Full Year Results: Elia Group Makes Crucial Investments for Energy Transition While Delivering Strong Financial Results

Total Page:16

File Type:pdf, Size:1020Kb

Full Year Results: Elia Group Makes Crucial Investments for Energy Transition While Delivering Strong Financial Results PRESS RELEASE | Brussels, 3 March 2021 8:00 am – Elia Group (Euronext: ELI) Full year results: Elia Group makes crucial investments for energy transition while delivering strong financial results Regulated information Highlights — Grid investments of €337.4 million in Belgium and €715.9 million in Germany while maintaining an excellent safety record and ensuring a reliable and sustainable energy system, resulting in asset growth of 6.1% — Resilient organisation delivering on investments and ensuring continuity of supply during this challenging period — Adjusted net profit up 0.6% to €308.1 million1 driven by the realisation of investments, a solid operational performance in Belgium, Germany and Nemo Link and regulatory settlements in Germany — Elia Transmission and Eurogrid GmbH successfully accessed the debt capital market with green financing lowering the average cost of debt to the benefit of society — A dividend of €1.71 per share will be proposed at the General Meeting on 18 May 2021 Looking back at 2020, I am particularly proud of the commitment and resilience of our employees and contractors and the way they immediately anticipated the COVID measures. Working under difficult circumstance, Elia Group delivered complex infrastructure projects like the ALEGrO and Combined Grid Solution interconnectors and we continued our operational activities to ensure a reliable grid in the interest of society. Although no other event in recent history has hit the economy as hard as the coronavirus, we are optimistic about the future. Given Europe’s objective of becoming the first climate-neutral continent by 2050, the European Green Deal will likely serve as a compass in many recovery plans with a focus on the green economy and digitalisation, both of which are key components of our strategy. This will bring new opportunities and accelerate the development of our Group. Chris Peeters, CEO Elia Group 1 Adjusted net profit Elia Group includes adjusted items linked to the corporate reorganisation implemented at the end of 2019. 1 2020 Highlights A turning point for empowering end consumers in a decarbonised and digitalised energy system Ensuring business continuity In a year marked by the COVID-19 pandemic, Elia Group proved to be a resilient organisation and capable of immediately responding to the crisis. We focused fully on ensuring business continuity. In order to supervise this process optimally, an internal task force was set up spanning multiple departments. Maintaining security of supply and the health and safety of our employees and contractors were our main priorities. By consistently applying the announced measures, we jointly assumed our full social responsibility. In this way, we protected not only our families and ourselves, but also other vulnerable groups. Teleworking on administrative sites and strict measures for critical jobs Belgium - Some 24 hours after the announcement of the first semi-lockdown in Belgium (March 2020), 95% of our employees were already teleworking and all project sites had been shut down. After a short interruption of just a few days, Elia enabled a gradual restart of construction works by applying modified working methods in close collaboration with our contractors. After testing our methods out on a number of pilot projects, the more complex sites with multiple contractors were able to resume in May. By the end of the year, the situation on our project sites was practically back to normal. Even complex projects were delivered on time. Germany – Project sites in Germany were less impacted by the COVID measures. The only exception was the commissioning of the Combined Grid Solution project; the hybrid interconnector between Germany and Denmark. The project had to cope with travel restrictions for the Danish team members. Due to these special circumstances, the project commissioned slightly later than planned. Support for anti-poverty funds In April, Elia Group donated the budget set aside for the organisation of its Annual General Meeting to three King Baudouin Foundation solidarity funds, even topping up the amount so that it came to total of €100,000. In May, the members of Elia's Management Committee unanimously decided to contribute their entire salary