Ekovest Berhad Last Price RM0.935 Kenanga Trading Sell RM0.800 Hold Your Horses Consensus N.A

Total Page:16

File Type:pdf, Size:1020Kb

Ekovest Berhad Last Price RM0.935 Kenanga Trading Sell RM0.800 Hold Your Horses Consensus N.A On Our Radar 13 August 2015 Rating Fair Value Ekovest Berhad Last Price RM0.935 Kenanga Trading Sell RM0.800 Hold Your Horses Consensus N.A. N.A. By the Kenanga Research Team / [email protected] INVESTMENT MERIT Stock Information • Share prices has fallen 17%, since our last TRADING BUY recommendation on 31- Stock Name EKOVEST BHD Oct-13 (TP range from RM1.17-1.31), titled “ A Triple Play? ” before peaking at RM1.40 CAT Code 8877 on 30-Jul-14. YTD, its share price has eroded by 13%, 4% more than KL Construction Industry Engineering&Construction Index’s 9% decline. We believe the stock price has lost momentum due to: (i) lack of Industry Sub-sector Building&Construct-Misc fresh orderbook replenishment for FY15, (ii) consolidated losses arising from acquiring YTD stock price chg -12.62% the remaining 30% stake in DUKE, and (iii) lowering of dividend payout given to Market Cap (RM m) 799.84 shareholders. Issued shares (m) 855.45 • Acquired 100% equity interest in DUKE highway. EKOVEST has completed its 52-week range (Hi) 1.41 rights issue exercise in Jun-14 and used the proceeds to acquire the remaining 30% 52-week range (Low) 0.935 equity interest in DUKE from MRCB. This resulted in a plunge in FY14 net profit due to 3-mth avg daily vol: 39056.06 losses of RM33.9m from the non-controlling interest unit. The current DUKE highway Free Float 24% carries an average daily traffic of 130.0k vehicles. This exercise should yield positive Beta 0.83 result as EKOVEST will have full control over its operations and management. Altman’s Z-score 1.64 • Orderbook at RM2.0b. The total orderbook of RM2.0b is mostly for DUKE Phase 2 and Phase 1 of River of Life project in Kuala Lumpur. The RM1.18b worth of DUKE Major Shareholders Phase 2, which was secured on Jan-14, is currently 45% completed. While guidance of Kang Hoo Lim 20.19% remaining orderbook is not available, we estimate that the group has some 40%-50% Kota Jayasama Sdn Bh 20.16% remaining out of its total orderbook, which offers 1.5 years visibility. The DUKE Phase 2 Ekovest Holdings Sdn 12.19% project, which is expected to be completed and opened by 4Q16, is expected to provide earnings visibility from FY17 onwards. Financials • Secured Approval-in-Principle for DUKE Phase 3. The c.35km length of DUKE FYE June (RM’m) 2014A 2015E 2016E Phase 3 will cover areas such as University Tunku Abdul Rahman, Wangsa Maju, Revenue 229.1 425.3 509.4 Setiawangsa, Ampang, the Tun Razak Exchange and Bandar Malaysia development EBIT 138.0 119.0 168.1 corridor and Kerinchi. On 10-Aug-15, the digital Edge Weekly reported that EKOVEST Net Profit (NP) 47.1 13.1 50.2 is in talks with 1Malaysia Development Bhd (1MDB) on the realignment of highway, EPS (sen) 7.2 1.5 5.9 whereby a 2km section will run along the border of Bandar Malaysia in Sungai Besi. BV/Share (RM) 1.69 1.28 1.28 Conceptually, this should provide better accessibility and higher traffic growth from PER 12.9 60.9 15.9 Bandar Malaysia. Price/BV (x) 0.6 0.7 0.7 Net Gearing (x) 0.1 0.1 0.1 • However, significant earnings contribution before FY17 is unlikely. The financing DPS (sen) 1.0 1.0 1.0 method of this c.RM3.57b project is still unknown while details of project Dividend Yield (%) 1.1% 1.1% 1.1% commencement remain vague. We reckon it is likely to be financed via issuance of Islamic medium-term notes by the SPV. This project duration is expected to be 3.5 Quarterly years. We believe that DUKE Phase 3 should garner