World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document OFFICIAL ~L -/ DOCUMENTSi World Bank Office, Beijing Public Disclosure Authorized April 4, 2014 Ms. Zou Jiayi Director General International Department Ministry of Finance Sanlihe, Beijing, 100820 People's Republic of China China: Second Liaoning Medium Cities Infrastructure Project (Loan 4864-CHA) Amendment to the Loan Agreement Public Disclosure Authorized Dear Ms. Zou, We refer to the Loan Agreement between the People's Republic of China (the "Borrower") and the International Bank for Reconstruction and Development (the "Bank"), dated September 19, 2007, as amended on April 1, 2008 (the "Loan Agreement"), and to the Project Agreement of the same date between the Bank and Liaoning Province (the "Project Agreement"), for the Second Liaoning Medium Cities Infrastructure Project. We also refer to the letter from Mr. Chen Shixin, Deputy Director General, International Department, Ministry of Finance dated August 7, 2013 as well as to recent discussions between the Borrower and the Bank teams, requesting certain amendments to the Loan Agreement and the Project Agreement. We are pleased to inform you that the Bank concurs with the request, and accordingly Public Disclosure Authorized amends the Loan Agreement as set forth below, and the Project Agreement as provided in the letter of even date herewith from the Bank to Liaoning Province (the "Letter of Amendment to the Project Agreement"): 1. Part C of Schedule 1 to the Loan Agreement is hereby amended to read as follows: "Improving the infrastructure and management of solid waste services in the Project Cities (with the exception of Yingkou EDZ), through: (i) constructing and/or expanding solid waste collection and transfer systems, sanitary landfills with leachate control and treatment, closure of open dumps, and other associated works; and (ii) strengthening solid waste management practices, including: developing integrated and city-wide solid waste management programs, dedicated cost accounting systems, and management information systems; and improving cost recovery through user fees." Public Disclosure Authorized 2. Parts D.2, D.3 and D.4 of Schedule 1 to the Loan Agreement are hereby amended to read as follows: Ms. Zou Jiayi Page 2 April 4, 2014 "2. Public Utility Management: Providing technical assistance with respect to: (i) a capacity building program for public utility functions in water for Yingkou, Anshan, Panjin, Haicheng and Fushun cities, and wastewater for Panjin and Gaizhou cities; (ii) data collection and development of an information management system for Anshan, Yingkou, and Haicheng urban water distribution networks; and (iii) studies on ecology service function and basin ecology compensation mechanism of Dahuofang reservoir. 3. Solid Waste Master Planning: Providing technical assistance to Fushun, Yingkou EDZ, Gaizhou and Panjin for solid waste management planning and its implementation with respect to: (i) development of solid waste master plans; (ii) institutional development; (iii) landfill site assessment and engineering design; (iv) procurement assistance; (v) landfill construction supervision; and (vi) training of personnel for effective operation of solid waste management systems. 4. Water Pollution Control Management: Providing technical assistance to Panjin and Gaizhou for water pollution control management, including: (i) institutional development and financial sustainability; (ii) wastewater master planning; (iii) industrial water pollution control; and (iv) sludge management." 3. Section IV.A.2 of Schedule 2 to the Loan Agreement is amended by replacing the disbursement table with the table set forth in Attachment 1 to this letter of amendment. 4. Section (h) of the Appendix to the Loan Agreement is hereby amended to read as follows: "Environmental Management Plan" means, collectively, the Environmental Management Plans dated September 2006, April 2009, and April 2011, prepared for the Project, and any other environmental management plans to be prepared pursuant to Section 1.3(b) of the Schedule to the Project Agreement, which said plans set out the environmental protection measures in respect of the Project, as well as the administrative and monitoring arrangements to ensure the implementation of said plans, as said plans may be revised from time to time with the prior agreement of the Bank. 5. Section (aa) of the Appendix to the Loan Agreement is hereby amended to read as follows: "Resettlement Action Plans" means, collectively, the Resettlement Action Plan dated August 2006, prepared on