Newsletter-April 2017 5

Total Page:16

File Type:pdf, Size:1020Kb

Newsletter-April 2017 5 FREEHOLD APRIL 2017 EKOVEST PP18916/11/2015(034379) TOP ASIA AWARD FOR SUKUK ISSUANCE SOME THINGS ARE DUKE 3 Worth Treasuring PRIME MINISTER'S VISIT In Life TO RIVER OF LIFE SITE River Beautification In Precinct 7 EkoCheras Mall EKOCHERAS EQUATES EARTH-CONSCIOUSNESS SUSTAINABILITY EkoCheras BEST MIXED DEVELOPMENT EkoRiver Centre (KL River City) REDEFINED by Ekovest Berhad LAVISH YOURSELF IN THE HEART OF THE CITY LIKE NEVER BEFORE Embrace uber modern contemporary living. Inside and outside. From lavish living space full of natural light to leisurely outdoors filled with breezy style and comfort. EkoTitiwangsa is a living icon connected to a 7-storey shopping mall (approx. 600,000sf) with a breathtaking view of the stunning KL skyline. Not Least, EkoTitiwangsa is located along Titiwangsa, right next to the DUKE Highway and KL River City. Offering exceptional accessibility, these 3 blocks of freehold service apartments are the answer to urbane living in luxury suites ranging from 820sf to 1340sf, as well as immense safety via 24-hour CCTV surveillance with 3-tier security complete with smart card access and guard patrol. EKOVEST BERHAD DEVELOPER HEAD OFFICE EKOVEST BERHAD SALES GALLERY Ground Floor, Wisma Ekovest, No. 118, No 122, Jalan Desa Gombak 1, Ekovest Land Sdn Bhd (549480-K) Jalan Gombak, 53000 Kuala Lumpur. 53000 Kuala Lumpur. +603 4032 1881 (A wholly owned subsidiary of Ekovest Berhad) T : +603-4021 5948 F : +603-4032 1771 GPS Co.: N 3°11'38.6" E 101°42'18.5" www.ekotitiwangsa.com E : [email protected] fb.com/Ekovest Berhad Developer's License No : 13673-1/09-2016/0899 (L) • Advertising & Sales Permit No : 13673-1/09-2016/0899 (P) • Validity Period : 06/09/2016 - 05/09/2017 • Total Units : Block A-246 (Service Apartment) ; Block B-180 (Service Apartment) ; Block C-270 (Service Apartment) • Approving Authority : Dewan Bandaraya Kuala Lumpur • Building Plan Reference No : BP U2 OSC 20132882 • Land Tenure : Freehold • Expected Date of Completion : July 2018 • Selling Price : RM591,986 (min) - RM1,725,630 (max) • Land Encumbrances : Public Bank • Bumiputra Discount : 5% • All information contained herein is subject to change without notification as may be required by the relevant authorities or developer's architect and cannot form part of an offer or contract. All illustrations and pictures are artist's impressions only. All measurements are approximate. Whilst every care has been taken in providing this information, the owner, developer and managers cannot be held liable for any inaccuracy. All above items are subject to variations, modifications and substitutions as may be required by the relevant Authorities or recommended by the Architects or Engineers. Life offers uncountable opportunities, every day, every minute, every moment. To grasp these opportunities, one has to be prepared to grabbed them the moment they emerge, and there's no telling when it would Content happen. EKOVESTaccess DUKE 1 . DUKE 2 . DUKE 3 EKOVEST 03 the name synonymous with building construction and civil engineering excellence was formed by a group THERE'S of highly enterprising, self-motivated individuals and EKOVESTfuture highly qualified experienced professionals. POTENTIAL IN 09 KL River City . River of Life Ekovest, Putting its citizens first. EVERY MOMENT Ekovest Berhad was established since 1985 and listed in Bursa Malaysia since 1993. Ekovest is one EKOVESTproperty of the world-class leading construction company in Malaysia involved in all aspects of construction EkoCheras . Oasis Kajang . That is what makes our lives so rich - from our work including major civil engineering and building 21 EkoTitiwangsa cherished relationships with the people who are close works such as turnkey-design, build projects and project management. We strive to provide optimum to us to the very home or career that we treasure so value in functionality, and innovative thoughts to much. Being able to strike while the iron is hot, when fulfil our client’s satisfaction. the opportunity is