investors’ interest in the long run Financial Data 1Q15 2Q15 3Q15 as it will catalyse the overall future EKOVEST’s earnings growth. However, at this Revenue 88.9 104.9 125.3 juncture, we have not built this into our estimates as any significant earnings PBT 2.2 4.5 7.5 contributions before FY17 is unlikely. Net Profit (NP) 1.4 3.2 5.2 • Property unbilled sales of RM588.0m. The major portion of the unbilled sales is from EPS (sen) 0.2 0.4 0.6 EkoCheras (GDV RM1.6b) and expected to last until 2017. Also, EKOVEST has EPS Growth (QoQ) -97.1% 117.6% 64.9% launched Phase 1 of EkoTitiwangsa (GDV RM202.0m) in Jun-15 with some 40% take- Revenue Growth 93.8% 18.0% 19.5% up rate. In terms of upcoming launches, EKOVEST is looking to launch another 3 (QoQ) projects over the next 18 months, with a total GDV of RM2.4b (EkoGateway RM1.9b, PBT Margin 2.5% 4.3% 6.0% EkoQuay RM210.0m, EkoPark Place RM320.0m). This should contribute to the Group’s earnings for next 2-3 years. Peers PER Div. Yld Mkt Cap Comparisons (FY16) (%) (RM’m) • Fairly valued. We introduced our FY15-16E earnings with higher revenue assumption WCT 9.0 3.8 1,440.6 from recognition of progressive unbilled property sales and DUKE Phase 2 project in MITRA 9.5 3.7 713.0 FY16. It will take a while for the potential earnings accretion of the acquisition of the remaining 30% stake in DUKE to bear fruits as traffic growth numbers remains GADANG 5.0 1.5 293.6 unexciting and thus, the rights issuance used to fund this acquisition will be a drag on Average 7.8 3.0 815.7 the near-term EPS and ROE. Hence, our TP is revised downwards to RM0.80 (from Ekovest 15.9 1.1 799.8 RM1.17-1.31 previously), based on FY16E PER of 13.6x (-0.5SD @ 5-yr average), FBMKLCI 13.8 3.7 958.4B implying that the stock is fairly valued at this juncture. We may revisit the stock pending fresh updates on DUKE Phase 3 commencement date. Our TP which implies FY16E PER of 13.6x is already at the upper band of mid-cap contractors range of 10.0x-14.0x, implying that a lot of the announced positives have been priced-in and requires stronger earnings accretion to re-rate the stock further. PP7004/02/2013(031762) Page 1 of 3 Ekovest Berhad On Our Radar 13 August 2015 Daily Charting – Ekovest Berhad Comment: EKOVEST has been on a downtrend after reaching About the stock: its peak on Aug-2014 at RM1.44. Recently, due to the sell-down Name : Ekovest Berhad in the local bourse, the share price has broken down from its Bursa Code : EKOVEST strong support-turned-resistance level of RM0.98 (R1) to settle at the -1SD regression level. In tandem with the tepid trading CAT Code : 8877 volume, key indicators such as Stochastic and RSI are also posting bearish-biased outlook as reflected in their negative Key Support & Resistance level trends, with the former already in oversold territory. We reckon Resistance : RM0.98 (R1) RM1.05 (R2) RM1.09 (R3) that with the poor market sentiment and negatively biased Support : RM0.87 (S1) RM0.75 (S2) RM0.69 (S3) technical picture, the share price would likely trend south towards Outlook : Bearish the RM0.87 level in the near-term. Source: Kenanga Research CORPORATE STRUCTURE BUSINESS OVERVIEW • Established in January 1985, Ekovest is one of the contractors in Malaysia. It is involved in a wide range of business activities related mainly to civil engineering and building construction. • Ekovest was involved in several large prestigious projects which include University Malaysia Sabah, Kuala Lumpur Sentral station, KLCC Fit-Out Package, Labuan Financial Park, KLIA, TheFederal Administration Capital of Putrajaya, Universiti Tun Hussein Onn Malaysia and DUKE Highway. • Ekovest has diversified into infrastructure (through 100%-owned DUKE highway) and property development. BUSINESS SEGMENTS • Construction operations. Construction segment is the biggest contributor to EKOVEST’s revenue which accounts for 60% of its total revenue in FY14. • Property development. The entire landbank in northern Kuala Lumpur is expected to deliver an estimated GDV of RM3.24b over the next 10 years. • Investment holding. This division contributed 1% of its total revenue in FY14. • Toll operations. This division is the second major contributor to EKOVEST’s revenue, accounts for 39% of its total revenue in FY14. PP7004/02/2013(031762) Page 2 of 3 Ekovest Berhad On Our Radar 13 August 2015 This page is intentionally left blank. This document has been prepared for general circulation based on information obtained from sources believed to be reliable but we do not make any representations as to its accuracy or completeness. Any recommendation contained in this document does not have regard to the specific investment objectives, financial situation and the particular needs of any specific person who may read this document. This document is for the information of addressees only and is not to be taken in substitution for the exercise of judgement by addressees. Kenanga Investment Bank Berhad accepts no liability whatsoever for any direct or consequential loss arising from any use of this document or any solicitations of an offer to buy or sell any securities. Kenanga Investment Bank Berhad and its associates, their directors, and/or employees may have positions in, and may effect transactions in securities mentioned herein from time to time in the open market or otherwise, and may receive brokerage fees or act as principal or agent in dealings with respect to these companies. Published and printed by: KENANGA INVESTMENT BANK BERHAD (15678-H) 8th Floor, Kenanga International, Jalan Sultan Ismail, 50250 Kuala Lumpur, Malaysia Chan Ken Yew Telephone: (603) 2166 6822 Facsimile: (603) 2166 6823 Website: www.kenanga.com.my Head of Research PP7004/02/2013(031762) Page 3 of 3 .
Recommended publications
  • TA Securities COMPANY UPDATE Tues Day , 14 February , 201 7 a Member of the TA Group FBMKLCI : 1, 710 .24
    TA Securities COMPANY UPDATE Tues day , 14 February , 201 7 A Member of the TA Group FBMKLCI : 1, 710 .24 MENARA TA ONE, 22 JALAN P. RAM LEE, 50250 KUALA LUMPUR, MALAYSIA TEL: +603 -20721277 / FAX: +603 -20325048 Sector: Construction Ekovest Berhad TP: RM 3.43 (+20.4%) A Cash Cow in the Making Last traded: RM2.85 THIS REPORT IS STRICTLY FOR INTERNAL CIRCULATION ONLY* Not Rated Ooi Beng Hooi +603-2167-9612 [email protected] www.taonline.com.my Despite a sharp rally in sha re price of 166. 4% since early -2015, we still Share Information think the stock is undervalued and see long term value in this rising star. Bloomberg Code EKO MK We like the company for its i) sizeable outstanding construction order book; Stock Code 8877 Listing Main Market ii) likelihood of sustaining its construction order book for another 5 to 10 Share Cap (mn) 855.5 years; iii) potential unlocking of asset value through IPO for its Market Cap (RMmn) 2438.0 expressways; iv) potential REITing of its shopping malls in long term; and Par Value 0.50 v) potential transformation into a prominent cash cow in long run. We 52-wk Hi/Lo (RM) 1.01/2.88 arrive at a fair value of RM3.43/share. NOT RATED 12-mth Avg Daily Vol ('000 shrs) 1,603.7 Estimated Free Float (%) 40.8 Listed on the Second Board of Bursa Malaysia in 1993 and promoted to the Beta 0.36 Major Shareholders (%) Main Board in 2000, Ekovest Berhad is involved in construction, property Lim Kang Hoo - 20.19 development and highway toll operation.