for that month to the King Baudouin Foundation in support of its COVID-19 fund for combatting poverty. The Board of Directors and some company staff also decided to donate money to the same fund, bringing the total donation to €255,000. Accelerating towards the net-zero society As Europe prepares for the largest vaccination campaign in its history, major economic stimulus plans are being prepared to battle a deep economic recession. Complementing national efforts, the European Green Deal and the 2 European Commission’s recovery plan will likely serve as a compass, given Europe’s objective of becoming the first climate-neutral continent by 2050. Sustainability will therefore be a cornerstone of many COVID-19 recovery initiatives. In line with our mission to serve society, Elia Group has been working on a number of tangible recovery measures to support economic recovery and help combat climate change. The proposals have been discussed with certain critical stakeholders. In addition to decarbonising and digitalising the energy system, we are working towards meeting the changing needs of residential and industrial customers who also wish to go green. Ensuring a secure grid 24/7 Electricity consumption below average Belgium | The gradual restriction on activities to prevent the spread of the coronavirus had a noticeable impact on electricity consumption in Belgium. Total consumption in 2020 was 7% below the average for the previous five years. The average price of electricity also dropped below normal at times. Germany | The coronavirus measures had a slightly less noticeable impact on the electricity system in Germany, where electricity consumption dropped 4% compared to 2019. The temporary reduction in electricity consumption in Germany and Belgium had no impact on the operating revenues from our grid as the tariff methodology does not take transported volume into account. Renewables on the rise Belgium | Renewable generation (wind and solar) accounted for 18.6% of the electricity generation mix in 2020, up 31% in absolute terms compared to 2019. The commissioning of new offshore wind farms in the Belgian North Sea (Northwester 2 and Mermaid) marked the completion of the first phase of offshore development, and pushed offshore capacity up to 2,262 MW. Installed onshore wind capacity also increased, making February 2020 Belgium's most productive month ever in this category, with absolute generation of 629 GWh (compared to 499 GWh in December 2019). Germany | Thanks to slightly lower consumption combined with a large supply of renewable energy, 50Hertz set a new record in 2020: 62% of electricity demand was covered by renewables, mainly wind and solar energy. In 2020, 50Hertz saw an addition of approximately 1,350 megawatts (MW) of photovoltaic energy to its grid area, alongside almost 430 MW of onshore wind power. This means that the total installed capacity of renewable energies in the 50Hertz control zone increased to 36,129 MW in 2020. This is bringing the amount of onshore wind power to 19,138 MW, offshore wind to 1,068 MW and photovoltaic energy to 13,552 MW. 3 Good progress in some major infrastructure projects despite COVID BELGIUM ALEGrO, a vital link in the construction of the integrated European electricity system On 9 November, Elia (Belgium) and Amprion (Germany) inaugurated the first electrical interconnector between Belgium and Germany. ALEGrO, which will enable Belgium and Germany to exchange an additional 1,000 MW of electricity, started operating commercially on 18 November 2020 (day-ahead market) and 8 December (intraday market). The interconnector will enhance both countries' security of supply and contribute to price convergence, as well as facilitating the energy transition by enabling better integration of renewable energy. MOG fully operational - MOG II in preparation The connection of the Seastar project marked the completion of the Modular Offshore Grid (MOG), Elia’s power hub in the North Sea. Located 40 km off the Belgian coast, the switching platform bundles the export cables from four offshore wind farms and transports the generated energy to the mainland via a shared transmission system. Offshore wind power is crucial to achieving Belgium's climate targets. In the meantime, the federal government has begun developing a second area for offshore wind. To ensure that the new concessions are connected to the Belgian electricity system, Elia is developing the MOG II project. Brabo-II: 380-kV loop around the port of Antwerp enters service In