<<

Nelson Bouchard Senior Architectural Technician

RESPONSIBILITIES AND ACCOMPLISHEMENTS

All phases of industrial, institutional, commercial and residential projects realization. From concept to production drawings and interdisciplinary coordination and shop drawings. Computer assisted design using AutoCAD, MicroStation, etc.

PROFESSIONAL EXPERIENCE / PROJECTS

Industrial :  Muskrat Falls Power Plant, Lower Churchill, Newfoundland and Labrador, 2013  Kitimat smelter for Rio Tinto Alcan, British Columbia, 2013 : New aluminum smelter  RioTinto Alcan Aluminum smelter, AP50 Pilot plant, Jonquiere, Québec, 2007 – 2011 : New aluminum smelter  Mosaic Potash Expansion Program, Saskatchewan, 2009 – 2010 : Expansion to Esterhazy and Colonsay plants  Zinc Production Plant « Zinc expansion plant », 2000  L’Oreal Inc. Facility Expansion, 2001  Alcan Aluminum smelter “Alma” , Alma, , 1998 - 2000

Healthcare/Pharmaceutical/Research laboratory :  Pharmaceutical complex Merck-Frost, Kirkland, Quebec , 2003 – 2004 : Buildings 18 and 19  Pharmaceutical complex Merck-Frost, Kirkland, Quebec, 2001 – 2003 : Buildings 14 and 15  Wyeth-Ayerst Canada Inc., , Quebec, 2000 : Buildings 15 and 17  Citec Méthylgène and Neurochem, St. Laurent, Quebec, 1998 – 2000 : Offices and laboratories  ITR Laboratories Canada Inc., Montreal, Quebec: New second floor extension  CTBR, Montreal, Quebec : New Building  Sainte-Justine Hospital, Montreal, Quebec : Refitting of the Emergency Department  Héma-Quebec St-Laurent, Quebec : New Center for blood transformation  Royal Victoria Hospital, Montreal Quebec : Roofing repairs studies

Institutional and commercial :  CDTI De Montreal: Office building Phase 3 /Loc.:/ IP5  ITF Optic Technology, Montreal, Quebec: Refitting of «400 Mont-Pellier »  Stocker Yale (Certifab), Montreal, Quebec: New clean room and mezzanine  Polythechnique (Pavillon Reine-Marie), Montreal, Quebec: Refitting of the existing (Electronic engineering)  Concordia University, Montreal, Quebec: New Science building  Pierre Élliott Trudeau Airport, Dorval, Quebec; Feasibility study Phase II for expansion P2C, Implementation of various projects (lots) related to Phase II P2S and to Phase 2

EDUCATION

1998 Professional Center Émile Legault (A.S.P), Training in repair and of microcomputer maintenance 1990 - 1996 In-house improvement in the configuration and installation of Personal computers 1990 Cégep St-Laurent, Training in computer aided design (Autocad advanced) 1984 “Collège d’enseignement générale et professionnel de Rimouski “(A.E.C.), Training in architectural drawing technique 1978 “Polyvalente” of Thetford Mines (C.E.S.), Secondary courses in Construction worker ll Courses in health and safety in construction and electronics.

CV NB-EN14 Page 1

EMPLOYEMENT HISTORY

2007 to date Industrial Architecture Alliance (IAA Inc.) / Gemayel+Emmian+Kirimidtchiev, Architects(GEK), Montreal, Quebec 2005 - 2007 DCYSA architects and associates, Montreal, Quebec 2001 - 2005 Cardinal and Hardy Group, Architects, Montreal, Quebec 1998 - 2001 NFOE and Associates Architects, Montreal, Quebec 1996 Giasson, Faregut Architects, Laval, Québec 1996 Les construction De Mausolée Carrier, Montréal, Québec 1996 Régis Côté and Associates Architectects, Montréal, Québec 1993 - 1995 Viau Bergeron Architects, Laval, Québec 1994 - 1995 Commision Scolaire Les Écores, Laval, Québec 1990 - 1992 Tecsult Inc., Montréal, Québec 1990 Bijok, Lamothe, De Meideiros, Architects, Québec 1989 - 1990 Les Architectes Lefebvre, Lefebvre et Associés 1986 - 1989 Jean Martel Architects, Montréal, Québec 1984 - 1985 Consultant T.A.G., Québec

LANGUES

 French and English

CV NB-EN14 Page 2