just right is what brings about our success. Success in love, success in companionship, EKOVESTnews In year 2004, Ekovest had signed a concession success in ownership, success in life. We, at Ekovest, EKOVEST Media agreement to undertake the Build, Operate & wish to share with you the ideas, the news, the latest 29 Transfer (BOT) contract with the government for happenings yet again in this Quarterly Issue so that if Duta-Ulu Kelang Expressway (DUKE), spanning across 18km from northern-east to northern-west there were any opportunities to be caught, you'd be of Kuala Lumpur city. DUKE was completed and the first to do so. commenced operations on the 9th of January EKOVEST & CSR events 2009. Later on in 2013, Ekovest undertook the expansion of DUKE highway by signing on a EGAP townhall session supplement concession agreement on 2013 and iil 31 Ekovest Berhad Chinese New Year Open House 2017 construction works is in progress. T Driving ITS to a new normal Women’s cycling convoy 2017 We are a visionary and innovative company that provides only high quality services and thoughtful design. This is what makes us better and worthy for your investment. EKOVEST Sustainability EKOVESTaccess THE PROPOSED DISPOSAL REPRESENTS AN OPPORTUNITY FOR EKOVEST AND EPF TO The DUKE Phase 2 comprising of two links, namely the ESTABLISH A LONG-TERM RELATIONSHIP Sri Damansara Link and the Tun Razak Link and is WITH EACH OTHER THROUGH THEIR JOINT expected to be completed by mid 2017 and the toll INVESTMENT IN A MATURE concession runs until 2059, subject to another YIELD-GENERATING INFRASTRUCTURE extension by 10 years. The Sri Damansara Link PROJECT. WE LOOK FORWARD TO THE connects MRR2 and DUKE and helps to disperse traffic PROSPECT OF LEVERAGING ON THE to and from MRR2 to city centre. The Tun Razak Link will act as an additional dispersal link between DUKE ESTABLISHMENT OF THIS RELATIONSHIP AS and MRR1 thus providing an additional dispersal option A PLATFORM TO PURSUE COLLABORATIONS for the congested Jalan Tun Razak. ON OTHER POTENTIAL INVESTMENTS IN THE FUTURE. Speaking after the signing ceremony between Kesturi He added. and EPF held at the Sheraton Imperial Hotel, Kuala Lumpur on the 8 November 2016, Ekovest Berhad Executive Chairman Tan Sri Dato’ Lim Kang Hoo said, “The Proposed Disposal is in line with the Company’s strategy to monetise its matured infrastructure assets to EPF INVESTS IN DUKE free up its financial resources for the expansion of its infrastructure division and other core businesses, such THE EMPLOYEES PROVIDENT FUND (EPF) BOARD as construction and property development. It represents BOUGHT A 40% STAKE IN KONSORTIUM LEBUHRAYA an opportunity for the Company to partially monetise its UTARA-TIMUR (KL) SDN BHD (KESTURI), FOR investment in Kesturi at an attractive price, while DUKE RM1.13BIL CASH. KESTURI, WHICH IS THE allowing Ekovest to continue participating in Kesturi and CONCESSION HOLDER OF THE DUTA-ULU KELANG operate the highway via its remaining 60% equity stake. HIGHWAY EXPRESSWAY (“DUKE”), A 34-KILOMETRE HIGHWAY It is estimated to result in a balance sheet gain on COMPRISING TWO PHASES. disposal of RM764 million which will further strengthen Ekovest’s shareholders funds. Managing director Datuk Seri Lim Keng Cheng said the Duke phase 1 is already in operation while phase 2 is KESTURI had carried out a detailed study on the group was upbeat on its partnership with EPF.“EPF sees expecting to complete construction and commence toll alignment spanning three years including an us as a connector because of the Duta-Ulu Kelang collection by the first half of 2017. Upon completion of the Environmental Impact Assessment and Public Opinion Expressway (Duke) project, which will link roads and construction for duke phase 2, the traffic volume for duke Survey. Both these studies and reports were approved highways in the Kuala Lumpur city. We want to be is expected to double. before the Concession Agreement was signed with the market leaders. With Duke, we are the highway Malaysian Government on 12th August 2004. connectors and the missing link. With capital