November 2020, Elia commissioned the second phase of the Brabo project. Along the A12 road between Zandvliet and Lillo an existing overhead line was upgraded from 150 kV to 380 kV, with 46 pylons and conductors being replaced over 16 kilometres. In the meantime, the permit procedure has started for the third phase. Elia’s Brabo project will increase the grid’s supply capacity, enabling it to cope with growing electricity consumption in the Port of Antwerp. At national and international level, the project will upgrade Belgium’s north-south axis and bolster Europe’s network of international interconnections. Horta-Avelgem project completed Another upgrade was completed on the high-voltage line between Zomergem and Avelgem. Over the past two years, 97 pylons and foundations have been
Recommended publications
  • Public Participation and Transparency in Power Grid Planning
    Public Participation and Transparency in Power Grid Planning Recommendations from the BESTGRID Project Handbook – Part 1 BESTGRID PARTNERS Transmission System Operator (TSO) Partners Natagora asbl www.natagora.be 50Hertz Transmission GmbH Julien Taymans (Waterloo-Braine l'Alleud project) www.50hertz.com [email protected] Dr Dirk Manthey, [email protected] Phone: +32 (0) 81 390 720 Phone: +49 (0) 30 5150 3419 98 rue Nanon, B-5000 Namur Eichenstr. 3A, D-12435 Berlin German Environment Aid (DUH) Elia System Operator NV www.duh.de www.stevin.be Liv Becker (Suedlink / Bertikow-Pasewalk) Jeroen Mentens (Stevin project) [email protected] [email protected] Phone: +49 (0) 30 2400 867 98 Phone: +32 (0) 2 546 7957 Hackescher Markt 4, D-10178 Berlin Christophe Coq (Waterloo-Braine l'Alleud project) Germanwatch e.V. [email protected] www.germanwatch.org Phone: +32 (0) 2 382 2334 Leon Monnoyerkaai 3, B-1000 Brussels Rotraud Hänlein, [email protected] Phone: +49 (0) 30 2888 356 83 National Grid Stresemannstr. 72, D-10963 Berlin www.nemo-link.com International Institute for Applied Systems Analysis (IIASA) Phil Pryor, [email protected] www.iiasa.ac.at Phone: +44 (0)7795 641 431 Warwick Technology Park, Gallows Hill, Warwick, Joanne Linnerooth-Bayer, [email protected] UK-CV346DA Dr Nadejda Komendantova, [email protected] Phone: +43 (0) 676 83 807 285 TenneT TSO GmbH Schlossplatz 1, A-2361 Laxenburg www.suedlink.tennet.eu Marius Strecker, [email protected] Naturschutzbund Deutschland (NABU) Phone: +49 (0) 921 50740 4094 www.nabu.de Bernecker Str.
    [Show full text]
  • Facts and Figures 2019
    Contact and imprint Facts Publisher Design 50Hertz Transmission GmbH Heimrich & Hannot GmbH and Figures Heidestrasse 2 10557 Berlin Images T +49 30 5150 0 50Hertz 2019 F +49 30 5150 2199 Jan Pauls info@ 50 hertz.com Frank Wölffing Board of Management Printing Stefan Kapferer (CEO) PocketPlaner Dr. Frank Golletz (CTO) FP Werbung GmbH Dr. Dirk Biermann (CMO) Marco Nix (CFO) Sylvia Borcherding (CHRO) 50hertz.com For a successful energy transition in a sustainable world You can find our sustainability report online at csr.50hertz.com enmark About us Our tasks nerginet Key figures In the north and east of Germany, cleswig-olstein we operate the high voltage grid Lubmin Value TenneT reliably ensuring electricity supply Market facilitation – Gstrow GRID-RELATED KEY FIGURES WESTE for around 18 million people. EI CETE NORTHE 2 We are part of the amburg EI CETE Grid area 109,702 km TenneT European integrated Our grid with voltage levels of 150 kilo- Our locations Total lenghts of lines market. (equivalent to power 10,490 km volt (kV), 220 kV and 380 kV extends P circuit length) thereof overhead lines 380 kV 7,250 km over a circuit length of 10,490 km. 50Hertz Netzquartier Eastern Regional Centre Lower axony Poland CET We deliver the (Headquarters) Sigmund-Bergmann-Str. 1 EI CETE thereof overhead lines 220 kV 2,607 km 50ert-Netquartier Heidestrasse 2 03222 Lübbenau/ BerlinCarlottenburg Neuenagen At our eleven locations, over 1,100 infrastructure of bei Berlin thereof sea cables 220 kV 290 km 10557 Berlin Spreewald employees ensure that electricity the future TenneT Wolmirstedt thereof sea cables 150 kV 270 km flows around the clock in Berlin, Service location Röhrsdorf Trusteeship – Northern Regional Centre thereof underground cables 73 km Brandenburg, Hamburg, Mecklen- WESTE Lbbenaupreewald Substations and switching We transparently integrate Rostocker Chaussee 18 Southern Regional Centre EI CETE 74 burg-Western Pomerania, Saxony, stations (number) renewable energies 18273 Güstrow Zentrales Umspannwerk 8 Saxony-Anhalt and Thuringia.
