Limburg Belgium

Total Page:16

File Type:pdf, Size:1020Kb

Limburg Belgium Limburg (Belgium) PROJECT TOTAL ERDF ERDF URL - WEB ADRESS POPULATION LIMBURGACRONYM BUDGET CONTRIBUTION OBJECTIVE Strategic Plan Innovation: New Opportunities For ECU 498,954 2 761,565 the Future in Limburg CONTEXT AND OBJECTIVES DEVELOPING A REGIONAL INNOVATION PARTNERSHIP Limburg is a small province located at the eastern edge of Flanders, bordering with the Netherlands Strategisch Plan Limburg being an established plat- and Germany. Limburg is part of the Euregion form took the initiative to bring the main regional Meuse / Rhine: Maastricht, Aachen, Liège, Hasselt. players together in an innovation partnership. The From a mainly rural area, the region was trans- Steering Committee, the main executive body of the formed into a coal mining region at the beginning of RIS exercise, is composed of members of govern- this century. The closing of the mines in recent ment (local and regional), organisations (unions and decades presented a major socio-economic prob- employers), private sector (industry and services), lem for the region. A reconversion plan was drafted institutions (university and polytechnics). In order to and executed by the Flemish government. ensure a business focus, a captain of industry, a senior director of Philips Electronics, was invited to Alongside this plan a platform was formed by the be chairman of the steering committee. employers organisation in 1987 in order to co-ordi- nate the local actors in helping to build a new eco- Local resources were largely tapped for the analy- nomic structure. In the decade since Strategisch sis phase with a specialist in innovation management Plan Limburg was formed three key objectives have and strategy from Limburgs Universitair Centrum been defined and pursued: contracted to lead the interviews and workshops of the SME needs analysis. A total of 30 SME’s, • Developing star sectors; selected from seven ‘star sectors’ were chosen for • Education and training of managers (SME’s); interviewing and in addition seven workshops were organised in sub-regional industry clubs with some • Promotion of technology and innovation. 100 SME’s attending. In order to facilitate wider com- The third objective was realised by starting the RIS.- parison of the results, the questionnaire used was Limburg project. From the outset, an ambitious aim based on the ‘Repertory Grid’ method applied in the for the project was set by the Steering Committee: RITTS-Flanders project. The questionnaire was “A larger share of innovative products and services adapted and improved in collaboration with an expert in the total economic output of the region”. from the Catholic University of Louvain (KUL) for more in depth interviewing. An expert from the KUL STEERING COMMITTEE carried out interviews with the main business and innovation support organisations (some 30 interviews Chair: Senior Director, Philips Electronics. in 24 organisations). Prior to starting the supply anal- Members representing: ysis, the KUL team also carried out some interviews Public authorities and agencies: European Com- of SME’s in the needs analysis study, in order to mission; GOM Limburg; Management Committee appreciate the typical problems regarding innovation Objective 2 Limburg; Provincial Government; Flem- and business support. ish Government. Social partners: ABVV (Trade At the end of the analysis phase, a launch meeting union); ACV (Trade union); KHNL (Chamber of Com- was arranged in order to give the project an exten- merce); NCMV (employers); Strategisch Plan Lim- sive media coverage and to ensure the commitment burg; VIA (employers); VKW (employers). Private of the 170 SME’s and organisations present for the sector: Generale Bank; Helvoet Pharma; Inalfa; implementation phase of Spin Off-Limburg. Paclan; Plastruco; Radson; Radson Alutherm; Higher Education: Katholieke Hogeschool Limburg; FIRST RESULTS AND PILOT PROJECT Limburgs Universitair Centrum; Provinciale Hoge- school Limburg Three long term objectives were chosen as