PROCEEDINGS OF THE DISTRICT COLLECTOR, RAJANNA

Present: D.Krishna Bhaskar, I.A.S.,

Proc. No. G2/36412020 Dt: 30.09.2020 Sub:-Land Acquisition - Rajanna Sircilla District - Acquisition of lands for construction of New B.G Railway Line from Manoharabad to Kothapalli Project in the limits of Nampelli and Vemulawada villages of ' Vemulawbda Urban Mandal and Anupuram village of Vemulawada Rural Mandal - Villagers made objection for conduct of Survey - Notiflcation U/s 11 of the L.A Act 30/2013 Amended act 2U2OL7 issued - Withdrawal of Notification - Orders - Issued.

Read : - 1 ) Th is Office Proc. No. G2l36 4 / 2O2O, Dt.29.O2.2O2O. ( Form-C Notification). 2) LAO & RDO, Sircilla Lr.No.Atl727/2020, Dt.11.09.2020.

*Jr*

ORDERS:

The Deputy Chief Engineer, Const:'uction SC Railway, Nizamabad has filed requisition for acquisition of Ac. 237.08 3/+ gts of land within the limits of Nampalli and Vemulawada Villages of Vemulawada Urban Mandal and Anupuram village of Vemulawada Rural Mandal for construction of New B.G Railway Line from Manoharabad to Kothapalli Project.

Accordingly, the Revenue Divisional OFficer, Sircilia has been appointed as Land Acquisition Officer, and directed to initiate the Land Acquisition Process.

The Land Acquisition Offlcer and Revenue Divisional Officer Sircilla has submitted that, the Asst. Director of Survey & Land Records, Rajanna Sircilla has reported that, the Land owners and enjoyers of Viilages are not cooperating and obstructing the Survey work. Due to non cooperation of Land owners / enjoyers for conduct of Survey in Vemulawada, Nampalli and Anupuram Villages, to avoid delay in acquisition, .as per the requisition furnished by the Deputy Chief Englneer, Construction Sc Railway Nizambad, Chainage Point from 109+000 to 125.000, and as per the entries in Revenue Records, the Preliminary Notification in Form-C U/s 11 (1) of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and read wlth Amendment Act, 2016 (Act. No. 2U2O17) for Acquisition of land to an extent of Ac 237.08 3/q Gts In the limits of Anupuram, Nampalli and Vemulawada Villages of Vemulawada Mandals was submitted by the LAO and RDO Sircilla, the same was approved vide Gazette No. 08 dt:29-02-2020 and Published in Two News papers. The New Indian Express English News Paper on 03-03-2020 and Vaarta Telugu Daily News Paper on 04-03-2020.

The Land Acquisition ffiicer and Revenue Divisional Officer Sircilla has reported that, aggrieved with the above Preliminary Notification, Sri, Kuragayala Thirupathi S/o. K. Rajalingam and 45 others all are R/o. Vemulawada Town have filed Writ Petition No. 9652 of 2O2O before this Hon'ble High Court for the State of Telangana at Hyderabad, alleging that, the proposed alignment of railway line between Sircilla and Vemulawada town Chainage Point from 109+000 to 125+000 as not backed by any techno-feasibility survey or any survey reflects the present urbanization trends and contrary to the mandatory instructions dated:- 17- 12-2009 issued by the Railway Board, Ministry of Railway and as such declare said proposed alignment of railway Iine between Sircilla and Vemulawada towns.

The Land Acquisition Officer and Revenue Divisional Offlcer Sircilla has reported that, after issue of draft notification, the Asst. Director, (S&LR) Rajanna Sircilla has lnitiated the Survey work U/s 12 of RFCTLARR Act 2013 (Act 3Ol2013) conducted Survey and furnished the Sub-Division Record, on veriflcation of Sub-division record furnished by the Asst. Director, (S&LR) Rajanna Sircilla, it is noticed that most of the survey numbers which are coming under the alignment as per Assistant Director (S&LR) report are not matched with the survey numbers notified U/s.11 (1) of the Act, 30 of 2013, for issue of fresh notification requested to withdraw the notification issued earlier d[ 29.O2.2O2O.

In view of the above as reported b/ the Land Acquisition Officer and Revenue Divisional Officer, Sircilla, and as per the powe.s laid down in RFCTLARR Act, 2016 (Act No.21l2017) U/s 93(I) the Notification issued U/s 11 (1) of Act 30/2013 in Form-C , vide Gazette No 08, Dt.29.02.2020 (c2/36412O2O) is hereby withdrawn subject to the outcome of the Orders of the Hon'ble High Court io the instant Writ Petition. Ic".^r Districtf.r-r- Collector Rajanna Sircilla

Copy to the Land Acquisition Offlcer & Revenue Divisional Officer, Sircilla. lopy to the Deputy Chief Engineer, Consiruction SC Railway, Nizamabad for // inf otmation.