Procurement Plan Updated September 25, 2009

Public Disclosure Authorized Disclosure Authorized Public Public SECTION I – URBAN INFRASTRUCTURE AND SERVICE DELIVERY PROJECT IDA 3954BOS

I. General

1. Project information:

Country: Borrower: Government of Bosnia and Herzegovina, Ministry of Finance Project Name: Urban Infrastructure and Service Delivery Project Project Implementing Agency: Ministry of Foreign Trade and Economic Relations (MFTER) Project Closing date: Original: 15 December 2009 Revised: 15 December 2010

2. Bank’s approval Date of the procurement Plan: Original May 6, 2004.

Public Disclosure Authorized Disclosure Authorized Public Public 3. Date of General Procurement Notice: November 16, 2004. 4. Period covered by this procurement plan: 18 months.

II. Goods and Works and non-consulting services.

Contract Completed Contract Signed Procurement Ongoing 1 2 4 5 6 7 8 9 10 11 12 Procur Expected ement Review Bid Contract Ref. Metho by Bank BD Invitation Opening Contract Contract Contractor’ Complete No. Contract Description d Prior/Post Prepared to Bid Date Award amount s name d

Public Disclosure Authorized Disclosure Authorized Public Public 1. Civil Works

1 Public Disclosure Authorized Disclosure Authorized Public Public 1.1 Completion of Filter Plant construction. Construction of filter room, construction of pipeline for connection of new BAM Integral and old treatment plant – 1 st Oct. 2,886,459. Inzinjering 1.1 Construction Phase ICB Prior Aug 22,05 Aug 24,05 12,05 Feb 10, 06 53 Laktasi, BiH Nov, 06 EGW- inzinjering za gas I 1.3 Supply of materials, vodu, equipment and pipeline Dec February BAM , 1.3 construction (to Dolezaj WSR) NCB Prior Nov 11,05 Nov 14,05 16,05 27, 06 244,123.40 BiH July, 06 1.4 Replacement of pipelines 1.4 (water supply network) NCB Post March,08 April,08 June 08, June, 08 Nov,08 Jan,2010 Feb,2010 Mar,2010May,2010 Sep,2010 1.5 Rehabilitation, replacement and extension of Modrac and 1.5 Tabaci water supply network NCB Post March,08 March,08 April, 08 April,08 June, 08

Update s dates: Oct,09 Nov,09 Jan,2010 Mar,2010 May, 2010

1.6 Rehabilitation /extension of water treatment plant and well 1.6 system ICB Prior March,08 March, 08 May,08 July,08 July, 09

Update d dates: Jan,2010 Feb,,2010 Apr,2010 June,2010 Dec,2010 Posusje KTM- 1.7 Construction of Tribistovo – BAM BRINA Posusje Pipeline (600 mm dia), April 25, June 5, 1,394,307. d.o.o. and 1.7 5 km ICB Prior March, 06 06 06 Oct., 27,0678 MAC BiH Dec, 07

2 Putovi d.o.o. BAM and Hering 1.8 Construction of Water March27, 1,137,177. d.d. Siroki 1.8 storage reservoir (3000 cbm) ICB Prior June, 06 Sep16,06 Oct,30,0607 23 Brijeg, BiH Feb, 08 1.9 Construction of Water Treatment Plant - 100 l/s 1.9 capacity (Phase 1) ICB Prior Nov,08 April ,08 June,08 July,08 April, 09

Oct, 09 Nov,09 Jan,2010 Mar,2010 Nov,2010 BC- 1.10 Pipeline construction BAM GRADNJA 1.10works ICB Prior Feb,06 March,06 May 8,06 Aug 11,06 589,907.19 d.o.o May,08 Pale 1.11 Construction of Works for improvement of existing sewerage collector Jahorina- 2.April,0 BAM MAJNEX, 1.11Pale NCB Post Feb,08 29 Feb,08 8 7 May, 08 133,150.29 Pale 7 Nov, 08 1.12 Construction Works for Prior construction of new sewerage (Originall system Sator-Poljice y was MILJKOVI (Development of the existing planned 19 22.April, BAM d.o.o. 1.12Jahorina sewerage system NCB Post) March,08 March,08 08 15 July, 08 349.573,37 Banja Luka 15 Oct, 08 Total civil works 2. Goods Banja Luka

