Northstowe Phase 2 Design Code October 2017 Key Plan DD CC 9.3

Total Page:16

File Type:pdf, Size:1020Kb

Northstowe Phase 2 Design Code October 2017 Key Plan DD CC 9.3 Northstowe Phase 2 Rampton drift western edge Proposed native tree Existing property Plot boundary Plot boundary Shared Private Boundary Ornamental footpath/ Existing backgarden fence planting cycleway footpath Planted swale C C’ 1.5m min. 3m 2m 5m 1.1m 1.1m 9.3m 24m 0 1m 3m 5m 1:200@A4 Figure 4.36: Rampton Drift Landscaped Edges Sketch View Figure 4.37: Rampton Drift Landscaped Edges Section C-C’ Northstowe phase 2 Proposed Rampton Drift Northern Edge Key Plan native tree Access to D-D Rampton Drift only Plot boundary Carriageway Bridleway Plot boundary Footpath incorporating Footpath Front C-C cycling garden Existing Planted hedgerow swale D D’ 2m 1.5m 5m 2.5m Approx 5.2m 4.8m -5m 2m 23m 0 1m 3m 5m 1:200@A4 Figure 4.38: Rampton Drift Landscaped Edges Section D-D’ October 2017 Northstowe Phase 2 Design Code 83 Key plan Water Park Northstowe Water Park is an expansive open parkland along the eastern site boundary providing a valuable green infrastructure corridor Phase 1 and landscaped transition between the new town and the surrounding lowland farmland. The Water Park is required to provide essential water attenuation and flood alleviation as well as providing ecological, recreation, amenity and circulation functions. Three large attenuation ponds dominate the park with fluctuating water tables and permanent water expected to be present throughout the year. Graded pond edges are shaped to create opportunities for access and recreation as well as providing a rich ecological environment of wetland, riparian and aquatic vegetation. Phase 2 Figure 4.39: Timber walkways through wetland areas and shared Key pedestrian/ cycle routes Phase 2 Application Boundary Crossing Existing trees Footpath/ cycleway Proposed trees Footpath Wetland and aquatic vegetation Wide-ranging view Grassland Secondary play areas (LAP) Native shrubs (indicative location) Listed Pillbox Area of ecological enhancement Observation area Swale Phase 3 Seating Orchard N Figure 4.40: Landscaped water attenuation ponds 0 100m 200m Figure 4.41: Water Park 1:7500@A4 84 Northstowe Phase 2 Design Code October 2017 4.3 Sustainable Design Principles 4.3.1 Energy 4.3.2 Water All proposals should maximise opportunities to enable residents of All homes for Northstowe Phase 2 must: All homes for Northstowe Phase 2 must achieve water efficiency Northstowe to live a healthy lifestyles and minimise their environmental • adopt a fabric first approach and achieve Fabric Energy Efficiency standards at 105 litres per person per day or less, by: and carbon footprint. Standards (FEES) through good insulation and construction in order • incorporating low flow and flush fixtures and fittings; A site wide Energy Strategy has been developed to inform the outline to reduced space heating requirements and ensure that they do not • using low water appliances; require comfort cooling or excessive ventilation; planning application. This is expected to be updated and any proposal • consider rainwater harvesting and explore grey-water recycling in must comply with the current Energy Strategy or any subsequent • ensure high levels of energy efficiency through adoption of higher density areas; and revision. appropriate building management systems and low energy appliances • utilise green-roofs on some residential, community and commercial and lighting; The following sustainable targets must be met: buildings as well as schools. • be future proofed so that they can be connected to site wide CHP Sustainable buildings & neighbourhoods Non-domestic buildings will achieve a reduction in potable water network in the future; • Building for Life 12 (80% green lights; zero red lights); and use by up to 50% over typical industry baseline figures through the • be installed with a simple and easy to use display energy monitor; • Adopt Secure by Design standards. implementation of demand reduction measures such as low flow taps, • be capable of the installation of Solar PV on roofs; and low flush toilets and low flush / water free urinals as well as rainwater Adaptable buildings & spaces • deliver at least 10% of predicted energy demand through on-site harvesting. • Ensure buildings that meet 2030 UKCIP weather overheating analysis; renewable or low carbon energy generation. Runoff from parking areas and