behalf of Yingkou for Part A of the Project; the Resettlement Action Plan dated August 2006, prepared on behalf of Yingkou for Part B of the Project; the Resettlement Action Plan dated December 2006, prepared on behalf of Panjin for Part A of the Project; the Resettlement Action Plan dated December 2006, prepared on behalf of Haicheng for Part B of the Project; the Resettlement Action Plan dated December 2006, prepared on behalf of Anshan for Part B of the Project; the Resettlement Action Plan dated December 2006, prepared on behalf of Gaizhou for Part A of the Project; the Resettlement Action Plan dated December 2006, prepared on behalf of Fushun for Part C of the Project; the Resettlement Action Plan dated April 2011, prepared on behalf of Panjin for Part C of the Project; the Resettlement Action Plan dated February 2014, prepared for Gaizhou for Part A of the Project; and any other resettlement action plans to be prepared pursuant to Section I.2(b)(ii) of the Schedule to the Project Agreement; Ms. Zou Jiayi Page 3 April 4, 2014 which said plans set out the principles and procedures governing the acquisition of land and other assets, and the resettlement, compensation and rehabilitation of Displaced Persons on account of its Respective Part of the Project, as well as monitoring and reporting arrangements to ensure compliance with said plans, as the same may be revised from time to time with the prior agreement of the Bank; and "Resettlement Action Plan" means, individually, either of the Resettlement Action Plans. 6. The reference to Yingkou EDZ in Section (cc) (viii) of the Appendix to the Loan Agreement is hereby deleted and replaced by the following sentence: "(viii) [intentionally left blank] Except as specifically amended in this letter, all other terms and conditions of the Loan Agreement shall remain in full force and effect. Please confirm your agreement to the foregoing on behalf of the Borrower by countersigning and dating the corresponding form of confirmation set forth below, and returning one fully countersigned original of this letter to us. The above amendment to the Loan Agreement shall become effective as of the date of this letter, and upon receipt by the Bank of: (a) a duly countersigned original of this letter by the authorized representative of the Borrower; and (b) a duly countersigned original of the Letter of Amendment to the Project Agreement by the authorized representative of Liaoning Province. Yours sincerely, Klaus Rohland Country Director, China CONFIRMED: PEOPLE'S REPUBLIC OF CHINA By: Name: L GL Title:0W4 J-e& eref Intom,4*~1"V114''"'~ Date: 4 i Copy to: Mr. Zhou Zhongxuan Executive Vice-Governor People's Government of Liaoning Province P.R. China Ms. Zou Jiayi Page 4 April 4, 2014 ATTACHMENT 1 Amount of the Loan Percentage of Expenditures Category Allocated to be financed (expressed in Dollars) (inclusive of Taxesl (1) Civil works (a) under Part A of the Project ) in Panjin City 8,636,900 ) (b) under Part A of the Project in Yingkou City 10,753,000 (c) under Part B of the Project ) in Anshan City 13,786,200 ) (d) under Part B of the Project ) in Haicheng City 5,852,500 ) (e) under Part B of the Project ) in Panjin City 2,788,900 ) (f) under Part B of the Project ) in Xingcheng City 2,148,900 ) 60% (g) under Part B of the Project in Yingkou City 17,976,300 (h) under Part B of the Project ) in Fushun City 9,189,000 ) (i) under Part C of the Project in Panjin 2,020,000 (j) under other Parts of the Project (including Part A of the Project in Gaizhou, and Parts A and C of the Project in Fushun) 13,175,200) (2) Goods: (a) under Part A of the Project ) in Panjin City 12,869,300 ) (b) under Part A of the Project in Yingkou City 13,860,000 (c) under Part B of the Project ) in Anshan City 4,140,000 ) (d) under Part B of the Project ) in Haicheng City 2,760,000 ) (e) under Part B of the Project 100% in Panjin City 10,920,000 Ms. Zou Jiayi Page 5 April 4, 2014 (f) under Part B of the Project ) in Xingcheng City 340,000 ) (g) under Part B of the Project in Yingkou City 3,950,000 (h) under Part B of the Project ) in Fushun City 16,470,700 ) (i) under Part C of the Project ) in Panjin City 9,521,400 ) (j) under other Parts of the ) Project (including Part A ) of the Project in Gaizhou, ) and Parts A and C of the ) Project in Fushun City) ) 9,709,200 ) (3) Consultants services, training, workshops, and study tours under Part D.I of the Project 1,700,000 100% Amount payable pursuant to section 2.03 of this Agreement (4) Front-end Fee in accordance with Section 2.07(b) of the General 432,500 Conditions TOTAL AMOUNT.