3 Lot 1 Lackeby Lot 1 WAter AB- Feb,2010 Purac Lot 1 Division, July 20, 09 Lund, Sweden 2.1.Raw Water Process and Lot 1 Lot 2 Monitoring Equipment for the 4,634,460. Lot2 Feb,2010 Novoselija 2 Water Treatment Lot 2 00 SEK Strabag AG Plant 24 July 09 Vienna, Lot 1 Water clarification Lot 2 Austria equipment 4 February 8 April 245,300.00 2.1 Lot 2 Preozonation equipment ICB Prior March,08 09 09 Euro 2.2. Water Treatment Plant Laboratory Equipment, Furniture-1 st Construction 2.2 Phase ICB Prior Jan,09 Jan, 09 March,09 May,09 Nov, 09 Lukavac 2.3 Supply of bulk water meters, valves, pressure reduction valves, and supply of 2.3 material for pipeline repair ICB Prior March,08 March,08 June,08 Aug,08 Jan,09 Update d dates: Oct,09 Jan,2010 Mar,2010May,2010 Sept,2010 Posusje 1. for Lot 1 Aqua 1.Euro Promet, 1.March 648,067.04 Zagreb, 27, 06 Croatia

2.4.Supply of Materials and 2. for Lot 2 Equipment for Pipeline & 2.Euro HTC, Water Storage Reservoir Sept 2. March 311,765.95 Sarajevo, 2.4 Assembling Works ICB Prior Aug 5,05 Aug 12,05 22,05 6,06 4 BiH Dec,06 Cazin 2.5 Supply of pipes, fittings, Sept 1.March 1.Euro 1.for Lot 1 2.5 materials and equipment for ICB Prior Aug 10,05 Aug 16,05 30,05 15, 2006 1,360,533. CMC Dec.06

4 pipeline construction 6 Slovenia 2. March 15, 2006 2.for Lot 2 2. BAM Bosnaplast, 34,457.65 Sarajevo

3. March 3 for Lot 3 15, 2006 CMC Slovenia 3. Euro 4.May 156,406.71 4. for Lot4 10,2006 Elin, Vienna

4. Euro 48,450 Pale 2.6 Procurement of necessary basic material for construction of new fecal sewerage Sator- Poljice /Development of the existing Jahorina sewerage system(pipes, connecting Zagozen fittings, prefabricated manholes, Euro Slovenia 2.6 manhole covers etc) ICB Prior May,07 May, 07 July, 07 3 Sept, 07 74,353.74 Nov, 07 Lot1: 2.7 Procurement of necessary BAM equipment for remote reading of 250,391 Lot1:Ecoinv water consumption (water Lot1: est, meters with remote accessories 8 Sep,09 Lot2: ,BiH and appropriate softwares for Euro56,509Lot2:sebaKT radio remote control) and Lot2: Baunach, procurement of necessary 15Sep,09 Lot3: Germany equipment for leakage detection Lot3: BAM Lo3: Gauss, 2.7 with appropriate softwares ICB Prior Feb,09 April, 09 May, 09 Sep,09 17,800 , BiH Dec,09 2.8 Supply of the basic materials (pipes, connecting material and manholes) for construction of the sewage connections to the new 2.8. constructed Fecal Sewerage Shopp. Post Feb, 09 May, 09 May, 09 June, 09 July, 09