roads will require some form of • Integration of landscape places, including trees and water; pollutant removal due to the presence of to remove hydrocarbons and • Ensure all building enable access for all (i.e. meet DDA requirements); other similar pollutants associated with motor vehicles. The following and treatments may be used: • Achieve Lifetime Homes for all affordable rented units and 15% of all • filtration within SUDS features as it runs through vegetation and other homes. percolates through the surface stratum; Low Carbon Community • percolation through layers of filtration material such as sand within permeable paving; • Non-residential buildings to achieve BREEAM Excellent; • bypass separators (petrol interceptors) or vortex separators could • Reduce carbon emissions by at least 10% compared to minimum be used in high risk areas for discharges where space is insufficient Building Regulation requirements; for a suitable SUDS feature; and • Integrated walking and cycling; • catch-pits will be used within any piped networks to capture • Integrated public transport network; sediments. • Enable electric vehicle charging; and • Utilise Green Build specifications. October 2017 Northstowe Phase 2 Design Code 85 Mews Streets Clearly articulated 4.4 Designing Positive Edges / Frontages entrance to residential Design requirements: Streets and spaces must be overlooked by attractive frontages. The • must have integral garages and entrances at groundfloor - access to degree of ‘activity’ may vary depending on their location and character. parking areas may be screened with garage doors or gates, but must All frontages: not be left open. • must have entrances onto the street; • must have large windows on upper floors to ensure overlooking of commercial commercial commercial • must have windows to primary living areas (kitchen and living the street - this could be bay windows, large windows or balconies; rooms) either on first or groundfloor - where there is no primary • groundfloor entrancesshould have a narrow window adjacent to Active frontage (mixed-use block): living area on the groundfloor first floor windows must be large the front door. Figure 4.42: commercial and (guidance: floor to ceiling height or of equivalent prominence) and entrance lobbies to residential on the ground floor - required either ensure a good degree of passive surveillance; side of the busway within the town centre boundary Gables and side elevations • must avoid bedroom windows on groundfloor facing streets; • must not have continuous, uninterrupted blank garden walls of Where fully active of positive frontage cannot be achieved due to more than approximately 20m. site constraints, gables and walls must be carefully designed. Design Requirements: Active frontages • gable ends and boundary walls must be set at a consistent building Active frontages, generally, have non-residential uses on the groundfloor line and made of the same material. Walls must be brick. and are located within the town centre. • gable ends must have meaningful windows to living areas on the garage doors garage doors entrance entrance Commercial units must be interspersed with entrances to residential first or ground floor in order to ensure overlooking. Figure 4.43: Mews street: must have large on upper floors. Entrances to residential must be clearly identifiable and • edges with no front door and longer than approximately 30m windows or balconies on upper windows to prominent. should be broken up by entrances to vehicle or cycle parking. provide a good degree of overlooking Shop windows must not become blank, blacked out or blocked by full • edges must not have more than approximately 20m with no signage. They must have a strong sense of transparency and present animation at ground or first floor. active edges to the High Street and the Town Park. clearly articulated entrance to residential Positive frontages Undercroft parking windows on first floor must be larger and Positive frontage are generally residential. The type of frontage will Figure 4.44 illustrates various ways to deal positively with undercroft ensure a good degree depend on the character of the area, the location, e.g. on Primary Street parking. Design requirements: of overlooking or quiet tertiary street or overlooking a Greenway and the housing type. • entrances to residential units on upper floorsmust be designed The adjacent diagrammatic elevations illustrate design