    [Show full text]
  • Electricity Systems and Markets) EDF R&D
    European system with an efficient coordinated use of flexibilities for the integration of a large share of RES Vera Silva Research program director « Electricity systems and markets) EDF R&D EU-SysFlex overall objective EU SysFlex objective is to contribute to developing a market design and regulation framework able to foster the development of innovative flexibility approaches to address the technical shortfalls of a European system with high RES. These innovative approaches cover both the technical capability for providing the right flexibilities and system services and the ability of TSOs to integrate these into system and network operation. EU-SysFlex will make a major contribution to a cost effective system transformation to meet EU world leading RES objectives Three pillars of EUSysFlex approach System needs TSO driven Whole system driven Technical shortfalls Economic shortfalls Market driving innovation to respond to system needs Demonstrations/ Scalability Market design and Replicability/ TSO Services/ Products/ enhancement & operations simulation Procurement/Remuneration regulation evolution Flexibility Roadmap – Implementation and exploitation Scalability and System Implementation Exploitation of results replicatbility benefits Roadmap business creation EU SysFlex will provide a significant improvement of EU innovation capacity by combining “top-down” and “bottom- up” approaches to flexibility enabled by a strong consortium - Cost effective enhancement of flexibility and system services capability - new approaches and tools
    [Show full text]
  • Dansk Energi Brev
    To: Energinet Astrid Buhr Broge [email protected] [email protected] Dok. ansvarlig: CAC Sekretær: Sagsnr: s2013-388 Doknr: d2021-22033-1.0 30. august 2021 Energinet consultation on the methodology for procurement of counter- trade energy Dansk Energi welcomes Energinet’s consultation on the methodology for procurement of so-called countertrade energy. Energinet has highlighted several issues driving the proposed methodology over the past year. However, the central task of a TSO is not to arrange a border specific market setup according to cli- mate effects or according to the costs of specific market dispatches. The central task of a TSO is to facilitate markets that provides correct price and investments signals in compliance with EU-regulation. Energinet’s proposed methodology seeks to address an internal German issue – lack of capacity in TenneT’s transmission grid – which has previously resulted in heavy reduction of capacity on the Dan- ish-German border. While this was solved with the Joint Declaration and Tennet Commitments in 2017-2018, Energinet’s proposed methodology rolls back these advances. The proposed methodology will sustain a distorted day-ahead market price formation in Denmark, an intraday market in DK1 with no export capacity towards Germany and an intraday market in Denmark where Energinet directly or through a third party is by far the largest market participant. These are not efficient elements in a well-functioning wholesale market and Dansk Energi does not consider it compliant with EU-regulation, nor do we consider it a proportional solution to address the internal German grid congestion. At this stage, Dansk Energi would like to highlight the following concerns and objections: 1.
    [Show full text]
  • Tennet Integrated Annual Report 2019
    TenneT Holding B.V. Integrated Annual Report 2019 Key figures 2019 Safe workplace Diverse workforce Safety (TRIR) Gender ratio 4.8 23% 77% Satisfied capital providers* Environmental impact ROIC % Greened of our carbon footprint 5.1 27.4% Grid availability Safeguard capital structure* Grid availability FFO/Net debt 99.9998% 14.8% Future proof grid* Our workforce Annual Investments (EUR million) Number of employees (internal and external) 3,064 4,913 Engaged stakeholders Healthy financial operations* Reputation survey EBIT (EUR million) fairly strong to very strong 768 * Based on underlying figures Table of contents Integrated 2019 at a glance 2 Annual Letter from the Board 4 Report 2019 * About TenneT 6 Profile 6 Our strategy and value creation 9 Materiality analysis 14 * Our performance in 2019 16 Deliver a high security of supply 16 Ensure critical infrastructure for society 23 Create a sustainable workplace 30 Contents Create value to transition to a low carbon economy 36 Secure a solid financial performance and investor rating 44 Solve societal challenges with stakeholders and through partnerships 50 Statements of the Executive Board 57 Our Executive Board 58 Supervisory Board Report 60 Supervisory Board Report 60 Remuneration policy 66 Board remuneration 68 Our Supervisory Board 72 * Governance and risk management 74 Corporate governance 74 Risk management and internal control 76 Risk management and internal control framework 79 Compliance and integrity 80 Risk appetite 82 Key risks 83 Financial statements 87 Consolidated financial statements 88 Notes to the consolidated financial statements 95 Company financial statements 147 Notes to the company financial statements 149 Other information 152 Profit appropriation 152 Independent auditor’s report 153 Assurance report of the independent auditor 160 About this report 163 Reconciliation of non-IFRS financial measures 168 SWOT Analysis 169 Key figures: five-year summary 170 Glossary 171 * These sections reflect the director’s report as mentioned by Part 9 of Book 2 of the Dutch Civil Code.