5 System Sator-Poljiice (from item 3)

Dec,09 Jan.2010 Feb,2010 Marc,2010 May,2010 Total Goods

III. Selection of Consultants

Contract Completed Contract Signed Procurement Ongoing

1 2 4 5 6 7 8 9 10 11 12

Review by Proposal Contrac Contract Ref 3. Consultants’ Services and Selection Bank RFP Invitation submission Contract t Consultant’ completed No. Training Method Prior/Post Ready for EOI date Awarded amount s name Lukavac

3.1 Water Treatment Plant Conceptual Design and tender 3.1 Documents CQ Post March,08 March,08 April,08 April,08 Aug,08

6 Updated dates: Oct,2009 Nov,09 Dec,09 Jan,2010 Febr,2010

3.2 Construction Supervision for 3.2 Water Treatment Plant CQ Post March,08 March,08 May, 08 June, 08 July, 09

Updated dates: Sept,09 Oct,09 Nov,09 Nov,09 Dec,2010 EUR IMGD 26,050.0d.o.o. 21July.08 3.3 Hydraulic network analysis and 21. 0 Zagreb 3.3 zoning plan preparation CQ Post Dec,07 12.Dec,07 4.Jan, 08 May,08 Hrvatska

3.4 Construction supervision for 3.4 pipeline construction works CQ Post March,08 March,08 April,08 April,08 Aug,08

Oct,09 Nov,09 Dec,09 Dec,09 May,

7 2010

3.5 Construction supervision for 3.5 pipeline replacement works CQ Post March,08 March,08 April,08 April,08 Aug,08

Updated May, dates: Oct,09 Nov,09 Dec,09 Dec,09 2010 3.6 Construction Supervision for rehabilitation, replacement and extension of Modrac and Tabaci 3.6 water supply network CQ Post March,08 March,08 April,08 April,08 Aug,08

Updated May, dates: Oct,09 Nov,09 Nov,09 Dec,09 2010 Posusje BAM 3.7 Construction supervision for 36,100 Triel/Damir 3.7 Pipeline IC Post Aug, 06 Aug,06 Aug, 06 3 May,07 Loncar May,08

3.8 Vinko Geological-geo-technical BAM Bilopalovic Jan,08 3.8 supervision for Pipeline IC Post Aug, 06 Aug,06 Aug, 06 17 July, 075,375 Mostar

8 BAM Projektni June, 08 35.942,4zavod Hercegovina , 3.9 Construction supervision for Mostar, 3.9 Water Storage Reservoir IC Post April, 07 April 5, 07 12 Sept,07 25 Sept,07 BiH BAM Electron July, 08 3.10 Electric supervision for Water 24.March, 8,496.73d.o.o. 3.10 Storage Reservoir IC Post April, 07 April, 07 Oct, 07 08 Posušje

3.11 Construction supervision for March, 09 3.11 Water Treatment Plant IC Post March,08 April,08 May,08 July,08 Jan, 2010 Jan,2010 Febr,2010 Mar,2010 Nov,2010 Cazin

Best-soft 3.12 Supervision of Pipeline BAM d.o. Cazin, 3.12 construction works CQ Post July, 06 July 8, 06 July 24,06 1 Nov,06 24,300 BiH May,08 Pale 3.13 Preparation of cadastre (geodesic measuring and mapping of GIS) of the existing sewerage collector Jahorina-Pale, as swell as near existing installations, and preparation final design for improvement of collector

Preparation of cadastre (geodesic measuring and mapping of GIS) of June,08 the existing installations in the area Beoinzinjeri of Sator-Poljice and preparing final USD ng 2000, design of sewerage connection at the 75,605.7Belgrade, 3.13 area of Sator-Poljice CQ Post May, 07 June, 07 July, 07 30 Sep, 07 Serbia

9 3.14 Investigation of leakages on existing Water Supply System Jahorina (Leak Detection), and Beoinzinjeri preparation of final design for ng 2000, improvement of existing WSS June 5,09, June, USD Belgrade,Ser 3.14 Jahorina (Leak Reduction) CQ Post Feb, 09 March, 08 09 15,09 40,422.8bia Sept, 09 Total Consultants’ Services