requirements for to be prominent and stand out within the frontage. They must be a variety of frontages. A number of variations are possible and these will designed to be double height and fully glazed. visible cycle parking entrance to undercroft parking be defined through the detailed design process. • first floor windows and balconiesmust provide surveillance and a area sense of overlooking, either through large windows, bay windows or Residential Street balconies. • cycle parking areas should be articulated and designed to be Design requirements: visible, e.g glazed screen in order to create additional animation at • must have frequent entrance doors - the primary entrance for each groundfloor level. house faces the street. • must have windows to habitable rooms on ground and upper floors. Figure 4.44: Undercroft
Recommended publications
  • The Energy Challenge Energy Review Report 2006 Department of Trade and Industry
    The Energy Challenge ENERGY REVIEW A Report JULY 2006 The Energy Challenge Energy Review Report 2006 Department of Trade and Industry Presented to Parliament by the Secretary of State for Trade and Industry By Command of Her Majesty July 2006 Cm 6887 £22.00 © Crown copyright 2006 The text in this document (excluding the Royal Arms and departmental logos) may be reproduced free of charge in any format or medium providing that it is reproduced accurately and not used in a misleading context. The material must be acknowledged as Crown copyright and the title of the document specified. Any enquiries relating to the copyright in this document should be addressed to The Licensing Division, HMSO, St Clements House, 2-16 Colegate, Norwich, NR3 1BQ. Fax: 01603 723000 or e-mail: [email protected] Contents Foreword by the Rt Hon. Tony Blair MP 4 Preface by the Rt Hon. Alistair Darling MP 8 Introduction 10 Executive Summary 12 Chapter 1: Valuing Carbon 27 Chapter 2: Saving Energy 36 Chapter 3: Distributed Energy 61 Chapter 4: Oil, Gas and Coal 77 • International Energy Security 78 • Oil and Gas 83 • Coal 84 • Energy Imports 86 Chapter 5: Electricity Generation 92 • Renewables 98 • Cleaner Coal and Carbon Capture and Storage 107 • Nuclear 113 Chapter 6: Transport 126 Chapter 7: Planning for Large-scale Energy Infrastructure 134 Chapter 8: Meeting Our Goals 149 Chapter 9: Implementation 156 Annexes 161 3 Foreword by the Rt Hon. Tony Blair MP A clean, secure and sufficient supply of energy is simply essential for the future of our country.
    [Show full text]
  • Going for Gold – the South Cambridgeshire Story
    Going for gold The South Cambridgeshire story Written by Kevin Wilkins March 2019 Going for gold Foreword Local government is the backbone of our party, and from Cornwall to Eastleigh, Eastbourne to South Lakeland, with directly elected Mayors in Bedford and Watford, Liberal Democrats are making a real difference in councils across the country. So I was delighted to be asked to write this foreword for one of the latest to join that group of Liberal Democrat Jo Swinson MP CBE councils, South Cambridgeshire. Deputy Leader Liberal Democrats Every council is different, and their story is individual to them. It’s important that we learn what works and what doesn’t, and always be willing to tell our story so others can learn. Good practice booklets like this one produced by South Cambridgeshire Liberal Democrats and the Liberal Democrat Group at the Local Government Association are tremendously useful. 2 This guide joins a long list of publications that they have produced promoting the successes of our local government base in places as varied as Liverpool, Watford and, more recently, Bedford. Encouraging more women to stand for public office is a campaign I hold close to my heart. It is wonderful to see a group of 30 Liberal Democrat councillors led by Councillor Bridget Smith, a worthy addition to a growing number of Liberal Democrat women group and council leaders such as Councillor Liz Green (Kingston Upon Thames), Councillor Sara Bedford (Three Rivers) Councillor Val Keitch (South Somerset), Councillor Ruth Dombey (Sutton), and Councillor Aileen Morton (Argyll and Bute) South Cambridgeshire Liberal Democrats are leading the way in embedding nature capital into all of their operations, policies and partnerships, focusing on meeting the housing needs of all their residents, and in dramatically raising the bar for local government involvement in regional economic development.
