production of 8455tt1s gitti stone annually. With this proposed production anticipated mine life is about 28 years. Mining is proposed up to 1.2.Om. As per MoEF notification no. OM No.J-I3OI2 lL2 l2OI3 -IA-II (i) dated 24th December 2013. The project comes under 82 category. Hence Pre-feasibility report has been prepared for a final decision by competent authority in issuing environmental clearance to the proposed project. 3lPage (IUl NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE couNTRY AND/OR REGION: Basa-lt Stone is most commonly used in building and road construction. The basic objective of the project is effective utilization and fulfillment of the demand of mineral in the region. Basalt/gitti will be supply to nearby area to fulfill the loca-l requirement. After fulfillment of local requirement it will sold in adjoining areas. (rvl DEMAND - SUPPLY: Basalt Stone is used as building and road material. Lot of developmental work like road and building are going on in the region. It has sufficient demand to sustain the supply of proposed mineral production. (vl IMPORT VS. INDIGENOUS PRODUCTION: This is indigenous production. This will not be neither exported nor imported. (vrl ExPoRT POSSIBTLITY: Not expected. (vIIl EMPLOYMENT GENERATION (DIRECT AND INDIRECTI DUE TO THE PROJECT: Total IO-L2 Numbers of person, including skilled and unskilled, are likely to be engaged in this project. Most of these persons will deployed from nearby villages. 4lPage 3. PROJECT DESCRIPTION (II TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS: The proposed project is stone quarry in which mechanical crushing of stone is involved. There is no any interlinked and interdependent project. (u) LocATroN: Location and the Geo Co-ordinates of the lease area already mention in salient features of the project. (rrr) DETATLS OF ALTERNATE SITE CONSIDERED AND THE BASIS oF SELECTING PROPOSED SIT-8, PARTICULARLY THE ENVIRONMENTAL CONSIDERATION GONE INTO HIGHLIGHTED: This is a site specifrc project. Hence at present situation no alternate site is considered. (ry| srzEl MAGNITUDE OF OPERATION: This is a small quarry. It is proposed to produce crushed stone/ material 8455 cubic m. annually. It is round the year operation work the total manpower require for the proposed stone mining project will be IO-I2. (vl GEOLoGY: In the lease area Basalt form the country rock over which recent and sub - recent black cotton soil and laterite are developed. Basalt found is melanocratic grey to black in colour. It is fine to medium grained hard and compact in nature are generaTly horizontal in disposition with south casterly gentle slop. (vII RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERTAL AND FINISHED PRODUCT. Raw material is not required for the stone excavation project, only mining tools & machinery are required. The crushed material of varies in size (2Omrn,4Omm,60mm) will be carried out by the truck f tractor trolley. 5lPage (vrrl REsouRcE oPTIMIZATION / RECYCLING AND RESOURCE ENVISAGED IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED: Resource optimization has been exercised but there is no scope of recycling and re-use in the project. Only top soil (0.-0.3Ocm) shall be used in re- generation of soil quality. (vlill AVATLABILTTY OF WATER AND ITS SOURCE, ENERGY/ POWER REQUIREMENT AND ITS SOURCES: The total water requirement for the project is estimated 2.00 KLD for mining spraying and domestic uses which will be arranged on personal and purchased basis. No electricity is required even so if required in future the same will be arranged by taking connection from MPSEB (IX) EQUIPMENTS AND MACHINERIES: It is a small quarry having total area of 1.600hectare. Proposed annual production is about 8455 cubic meters. Mining method will be open cast semi mechanized type using hammer (81b, 2lb), crowbar, spade, iron pots, chisels etc. of various sizes, light duty jack hammer drill, compressor and excavator. Crusher is also installed near by the mine site. 6lPage 4. SITE ANALYSIS (rl coNNECTrvrTY: Connectivity details are already given in the salient features of the project. : (III LAND FORM, LAND USE AND LAND OWNERSHIP: District Tehsil Village Khasra Area In Status Mineral and No. Hectar Of Land / Rock State e Shivpuri, Badarwas Atalpur 734 I 13 1.600 Govt. Basalt M.P. Revenue land (IIII LAND USE PATTERN: Existing land use pattern and land use after lease period is mention below: Area under land Existing Land use (In Land use after lease uae hect.f period (In hect.f Mine pit 0.000 0.950 Crusher 0.000 0.100 Dump, Offrce I 0.000 o.o74 Shelter Approach road 0.000 0.000 Plantation 0.000 o.476 Unused 1.600 0.000 Total 1.600 1.600 (rvl ExrsTrNG TNFRASTRUCTURE: No existing Infrastructure is present in the lease area.