Recommended publications
  • Annual Report 年報 2015 Contents
    Annual Report 年報 2015 Contents General Information on the Company 2 Chairman’s Statement 8 Financial Highlights 10 Management Discussion and Analysis 11 Directors’ Report 48 Corporate Governance Report 60 Profiles of Directors, Supervisors and Senior Management 72 Independent Auditor’s Report 76 Consolidated Balance Sheet 77 Consolidated Income Statement 79 Consolidated Cash Flows Statement 80 Consolidated Statement of Changes in Shareholders’ Equity 82 Company Balance Sheet 83 Company Income Statement 85 Company Cash Flow Statement 86 Company Statement of Changes in Shareholders’ Equity 88 Notes to the Financial Statements 89 Supplementary Information to the Financial Statements 228 Financial Highlights for the Past Five Financial Years 230 General Information on the Company 1) Company Profile Dalian Port (PDA) Company Limited (the “Company”) was established in Dalian City, Liaoning Province, the People’s Republic of China (the “PRC”) on 16 November 2005. The Company was successfully listed on the Main Board of the Stock Exchange of Hong Kong Limited with stock code of 2880 and Shanghai Stock Exchange with stock code of 601880 on 28 April 2006 and 6 December 2010, respectively. The Company is the first port company listed in both the stock exchanges of Hong Kong and Shanghai. Located at the entrance of Bohai Bay, with its proximity to major international shipping routes as compared to other ports in Bohai Bay and with deep water and ice-free port conditions, Dalian port is able to operate its terminals throughout the year. As the consolidated operational platform for port and logistics services in Dalian port, the Company and its subsidiaries (collectively, the “Group”) are the biggest comprehensive port operator in the Three Northeastern Provinces of China (collectively, Heilongjiang Province, Jilin Province and Liaoning Province).
    [Show full text]
  • Study on the Economic Competitiveness
    6th International Conference on Management, Education, Information and Control (MEICI 2016) Study on the Economic Competitiveness Evaluation of Coastal Counties: Example as Liaoning Province Qiang Mao School of Management, Bohai University, Jinzhou 121013, China. [email protected] Keywords: Economic competitiveness; Competitiveness evaluation; Coastal counties Abstract. The competitiveness of coastal county is an important area of study on regional competitiveness, and evaluation study on county economy is important basis and foundation to improve the competitiveness of coastal county economy. Based on a brief description of literature review, a method based on stakeholders’ perspective is proposed to solve the competitiveness evaluation problem. In addition, the effectiveness of the proposed method is illustrated by the example as Liaoning province. Finally, some countermeasures are proposed to promote coastal county economy according the evaluation result and characteristics. Introduction Due to convenient transportation conditions for international trade, coastal counties get prosperity for trading with the world and will be easy to form manufacturing bases for processing trade. Many scholars are attracted to the research of economic competitiveness evaluation for its widely application background. Liu(2013) established evaluation index system of county economy for Tangshan, and proposed a method for county economy evaluation based on factor analysis [1]. He(2014) designed evaluation index system based on the perspective of economy development demand in county level, and analyzed the supporting ability of science and technology in Anhui by means of analytic hierarchy process(AHP) [2].Above mentioned methods have each superiority, but evaluation results rely too much on experts’ preference. Evaluation objects are considered as passive objects in the above evaluation problems, while evaluation objects always have more complete evaluation information.