    [Show full text]
  • THE PLACE of SOCIAL HOUSING in INTEGRATED URBAN POLICIES Current Perspectives Edited by Darinka Czischke
    URBAN REGENERATION IN EUROPE: THE PLACE OF SOCIAL HOUSING IN INTEGRATED URBAN POLICIES Current perspectives Edited by Darinka Czischke 1 Urban regeneration in Europe: The place of social housing in integrated urban policies Current perspectives Edited by Darinka Czischke May 2009 Published by the CECODHAS European Social Housing Observatory Sponsored by BSHF (Building and Social Housing Foundation) 3 This publication was produced by the CECODHAS European Social Housing Observatory, Brussels (Belgium). It was sponsored by the Building and Social Housing Foundation (BSHF) (United Kingdom). ISBN 978–92–95063–08–2 Edited by Darinka Czischke Design by Maciej Szkopanski, [email protected] Printed by Production Sud, Brussels Photographs by Darinka Czischke. Brussels, May 2009. TABLE OF CONTENTS Page Foreword David Orr 07 Introduction Darinka Czischke 09 Perspectives Achieving Balanced Communities: Challenges and Responses Nicholas Falk 12 Policy measures to tackle urban regeneration in early post–war neighbourhoods: A refl ection from the Netherlands Karien Dekker 25 On the Governance of Social Housing John Flint 35 From “bricks-and-mortar” investors to community anchors: Social housing governance and the role of Dutch housing associations in urban regeneration Gerard van Bortel 45 Conclusions Sustainable urban regeneration in Europe: Rethinking the place of social housing in integrated policies Darinka Czischke 59 About the authors 71 5 PUBLISHER CECODHAS European Social Housing Observatory www.cecodhas.org/observatory The Observatory is the research branch of CECODHAS. Its main aim is to identify and analyse key trends and research needs in the fi eld of housing and social housing at European level. Its role is to support policy work for the delivery of social housing by providing strategic and evidence-based analysis in the fi eld.
    [Show full text]
  • Northstowe New Town, Cambridgeshire
    Landscape Masterplanning and Design | Public Realm Location UK Northstowe New Town, Cambridgeshire Client Landscape Strategy and Design Codes Homes England Northstowe is designed as a 21st century town in Cambridgeshire with up to Budget 10,000 residential homes that will take shape over a period of 15-20 years. It Confidential aims to achieve the highest quality of community living, conserving precious Period resources and contributing to the local identity of the area and supporting a 2015 - 2016 vibrant community. Founded on contemporary place-making principles, it will reference the spatial character of fen-edge market towns, making provision for Services more sustainable patterns of living. As part of a multi-discliplinary team and Masterplanning Landscape and Public Realm Design within the context of the development principles of the Northstowe Action Plan, Consultation CBA prepared the landscape and public realm strategy and design codes for the Northstowe Phase 2 Development. The Codes evolved from a collaborative Website process involving South Cambridgeshire District Council, Cambridge County www.cbastudios.com Council and the local community. The landscape and open space strategy for Northstowe Phase 2 is the provision of a robust landscape framework that contributes a rich variety of landscapes, open spaces and green routes proposed to meet the needs of the new and existing local communities. The landscape strategy seeks to create multi-functional high quality landscape and open spaces that deliver on the aspiration for Northstowe to become a ‘Healthy Town’ under the NHS England Healthy Town initiative. ARUP © 0286.
    [Show full text]
  • Northstowe Phase 2 Planning Application
    NORTHSTOWE PHASE 2 PLANNING APPLICATION Stakeholder and Community Engagement Report August 2014 Homes & Communities Agency Northstowe Phase 2 Stakeholder and Community Engagement Report Contents Page 1 Introduction 1 2 Pre-Application Consultation 2 3 Methods of Pre-application Consultation 3 3.1 Council and Technical Consultee Engagement 3 3.2 Member Engagement 6 3.3 Rampton Drift Consultation 12 3.4 Public Consultation 14 4 How the comments received have been taken into account 28 4.1 Scope of applications 28 4.2 Layout and design 28 5 Conclusion 31 Appendices Appendix A Consultation Strategy A1 Consultation Strategy Appendix B Quality Panel Reponse B1 Letter Received from Cambridgeshire Quality Panel Appendix C Rampton Drift Consultation C1 Letters C2 Workshop Material 8 February 2014 C3 Workshop Materials 8 April 2014 C4 Analysis of Response Appendic D Public Consultation D1 Staffed Public Exhibition Boards D2 Unstaffed Public Exhibition Boards D3 Consultation Material D3.1 Information Leaflet and Comment Form D4 Publicity D4.1 Leaflet D4.2 Website D4.3 Press Release D4.4 Social Media D4.5 Poster D5 Analysis of Response Page 1 | Issue | August 2014 Homes & Communities Agency Northstowe Phase 2 Stakeholder and Community Engagement Report Page 2 | Issue | August 2014 Homes & Communities Agency Northstowe Phase 2 Stakeholder and Community Engagement Report 1 Introduction This Stakeholder and Community Engagement Report has been prepared by Arup on behalf of the Homes and Communities Agency, “the applicant”, in support of a planning application for development of Phase 2 of Northstowe. Further information about the proposals is provided in the Planning Statement, submitted in support of the applications.