6. Other Elements of the Project. Some to be defined and decided with subsequent revision of the Procurement Plan.

Activity Description 4. Operational Cost

4.1 Project implementation N/A Post N/A 4.2 Project Audits Lukavac

4.2.1 Audit of financial statements for - - Sept, Deloitte EURO Oct 2007 SSS Prior July, 08 26,08 Belgrade 14,000 31, 08 Posusje

4.2.2 Audit of financial statements for Deloitte EURO 2007 LCS Prior Sept, 08 Oct, 08 Nov,08 Nov,08 Belgrade 17,000 Dec,08 Other audits Total Operational Cost

5. Urban Management Development Plans and Investments 5.1 Works Tuzla Canton

10 5.1.1 Drinking Water Treatment Plant for Municipality ICB Prior Dec,08 April,09 Jun,09 July,08 Dec,09

Updated March, dates: May,09 June,09 Aug,09 Nov, 09 2010

5.1.2 Drinking Water Treatment Plant for Teocak Municipality. ICB Prior Dec,08 Febr,09 March,09 April 09 Aug,09

Febr, June, Sept,09 Oct,09 Dec,09 2010 2010

5.1.3 Drinking Water Treatment Plant- municipality ICB Prior Jan,09 May,09 July,09 Oct,08 Nov,09

Nov, Jan,2010 Jan, 2010 Mar, 2010 May, 2010 2010 Town Banjaluka

5.1.4 Modernization of the local road Mrkonjipu Kola-Kantari-Zelenci- L=1 km, Section BAM tevi,a.d. 15 July, Veselicko cemetery NCB Prior July,07 30.Nov,07 10.Jan,08 8.April,08 187,308.52 Mrkonjigr 08

11 ad

5.1.5 Modernization of the local road Kola-Kantari-Zelenci- L=2,4 km, Section from 4th to 6th km ICB Prior Oct,08 Nov,08 Jan,09 Feb, 09 May, 09

October, January May ,09 June, 09 Aug,12,09 2009 2010 Municipality

5.1.6 Reconstruction and additional Lot1 Polet building on residential objects for BAM Srebrenica common living in the city of Srebrenica 19 June,09 327,189.65 Ilijas Oct, 09 Lot 1 Building S8, Building S- 9 and Building S-10 Prior (first Lot2 Citadela Lot 2 Building S4/1-2 and S/42-2 NCB contract March,09 April,09 7 May, 09 19 June 123,389.68 Sarajevo NCB in RS) ,09 Municipality (Canton ) Lot 1: Lot 1: Lot 1: BAM KTM Brina 08.Janu 180,547.97 Posusje a09 5.1.7 Infrastructural works on industrial zone Vuciji brig Lot 1- Building of roads Lot 2: and Precipitation sewage system , Lot 2- BAM Lot 2 : Low voltage power grid and public 118,815.84 Vran-Dukic Lot 2 : lighting Tomislavgr 15.Janu Prior (Post ad a09 was originally NCB planned) March,08 19,May,08 20 June,08 8 Aug, 08

5.1.8 Paving with asphalt the roads in industrial zone Vuciji Brig July 7, 14 August Dec. NCB Post 2009 11 July 2009 2009 Sept,09 2009 Municipality Glamoc (Canton Livno) 5.1.8 Construction of pipeline Glamoc- NCB Prior (second

12 Novo Selo NCB contract in the Federation)

Dec,07 12.Dec, 07 16 Jan08 11.April,0 BAM AGI Sept,12, 8 284,423.59 08,

! Municipality Livno

5.1.9. Construction works on water supply system Livanjski horizont, section Bila-Srdjevici-Podhum in Livno 25. April, BAM Strabag, ICB Prior 08 30. April, 08 6 Aug, 08 5 Nov, 08 550,175.42 Austria May,09 Municipality 5.1.10. Infrastructure works in weekend settlement area ajuša 1” Water supply system construction Qdsr 15,4m3/h Prior (Post was originally NCB planned) April, 09 May, 09 15 June, 09 June,09 Sep, 09 Oct, 09 Jan, 2010 Total works 5.2 Goods Canton Sarajevo