coming in, I The 18km DUKE highway started operations in April will propose more highways but I won’t overstress my 2009. Formerly known as the Kuala Lumpur North East The Expressway was officially launched by the Works company financially. Because our infrastructure division Expressway (KLNEE), the expressway was a prominent Minister, Yang Berhormat Dato Mohd Zin Mohamed, on 9 grew so big, we decided that we should divest the 40 per element in the Kuala Lumpur Road Master Plan as January 2009.. Designed to cater for 120,000 vehicles cent to EPF. The relationship with EPF is very good as highlighted in the Japan International Corporation per day, the Expressway will offer an attracitve they trust us,” said Lim. He further acknowledged that Agency (JICA) Transport Study which was carried out for alternative route for residents in the Klang Valley, Ekovest was set to remain a strong player in the the Dewan Bandaraya Kuala Lumpur (DBKL) in 1985. especially for those travelling from east to west and vice construction sector, backed by a solid track record and Earmarked by DBKL as one of the key links to complete versa and for those heading towards the city centre. confidence brought on by investments from EPF. the Kuala Lumpur Master Traffic Dispersal Plan, 03 04 EKOVEST Sustainability EKOVESTaccess SRI DAMANSARA LINK TUN RAZAK LINK Commences at the Menjalara Commences at Jalan Tun Razak near KL DESCRIPTION Interchange at Bandar Hospital/IJN and traverses northwards Menjalara on the west and along Jalan Pahang and Jalan 9/48A to traversing eastward to the connect to the existing Jalan Gombak Segambut Interchange at after crossing existing DUKE at Sentul DUKE Jalan Segambut. Pasar Interchange. HIGHWAY LENGTH 7 km 9 km CARRIAGEWAY Dual-three carriageway (6 lanes) DUKE Phase 2 is the answer to enhanced accessibility in the North-western catchments 2 INTERCHANGES Two interchanges and a pair of One trumpet interchange and of Rawang, Sungai Buloh and beyond.
Recommended publications
  • KL Main Kuala Lumpur Main FT Bukit Bintang FT Jalan Klang Lama FT Jalan Pudu FT Jalan Tun H.S
    STATE BRANCHES/SERVICE CENTRES/PBC KL Main Kuala Lumpur Main FT Bukit Bintang FT Jalan Klang Lama FT Jalan Pudu FT Jalan Tun H.S. Lee FT Medan Tuanku FT Taman Tun Dr. Ismail FT Taman Setiawangsa FT Rivercity,Jln Ipoh FT KLCC FT Kepong Prima FT Bandar Sri Permaisuri FT Seksyen 5, Wangsa Maju FT Bangsar Baru S'GOR Banting S'GOR Damansara Utama S'GOR Kajang S'GOR Klang S'GOR Rawang S'GOR Shah Alam Main S'GOR SS 2 (Jln 2/63) S'GOR Bandar Sunway S'GOR Pandamaran S'GOR Petaling Jaya Main S'GOR Bandar Puteri Puchong NS Seremban NS Seremban 2 PRK Ipoh Garden PRK Jelapang PRK Menglembu PRK Pasir Putih PRK Jalan Sultan Idris Shah PRK Taiping PRK Tanjong Malim PRK Sitiawan PRK Kamunting JHR Jalan Tebrau JHR Johore Bharu Main JHR Jalan Zabedah, Batu Pahat JHR Bkt Pasir, Batu Pahat JHR Taman Molek JHR Taman Daya JHR Taman Perling MCCA Taman Malim Jaya PP Bayan Lepas PP Butterworth PP Jelutong PP Penang Road PP Penang Main PLS Kangar PHG Kuantan Main PHG Jln Beserah KDH Alor Setar KDH Jitra KDH Lagenda Height KLTN Kota Bharu KLTN Tanah Merah KLTN Wakaf Siku T'GANU Kemaman SBH Kota Kinabalu SBH Tawau SWK Kuching Main SWK Boulevard Centre, Miri SWK Kuching Selatan SWK Sibu FT Ampang Park FT Kompleks Bandar FT Bukit Damansara FT Jalan Ipoh FT Jalan Raja Laut FT Jalan Raja Muda FT Jinjang FT Setapak FT Taman Midah FT Desa Park City FT Wisma Sime Darby FT Wisma Genting FT Selayang FT Sentul Raya FT Mid Valley FT Desa Pandan FT Jalan Bunus FT KL Sentral FT Desa Sri Hartamas FT Jalan P.Ramlee FT Kuchai Lama FT Alam Damai FT Taman Cheras Makmur FT Taman Connaught FT Mont Kiara FT MIB TTDI FT Dataran Maybank S'GOR Genting Highlands S'GOR Jalan 222 S'GOR Kelana Jaya S'GOR Kepong S'GOR PJ Old Town S'GOR SEA Park S'GOR Section 18, Shah Alam S'GOR Section 20, Shah Alam S'GOR Subang Jaya S'GOR Taman Melawati S'GOR Subang Perdana S'GOR Wisma Consplant S'GOR Pandan Indah S'GOR USJ Subang Jaya S'GOR Bandar Sri Damansara S'GOR Taman Bukit Emas S'GOR Menara Klang, Jalan Raja Hassan S'GOR TTDI Jaya S'GOR Bdr.