    [Show full text]
  • System Operation Stakeholders Committee
    System Operation Stakeholders Committee Materials for meeting 16th September 2020 1.1 Review of the Agenda Time Agenda Topics Documents Lead 1. Opening Uros Gabrijel 13:30-13:35 1.1 Review of the agenda Agenda 13:35-13:45 1.2 Review and approval of minutes from previous meeting Minutes 13:45-13:55 1.3 Review of actions Slides Ana Cigaran 13:55-14:15 2. Update on the implementation actions at pan-EU level Slides Ana Cigaran 3. System Operation Guideline Slides 14:15-14:30 3.1 Cost Benefit Analysis for FCR providers by Limited Energy Reservoirs: Luca Ortolano Status update 3.2 Information on Exchange\Sharing of reserves 14:30-15:00 Mohamed El Jafoufi 15:00-15:15 4. CGM Program Implementation Update Derek Lawler 15:15-15:45 5. NC ER Implementation update Slides Rafal Kuczynski 5.1 Update on TCM Status according to Art. 4. 6. Information on Low frequency Pump disconnection & energy storage units Rafal Kuczynski\Walter Sattinger 15:45-16:00 6.1 Why low frequency pump disconnection is triggered at different frequencies across Europe? 6.2 Outlook on the plans for the energy storage units 16:00-16:15 16:15-16:30 7. AOB – Next meeting 9th December Uros Gabrijel 2 1.3 Review of actions Ana Cigaran 3 1.3 Review of actions (I) ACTION ANSWER STATUS 1. Note for future SO GL active library to include pre- Preparation for SO GL Active Library Open qualification process aFRR, mFRR, RR. is in good progress both for the Digital and content part.
    [Show full text]
  • Tennet's Annual Market Update 2020
    Annual Market Update 2020 Electricity market insights 7 April 2021 Introduction Introduction Annual Market Update 2020, an electricity market review focused on the Netherlands and Germany, including wider European trends Main findings This Annual Market Update (AMU) is focussed on relevant developments on the Central Western European electricity markets, and the Dutch and German electricity markets in particular. This is the third edition of the Wholesale market prices TenneT Annual Market Update. Previous editions of the AMU and its predecessor the TenneT Market Review can be found here. Fuel prices & The developments in the Annual Market Update are structured alongside several main topics: generators • The chapter Wholesale market prices discusses wholesale day-ahead and identifies price trends. • As our electricity system is still highly dependent on fossil-fuelled power, the chapter Fuel prices describes Capacity & developments in hard coal, natural gas and emission allowance prices, as well as the margins for generators. generation • The chapter Capacity & generation focuses on the supply side of the electricity system and discusses developments in installed capacity and generation. RES support • Support for renewables in the Dutch and German system are discussed in the chapter RES support schemes, schemes by looking at budget distribution, awarded capacity and generation in the subsidy schemes. • In the chapter Wholesale market integration the storyline zooms out and includes the interactions of the Dutch Wholesale market and German electricity system with neighbouring systems. Additionally, the ongoing efforts of coupling EU integration electricity markets are discussed in this chapter. • The last two chapters focus on mechanisms in place to ensure the stability and functioning of the electricity system for both the Netherlands and Germany: Balancing measures, to ensure supply and demand is equal at Balancing all times; and redispatch measures, to resolve congestion in the grid.
    [Show full text]
  • The Role of Innovative Grid-Impacting Technologies Towards the Development of the Future Pan-European System: the Gridtech Project
    21, rue d’Artois, F-75008 PARIS C1-213 CIGRE 2014 http : //www.cigre.org The role of innovative grid-impacting technologies towards the development of the future pan-European system: the GridTech project A. L’Abbate 1, R. Calisti, A. Zani (RSE SpA, Italy) H. Auer 2, G. Koerbler, G. Lettner (EEG TU Wien, Austria) P. Frias, L. Olmos, C. Fernandes (IIT UP Comillas, Spain) T. Maidonis (WIP GmbH, Germany) S. Vitiello, G. Fulli (EC - JRC, The Netherlands) G. Schauer (Verbund, Austria) S. Sulakov 3, A. Andreev, M. Ivanov (ESO EAD, Bulgaria) A. Mansoldo (EirGrid plc, Ireland) C. Vergine, P. Tisti, O. D’Addese, A. Sallati (Terna Rete Italia SpA, Italy) K. Jansen, R. van Houtert, J. Bos (TenneT TSO BV, The Netherlands) B. Heyder (EnBW AG, Germany) L. Radulov (BSERC, Bulgaria) J. Wolpert (TransnetBW GmbH, Germany) SUMMARY For the achievement of the European Union’s ambitious renewable energy targets for 2020 and beyond, extensive electricity system planning and investments are necessary. This covers electricity generation capacity, transmission networks, and supporting technologies and measures that will ensure clean, secure and efficient energy supply. Within this framework, the European project GridTech mainly aims at conducting a fully integrated assessment of new grid-impacting technologies and their implementation into the European electricity system. This will allow comparing different technological options towards the exploitation of the full potential of future electricity production from renewable energy sources (RES), with the lowest possible total electricity system cost. Within the 2020, 2030 and 2050 time horizons, the goal is to assess where, when, and to which extent innovative technologies could effectively contribute to the further development of the European transmission grid, fostering the integration of an ever-increasing penetration of RES generation and boosting the creation of a pan-European electricity market, while maintaining secure, competitive and sustainable electricity supply.