13 1. for LOT1 Lot 1: Lot1: LogoSoft 1. Dec, 1. BAM d.o.o. 31,07 196.793,83 Sarajevo, 12 Sep, 07 (VAT BIH Feb,08 Lot 2: included) 2. Jan,15, Lot 2: 2. for LOT2 08 2. BAM Digital Nett 5.2.1 Procurement of the required 151.090,63 Computers software and procurement of the (VAT d.o.o. equipment required for realization of included) Sarajevo, projects ICB Prior 12 July,07 18 July,07 BiH Ministry for Spatial Planning, Civil Engineering and Ecology of RS Lot 1: Lot1: Lot 1: 19 May 16,317.87B Lanaco 09 AM Banaj Luka Lot 2: BiH 14 May 09 Lot 2: Lot 2: Nov,08 Nov, 08 Dec,08 18,261.36 INOVA 5.2.2 Procurement of the equipment for BAM Banja Luka, PIT Hardware and Software Shopping Prior BiH

5.2.3 Procurement of computer and telecommunication equipment for Project Information System implementation Hardware, Sofware, Program package for GIS ICB Prior Jan, 09 February, 09 March 09 May.09 June, 09

Updated dates: Oct, 2009 Oct,2009 Dec,2009 Feb,2010 May 09 5.2.4 Data base creating, tests of systems and education for users ICB Prior March, 09 March, 09 May 2009 Oct, 09

Updated August, dates: Nov, 2009 Nov,2009 Jan,2010 Mar,2010 2010

14 City of Mostar 5.2.5 Procurement of the equipment required for realization of project ICB Prior Feb, 09 Feb, 09 April, 09 May, 09 June, 09

Febr, Sept,09 Sept,09 Oct,09 Nov,09 2010 Total Goods 5.3 Consultants services Tuzla canton

5.3.1. The final part of the Predraft of the JP Zavod za Regional Plan of Tuzla Canton for the 10 June, 27 June, 05 05 July, 05 08 Aug, BAM urbanizam Dec,05 period 2005-2005 SSS Prior 05 05 290,000 Tuzla 5.3.2. Supervision for works on Kalesija Drinking Water Plant CQS Post Jan,09 Jan,09 Feb,09 March, 09 July,09 Oct,09 Oct,09 Oct,09 Nov,09 March, 2010 5.3.3. Supervision for works on Teocak Drinking Water Plant CQS Post Feb,09 Feb,09 March,09 April, 09 Aug,09

June, Dec,09 Dec,09 Jan,2010 Febr,2010 2010 5.3.4. Supervision for works on Kladanj Drinking Water Plant CQS Post May,09 May,09 May,09 July, 09 Nov,09

March, April, Nov, 2010 March,2010 2010 May,2010 2010 Total

5.3.5 Production of digital model of Geodetski canton Sarajevo terrain (DTM) BAM zavod 1 Sep, CQS Post Feb, 07 March,07 April, 07 1 June, 07 140,000 Sarajevo 07 5.3.6 Study Strategic Environment Assessment QCBS Prior

15 March,08 April,08 June, 08 July, 08 April, 09 5.3.7 Prospective of the communications Saobracaj i and connections development in Canton BAM komunikaci 6 Dec, Sarajevo SSS Post Jan, 07 Feb, 07 May, 07 6 Sep, 07 50,497.2 je Sarajevo 07