    [Show full text]
  • Development Credit Agreement Public Disclosure Authorized
    Public Disclosure Authorized CREDIT NUMBER 2219-0-CHA Development Credit Agreement Public Disclosure Authorized (Liaoning Urban Infrastructure Project) between PEOPLE'S REPUBLIC OF CHINA and Public Disclosure Authorized INTERNATIONAL DEVELOPMENT ASSOCIATION Dated 2 , 1991 Public Disclosure Authorized CREDIT NUMBER 2219-0-CHA DEVELOPMENT CREDIT AGREEMENT between AGREEMENT, dated /)of , 1991, PEOPLE'S REPUBLIC OF CHINA (the Borrower) and INTERNATIONAL DEVELOPMENT ASSOCIATION (the Association). WHEREAS: (A) the Borrower, having satisfied itself as to the 2 to feasibility and priority of the Project described in Schedule the this Agreement, has requested the Association to assist in financing of the Project; (B) the Project will be carried out by Liaoning Province as part of such (Liaoning) with the Borrower's assistance and, assistance, the Borrower will make available to Liaoning the proceeds of the Credit as provided in this Agreement; and WHEREAS the Association has agreed, on the basis, inter alia, the of the foregoing, to extend the Credit to the Borrower upon terms and conditions set forth in this Agreement and in the Project and Agreement of even date herewith between the Association Liaoning; NOW THEREFORE the parties hereto hereby agree as follows: ARTICLE I General Conditions; Definitions Section 1.01. The "General Conditions Applicable to Development Credit Agreements" of the Association, dated January 1, 1985, with the last sentence of Section 3.02 deleted (the General Conditions) constitute an integral part of this Agreement.
    [Show full text]
  • World Bank Document
    The World Bank Report No: ISR8824 Implementation Status & Results China China-Second Liaoning Medium Cities Infrastructure Project (P092618) Operation Name: China-Second Liaoning Medium Cities Infrastructure Project Project Stage: Implementation Seq.No: 6 Status: ARCHIVED Archive Date: 16-May-2013 (P092618) Public Disclosure Authorized Country: China Approval FY: 2007 Product Line:IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Lioning Urban Construction and Renewal Project Office Key Dates Public Disclosure Copy Board Approval Date 26-Jun-2007 Original Closing Date 31-Dec-2013 Planned Mid Term Review Date Last Archived ISR Date 08-Apr-2012 Effectiveness Date 04-Dec-2007 Revised Closing Date 31-Dec-2013 Actual Mid Term Review Date 18-Oct-2010 Project Development Objectives China-Second Liaoning Medium Cities Infrastructure Project (P092618) Project Development Objective (from Project Appraisal Document) The project development objective is to improve the performance and sustainability of water supply, wastewater, and solid waste services in the LMC-2 cities. Enhanced wastewater and solid waste services will also help reduce pollution into the Bohai Sea and contribute to improving Bohai Sea water quality. Has the Project Development Objective been changed since Board Approval of the Program? Public Disclosure Authorized Yes No China-GEF-Liaoning (P090375) Global Environmental Objective (from Project Appraisal Document) The global environmental objective of the LMC-2 project with the GEF enhancements is the reduction of land-based pollution into the Bohai Sea through investments in wastewater and solid waste infrastructure and improved utility regulation, planning and management in the LMC-2 cities and throughout Liaoning Province.
    [Show full text]
  • Integrated Development of Key Townships in Central Liaoning
    Environmental Monitoring Report 9th Semestral Report Project Number: 44021-013 August 2018 PRC: Integrated Development of Key Townships in Central Liaoning Prepared by HJI Group Corporation for Heilongjiang Provincial Government and the Asian Development Bank This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Director, Management or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Ref No: LNK2-EMR-09 PEOPLE’S REPUBLIC OF CHINA INTEGRATED DEVELOPMENT OF KEY TOWNSHIPS IN CENTRAL LIAONING (ADB Loan No. 2901-PRC) Semi-annual Environmental Monitoring Report (As of June 2018) Prepared by: Liaoning Urban Construction and Renewal Project Office HJI Group Corporation August 2018 i ABBREVIATIONS ADB Asian Development Bank CNY Chinese Yuan EIA Environmental Impact Assessment EMO Environmental Management Office EMP Environmental Management Plan EPB Environmental Protection Bureau EPMS Environmental Protection and Monitoring Station GEPMS GaizhouEnvironmental Protection and Monitoring Station IA Implementing Agency LPEPB Liaoniong Provincial Environmental Protection Bureau LPG Liaoning Provincial Government MEMR Monthlyenvironmental management reports PMO
    [Show full text]
  • Report on Infrastructure Financing