    [Show full text]
  • Voorstel Tennet TSO Artikel 51 Lid 2
    Openbaar xenne Taking power furt VERZONDEN 17 ^ ^ Postbus 718, 6800 AS Arnhem, Nederland DATUM 17 juni 2019 Autoriteit Consument en Markt UW REFERENTIE T a v. de heerdr F J.H. Don ONZE REFERENTIE REC-N 19-038 Postbus 16326 BEHANDELD DOOR 2500 BH DEN HAAG TELEFOON DIRECT E-MAIL @tennet.eu TE19015232 BETREFT Voorstel van asynchroon gekoppelde ISO's o.b.v. GL EB artikel 50(4) en 51(2) Geachte heer Don, Hierbij ontvangt u twee voorstellen die door de gezamenlijke asynchroon gekoppelde ISO's zijn opgesteld op basis van de artikelen 50(4) en 51(2) van de Verordening (EU) 2017/2195 van 28 november 2017 tot vaststelling van richtsnoeren betreffende elektriciteitsbalancering (op basis van de Engelse titel afgekort als: GL EB). Het betreft: • "All asynchronously connected TSOs’ proposal for Common settlement rules for intended exchanges of energy between synchronous areas as a result of the frequency containment process and of ramping re- strictions in accordance with the Article 50(4) of Commission Regulation (EU) 2017/2195 of 23 Novem- ber 2017 establishing a guideline on electricity balancing" d.d. 18 juni 2019; • "All asynchronously connected TSOs' proposal for Common settlement rules for all unintended ex- changes of energy between synchronous areas in accordance with the Article 51(2) of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing" d.d. 18 juni 2019. Het bijbehorende explanatory document za\ zo spoedig mogelijk worden nagezonden. De voorstellen bevatten geen vertrouwelijke gegevens en kunnen integraal door u gepubliceerd worden. U wordt verzocht deze voorstellen goed te keuren krachtens artikel 5, eerste lid, van de GL EB.
    [Show full text]
  • Decision Norned 101783 2
    Public Version – this is a non-certified translation (leading is the original decision in Dutch, Netherlands Government Gazette of 23 December 2004, No. 248, page 17) Office of Energy Regulation DECISION Number: 101783_2-76 Subject: Decision on the application by TenneT for permission to finance the NorNed cable in accordance with section 31 (6) of the Electricity Act of 1998 This decision consists of the following parts: I. TenneT’s application 1 II. Public preparation 2 III. Consultation with TenneT and the Norwegian authorities 3 IV. Legal context 4 V. Utility of interconnector capacity 4 VI. Opinions received 6 VII. Assessment grounds 9 VIII. Socio-economic assessment of the application 9 IX. Market coupling 17 X. Incentives for TenneT 18 XI. Decision 21 Annex A: Conditions Annex B: Accounting Rules 1. On 31 August 2004, the Director of the Office of Energy Regulation (hereinafter "the Director of DTe") received a written application from TenneT B.V., the manager of the national high- voltage grid (hereinafter "TenneT"). In the application, TenneT requests permission to finance a high-voltage cable between the Netherlands and Norway (hereinafter "the cable") using the revenues, as referred to in section 31 (6) of the Electricity Act 1998 (hereinafter "the Electricity Act"). 2. TenneT and the Norwegian grid manager, Statnett SF (hereinafter "Statnett") intend to construct a high-voltage cable between the Netherlands and Norway (also referred to as the ‘NorNed cable’ or the ‘NorNed project’) and, by doing so, to create a direct connection between both high-voltage grids. According to the application, the cable has a length of 1 Public Version – this is a non-certified translation (leading is the original decision in Dutch, Netherlands Government Gazette of 23 December 2004, No.