    [Show full text]
  • Geological Structure and Geomorphological Aspects in Karstified Susceptibility Mapping of Limestone Formations
    Available online at www.sciencedirect.com ScienceDirect Procedia Chemistry 19 ( 2016 ) 659 – 665 5th International Conference on Recent Advances in Materials, Minerals and Environment (RAMM) & 2nd International Postgraduate Conference on Materials, Mineral and Polymer (MAMIP), 4-6 August 2015 Geological Structure and Geomorphological Aspects in Karstified Susceptibility Mapping of Limestone Formations H. Zabidi1*, M. Termizi2, S. Aliman2, K. S. Ariffin1 and N. L. Khalil1* 1Strategic Mineral Niche Group, School of Materials and Mineral Resources Engineering,Engineering Campus, Universiti Sains Malaysia, Penang, Malaysia 2SBA Consultants Sdn Bhd Abstract Major cavities and underground drainage tend to develop with the aid of massive or thick-bedded and well-jointed limestone whilst porous and soft limestone is more likely to form micro-cavities and localized karst along bedding and close to ground level. This phenomenon wouldprobablybe explained by studying the movement of water circulating through the pores in the limestone. Strong correlations between fracture patterns and drainage lines/cavity zones have been long suspected by many researchers in the past (Mayer, et al., 2003). An assumption has been made that fractures offer lines of decreased hydraulic resistance to groundwater flow and therefore they are more easily exploited by weathering and erosion processes than their adjacent rock (Sower, 1975 and Ericson et al., 2004). The end product of the weathering and erosion process is a river channel or active cavity, developed along fractures orientation. Thus, the karstic surfaces are consistently developed along the joint sets orientated at limestone is strongly fractured with the dominant joint orientations.In this paper, a methodology for karstified susceptibility assessment of three selected limestone formations is presented specifically looking at tectonic history, joint pattern, and topographyand karstification intensity.
    [Show full text]
  • Asian Insights Sparx
    Asian Insights SparX KL-SG High Speed Rail Refer to important disclosures at the end of this report DBS Group Research . Equity 27 Jun 2019 KLCI : 1,676.61 Riding the HSR revival Success of Bandar Malaysia hinges on HSR Analyst Tjen San CHONG, CFA +60 3 26043972 [email protected] Holistic project financing is key QUAH He Wei, CFA +603 2604 3966 [email protected] Strong catalyst to revitalise property market STOCKS Top picks – IJM Corp, Gamuda, Matrix Concepts 12-mth HSR revival. Two key events unfolded in 2Q19 which could pave the Price Mkt Cap Target Price Performance (%) way for the recommencement of the Kuala Lumpur (KL)-Singapore(SG) RM US$m RM 3 mth 12 mth Rating high-speed rail (HSR) project in May 2020. First, MyHSR Corp called for a Technical Advisory Consultant (TAC) and a Commercial Advisory Gamuda 3.62 2,165 4.30 27.5 11.0 BUY Consultant (CAC) tender. Second is the revival of the Bandar Malaysia. IJM Corp 2.40 2,108 2.55 8.6 32.6 BUY Muhibbah 2.77 323 3.55 (6.1) (9.5) BUY The revival would be timely for construction as it will ensure a growth WCTEngineering Holdings Bhd 1.05 358 1.37 30.6 33.0 BUY agenda during the mid-term of the PH-led government. From an Kimlun Corp 1.40 113 2.16 15.7 2.9 BUY economic standpoint, the project would appear feasible given that the Sunway 2.02 631 1.91 9.2 8.6 HOLD KL-SG flight route remains the world’s busiest.