a result of the first phase findings: streamline the interme- diary infrastructure; increase the customer focus of all players in the innovation infrastructure (including government); stimulate internal innovation in SMEs. In order to develop a vision and to prepare the implementation phase, four pilot projects were launched each looking respectively at how innova- tion can be stimulated by SMEs themselves, 32 G government; intermediaries; and education and Although already active in cross-broder co-opera- research. For each of the four pilot projects, a task- tion the RIS has provided the opportunity for the force has been established, chaired by a captain of partnership to open up new contacts on a wider industry, and composed of approximately 25 mem- European level. One concrete example is the deci- bers, representing companies, institutions and sion to choose Wales as a best practice region for organisations. After an initial meetings of the pilot benchmarking purposes. From the start Limburg projects working groups, the following short- and was also part of the ‘Industrial Regions’ subgroup long-term projects are taking shape: of the RIS-RITTS network. Several meetings were held in different regions which was very useful for • PLATO-project around the theme: innovation in sharing experiences and working methods. Limburg SME’s; is now participating in a TRIPS (Trans Regional Inno- • establish a ‘Regional Innovation Forum’; vation Projects) together with Castilla y Leon, Aragon and Wales which will concern the theme of • one central access and communication point for supply chains in the automotive sector. regional and local government; • establishing a Forum SME’s/Local Government; APPLYING TECHNOLOGY FORESIGHT AT THE REGIONAL LEVEL • improve coherence and insight in innovation sup- ply for SME’s; An important aspect of the RIS approach to sup- porting the “star” industrial sectors of the province • first stop shop for SME’s when consulting inter- was the undertaking of a technology trends analy- mediaries; sis. For Limburg, as part of a small open economy, • improve vocational training for the 7 star sectors it is important to take into account the business and of the region; industry evolution on a European and worldwide scale. It was decided to work on the basis of the trends • establish an ‘Open Learning Center’ in the local defined by the UK’s Technology Foresight exercise. university (L.U.C.); The UK exercise, based on working groups of aca- • streamline the co-operation between SME’s and demics and company directors, had set out a range Schools. of themes out of which the following four were The overall RIS will be built around these pilot proj- selected for their relevance to the future develop- ects with the aim being to have the pilot projects up ment of Limburg: 1- the changing business envi- and running by the end of 1998. The four task- ronment; 2- patterns of work & leisure; 3- security forces of the pilot projects will form an “innovation & safety in private and professional activities; 4- Forum” acting as a “sounding board” for the imple- increased use of sensors & control instruments; 5- mentation of the Spin Off-Limburg action plan. computer modelling & simulation. These trends will be used to set objectives and provide targets for the IMPACT ON REGIONAL POLICY innovation strategy. AND FUTURE PERSPECTIVES It is already evident that the RIS project will not end in December 1998 at the end of the period of ERDF co-financing. Indeed the project is more like a feasability study and action plan leading to the launch of activities and projects. In particular, it is clear that the Steering Committe will remain in place after the project is finished, albeit in a modified form. It is foreseen to organize an annual ‘Spin Off meet- ing’ in order to maintain the level of innovation ¨ CONTACT awareness and to foster contacts with the socio- economic actors including those of partner regions. Dirk Broeckx Strategisch Plan Limburg Tel: +32-11/591432 Fax: +32-11/591434 E-mail: [email protected] 33.