5.3.8 Stability of the terrain in Canton Sarajevo QCBS Prior March,08 April,08 June, 08 July, 08 Dec, 08 5.3.9 Achieving optimal energy supply in Canton Sarajevo QCBS Prior March,08 April,08 June, 08 July, 08 Jan,09 BAM ECO PLAN 5.3.10 Functions of the centrality of the Prior (Post Aug, 07 Nov,08 Nov, 08 Dec, 08 55,238.04 d.o.o. Capital City – Second phase was originally Mostar April, CQS planned) 09 27 May.09 27 Updates: Sep,09

5.3.11 Cultural-historical and natural BAM Urbing, April, heritage of Canton Sarajevo Prior (Post July,08 Julyt,08 August, 08 26 Mar,09 128,062.20 Sarajevo 09 was originally CQS planned) 26 Sept, 09 BAM Ekonomski 126.104,95 institut 5.3.12 Study of the economic activities – 16 Oct, 07 19 Oct, 07 7 Nov, 07 March,18, (VAT Sarajevo, 18.Sep, Second phase 08 included) Sarajevo, 08 CQS Post BiH 5.3.13 Study of the housing and housing construction in Canton Sarajevo – sociological study CQS Post March,08 March,08 April,08 May, 08 Sept, 08 Nov, 09 Nov,09 Dec,09 Jan,2010 May,

16 2010 Urbanistick i institut 5.3.14 Study of the space vulnerability Republike 29.Feb, May, 07 June, 07 25 July, 07 USD 93,000 Slovenie, 08 CQS Post April, 07 Ljubljana 5.3.15 Monitoring of the urban March,08 May, 08 June, 08 April,’1 development. QCBS Prior March,08 0 Nov, Nov, 09 Dec,09 Febr,.2010 Mar, 2010 2010 5.3.16 TBD Total

Municipality Kupres

5.3.17 Preparation of the main Jan, electrification design CQS Post Oct, 09 Oct, 09 Nov, 09 Nov, 09 2010 March, May, Jan,2010 Jan,2010 Febr,2010 2010 2010 ¸Municipaliy 5.3.18 Making of the design (project) documentation for electrification of local community Tiskovac (high voltage’low voltage CQS Post Sept,09 Sept, 09 Oct, 0 9 Oct, 09 Dec, 09 Updated Jan, dates: Oct,09 Oct,09 Nov,09 Nov,09 2010 Ministry for Spatial Planning, Civil Engineering and Ecology OF RS

INOVA Sept,09 5.3.19 Information System Project June July 9, 27,939.60 Banjaluka, Creating CQS Post Febr,09 Febr,09 26,2009 2009 KM BiH City of Mostar 5.3.20 Production of the digital model of Prior (first City of Mostar terrain (DTM) CQS CQ) Feb, 09 March, 09 March, 09 June, 09 Sept, 09 Updates: Sept,09 Oct,09 Oct,09 Nov,09 Febr

17 2010 Prior (first March, 09 April, 09 April, 09 May, 09 Aug., 5.3.21Study of demography CQS two CQ) 09 Oct,09 Nov,09 Nov,09 Dec,09 Febr, 2010 5.3.22 Study of renewal energy sources CQS Post March, 09 April, 09 April, 09 May, 09 July, 09 Oct,,09 Nov, 09 Nov,09 Dec, 09 Febr, 2010 5.3.23 Cultural-historical and natural heritage of City of Mostar CQS Post March, 09 April, 09 April, 09 May 09 July, 09 Oct,09 Nov,09 Dec,09 Decd,09 Febr, 2010 5.3.24 Study of economic development CQS Post April, 09 April, 09 May, 09 May 09 July, 09 Octob,09 Nov,09 Dec,09 Dec,09 Febr, Updates: 2010 5.3.25 Study of rural development CQS Post April, 09 May, 09 June 09 July , 09 Sept, 09 Oct,09 Nov,09 Dec,09 Dec,09 Febr, 2010 April, 09 May, 09 June 09 July , 09 Sept, 5.3.26 Study of mineral deposits CQS Post 09 Oct,089 Nov,09 Dec,09 Dec,09 Febr, 2010 5.3.27 Study of the space vulnerability CQS Post May, 09 May, 09 May, 09 June, 09 Aug, 09 Dec, 09 Dec,09 Jan,2010 Jan, March, Updates: 2010 2010 5.3.28 Study of utilizability of land CQS Post June, 09 July, 09 July., 09 July, 09 Sept, 09 Dec,09 Dec,09 Jan,2010 Jan,2010 April,20 Updates: 10