    [Show full text]
  • Northstowe Town Centre Strategy COMPLETE 200304
    NORTHSTOWE TOWN CENTRE STRATEGY 1 CONTENTS INTRODUCTION 3 ‐ The Opportunity 3 ‐ Purpose of the Strategy 4 ‐ What does the Strategy include? 6 1. TOWN CENTRE VISION 8 A place for everyone 8 2. WHY THIS APPROACH? 12 2a: Dynamic strategic context 12 2b: The Evidence 14 2c: An opportunity for local disncveness 18 2d: A different mix of residents 21 2e: Limited ‘core’ retail need but can capture ‘footloose’ spend 23 3. The Core Components 28 3a: Spaces with purpose 28 3b: A focused centre 44 3c: Indicave spaal plan 47 3d: Movement and parking 54 4. MAKING IT HAPPEN 56 4a: Placemaking & pioneer uses 60 4b: A sequenced approach 66 4c: Acve management and curaon 84 APPENDIX A1: Baseline Report A2: Evolving the Strategy for Northstowe A3: Northstowe Delivery Concept Tesng Note A4: Place‐led Approach to Delivery Note A5: Summary of Consultaon Feedback A6: Strategic Trends & Influences 2 INTRODUCTION The Opportunity Northstowe will be a new kind of new town. One with The Northstowe Town Centre Strategy provides a a keen eye on the future, whilst being grounded in its framework for the town centre. It will guide its make‐ context and what has gone before. up and layout, the nature of the development that comes forward, the delivery models used and its long The town will be well connected physically and term stewardship. economically within its Cambridgeshire context. Providing 10,000 new homes, and with the first phase This strategy is both evidence and research based. It already under construcon, Northstowe will play a vital learns from past mistakes in new town centre planning role in addressing the growing gaps in housing and and is informed by future trends to ensure the town business space in the Cambridge sub‐region.
    [Show full text]
  • Residential Framework Travel Plan Northstowe - Phase 1 Development Gallagher / HCA 14 February 2012
    Residential Framework Travel Plan Northstowe - Phase 1 Development Gallagher / HCA 14 February 2012 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks For Application Date 14 February 2012 Prepared by N Poulton Signature Checked by N Findlay Signature Authorised by N Findlay Signature Project number 11012988 File reference N:\Northstowe, Phase 1, planning application\TEXT\ REPORTS\Trans port Reports\Travel Plans\120214 RFTP.docx WSP UK Ltd | Registered Address WSP House, 70 Chancery Lane, London, WC2A 1AF, UK | Reg No. 02136404 England | WSP Group plc | Offices worldwide Contents 1 Introduction 1 2 Background to Travel Plans 5 3 Policy Background 7 4 Travel Plan Aims & Objectives 15 5 Site Conditions and Travel Opportunities 16 6 Travel Plan Targets 25 7 Travel Plan Measures 27 8 Travel Plan Management, Implementation & Funding 37 9 Travel Plan Monitoring 41 FIGURES Figure 1 Site Location Figure 2 Existing Public Rights of Way Figure 3 Existing Cycle Routes Figure 4 Existing Public Transport Figure 5 Local Facilities Figure 6 Proposed Bus Route APPENDICES Appendix A - Example Travel Plan Events Calendar Appendix B - Example Residential Survey 1 Introduction 1.1 PREAMBLE 1.1.1 WSP has been commissioned by Gallagher and the Homes and Communities Agency (HCA) to provide travel planning advice to support their promotion of the new town of Northstowe in Cambridgeshire. This Residential Framework Travel Plan (RFTP) supports the application by Gallagher for a Phase 1 development at Northstowe comprising; up to 1,500 dwellings, a primary school, a mixed-use local centre (including a community building and provision for non-residential institutions, financial and professional services, shops, cafes and restaurants, drinking establishments and hot food takeaways), leisure, community, residential institutions, cultural, health and employment provision (business, general industry and storage & distribution) including a household recycling centre, formal and informal recreational space and landscaped areas.