Recommended publications
  • Onderzoeksrapporten Agentschap Onroerend Erfgoed
    Vlaanderen is erfgoed Onderzoeksrapporten Agentschap Onroerend Erfgoed Registratie van toevalsvondsten in het voormalige minderbroeder- klooster in de Boomgaardstraat 12 (Maaseik, Prov. Limburg) 26 Onderzoeksrapporten Agentschap Onroerend Erfgoed Vlaanderen is erfgoed Brussel 2015 COLOFON Onderzoeksrapporten Agentschap Onroerend Erfgoed Een uitgave van Onroerend Erfgoed Wetenschappelijke instelling van de Vlaamse Overheid, Beleidsdomein Ruimtelijke Ordening, Woonbeleid en Onroerend Erfgoed Published by the Flanders Heritage Agency Scientific Institution of the Flemish Government, Policy area Town and Country Planning, Housing Policy and Immovable Heritage Verantwoordelijke uitgever: S. Vanblaere Onroerend Erfgoed Phoenixgebouw Koning Albert II-laan 19 bus 5, B-1210 Brussel tel.: +32(0)2 553 16 50, fax: +32(0)2 553 16 55 [email protected] www.onroerenderfgoed.be Dit werk wordt beschikbaar gemaakt onder de licentie Creative Commons Naamsvermelding- GelijkDelen 3.0 Unported. Bezoek http://creativecommons.org/licenses/by-sa/3.0/ om een kopie te zien van de licentie of stuur een brief naar Creative Commons, 444 Castro Street, Suite 900, Mountain View, California, 94041, USA. This work is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License. To view a copy of this license, visit http://creativecommons.org/licenses/by-sa/3.0/ or send a letter to Creative Commons, 444 Castro Street, Suite 900, Mountain View, California, 94041, USA. ISSN 1371-4678 D/2015/6024/19 Onderzoeksrapporten agentschap Onroerend Erfgoed
    [Show full text]
  • Voorstel Inrichting Buffergebied “De Baenjd” Datum; 25 November 2019
    Voorstel Inrichting buffergebied “De Baenjd” Datum; 25 november 2019 Projectnaam: Kwistbeek fase 2 waterbuffer Projectnummer: 60-2019-OV-013 Projectgebied: Gemeente Peel en Maas Onderdeel: Helden Versie: Concept/praatstuk Document: Auteur: Ron Janssen Trekkers: Ron Janssen ism gemeente Peel en Maas 1. Inleiding Binnen de gemeente Peel en Maas wordt werk gemaakt om de regenwaterproblematiek op te lossen. Vanuit het veranderende klimaat en de hoeveelheid verharding is het noodzakelijk dat regenwater “gebufferd” kan worden, waarna het gedoseerd zijn weg kan vervolgen. Binnen de gemeente Peel en Maas is samen met Waterschap Limburg het gebied “De Baenjd” benoemd als buffergebied. De gemeente heeft een structuur opgezet met werkgroepen en voor dit onderdeel wil men graag een plan, dat vroegtijdig besproken is met de omgeving. Daarom heeft IKL, Ron Janssen, inzet gepleegd vanuit de kaders Waterschap Limburg en de gemeente Peel en Maas om samen met de streek een voorstel uit te werken. Onderstaand de opzet van het voorstel, dat op 27 november besproken wordt in de Werkgroep. 2. Uitgangspunten en randvoorwaarden Vanuit de opdracht heeft IKL uitgangspunten meegekregen die duidelijk aangeven dat de buffer voor waterretentie functioneel moet zijn en te allen tijde zijn functie kan volbrengen. Vandaar heeft Antea berekend wat de inhoud van de retentiebuffer dient te zijn. Gemeente heeft de beoogde locatie aangegeven. Vanuit deze uitgangspunten heeft de gemeente en werkgroep aangeven wat de aanvullende randvoorwaarden zijn: • Inrichting gebied dient een bijdrage te leveren aan de landschappelijke structuur/cultuurhistorische opbouw van het gebied • Ecologisch mogen bestaande waarden niet in het gedrang komen door wijziging watertoestand/instroom gebiedsvreemd water • De inrichting moet beheersbaar zijn, zodat de functionaliteit ten alle tijden gewaarborgd is.
    [Show full text]
  • State of Play Analyses for Antwerp & Limburg- Belgium
    State of play analyses for Antwerp & Limburg- Belgium Contents Socio-economic characterization of the region ................................................................ 2 General ...................................................................................................................................... 2 Hydrology .................................................................................................................................. 7 Regulatory and institutional framework ......................................................................... 11 Legal framework ...................................................................................................................... 11 Standards ................................................................................................................................ 12 Identification of key actors .............................................................................................. 13 Existing situation of wastewater treatment and agriculture .......................................... 17 Characterization of wastewater treatment sector ................................................................. 17 Characterization of the agricultural sector: ............................................................................ 20 Existing related initiatives ................................................................................................ 26 Discussion and conclusion remarks ................................................................................