5.3.29 Study of environment protection CQS Post June, 09 June, 09 July, 09 July, 09 Oct, 09 Dec,09 Dec,09 Jan,2010 Jan, March,2 2010 010 5.3.30 Study of tourist potentials of City May, 09 May, 09 June, 09 June, 09 Aug, 09 of Mostar CQS Post Oct,09 Nov,09 Dec,09 Dec,09 Febr, Updates: 2010

18 5.3.31 Study of traffic in Mostar City CQS Post June, 09 Sept, 09 Sept, 09 Oct, 09 Dec, 09 Nov,09 Dec,09 Dec,09 Jan,2010 March, 2010 5.3.32 Study of water resources management capacities CQS Post June, 09 Sept, 09 Oct, 09 Oct, 09 Dec, 09

Updates: Febr, April, CQS Post Nov,09 Dec,09 Jan,2010 2010 2010 5.3.33 Study – System of housing development CQS Post June, 09 Sept, 09 Oct, 09 Oct, 09 Dec, 09

Febr, April, Updates: Nov,09 Dec,09 Jan,2010 2010 2010 5.3.34 TBD Total Municipality TBD Total Consultants services

1.2 Rehabilitation of water intake Zeleni Jadar Works for rehabilitation of water intake facility:

-Works on reservoir, settling tank and canals

-Hydro meteorological part works on water supply network and automatic station 1.2 NCB No No Post July,09 Aug,09 Sep,09 Sep,09 Dec,09 Updated Jan, dates: Oct,09 Nov,0*9 Dec,09 2010 April,2010 Total civil works 2. Goods

19 Component 2. Urban Management Development Plans and Investments City of Mostar 2.1 Procurement Items to be iidentified as priority investments in the UMDP for 2.1 Mostar TBD No No TBD TBD TBD TBD TBD TBD Component 3. Investments for Improved Efficiency Utility Srebrenica 2.2 Rehabilitation of water intake Zeleni Jadar: Supply and installation of electric power transformer STSB 10/0,4 kV do 250(30)kVA 10bkV:

-Electric power installations and control system

-Supply and installation of video monitoring system for water intake .2.2 Shopping No No No July,09 Aug,09 Sep,09 Sep,09 Dec,09 Updated Jan, March, dates: Nov,09 Dec,09 2010 2010 June 2010 Utility 2.3. Combined vehicle vacuum tank car vehicles for sewers Jan, 2.3 cleaning septic hole ICB No No No Sept,09 Oct,09 Dec,09 2010 April,2010 2.4 Tools for repairing sewers Jan, 2.4 and water - Shopping No No No Sept,09 Oct,09 Oct,09 Oct,09 2010 Utility Vares

20 2.5 LOT 1: Procurement of backhoe loader LOT 2: Procurement of electricity aggregate, compressor, cutter for asphalt and concrete, vibratory roller Feb, ICB 2.5 and vibratory rammer No No Prior Oct,09 Oct,09 Dec,09 Dec,09 2010 2.6 LOT 1: Procurement of pipes and fittings LOT 2: Procurement of water Feb, ICB 2.6 mete No No Prior Oct,09 Oct,09 Dec,09 Dec,09 2010 2.7Procurement of horizontal Jan. 2.7 pump of high pressure DC Prior Nov,09 2010 Component 1Institutional strengthening Utility Stolac 2.8 2.8 PC equipment Shopping No No No Jan 08 Jan 08 March 08 April 08 May 08 Total Goods

21

22