    [Show full text]
  • No. 150 October/November 2014
    Celebrating 25 Years … … and 150th Issue No. 150 October/November 2014 EDITORIAL MERIDIAN COMMITTEE Editor: April Martin Tel: 01954 200533 This year seems to be the year of anniversaries! The 100th anniversary of the outbreak of WWI has been remembered nationwide but have you seen the exhibition in St Andrews Treasurer: David Gedny Tel: 01954 231305 Church put together by John Shepperson? If not try to go and see it -it will be there until Production: Alan Morris Tel: 01954 202664 Armistice day. Advertising: Rob Wills Tel: 01954 232947 We have also marked this with the supplement you have received with this issue, if you know someone who maybe had a connection to Swavesey but has left perhaps you could Distribution Selwyn Richardson Tel 01954 202974 pass it on to them if you do not want to keep it yourself. Did you know that the Memorial Subscriptions Jan Waller Tel: 01954 230795 Hall, which is used by many village groups, was built in memory of those who died in Complaints Maureen Hadfield Tel: 01954 230414 WW1? A local reporter was involved with the fund raising- you can find out more by visiting the exhibition. Proofreading Alison Lucas Tel: 01954 232984 A happier anniversary is our own 150th issue and also our “silver” 25 years anniversary General Assistant Simon Ansell Tel: 01954 231137 since your Meridians first issue. Website: Alan Morris Tel: 01954 202664 To mark the occasion The Meridian is donating a bench for the village to be placed at Swan Pond so you can admire the pond, and also to provide a place to stop on the way to and back Website: www.swavesey.org.uk from the guided bus.
    [Show full text]
  • Cambridge North West Transport Study Final Report
    Cambridge North West Transport Study Final Report JOB NUMBER: 5043251.002 DOCUMENT REF: Final Report E.doc E Final Report (Final Revision) RC CPG AR CPG July 2007 D Final Report (2nd Revision) RC CPG AR CPG June 2007 C Final Report (Revised) RC CPC SH CPG Feb 2007 B Final Report RC CPG SH CPG Dec 2006 A Draft Report for Comment RJ CPG SH CPG Sept 2006 O Draft Report Rev O RJ CPG SH CPG Aug 2006 Originated Checked Reviewed Authorised Date Revision Purpose Description CAMBRIDGE NORTH WEST Transport Study Contents Section Page 1. Introduction 1-1 Introduction 1-1 Background 1-1 Proposed Development 1-2 Aims and Objectives of this Study 1-4 Structure of this Report 1-5 2. Setting the Scene 2-1 Regional Planning Policy 2-1 Local Planning Policy 2-1 Supplementary Planning Guidance 2-3 Other Relevant Studies 2-3 Summary 2-5 3. North West Cambridge Today 3-1 Accessibility 3-1 Transport Networks 3-2 Existing Travel Patterns 3-10 Key Issues and Opportunities 3-11 4. Methodology 4-1 Philosophy 4-1 Process 4-1 Traffic Modelling 4-2 5. Strategic Options 5-1 Promoting Sustainable Travel 5-1 Strategic Highway Options 5-5 6. Highway Option Testing 6-1 Strategic Traffic Modelling Assessment 6-1 Local Junction Capacity Assessments 6-7 Summary 6-12 5043251.002 i Final Report E.doc CAMBRIDGE NORTH WEST Transport Study 7. The Preferred Transport Option 7-1 The Preferred Transport Option 7-1 Cost of Delivery of the Preferred Transport Option 7-5 Phasing of the Transport Preferred Transport Option 7-9 Summary 7-10 8.