    ADB Project Document TA–1234: Strategy for Liaoning North Yellow Sea Regional Cooperation and Development Technical Report G: Infrastructure Investment Problems and Alternative Financing December L2GM This report was prepared by Jean Francois Gautrin, under the direction of Ying Qian and Philip Chang. We are grateful to Wang Jin and Zhang Bingnan for implementation support. Special thanks to Edith Joan Nacpil and Zhuang Jian, for comments and insights. Zhifeng Wang provided indispensable research assistance. Asian Development Bank 4 ADB Avenue, Mandaluyong City GXX2 Metro Manila, Philippines www.adb.org © L2GX by Asian Development Bank April L2GX ISSN L3G3-4X3M (Print), L3G3-4X]X (e-ISSN) Publication Stock No. WPSXXXXXX-X The views expressed in this paper are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area. Note: In this publication, the symbol “$” refers to US dollars. Printed on recycled paper Contents Executive Summary .......................................................................................................... iv I. Introduction
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • An Analysis on the Relative Efficiency of the Infrastructure Investment in the Liaoning Coastal Economic Belt Based on DEA Method
    American Journal of Industrial and Business Management, 2012, 2, 13-15 13 http://dx.doi.org/10.4236/ajibm.2012.21003 Published Online January 2012 (http://www.SciRP.org/journal/ajibm) An Analysis on the Relative Efficiency of the Infrastructure Investment in the Liaoning Coastal Economic Belt Based on DEA Method Yinghui Xiang1,2, Tao Wen1, Yachen Liu1 1School of Management, Shenyang Jianzhu University, Shenyang; 2Institute of Economics, Liaoing University, Shenyang Email: [email protected] Received November 3rd, 2011; revised December 19th, 2011; accepted December 31st, 2011 ABSTRACT The infrastructure construction is playing an important role in the development of Liaoning Coastal Economic Belt, whereas a calculation and analysis on the relative efficiency of its 6 cities’ infrastructure investment will offer a useful reference to the decision on the future investment scale and structure of this area’s infrastructure. Based on DEA model and from the viewpoint of constant scale return and changing scale return, this paper calculates the comprehensive rela- tive efficiency and scale relative efficiency of the infrastructure investment in Liaoning Coastal Economic Belt in 2000-2009, and draws the following conclusion: Infrastructure investments in Dalian, Jinzhou and Panjin are compre- hensively relative efficient, while infrastructure investments in Dandong,Yingkou and Huhudao are comprehensively relative inefficient. Infrastructure investments in Yingkou and Huludao are technically efficient, but inefficient in the sense of scale, and are taking increasing scale returns, while the infrastructure investment in Dandon is inefficient from both the technology and scale senses, and is showing a decreasing scale return. Keywords: The Liaoning Coastal Economic Belt; DEA Method; Infrastructure Investment; Relative Efficiency 1.
    [Show full text]
  • Source Apportionment and Health Risk Assessment of Metal Elements in PM2.5 in Central Liaoning’S Urban Agglomeration
    atmosphere Article Source Apportionment and Health Risk Assessment of Metal Elements in PM2.5 in Central Liaoning’s Urban Agglomeration Qingyuan Guo 1,2,†, Liming Li 1,†, Xueyan Zhao 1, Baohui Yin 1, Yingying Liu 1, Xiaoli Wang 2, Wen Yang 1, Chunmei Geng 1,*, Xinhua Wang 1,* and Zhipeng Bai 1 1 State Key Laboratory of Environmental Criteria and Risk Assessment, Chinese Research Academy of Environmental Sciences, Beijing 100012, China; [email protected] (Q.G.); [email protected] (L.L.); [email protected] (X.Z.); [email protected] (B.Y.); [email protected] (Y.L.); [email protected] (W.Y.); [email protected] (Z.B.) 2 Tianjin Key Laboratory of Hazardous Waste Safety Disposal and Recycling Technology, School of Environomental Science and Safety Engineering, Tianjin University of Technology, Tianjin 300834, China; [email protected] * Correspondence: [email protected] (C.G.); [email protected] (X.W.) † These authors contributed equally to this work. Abstract: To better understand the source and health risk of metal elements in PM2.5, a field study was conducted from May to December 2018 in the central region of the Liaoning province, China, including the cities of Shenyang, Anshan, Fushun, Benxi, Yingkou, Liaoyang, and Tieling. 24 metal elements (Na, K, V, Cr, Mn, Co, Ni, Cu, Zn, As, Mo, Cd, Sn, Sb, Pb, Bi, Al, Sr, Mg, Ti, Ca, Fe, Ba, and Si) in PM2.5 were measured by ICP-MS and ICP-OES. They presented obvious seasonal variations, with Citation: Guo, Q.; Li, L.; Zhao, X.; the highest levels in winter and lowest in summer for all seven cities.
