Contact and imprint Facts Publisher Design 50Hertz Transmission GmbH Heimrich & Hannot GmbH and Figures Heidestrasse 2 10557 Berlin Images T +49 30 5150 0 50Hertz 2019 F +49 30 5150 2199 Jan Pauls info@ 50 hertz.com Frank Wölffing
Board of Management Printing Stefan Kapferer (CEO) PocketPlaner Dr. Frank Golletz (CTO) FP Werbung GmbH Dr. Dirk Biermann (CMO) Marco Nix (CFO) Sylvia Borcherding (CHRO)
50hertz.com For a successful energy transition in a sustainable world
You can find our sustainability report online at csr.50hertz.com enmark
About us Our tasks nerginet Key figures
In the north and east of Germany, c leswig- olstein we operate the high voltage grid ubmin Value enne reliably ensuring electricity supply Market facilitation – G strow GRID-RELATED KEY FIGURES WESTE for around 18 million people. E I CE T E THE 2 We are part of the amburg E I CE T E Grid area 109,702 km enne European integrated Our grid with voltage levels of 150 kilo Our locations Total lenghts of lines market. (equivalent to power 10,490 km volt (kV), 220 kV and 380 kV extends P circuit length) thereof overhead lines 380 kV 7,250 km over a circuit length of 10,490 km. 50Hertz Netzquartier Eastern Regional Centre ower axony Poland CE T We deliver the (Headquarters) Sigmund-Bergmann-Str. 1 E I CE T E thereof overhead lines 220 kV 2,607 km 50 ert -Net quartier Heidestrasse 2 03222 Lübbenau/ Berlin C arlottenburg Neuen agen At our eleven locations, over 1,100 infrastructure of bei Berlin thereof sea cables 220 kV 290 km 10557 Berlin Spreewald employees ensure that electricity the future enne Wolmirstedt thereof sea cables 150 kV 270 km flows around the clock in Berlin, Service location Röhrsdorf Trusteeship – Northern Regional Centre thereof underground cables 73 km Brandenburg, Hamburg, Mecklen- WESTE bbenau preewald Substations and switching We transparently integrate Rostocker Chaussee 18 Southern Regional Centre E I CE T E 74 burg-Western Pomerania, Saxony, stations (number) renewable energies 18273 Güstrow Zentrales Umspannwerk 8 Saxony-Anhalt and Thuringia. Service location Lubmin 06246 Bad Lauchstädt Installed capacity 57,432 MW into the market Bad auc st dt Service location E STE share of renewable energies 34,316 MW E I CE T E Central Regional Centre Vieselbach P thereof wind onshore 18,711 MW System control – Am Umspannwerk 10 enne Vieselbac R rsdorf thereof wind offshore 1,068 MW We maintain the 15366 Neuenhagen bei Western Regional Centre esse S THE E I CE T E share of conventional balance. Berlin Am Umspannwerk 1 energies 23,116 MW Service location 39326 Wolmirstedt Č P Maximum load 16,242 MW Berlin Charlottenburg Service location Hamburg enne C ec Republic Power consumption Bavaria (according to electricity supply to end consumers according to EEG) 99 TWh Transported quantities of electricity 109,4 TWh Dialogue with our Installed capacity in the Redispatch feed-in renewable 60 TWh Calculated share of renewable energies in stakeholders 50Hertz grid area energy consumption 60 %
Power export from control In order to make the energy tran- area (physical load flows) 59 TWh
Stand Dezember 2018 24.06.2019 sition happen, high voltage grids FINANCIAL KEY FIGURES have to be further developed. In the § (IFRS) 2019 regions where existing capacities are Ons ore ind 1 ,711 Revenue € 10,770 mn strengthened or new substations 01. Legal initiation 02. Feasibility study, 03. Presentation of the 04. Regional planning 05. Scope of examination 06. Plan approval procedure, 07. Private law agreement 08. Construction 0 9 . E cient operation therof grid business revenue € 1,360 mn and lines are built, the information internal approval, project, conferences procedure/federal building permit budget planning procedure Consolidated net income € 178 mn and participation needs of citizens Conventional Renewable Balance total € 7,082 mn and special interest groups are huge. Public participation energy energy Investment total € 489 mn 50Hertz engages in this dialogue very 23,116.0 MW 34,316.0 MW 650 57,432.0 openly and transparently: We involve e a a Mio. € FURTHER KEY FIGURES the public at an early stage, thus Workforce at year-end 1,1201) improving the projects and laying the Offs ore ind REDISPATCH COST COULD BE Congestion Geot ermal ener y