    [Show full text]
  • Taman Sri Segambut to See Its ˎrst High-Rise Residences
    EP 2 FRIDAY OCTOBER 6, 2017 • THEEDGE FINANCIAL DAILY NEWS HIGHLIGHTS from www.EdgeProp.my Tropicana TRX Residences eyes 1Q18 launch founder’s son Dion Tan is new MD; CEO TRX Residences, the residential com- es will comprise about 900 units, Yau retires ponent of the 17-acre TRX Lifestyle but not all of these units will be Tropicana Corp Bhd has redesignat- Quarter, is aiming to launch its fi rst launched simultaneously, said ed its executive director, 27-year-old homes sometime in the fi rst quarter Lendlease Malaysia residential di- Dion Tan, the son of founder and of next year. rector Eric Chan. largest shareholder Tan Sri Danny The TRX Lifestyle Quarter is part The unit sizes, which may range Tan Chee Sing who has a 30.45% of the 70-acre Tun Razak Exchange from 1-bedroom units of 500 sq ft to stake in the company, as managing (TRX) development which is set to be- 4-bedroom units of 2,000 sq ft, will director eff ective Oct 2. come a world-class fi nancial district be designed to cater for a broader Dion’s eldest brother, Datuk Dick- in Kuala Lumpur. It will encompass swathe of Malaysian property buy- son Tan Yong Long, is Tropicana’s investment Grade A offi ce space un- ers, said Lendlease Malaysia man- deputy group CEO, while another derpinned by world-class residential, aging director Stuart Mendel. brother, Dillon Tan Yong Chin, is an hospitality, retail, leisure and cultur- TRX Residences will comprise six executive director. al off erings. towers of 40 to 57 storeys each that Meanwhile, Tropicana said CEO The fi rst phase of TRX Residenc- will off er a total of 2,400 homes.
    [Show full text]
  • Greater Kuala Lumpur: Bridge Between Asia and the World Why Greater Kuala Lumpur Is the Ideal Business Hub for Regional and Global Companies
    www.pwc.com/my Greater Kuala Lumpur: Bridge between Asia and the world Why Greater Kuala Lumpur is the ideal business hub for regional and global companies July 2017 This publication has been prepared for general guidance on matters of interest only, and does not constitute professional advice. You should not act upon the information contained in this publication without obtaining specific professional advice. No representation or warranty (express or implied) is given as to the accuracy or completeness of the information contained in this publication, and, to the extent permitted by law, PwC, its members, employees and agents do not accept or assume any liability, responsibility or duty of care for any consequences of you or anyone else acting, or refraining to act, in reliance on the information contained in this publication or for any decision based on it. ©2017 PwC. All rights reserved. “PricewaterhouseCoopers” and/or “PwC” refers to the individual members of the PricewaterhouseCoopers organisation in Malaysia, each of which is a separate and independent legal entity. Please see www.pwc. com/structure for further details. 2 Greater Kuala Lumpur: Bridge between Asia and the world Foreword Asia remains the world’s growth driver, and Greater Kuala Lumpur is at the heart of it In PwC’s World in 2050 report, released earlier this year, Foreign investors are particularly interested in using we continue to foresee the shift in global economic power Malaysia and Greater KL as their regional operational away from established advanced economies towards hub to tap into the growing opportunities in emerging emerging economies in Asia.