    [Show full text]
  • Venlo Is in the Netherlands. We Are Called 'Blariacum College'. Http
    Venlo is in the Netherlands. We are called 'Blariacum College'. http://www.blariacum.nl/ Venlo in southeastern Netherlands Venlo, Netherlands, location map Location of Venlo: Venlo is located in the southeast Netherlands in the Dutch province of Limburg near the border with Germany. The historic center of the town is located on the east side of the river Meuse. The population of Venlo is around 100,000 people. Getting to Venlo - Railway Station: Venlo offers intercity connections to Den Haag, Delft, Rotterdam and Eindhoven among other stations, with connections to Germany via Kaldenkirchen. Regional and city buses are located in front of the station, and there is a large parking lot as well. Venlo Carnival and Other Events: Venlo's carnival celebration is called Vastenaovend, and it's a grand celebration held six weeks before Easter. The main event is on Saturday and festivities continue until the next Tuesday. The Zomerparkfeest is a big arts festival held in the park near the train station. Need to know what to do in the area? Here's a long list: a day out in Limburg. If you like country living, or are looking for lodging during Floriade or carnival, you might have to look for places in the Limburg countryside. HomeAway lists a variety of Limburg Vacation Rentals. Closest Airports: Venlo is served by the airports of Düsseldorf (Germany), Maastricht, Eindhoven and Weeze (Germany). Tourist Office: VVV Venlo: The address of the tourist office is Nieuwstraat 40-42, 5911 Venlo. It's open Monday through Friday from 10 am to 5:30 pm and Saturday from 10am to 5pm.
    [Show full text]
  • Curriculum Vitae of Wilfried Mullens, MD Phd
    Curriculum Vitae of Wilfried Mullens, MD PhD Social - DOB: August 5, 1974 - Nationality: Belgium - Married: Nele Hermans - 4 children: Kaat, Saar, Teun, Vic Medical Degrees - Degree of Medical Doctor: Summa cum laude - July 1999 Preclinical Years at Limburgs Universitair Centrum - Belgium: * First preclinical year 1992-1993: Magna cum laude (July 1993) * Second precinical year 1993-1994: Summa cum laude (July 1994) * Third preclinical year 1994-1995: Summa cum laude with congratulations of the jury (July 1995) Clinical Years at Katholieke Universiteit Leuven - Belgium: * First clinical year 1995-1996: Magna cum laude (July 1996) * Second clinical year 1996-1997: Magna cum laude (July 1997) * Third clinical year 1997-1998: Magna cum laude (July 1998) * Fourth clinical year 1998-1999: Summa cum laude (July 1999) - Proficiency in Medical English (February 1997) - Degree of Acute Medicine - Belgium: July 2002 - Degree of Internal Medicine: July 2002 (Katholieke Universiteit Leuven - Belgium) - Degree of Cardiology: July 2005 (Katholieke Universiteit Leuven - Belgium) - United States Medical Licensing Examination: June 2005 - Degree of Heart Failure and Cardiac Rehabilitation: July 2006 (Katholieke Universiteit Leuven – Onze Lieve Vrouw Ziekenhuis Aalst - Belgium) - Degree of advanced fellow in Heart Failure and Cardiac Transplantation: July 2007 (Cleveland Clinic Foundation in Cleveland – Ohio – USA) - Degree of advanced fellow in Electrical Therapies for Heart Failure: July 2008 (Cleveland Clinic Foundation in Cleveland – Ohio – USA) - Degree
    [Show full text]
  • Summary of the Limburg Region Seminar, November 8-9, 2012