    [Show full text]
  • Tennet Report 2013
    Staying Integrated Annual Report TenneT 2013 Integrated Annual Report TenneT Connected Integrated Annual Report TenneT 2013 Grid availability 99.99% Revenue (EUR million) 2,243 Total assets (EUR million) 11,5 6 3 Energinet.dk (Denmark) NordLink (Norway) Kassø (Denmark) SylWin1 Ensted (Denmark) Kassø (Denmark) BorWin3 BorWin4 NorGer (Norway) BorWin2 NorNed (Norway) HelWin2 Baltic cable (Sweden) BorWin1 COBRAcable (Denmark) HelWin1 Audorf alpha ventus DolWin1 DolWin2 DolWin3 Siems Nordergründe 20,997 km Hamburg Nord Total circuit length Riffgat Netherlands and Germany Hamburg Nord (50Hertz) Energinet.dk (Denmark) NordLink (Norway) Kassø (Denmark) Conneforde SylWin1 Ensted (Denmark) Kassø (Denmark) BorWin3 Eemshaven BorWin4 NorGer (Norway) Sottrum BorWin2 Meeden NorNed (Norway) HelWin2 Baltic cable (Sweden) BorWin1 COBRAcable (Denmark) HelWin1 Audorf alpha ventus DolWin1 DolWin2 DolWin3 Siems Wehrendorf (Germany) EnsNordergründe Niederrhein MeppHamburgen Nord Wehrendorf Landesbergen Riffgat (Germany) (Germany) Hamburg Nord (50Hertz)(Germany) Lehrte Merzen (Germany) Wahle Conneforde Eemshaven Gronau (Germany) Wolmirstedt (Germany) Sottrum Meeden Ede Arnhem Bechterdissen Waddinxveen BritNed (Great-Britain) Wehrendorf (Germany) Ens Niederrhein Meppen Wehrendorf Wesel (LandesbergenGermany) (Germany) (Germany) (Germany) Würgassen Lehrte Merzen (Germany) Wahle Gronau (Germany) Nehden (GerWolmmanirstye)dt (Germany) Ede Arnhem Bechterdissen Waddinxveen Weert BritNed (Great-Britain) Wesel (Germany) Van Eyck (Belgium) Würgassen Zandvliet (Belgium)
    [Show full text]
  • National Grid Ventures and Other Factsheet
    National Grid Ventures and other activities Investor Relations | May 2019 National Grid Ventures is a diverse portfolio of commercial energy businesses operating in competitive markets in the UK and the US. The portfolio comprises of long-term assets with a low risk profile and strong cash flows. Interconnectors Operational In construction Interconnectors deliver secure and affordable electricity between two markets and will play a critical role in the cleaner and smarter energy systems of the future. They are recognised by the UK Government as a vital tool to manage NSL energy security, costs to consumers and provide long term sustainability. As an interconnector owner and operator, we sell capacity on the Viking interconnector to energy traders and provide services for transmission system operators in the UK and mainland Europe. The main interconnection capacity is sold by auctioning capacity based on the price differentials between markets BritNed at each end of the link. This represents roughly 80-90% of revenues, with the remaining 10-20% derived from ancillary services. NEMO IFA2 IFA Overview of National Grid Interconnectors IFA BritNed Nemo Link IFA 2 NSL Viking Link Capacity 2GW 1GW 1GW 1GW 1.4GW 1.4GW Total length 70km 260km 140km 240km 720km 760km Converter UK: UK: UK: UK: UK: UK: stations Sellindge Isle of Grain Richborough Chilling Blyth Bicker Fen France: Netherlands: Belgium: France: Norway: Denmark: Les Mandarins Maasvlakte Herdersbrug Tourbe Kvilldal Revsing Commissioned 1986 2011 2019 FY21 est FY22 est FY24 est Ownership Partnership Joint venture Joint venture Partnership Partnership Partnership with RTE NG & TenneT NG & Elia with RTE with Statnett with Energinet Exp.
    [Show full text]