    [Show full text]
  • Newsletter-April 2017 5
    FREEHOLD APRIL 2017 EKOVEST PP18916/11/2015(034379) TOP ASIA AWARD FOR SUKUK ISSUANCE SOME THINGS ARE DUKE 3 Worth Treasuring PRIME MINISTER'S VISIT In Life TO RIVER OF LIFE SITE River Beautification In Precinct 7 EkoCheras Mall EKOCHERAS EQUATES EARTH-CONSCIOUSNESS SUSTAINABILITY EkoCheras BEST MIXED DEVELOPMENT EkoRiver Centre (KL River City) REDEFINED by Ekovest Berhad LAVISH YOURSELF IN THE HEART OF THE CITY LIKE NEVER BEFORE Embrace uber modern contemporary living. Inside and outside. From lavish living space full of natural light to leisurely outdoors filled with breezy style and comfort. EkoTitiwangsa is a living icon connected to a 7-storey shopping mall (approx. 600,000sf) with a breathtaking view of the stunning KL skyline. Not Least, EkoTitiwangsa is located along Titiwangsa, right next to the DUKE Highway and KL River City. Offering exceptional accessibility, these 3 blocks of freehold service apartments are the answer to urbane living in luxury suites ranging from 820sf to 1340sf, as well as immense safety via 24-hour CCTV surveillance with 3-tier security complete with smart card access and guard patrol. EKOVEST BERHAD DEVELOPER HEAD OFFICE EKOVEST BERHAD SALES GALLERY Ground Floor, Wisma Ekovest, No. 118, No 122, Jalan Desa Gombak 1, Ekovest Land Sdn Bhd (549480-K) Jalan Gombak, 53000 Kuala Lumpur. 53000 Kuala Lumpur. +603 4032 1881 (A wholly owned subsidiary of Ekovest Berhad) T : +603-4021 5948 F : +603-4032 1771 GPS Co.: N 3°11'38.6" E 101°42'18.5" www.ekotitiwangsa.com E : [email protected] fb.com/Ekovest Berhad
    [Show full text]
  • Kuala Lumpur Office
    Asian Cities Report – 2H 2019 REPORT Savills Research Kuala Lumpur Offi ce Kuala Lumpur Offi ce Strong interest in quality offi ce space is being led by the expansion of fl exible space operators NEW SUPPLY GRAPH 1: Greater KL Offi ce Stock, 2010 to 1H/2019 Stock of offi ce space in Greater KL, the single largest offi ce market in ASEAN, stands at approximately 126 million sq ft, with the completion of four new offi ce buildings KL City The Rest of Greater KL Greater KL contributing 1.08 million sq ft in 1H/2019. 140 125.3 126.4 The fi rst offi ce tower within the Tun Razak Exchange, namely Menara Prudential, 120.4 115.4 was completed this year and serves as the headquarters for Prudential Assurance 120 111.5 105.4 Malaysia Bhd. The KYM Tower in Mutiara Damansara and Symphony Square in 102.2 97.9 Petaling Jaya were also completed in early 2019. With the exception of the EkoCheras 100 91.5 86.7 Offi ce Suites, the other three new buildings are single-owned en-bloc buildings, built with quality features and modern specifi cations. 80 By the end of 2019, the stock of offi ce space is expected to expand by 3.8 million sq 60 ft, touching approximately 130 million sq ft – with the completion of Southeast Asia’s tallest building, The Exchange 106, which will replace the Petronas Twin Towers as MILLION SQ FT 40 the tallest building in the country. This landmark offi ce tower, located within the Tun Razak Exchange (TRX), stands at 492m tall, off ering 2.4 million sq ft of column- 20 free offi ce space with spacious fl oor plates ranging from 22,000 to 34,000 sq ft.
    [Show full text]
  • Malaysia Real Estate Highlights
    RESEARCH REAL ESTATE HIGHLIGHTS 1ST HALF 2015 KUALA LUMPUR PENANG JOHOR BAHRU KOTA KINABALU KUALA LUMPUR HIGH END CONDOMINIUM MARKET (MPC) meeting in May in an effort to support economic growth and domestic HIGHLIGHTS consumption. • Softening demand in the SUPPLY & DEMAND high-end condominium With the completion of seven notable segment amid a cautious projects contributing an additional market. 1,296 units [includes projects that are physically completed but pending Madge Mansions issuance of Certificate of Completion • Lower volume of transactions and Compliance (CCC)], the cumulative expected to come on-stream. The KL in 1Q2015. supply of high end condominiums in City locality will account for circa 35% Kuala Lumpur stands at 39,610 units. (1,310 units) of the new supply; followed • Developers with niche high by Mont’ Kiara / Sri Hartamas with Approximately 45% (582 units) of the new 34% (1,256 units); KL Sentral / Pantai / end residential projects in KL completions are located in the Ampang Damansara Heights with 20% (734 units); City review products, pricing Hilir / U-Thant area, followed by some and the remaining 11% (425 units) from and marketing strategies in 26% (335 units) in the locality of KL City; the locality of Ampang Hilir / U-Thant. a challenging market with 16% (204 units) from the locality of KL lacklustre demand, impacted Sentral / Pantai / Damansara Heights Notable projects slated for completion by a general slowdown in the area; and 14% (175 units) from the Mont’ in KL City include Face Platinum Suites, economy, tight lending Kiara / Sri Hartamas locality. Le Nouvel, Mirage Residences as well as guidelines, weaker job market the delayed project of Crest Jalan Sultan The three completions in Ampang Hilir amongst other reasons.