    Local Scenarios of Demographic Change: Policies and Strategies for Sustainable Development, Skills and Employment Summary of the Limburg Region Seminar, November 8-9, 2012 Maastricht, December 7, 2012 Summary of the Limburg Region Seminar, November 8-9, 2012 Acknowledgements This summary note has been prepared by Andries de Grip (Research Centre for Education and the Labour Market, Maastricht University) and Inge Monteyne (Zeeland Regional Province). Aldert de Vries, Roxana Chandali (Ministry of the Interior and Kingdom Relations) and Silas Olsson (Health Access) and Karin Jacobs, Hans Mooren (Benelux Union) revised the note and provide useful comments for its final format. The note has been edited by Cristina Martinez-Fernandez (OECD LEED Programme), Tamara Weyman (OECD project consultant) and Melissa Telford (OECD consultant editor). Our gratitude to the workshop participants for their inputs and suggestions during the focus groups. 2 Summary of the Limburg Region Seminar, November 8-9, 2012 List of Contents Introduction ....................................................................................................................................................... 4 Pre-workshop discussion and study visit ........................................................................................................... 4 Limburg Workshop ............................................................................................................................................ 5 Focus group 1. Opportunities within the cross-border labour
    [Show full text]
  • Programmaplan Preventiecoalitie Sittard-Geleen En CZ
    Programmaplan Preventiecoalitie Sittard-Geleen & CZ Versie 13-01-19 Inhoudsopgave Preventiecoalitie Sittard-Geleen & CZ 1. Aanleiding voor samenwerking 2. Uitdagingen in Sittard-Geleen 3. Doelstellingen 4. Aanpak 5. Monitoring en evaluatie 6. Governance 7. Bijlagen 2 De gemeente en CZ hebben ieder hun eigen verantwoordelijk- heden in een gefragmenteerd zorg/ondersteuningslandschap Preventiecoalitie Sittard-Geleen & CZ Zelf / Samen Sociaal domein Medisch domein Samenleving Gemeente Sittard-Geleen CZ CZ Zorgkantoor Wmo Jeugdwet Wet Publieke Gezond- Zvw Wlz heid Participa- Omge- tiewet vingswet Complexiteit van ondersteunings- / zorgvraag 3 Doelgroepen en en hun zorgvragen overstijgen de gefragmenteerde zorg en ondersteuning Preventiecoalitie Sittard-Geleen & CZ Zelf / Samen Sociaal domein Medisch domein Samenleving Gemeente Sittard-Geleen CZ CZ Zorgkantoor Gezonde bevolking Groepen/individuen Individuen met met een verhoogd gezondheidsprobleem gezondheidsrisico Complexiteit van ondersteunings- / zorgvraag 4 Voor verbeteringen in het sociale en medische domein is een gezamenlijke integrale aanpak nodig Preventiecoalitie Sittard-Geleen & CZ Zelf / Samen Sociaal domein Medisch domein Een gezamenlijke integrale aanpak (het in samenhang vormgeven van preventie, welzijn en zorg) is nodig omdat… • Gefragmenteerde ondersteuning en zorg een holistische benadering belemmeren • Veel ondersteunings- en zorgvragen betrekking hebben op zowel het sociale als medische domein • Gemeente en zorgverzekeraar wederzijds afhankelijk zijn • De gemeente heeft
    [Show full text]
  • Stad Tongeren: RUP Clarissenstraat
    Verwerking screeningsadviezen OHPL 1354 101153.12 Clarissenstraat Tongeren Stad Tongeren: RUP Clarissenstraat Screeningsnota: Verzoek tot raadpleging Onderzoek naar de planMER-plicht Deze samenvatting bevat: . een lijst van de aangeschreven adviesinstanties; . een samenvatting van de ontvangen adviezen; . een voorstel tot verwerking van de ontvangen advies binnen het verdere planproces; . de herinneringsbrief aan de instanties die hun advies niet bezorgden tot op heden. 1. Geraadpleegde adviesinstanties. De screening werd op 26 juni 2012 bezorgd aan onderstaande instanties: . Provinciebestuur Limburg – Directie Infrastructuur, Ruimtelijke Ordening, Milieu en Natuur – Sectie 3.2.2. Ruimtelijke Ordening – Planning en Beleid – Provinciehuis. Universiteitslaan 1 3500 Hasselt . ANB Limburg – VAC Koningin Astridlaan 50, bus 5 3500 Hasselt . Departement RO - Ruimtelijke Ordening Limburg – VAC Koningin Astridlaan 50, bus 1 3500 Hasselt . Onroerend Erfgoed Limburg – VAC Koningin Astridlaan 50, bus 1 3500 Hasselt . Agentschap Wonen-Vlaanderen, t.a.v. Jos Gorssen Koningin Astridlaan 50, bus 1 3500 Hasselt . Departement MOW, t.a.v. Fernand Desmyter – secretaris-generaal Graaf de Ferrarisgebouw Koning Albert II-laan 20 bus 2 1000 Brussel . Departement LNE Afdeling Land en Bodembescherming, Ondergrond, Natuurlijke Rijkdommen Dienst Land en Bodembescherming t.a.v. Bram Vogels Graaf de Ferrarisgebouw Koning Albert II-laan 20 bus 16 1000 Brussel . VMM, Afdeling Operationeel Waterbeheer, t.a.v. Bram Vogels Graaf de Ferrarisgebouw Koning Albert II-laan 20