    [Show full text]
  • 2030 Vision Papers and Report. 2009
    Chatteris Ely Alconbury E.Z St Ives Huntingdon Northstowe Waterbeach Newmarket St Neots CAMBRIDGE Haverhill Royston Saffron Walden Cambridge sub-region showing the city, the market towns, the proposed new settlements at Northstowe and Waterbeach and (in green) the green belt. FOREWORD Cambridge and the surrounding area has always been base of views, individuals from across the city – with varying a great place to live. But what will it be like in twenty experiences and expertise – were invited to attend. More than 600 people stepped forward to take part including businessmen years time? The city is facing a period of huge change. and women, academics, councillors, representatives from local The local population is growing and getting older. residents associations, key workers and sixth form students. There is an urgent need for more housing. Resources are under pressure. And transport networks are The conclusions that emerged from the ten topics are becoming more congested. documented here. The results represent diverse, sometimes contradictory and even controversial views. Findings do not Finding solutions to the challenges posed by the continuing reflect official local data (e.g. from the 2011 census) but they growth of Cambridge, which won’t compromise the quality of are nonetheless revealing and – we suggest – should be used life associated with the city, led to the launch of 2030 Vision in conjunction with official statistics to add a qualitative layer of for the Cambridge sub-region – a major initiative intended to information, revealing what many local people think. complement the activities of local authorities and the local enterprise partnership (LEP).
    [Show full text]
  • Oakington Transport Note
    NORTHSTOWE Phase 3A Oakington Transport Technical Note January 2021 Northstowe Phase 3A: Southern Access Road East and Oakington Traffic Impacts This note provides an overview of the background to the proposals for the Southern Access Road East (SARE) as part of the delivery of Northstowe Phase 3. This covers the purpose of the SARE, the background includes design issues and traffic impacts. The note seeks to respond to the comments made by Oakington and Westwick Parish Council and local residents. Northstowe Phase 3A is an outline planning application and seeks permission for the principle of development. It does not contain detailed design proposals and the SARE has not been designed in detail at this stage although the outline planning application does identify a corridor for the line of the new road (see Movement and Access Parameter Plan) and an indicative design has been prepared to support the Transport Assessment. The indicative design shows a possible design for the new road. The Purpose of the SARE Whilst public transport and cycling will be realistic travel choices for future residents of Northstowe, transport modelling to support the Northstowe Area Action Plan (NAAP) in 2007, the Phase 2 application in 2014 and the Phase 3A outline planning application all indicated that a new link from Northstowe to the south east would be required for later phases of Northstowe. This is in addition to a link to an improved Hatton’s Road and the A14 Bar Hill junction (now being constructed as the Southern Access Road West). The NAAP in 2007 set out broad principles and included reference to “new road from the A14 or its parallel distributor road in the vicinity of the existing Dry Drayton junction into the southern end of Northstowe”.
    [Show full text]
  • The South Cambridgeshire (Electoral Changes) Order 2021
    Status: This is the original version (as it was originally made). This item of legislation is currently only available in its original format. STATUTORY INSTRUMENTS 2021 No. 277 LOCAL GOVERNMENT, ENGLAND The South Cambridgeshire (Electoral Changes) Order 2021 Made - - - - 9th March 2021 Coming into force in accordance with article 1(2), (3) and (4) Under section 92(2) of the Local Government and Public Involvement in Health Act 2007(1), South Cambridgeshire District Council (“the Council”) made recommendations in a review to the Local Government Boundary Commission for England(2)for the related alteration of the boundaries of district wards and county electoral divisions within the Council’s area. The Local Government Boundary Commission for England has decided to give effect to the recommendations and makes the following Order in exercise of the power conferred by section 92(3) of that Act. Citation, commencement, extent and application 1.—(1) This Order may be cited as the South Cambridgeshire (Electoral Changes) Order 2021. (2) This article comes into force on the day after the day on which this Order is made. (3) Article 2(1) comes into force— (a) for the purpose of proceedings preliminary or relating to the election of councillors, on the day after the day on which this Order is made; (b) for all other purposes, on the ordinary day of election of councillors in England(3) in 2021. (4) Article 2(2) comes into force— (a) for the purpose of proceedings preliminary or relating to the election of councillors, on the day after the day on which this Order is made; (b) for all other purposes, on the ordinary day of election of councillors in England in 2022.
    [Show full text]