    [Show full text]
  • 7 Strengthening the Environmental Protection Management Organization
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Environmental Impact Assessment Summary Summary Assessment Impact Environmental The ThirdThe LiaoningMedium Cities Liaoning Academy of Environmental Sciences Sciences Environmental of Academy Liaoning Infrastructure Project Project Infrastructure Report Report Feb, 2008 Feb, For For V15 E1714 Table of Contents 1. General Introduction.................................................................................................................................. 3 1.1 Project Background ........................................................................................................................ 6 1.2 Assessment Basis............................................................................................................................ 8 1.3 Domestic Requirements for Environmental Assessment................................................................ 4 1.4 Requirements of Environmental Impact Assessment of World Bank............................................. 7 2. Project Summary ....................................................................................................................................... 8 3 Environment Quality Situation................................................................................................................. 13 3.1 Heating System Situations in Project Area................................................................................... 13 3.2 District
    [Show full text]
  • Study on Integrated Economic Strength Evaluation
    Advances in Computer Science Research (ACSR), volume 76 7th International Conference on Education, Management, Information and Mechanical Engineering (EMIM 2017) Study on Integrated Economic Strength Evaluation of Coastal Counties: Taking Liaoning Province as an Example Qiang Mao School of Management, Bohai University, Jinzhou 121013, China. [email protected] Keywords: Integrated economic strength; Comprehensive evaluation; Coastal counties; Liaoning province Abstract. The integrated economic strength evaluation of coastal counties is an important area of study on regional competitiveness, and the research results may help government to make strategic adjustments in the distribution and structure. Based on a brief description of literature review, a method based on stakeholders’ perspective is proposed to solve the integrated economic strength evaluation problem. In addition, the effectiveness of the proposed method is illustrated by the example as Liaoning province. Finally, some development proposals are proposed to promote coastal counties economy according to the evaluation result and characteristics. Introduction Coastal counties can get prosperity for trading with the world and will be easy to form manufacturing bases for processing trade, because they have convenient transportation conditions for international trade. Many scholars are attracted to the research of integrated economic strength evaluation for its widely application background. He (2014) designed evaluation index system based on the perspective of economy development demand in county level, and analyzed the supporting ability of science and technology in Anhui by means of analytic hierarchy process(AHP) [2]. Luo et al. proposed a method to evaluate the level of economic development of counties in Liaoning province based on entropy TOPSIS method. They took 44 counties of Liaoning province as research objects, and the evaluation index system was established from three aspects: economic development, people’s living and investment consumption.
    [Show full text]
  • Based on the Study of Optimal Pollutant Control in Yingkou Section of Daliaohe River
    E3S Web of Conferences 228, 02015 (2021) https://doi.org/10.1051/e3sconf/202122802015 CCGEES 2020 Based on the study of optimal pollutant control in yingkou section of daliaohe river Qiucen Guo1, Hui Yang1*, Huan He1 1 School of municipal and environmental engineering, Shenyang Jianzhu University, Shenyang, Liaoning, 110168, China Abstract. In view of the complexity of the river flowing into yingkou section of daliaohe river, an optimal pollutant control screening method combining the migration and degradation of toxic and harmful pollutants was proposed to improve the comprehensive scoring method. The weight factors of 10 synthetic scoring methods were proposed, and different weights were assigned to the weight factors, focusing more on the migration and degradation of pollutants. The improved comprehensive score method was used to screen 39 pollutants in the list of potential pollutants. Twelve kinds. 1 Introduction 2 Screening of optimal control pollutants in yingkou section of The tributaries of the liao river, hun river and taizi river, join together and enter the sea separately in yingkou city, daliaohe river and the river after the confluence is called daliao river [1- 2]. As the main water source of yingkou city, the water 2.1 Overview of pollution sources in yingkou quality of daliaohe river is seriously affected by the section of daliaohe river upstream huntai river system and the city's direct drainage enterprises. Compared with other rivers, the monitoring of Yingkou section of daliaohe mainly involves chemical water quality
    [Show full text]