    [Show full text]
  • Literature of the Low Countries
    Literature of the Low Countries A Short History of Dutch Literature in the Netherlands and Belgium Reinder P. Meijer bron Reinder P. Meijer, Literature of the Low Countries. A short history of Dutch literature in the Netherlands and Belgium. Martinus Nijhoff, The Hague / Boston 1978 Zie voor verantwoording: http://www.dbnl.org/tekst/meij019lite01_01/colofon.htm © 2006 dbnl / erven Reinder P. Meijer ii For Edith Reinder P. Meijer, Literature of the Low Countries vii Preface In any definition of terms, Dutch literature must be taken to mean all literature written in Dutch, thus excluding literature in Frisian, even though Friesland is part of the Kingdom of the Netherlands, in the same way as literature in Welsh would be excluded from a history of English literature. Similarly, literature in Afrikaans (South African Dutch) falls outside the scope of this book, as Afrikaans from the moment of its birth out of seventeenth-century Dutch grew up independently and must be regarded as a language in its own right. Dutch literature, then, is the literature written in Dutch as spoken in the Kingdom of the Netherlands and the so-called Flemish part of the Kingdom of Belgium, that is the area north of the linguistic frontier which runs east-west through Belgium passing slightly south of Brussels. For the modern period this definition is clear anough, but for former times it needs some explanation. What do we mean, for example, when we use the term ‘Dutch’ for the medieval period? In the Middle Ages there was no standard Dutch language, and when the term ‘Dutch’ is used in a medieval context it is a kind of collective word indicating a number of different but closely related Frankish dialects.
    [Show full text]
  • Geleen Kracht
    ONTWERP KONINKLIJK BESLUIT Besluit van tot aanwijzing van onroerende zaken ter onteigening in de gemeente Sittard- Geleen krachtens artikel 72a van de onteigeningswet (onteigening voor de aanleg van twee spooronderdoorgangen in verband met het opheffen van de onbewaakte gelijkvloerse spoorwegovergangen Raadskuilderweg en Lintjesweg, met bijkomende werken). Ingevolge artikel 72a, eerste lid, van de onteigeningswet kan onteigening van onroerende zaken plaatsvinden onder meer voor de aanleg en verbetering van wegen, bruggen, spoorwegwerken en kanalen, alsmede daarop rustende zakelijke rechten. Daaronder wordt op grond van artikel 72a, tweede lid sub a, mede begrepen onteigening voor de aanleg en verbetering van de in het eerste lid bedoelde werken en rechtstreeks daaruit voortvloeiende bijkomende voorzieningen ter uitvoering van een bestemmingsplan als bedoeld in artikel 3.1, eerste lid, van de Wet ruimtelijke ordening. Het verzoek tot aanwijzing ter onteigening ProRail B.V. (hierna: verzoeker) heeft Ons bij brief van 24 september 2019, kenmerk STD-GLN-OVW-RW en LW Z002-002579, verzocht, om ten name van ProRail B.V. over te gaan tot het aanwijzen ter onteigening van de onroerende zaken in de gemeente Sittard-Geleen. De onteigening wordt verzocht om de aanleg mogelijk te maken van twee spooronderdoorgangen voor fietsers en voetgangers op de spoortrajecten Maastricht-Sittard tussen km 19.429 en km 19.301 en Sittard-Heerlen tussen km 2.647 en km 2.753 in verband met het opheffen van de onbewaakte gelijkvloerse spoorwegovergangen Raadskuilderweg en Lintjesweg, met bijkomende werken, in de gemeente Sittard-Geleen. Planologische grondslag De onroerende zaken waarop het verzoek betrekking heeft, liggen in de gemeente Sittard-Geleen.