    [Show full text]
  • Bersubahat Kalau Undi Pemimpin Rasuah Hudud Tidak Ada Dalam
    BIL 95 25 - 31 MAC 2018 Hudud tidak ada Bersubahat kalau Kingmaker dalam manifesto Pas undi pemimpin untuk rasuah pastikan BN berkuasa ms2 ms2 ms8 SEMPENA ulang tahun ketiga pelaksanaan Cukai Barangan dan Perkhidmatan (GST) 1 April ini, Pakatan Harapan (PH) mengajak rakyat berkempen menolak cukai yang telah mendatangkan beban kenaikan kos sara hidup kepada mereka selama ini. PH akan mengeluarkan mekanisme kempen ini PIMPINAN PH minggu depan untuk mengumumkan pelancaran kempen dilaksanakan serentak "Rakyat Tolak GST" oleh rakyat. - yang akan diadakan serentak 1 April depan. Laporan penuh muka 2 2 NASIONALNASIONAL EDISI 95 • 25 - 31 MAC 2018 • PH kempen ‘Rakyat Tolak GST’ 1 April AKATAN HARAPAN (PH) akan Bagaimanapun parti pembangkang menganjurkan kempen ‘Rakyat Tolak menolak cadangan pelaksanaan GST apabila PGST’ sempena tiga tahun pelaksanaan menyifatkan ia akan membebankan rakyat Cukai Barangan dan Perkhidmatan (GST) berpendapatan rendah. yang dilaksanaka kerajaan Umno-BN itu. Namun dalam manifesto PH antara lain- Kempen itu dijangka akan diadakan selu- nya diumumkan jika PH berjaya mengambil ruh negara pada 1 April 2018 ini. alih kerajaan, GST akan dihapuskan dan Pengerusi PH Tun Dr Mahathir Mohamad mengawal harga barangan. berkata, kempen tersebut diadakan untuk Terakhir Pas menerusi Manifesto Gagasan rakyat menyatakan penolakan terhadap GST Sejahtera pada Ahad lalu turut menyatakan yang sebenarnya membebankan rakyat ker- akujanji jika parti itu menang dalam pilihan ana menyebabkan kenaikan kos sara hidup raya ke 14 akan melaksanakan penghapusan sejak ia dilaksanakan pada 1 April 2015. GST dan menggantikannya dengan sistem “Kita akan ada kempen untuk me- percukaian yang lebih adil. nyatakan rakyat tolak GST pada 1 April ini di Ketika ditanya mengenai manifesto Pas seluruh negeri,” ujarnya dalam sidang media melalui Gagasan Sejahtera mahu mengha- yang diadakan di Bilik Ketua Pembangkang puskan GST, Dr Mahathir mempersoalkan di bangunan Parlimen 20 Mac lepas.