    [Show full text]
  • 191 Bus Time Schedule & Line Route
    191 bus time schedule & line map 191 Taman Sri Segambut ⇌ Chow Kit View In Website Mode The 191 bus line (Taman Sri Segambut ⇌ Chow Kit) has 2 routes. For regular weekdays, their operation hours are: (1) Chow Kit: 6:00 AM - 11:30 PM (2) Taman Sri Segambut: 6:00 AM - 11:30 PM Use the Moovit App to ƒnd the closest 191 bus station near you and ƒnd out when is the next 191 bus arriving. Direction: Chow Kit 191 bus Time Schedule 40 stops Chow Kit Route Timetable: VIEW LINE SCHEDULE Sunday 6:00 AM - 11:30 PM Monday 6:00 AM - 11:30 PM Masjid Al-Qurtubi Tuesday 6:00 AM - 11:30 PM Taman Sri Segambut (Selatan) Wednesday 6:00 AM - 11:30 PM Pusat Komersial Taman Sri Segambut Thursday 6:00 AM - 11:30 PM Taman Sri Segambut (Barat) Friday 6:00 AM - 11:30 PM Dewan Serbaguna Taman Pusat Kepong Saturday 6:00 AM - 11:30 PM (Selatan) Dewan Serbaguna Taman Pusat Kepong (Utara) 191 bus Info Taman Pusat Kepong (Utara) Direction: Chow Kit Taman Sri Segambut (Timur) Stops: 40 Trip Duration: 24 min Line Summary: Masjid Al-Qurtubi, Taman Sri Kuil Sri Maha Mariamman Taman Sri Segambut Segambut (Selatan), Pusat Komersial Taman Sri (Barat) Segambut, Taman Sri Segambut (Barat), Dewan Serbaguna Taman Pusat Kepong (Selatan), Dewan Kuil Sri Maha Mariamman Taman Sri Segambut Serbaguna Taman Pusat Kepong (Utara), Taman (Timur) Pusat Kepong (Utara), Taman Sri Segambut (Timur), Kuil Sri Maha Mariamman Taman Sri Segambut Rumah Panjang Sri Segambut (Barat) (Barat), Kuil Sri Maha Mariamman Taman Sri Segambut (Timur), Rumah Panjang Sri Segambut Rumah Panjang Sri Segambut (Timur)
    [Show full text]
  • Ampang Point Branch Temporarily Closed Bandar Sri Damansara
    NOTICE : REVISED OPERATING HOURS AS AT 12 JULY 2021 Updated as at 9.45am 12 July 2021 Updates are highlighted in yellow. Our Customer Contact Centre has been operating on a reduced capacity since 26 January 2021, in order to ensure the health and safety of our employees and to comply with the SOP on social distancing. You may reach us at [email protected] offsite ATMs and Cheque Deposit for Machinesassistance. (SSTs) within the MCO areas will be operational from 6.00am to 10.00pm. SSTs within branches will operate as stated below. Branch Operating Hours Branch Operating Hours SST Operating Hours SST Operating Hours RHB BANK - KLANG VALLEY NORTH REGION Notes From To From To Ampang Point Branch Temporarily closed Bandar Sri Damansara Branch 9.15am 2.00pm 8.00am 8.00pm Dataran Wangsa Melawati Branch Temporarily closed 8.00am 8.00pm Jalan Pasar Branch 9.15am 2.00pm 8.00am 8.00pm Kepong Branch 9.15am 2.00pm 8.00am 8.00pm Kuala Lumpur Main Branch 9.15am 2.00pm 8.00am 8.00pm Kota Damansara Branch 9.15am 2.00pm 8.00am 8.00pm Pandan Indah Branch 9.15am 2.00pm 8.00am 8.00pm Rawang Branch 9.15am 2.00pm 8.00am 8.00pm Setapak Branch 9.15am 2.00pm 8.00am 8.00pm Pasar Borong Selayang Branch 9.15am 2.00pm 8.00am 8.00pm Bandar Baru Sg Buloh Branch Temporarily closed Jinjang Utara Branch 9.15am 2.00pm 8.00am 8.00pm Jalan Bukit Bintang Branch 9.15am 2.00pm 8.00am 8.00pm Plaza OSK Branch 9.15am 2.00pm 8.00am 8.00pm Jalan Raja Laut Branch 9.15am 2.00pm 8.00am 8.00pm Cawangan Utama Kuala Lumpur 9.15am 2.00pm 8.00am 8.00pm KLCC Branch 9.30am 2.00pm
    [Show full text]