    [Show full text]
  • Wonen Op Één Van De Uniekste Locaties Van België 2 | Be-Mine | Houtpark | Beringen Beringen | Houtpark | Be-Mine | 3
    URBAN VILLA’S WONEN OP ÉÉN VAN DE UNIEKSTE LOCATIES VAN BELGIË 2 | BE-MINE | HOUTPARK | BERINGEN BERINGEN | HOUTPARK | BE-MINE | 3 URBAN VILLA’S HOUTPARK De naam ‘Houtpark’ verwijst naar een plek op het mijnterrein waar men hout opstapelde. De mijn beschikte over een uitgebreide houtvoorraad, die diep onder de grond als ondersteuningsmateriaal dienst deed. 4 | BE-MINE | HOUTPARK | BERINGEN BERINGEN | HOUTPARK | BE-MINE | 5 VOORWOORD De mijnsite van Beringen omvat 100.000 m² aan bestaand gebouwenpatrimonium. Daarmee is het de grootste industriële erfgoedsite in Vlaanderen en uniek in Europa. Van alle overige mijnsites in Limburg is het de enige site waar het industriële hart van de mijn werd bewaard. De mijnsite is gelegen in het kleinstedelijk gebied van de derde grootste stad van Limburg en aan de voet van twee terrils. Onder de noemer be-MINE wordt de site nu herbestemd als een toeristisch-recreatief project. Stedelijke functies als wonen, werken en winkelen worden daarbij evenwichtig met elkaar vervlochten. Met het masterplan voor de herbestemming van 32 hectare mijnterrein, krijgt de historische locatie een waardige, waardevolle en eigentijdse invulling. Het masterplan voorziet in een belangrijke wooncomponent, een nieuwe wijk met de naam ‘Houtpark’. Anderzijds voorziet het masterplan ook een belevingscomponent in en rond de beschermde gebouwen. Daar staan toerisme, cultuur, ontspanning en winkelplezier centraal. Het project be-MINE werd door de Vlaamse Regering als toeristisch hefboomproject voor de regio erkend en kan genieten van de steun van de provincie Limburg en de stad Beringen. Een aantal stedelijke functies zoals het nieuwe zwembad ‘Mijn zwemparadijs’ en het Toeristisch Onthaal Limburg vinden er onderdak.
    [Show full text]
  • Province of North-Brabant ELENA: Zero Emission Buses in the South of the Netherlands Introduction
    Province of North-Brabant ELENA: Zero Emission Buses in the South of the Netherlands Introduction 20-20-40 Initiative European Union aims at • Reducing greenhouse gas emissions by at least 20% • Increasing the share of renewables in energy consumption to at least 20% • Improving energy efficiency by at least 20%, all by 2020 Covenant of Mayors Initiative • Initiative launched by the European Commission on 29 January 2008, under which • Signatory cities formally committed themselves to going beyond the objectives of the "20-20-20" Initiative in terms of reducing their C02 emissions through energy demand and renewable energy actions Elena Facility • European Local Energy Assistance Facility, set up by the European Commission and the European Investment Bank (EIB) under the Sustainable Energy Financing Initiative The ELENA Contract Provinces of North-Brabant and Limburg both teamed up with the Foundation ZEB: action plan to introduce Zero Emission Bus Transport within the two regions. This Project ensures that future bus transport concessions are based on the utilisation of zero emission buses. – Signed by EIB and Zero Emission Bus Transport Foundation – Cofinanced by provinces of North-Brabant and Limburg (10%) – Endorsements by the provinces in case of termination of the contract (partial) repayment of the grant is determined by the EIB – Loans by the provinces to overcome liquidity issues at the end of the project due to payment scheme of EIB (last 30% after determination of the final contractual amount) The ELENA Contract Goals/objectives: – Bridge the gap for urgent funding to move from high level plans to actual implementation of the envisaged regional investments within new public transport concessions.
    [Show full text]