    [Show full text]
  • Our Commitment to Sustainability
    Sustainability Statement OUR COMMITMENT TO SUSTAINABILITY Kwasa Sentral MRCB IS COMMITTED TO DISCLOSING THE PROGRESS OF OUR SUSTAINABILITY JOURNEY AND SETTING THE HIGHEST STANDARDS IN THE SOCIAL, ECONOMIC, SCOPE OF THIS STATEMENT AND ENVIRONMENTAL PERFORMANCES OF OUR SECTOR. WE ASPIRE TO RAISE The coverage of this statement includes all domestic operations of MRCB, consisting of OUR UNDERSTANDING OF SUSTAINABILITY ISSUES SO THAT WE MAY CONTINUE its subsidiaries, of which MRCB has direct TO GROW AND PERFORM BETTER AS A CORPORATE CITIZEN. control and holds a majority stake. REPORTING PERIOD We are currently in the process of reviewing and priorities through conducting stakeholder The reporting period covered is from our sustainability approach and intend to engagement and a materiality assessment, 1 January, 2017 to 31 December, 2017. explore various ways in which we can improve identifying sustainability indicators, referring to Where possible, historical information from our sustainability practices and performances global practices and standards in sustainability previous years were included to provide across our management and operations. reporting, and adopting the sustainability comparative data. guidelines provided by Bursa Malaysia. For this report, we began embarking on obtaining REPORTING CYCLE baseline data to measure and subsequently While we seek to maintain our compliance to monitor the impact of our projects and activities, national laws and regulations, we are becoming Annually which helped us determine our performance increasingly
    [Show full text]
  • Missionos Project Profile
    MissionOS Project Profile KVMRT 2 - Kuala Lumpur Building on the success of MissionOS on Line 1 of the Klang Valley MRT, Maxwell GeoSystems were appointed systems supplier for the Sungai Buloh–Serdang–Putrajaya line (MRT SSP) with an expanded to scope to look after instrumentation and TBM Process Control. The MissionOS system has been implemented by Gamuda to manage excavation progress and instrumentation data during the construction of the stations in retained excavations within difficult ground conditions. Gamuda were keen to build on Maxwell GeoSystems’ ability to manage effectively both ground investigation, instrument and tunnelling data in one platform and the configurability of the platform to their own requirements. Maxwell GeoSystems’ proprietary MissionOS integrates the construction and TBM data with the instrumentation data, providing a shared real-time “cause & effect” analysis resource, allowing project teams to predict and control the ground and ground-water movements. Gamuda also highly valued the audit and post processes The KVMRT Line 2 is one of three planned MRT rail lines which have enabled their teams to review and assimilate under Klang Valley Mass Rapid Transit Project by MRT Corp. huge quantities of data in very quick time reducing The Phase 1 between Kwasa Damansara and Kampung construction risk on the project. Batu expected to be operational by July 2021. The remaining line is expected to be operational in 2022. The approved rail alignment is 52.2km in length, of which 13.5km is underground. A total of 37 stations, 11 of them underground, will be built. The line will stretch from Sungai Buloh to Putrajaya and will include densely populated areas Sri Damansara, Kepong, Batu, Jalan Sultan Azlan Shah, Jalan Tun Razak, KLCC, Tun Razak Exchange, Kuchai Lama, Seri Kembangan and Cyberjaya.
    [Show full text]
  • Property Market Review | 2020–2021 3
    2021 2020 / MARKET REVIEW MARKET PROPERTY 2020 / 2021 CONTENTS Foreword | 2 Property Market Snapshot | 4 Northern Region | 7 Central Region | 33 Southern Region | 57 East Coast Region | 75 East Malaysia Region | 95 The Year Ahead | 110 Glossary | 113 This publication is prepared by Rahim & Co Research for information only. It highlights only selected projects as examples in order to provide a general overview of property market trends. Whilst reasonable care has been exercised in preparing this document, it is subject to change without notice. Interested parties should not rely on the statements or representations made in this document but must satisfy themselves through their own investigation or otherwise as to the accuracy. This publication may not be reproduced in any form or in any manner, in part or as a whole, without writen permission from the publisher, Rahim & Co Research. The publisher accepts no responsibility or liability as to its accuracy or to any party for reliance on the contents of this publication. 2 FOREWORD by Tan Sri Dato’ (Dr) Abdul Rahim Abdul Rahman Executive Chairman, Rahim & Co Group of Companies 2020 came through as the year to be remembered but not in the way anyone had expected or wished for. Malaysia saw its first Covid-19 case on 25th January 2020 with the entrance of 3 tourists via Johor from Singapore and by 17th March 2020, the number of cases had reached above 600 and the Movement Control Order (MCO) was implemented the very next day. For two months, Malaysia saw close to zero market activities with only essential goods and services allowed as all residents of the country were ordered to stay home.