  • TA Securities COMPANY UPDATE Tues Day , 14 February , 201 7 a Member of the TA Group FBMKLCI : 1, 710 .24
    TA Securities COMPANY UPDATE Tues day , 14 February , 201 7 A Member of the TA Group FBMKLCI : 1, 710 .24 MENARA TA ONE, 22 JALAN P. RAM LEE, 50250 KUALA LUMPUR, MALAYSIA TEL: +603 -20721277 / FAX: +603 -20325048 Sector: Construction Ekovest Berhad TP: RM 3.43 (+20.4%) A Cash Cow in the Making Last traded: RM2.85 THIS REPORT IS STRICTLY FOR INTERNAL CIRCULATION ONLY* Not Rated Ooi Beng Hooi +603-2167-9612 [email protected] www.taonline.com.my Despite a sharp rally in sha re price of 166. 4% since early -2015, we still Share Information think the stock is undervalued and see long term value in this rising star. Bloomberg Code EKO MK We like the company for its i) sizeable outstanding construction order book; Stock Code 8877 Listing Main Market ii) likelihood of sustaining its construction order book for another 5 to 10 Share Cap (mn) 855.5 years; iii) potential unlocking of asset value through IPO for its Market Cap (RMmn) 2438.0 expressways; iv) potential REITing of its shopping malls in long term; and Par Value 0.50 v) potential transformation into a prominent cash cow in long run. We 52-wk Hi/Lo (RM) 1.01/2.88 arrive at a fair value of RM3.43/share. NOT RATED 12-mth Avg Daily Vol ('000 shrs) 1,603.7 Estimated Free Float (%) 40.8 Listed on the Second Board of Bursa Malaysia in 1993 and promoted to the Beta 0.36 Major Shareholders (%) Main Board in 2000, Ekovest Berhad is involved in construction, property Lim Kang Hoo - 20.19 development and highway toll operation.
    [Show full text]
  • BANDAR MALAYSIA FAQ IWH-CREC Sdn Bhd (ICSB)
    BANDAR MALAYSIA FAQ IWH-CREC Sdn Bhd (ICSB) has signed a deal to acquire 60% of Bandar Malaysia Sdn Bhd (BMSB) equity from TRX City Sdn Bhd (TRXC) on 17th December 2019 for a consideration of RM6.45 billion. 1. Who is IWH-CREC Sdn Bnd (ICSB)? ICSB is a joint venture between Iskandar Waterfront Holdings Sdn Bhd (IWH) and China Railway Engineering Corp (M) Sdn Bhd (CRECM). IWH holds 60% interest in ICSB and the remaining 40% is by CRECM. CRECM is a 100% owned subsidiary of CREC. CREC is a world-leading construction conglomerate with more than 120 years history. As one of the world’s largest construction and engineering contractors, CREC takes a leading position in infrastructure construction, industrial equipment manufacturing and real estate development. Over the decades, the CREC has built more than 2/3 of China’s national railway network and 90% of China’s electrified railway. IWH shareholding is 37% Kumpulan Prasarana Rakyat Johor (KPRJ – Johor State Govt) and 63% Credence Resources (Tan Sri Dato’ Lim Kang Hoo). At the BMSB level, there will be approximately 76% Malaysian/local interest or 53% federal/state’s interest. Credence KPRJ Resources China Railway (Johor (TS Lim Engineering State Govt) Kang Hoo) Corporation 37% 63% (M) Sdn. Bhd. 100% China Railway Iskandar Engineering Waterfront Corporation (M) Holdings Sdn. Bhd Sdn. Bhd. Bhd. 60% 40% IWH CREC Sdn. Bhd. 2. Who is TRX City Sdn Bhd (TRXC)? TRXC is a wholly owned subsidiary of the Ministry of Finance, Malaysia. TRXC was formerly a subsidiary of 1Malaysia Development Bhd before it was transferred to MoF due to mounting 1MDB debts and the inability to fund the TRXC projects, including Bandar Malaysia.
