Singareni Collieries Company Limited Annexure - III

BRIEF SUMMARY OF KALYANI KHANI-6 INCLINE UNDERGROUND COAL MINING PROJECT The Kalyani Khani- 6 Incline underground coal mining project is proposed in Mandamarri Area of SCCL in district of State. Kalyani Khani- 6 Incline mine is covered in Mandamarri Shaft Block of Somagudem-Indaram Coal Belt. Mandamarri Shaft Block consists of 5 sectors namely Sector A, B, C, D & E. The present proposal is carved out of Sector D&E of Mandamarri Shaft Block (MMSB).This is an underground Coal mining project proposed for mechanized method of Bord and Pillar mining with Continuous Miner technology. The normative and peak capacity of the project is 0.80 MTPA and 1.230 MTPA respectively in the project area of 421.61Ha including 103.96 Ha of forest land. The total life of the project is 19 years including the period of accessing the coal deposit. The salient features of the project are given below.

1. Kalyani Khani-6 Incline underground Name of the project coal mining project 2. Type of project Underground 3. New/expansion New

4. Location • Village(s) Shankarapalli &Sandrapalli • Mandal Mandamarri • District Mancherial • State Telangana • Name of the Coalfield Godavari Valley Coalfield • Nearest Rly Station Mandamarri RGIA Shamshabad, Hyderabad • Nearest Air Port 5. Latitude North180 57' 39" to 180 59' 16" 6. Longitude East 790 30' 23" to 790 31' 39" 7. Survey of Topo sheet 56 N/9 8. The Singareni Collieries Company Name of the Organization Limited 9. Coal Field Godavari valley coal Field 10. Coal belt Somagudem-Indaram Coal Belt 11. Project area /Mine take Area(Ha) 421.61 12. Forest Land(Ha) 103.96 13. Private Land(Ha) 317.65 14. SCCL acquired land(Ha) Nil 15. Borehole Density 12.11 Bore Holes per Sq. Km 16. Seams present IB, IA, I, II, III, IV (Top), IV (Bottom). 17. Seams considered for extraction IA, I 18. Gradient and direction 1 in 5.5

16

Singareni Collieries Company Limited

19. Average thickness of seams IA Seam - 4.59 m I Seam - 2.14 m

20. Depth range 107m -565 m 21. Quality Seam GCV(Grade) After Washing IA G12 G9 I G14 G9

22. Technology Continuous Miner Technology 23. Method of Mining Bord and Pillar, Under ground 24. Manpower 738 25. Geological Reserves 59.196 MT 26. Extractable reserves 15.65 MT 27. Production Capacity Normative : 0.80 MTPA Peak : 1.230 MTPA

28. Life of the Mine 19 years 29. R&R involved Nil 30. Capital Requirement for the project 615.75 (in crores) 31. Fund provision for EMP(in crores) 2.05