    [Show full text]
  • Underground Stations Excavation of up to 45M Deep for Mass Rapid Transit in Limestone Formation, Malaysia
    Japanese Geotechnical Society Special Publication The 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering Underground stations excavation of up to 45m deep for mass rapid transit in limestone formation, Malaysia Tan Yean-Chini), Koo Kuan-Sengii) and Chow Chee-Mengiii) i) Senior Director, G&P Geotechnics Sdn Bhd, Wisma G&P, Jln Tasik Selatan 3, Bandar Tasik Selatan, 57000 Kuala Lumpur, Malaysia ii) Partner, G&P Geotechnics Sdn Bhd, Wisma G&P, Jln Tasik Selatan 3, Bandar Tasik Selatan, 57000 Kuala Lumpur, Malaysia. iii) Director, G&P Geotechnics Sdn Bhd, Wisma G&P, Jln Tasik Selatan 3, Bandar Tasik Selatan, 57000 Kuala Lumpur, Malaysia. ABSTRACT Kuala Lumpur Limestone formation exhibits karstic features with irregular bedrock profiles and variable weathering condition. The Klang Valley Mass Rapid Transit (KVMRT) SBK Line project is the first Mass Rapid Transit project in Malaysia. There are three underground stations namely Tun Razak Exchange (TRX) station, Cochrane Station and Maluri Station located in Kuala Lumpur limestone formation. TRX Station is the deepest station with maximum excavation depth of 45m below ground and also one of the underground interchange stations for future line. Cochrane Station with maximum excavation depth of 32m below ground also serves as launching shaft for the tunnel boring machine from both ends of the station. Maluri Station with maximum excavation depth of 20m below ground includes an underground train crossover as operational requirement. A technically appropriate and cost effective temporary earth retaining system suitable for the challenging geological formation using secant pile wall supported by temporary ground anchors or temporary strutting was adopted.
    [Show full text]
  • TUN RAZAK EXCHANGEUSE the New Financial City of Kualaon Lumpur Malaysian Annual Real Estate Convention 2018 (MAREC’18) 2Nd March 2018STRICTLY ISSUED KEY CONTENTS
    Source : The Malaysian Reserve, 1st February 2018 2018 2018 MAREC’ FOR ONLY 8-MARCH USE ON TUN RAZAK EXCHANGE TheSTRICTLY New Financial City of Kuala Lumpur Malaysian Annual Real Estate Convention 2018 (MAREC’18) 2 nd March 2018 ISSUED 2018 2018 MAREC’ FOR ONLY 8-MARCH USE ON ABOUT TRX CITYKEY SDN CONTENTS BHD STRICTLY CREATINGTHE DEMAND VISION ISSUED THE RESULT WHO WE ARE TRX City Sdn Bhd is 100% owned by Minister of Finance Incorporated (MOF Inc) and mandated by the Government2018 of Malaysia to be the strategic master developer for TRX. 2018 MAREC’ TRX City Sdn Bhd key roles are as follows : FOR ONLY 8-MARCH USE Nation Building Create &ON Enhance Value Project Delivery Support economic transformation Plan, design, implement, Develop and operate district-wide programme of Malaysia by commercialize and operates TRX infrastructure creating worldSTRICTLY class addresses as master developer ISSUED 2018 2018 MAREC’ FOR ONLY 8-MARCH USE KEY CONTENTS ON ABOUT TRX CITY SDN BHD STRICTLY CREATINGTHE DEMAND VISION ISSUED THE RESULT THE VISION FOR TUN RAZAK EXCHANGE A strategic enabler supporting 2018 the Malaysian Government’s 01 Economic Transformation Programme (ETP) 2018 TRX will be THE financial MAREC’ centre for Malaysia and set to 02 become a key regional financial hub FOR ONLY A catalyst for urban 8-MARCH regeneration in Kuala LumpurUSE 03 towards becoming a World- Class City. ON STRICTLY ISSUED 2018 2018 MAREC’ FOR ONLY 8-MARCHMARKET POSITIONING FOR TRX USE ON Canary Wharf STRICTLY ISSUED Wall Street IFC Hong Kong Dubai International Financial
    [Show full text]