and 2) foundations for maximum acceptance management amouts 2,510 GWh § landfill, sewer and mine gas 1,06 SAVED SINCE THE COMMISSIONING of our projects. Biomass OF THE SOUTHWEST COUPLING Congestion 69 4 2) 1,9 0 3 LINE UNTIL END OF THE YEAR 2019. management costs € 84 mn 01. Legal initiation 02. Feasibility study, 03. Presentation of the 04. RegionalFor more planning information 05. Scope pleaseof examination visit 06. Plan approval procedure, 07. Private law agreement 08. Construction 0 9 . E cient operation Hydropo er P otovoltai s internal approval, project, conferences procedure/federal building permit 2 3 7 budget planning procedure csr.50hertz.com 12,204 3 1) At group level including trainees and inactive employees for Eurogrid GmbH, 50Hertz Transmission GmbH, 50Hertz Offshore GmbH, Elia Grid International GmbH Public participation 2) Preliminary values
Status at January 2020 (§13.1 & §13.2)
Physical Change in the share of renewable energy Nature conservation is important to us
imports and exports* Changein electricity in the share of consumptionrenewable energy in Energinet electricity consumption Using appropriate measures, 50Hertz We divide these into six categories: We are a major exporter of electric- Development of imports and exports Dänemark compensates for unavoidable adverse Planting measures, forestry meas-
ity in Germany and Europe. An ever at the 50Herz grid area boundaries 2,350 effects on nature, the environment or ures, hydraulic engineering meas- increasing amount of renewable 70 habitats. We strive to achieve compensa- ures, species protection, renaturation GWh 65 energy generated in the 50Hertz grid 1,301 60 0 tion measures with the greatest overall measures and others. We involve the area is facing a relatively low popu- 60,000 60 56 5 social benefits. affected municipalities, conservation 10,086 PSE 53 4 lation density and thus lower energy 49,200 50 9 authorities, interested citizens and 50,000 48,760 Polen 47 8 43,478 20 50 consumption. 40,418 non-governmental organisations in 39,389 42 2 40,000 38 3 the planning and implementation of 40 35 8 We transport the resulting surplus compensation measures very early energy via the high voltage grid to 30,000 50Hertz 28 3 on, because they know the specifics 30 25 7 25 6 metropolitan areas in the south and of the nature and habitats in their lo- 20,000 grid area west of Germany and to our European 20 calities best. In partnership with each neighbours. 10,000 other, we develop suitable projects 10 and propose these in the course of 0 768 approval planning. * The amounts shown refer to physical 0 electricity flows, not commercial exports. 10,000 2009 2010 2011 2012 2013 2014 2015 2016 2017 201 2019 40,642 14,130 150 6,001 COMPENSATION MEASURES 20,000 WERE BEING PLANNED, REALIZED 2015 2016 2017 2018 2019 AND MAINTAINED WITHIN TenneT ČEPS 50HERTZ GRID AREA IN 2019. Exports in GWh Imports in GWh Germany Czech Republic Net exports (balance) 50Hertz weden grid map 150 enmark
S it in stations (most it lin s to distribution system operators) nerginet 150 3 0 220 Transformation 3 0 220 Transformation 3 0 150 150 220 Planned under onstru tion Ot er ompanies 110 Operatin volta e in Sear spa e 220 60 % c leswig- olstein ine 3 0 Ro ock Mecklenburg WAS THE CALCULATED SHARE OF ine planned under onstru tion 3 0 RENEWABLE ENERGIES IN ELECTRICITY Western Pomerania CONSUMPTION IN THE 50HERTZ GRID ine 220 AREA IN 2019. Hi olta e ire t Current 400 Conne tions (H C) enne Hi olta e ire t Current 300 320 525 G ro Conne tions (H C) planned under onstru tion amburg ch erin Ot er ompanies 3 0 220 H C Ba -to-Ba -Konverter 3 0 150 planned under onstru tion enne 220 eubran enbur H C C lin 400 H C C lin 300 320 525 1 planned under onstru tion Grid onne tion offs ore 150 220 Grid onne tion offs ore 150 220 planned under onstru tion 1 P
System users Our ustomers are re ional distribution system operators as ell as po er plants, pumped-stora e Brandenburg plants, ind farms and ma or industries onne ted Poland to t e transmission system ower axony 1 Conventional po er plant
Pumped-stora e plant 220 Inter onne tors Berlin Ons ore ons ore ind farm 220 Ons ore ind farm planned under onstru tion rank ur er km Offs ore ind farm planned under onstru tion Po am 10,490