    [Show full text]
  • Taman Sri Segambut to See Its ˎrst High-Rise Residences
    EP 2 FRIDAY OCTOBER 6, 2017 • THEEDGE FINANCIAL DAILY NEWS HIGHLIGHTS from www.EdgeProp.my Tropicana TRX Residences eyes 1Q18 launch founder’s son Dion Tan is new MD; CEO TRX Residences, the residential com- es will comprise about 900 units, Yau retires ponent of the 17-acre TRX Lifestyle but not all of these units will be Tropicana Corp Bhd has redesignat- Quarter, is aiming to launch its fi rst launched simultaneously, said ed its executive director, 27-year-old homes sometime in the fi rst quarter Lendlease Malaysia residential di- Dion Tan, the son of founder and of next year. rector Eric Chan. largest shareholder Tan Sri Danny The TRX Lifestyle Quarter is part The unit sizes, which may range Tan Chee Sing who has a 30.45% of the 70-acre Tun Razak Exchange from 1-bedroom units of 500 sq ft to stake in the company, as managing (TRX) development which is set to be- 4-bedroom units of 2,000 sq ft, will director eff ective Oct 2. come a world-class fi nancial district be designed to cater for a broader Dion’s eldest brother, Datuk Dick- in Kuala Lumpur. It will encompass swathe of Malaysian property buy- son Tan Yong Long, is Tropicana’s investment Grade A offi ce space un- ers, said Lendlease Malaysia man- deputy group CEO, while another derpinned by world-class residential, aging director Stuart Mendel. brother, Dillon Tan Yong Chin, is an hospitality, retail, leisure and cultur- TRX Residences will comprise six executive director. al off erings. towers of 40 to 57 storeys each that Meanwhile, Tropicana said CEO The fi rst phase of TRX Residenc- will off er a total of 2,400 homes.
    [Show full text]
  • Bandar Malaysia Jv Partners Settle Contractual Obligations to Government
    PRESS RELEASE FOR IMMEDIATE RELEASE BANDAR MALAYSIA JV PARTNERS SETTLE CONTRACTUAL OBLIGATIONS TO GOVERNMENT ALL IS CLEAR FOR PROJECT TO TAKE OFF NOW KUALA LUMPUR, SEPTEMBER 15 2020 – Bandar Malaysia, the single largest city development in the region, is now ready to take off with the settlement of the RM1.24 billion payment due to the Federal Government by IWH-CREC Sdn Bhd. A total of RM1,24 billion has been paid by IWH-CREC, under the revised share sale agreement and shareholders’ agreement, which includes the 10-per cent deposit and a RM500 million advance payment to TRX City Sdn Bhd, which is wholly owned by Minister of Finance Inc. Under the agreements, IWH-CREC will take up a 60-per cent stake in Bandar Malaysia Sdn Bhd, the project’s master developer, from TRX City, with the remaining 40- per cent held by the Ministry of Finance. IWH-CREC is a joint venture between Iskandar Waterfront Holdings Sdn Bhd (IWH) and China state-owned enterprise, China Railway Engineering Corporation (CREC). The Johor State Government also has an interest through Kumpulan Prasarana Rakyat Johor Sdn Bhd (KPRJ), which owns 37-per cent of IWH. Page 1 of 5 At a ceremony today, IWH, led by its executive vice chairman Tan Sri Lim Kang Hoo and CREC Malaysia Chairman Mr Chen ZhiGong handed over a cheque for RM1.24 billion to TRX City Sdn Bhd represented by Dato’ Asri bin Hamidon, witnessed by Minister of Finance YB Senator Dato’ Sri Tengku Zafrul Bin Tengku Abdul Aziz, Minister of Transport Datuk Seri Dr Wee Ka Siong, Ambassador Extraordinary and Plenipotentiary of the People's Republic of China to Malaysia, H.E.
    [Show full text]
  • Avara Brochure 12.5Inc Square 32Pages ENG FA Web
    www.avara.com.my Developer : BA SHENG SDN BHD (1058822-W) No. 10 (Lot 30), Jalan Seputeh, 58000 Kuala Lumpur. T: +603-7972 3365 Developer’s License No.: __________ • Validity: __________ – __________ • Advertising Permit No.: __________ • Validity: __________ – __________ • Building Plan Approving Authority: Dewan Bandaraya Kuala Lumpur • Building Plan Approval No.: BP S1 OSC 2017 1667 • Expected Date of Completion: 48 months (October 2021) • Land Tenure: Freehold • Land Encumbrances: Charged To RHB Bank Berhad (October 2021) • Type of Property: Serviced Apartment • Total Units: 366 • Selling Price: Type A (46 Units - 667 sq ft) – RM731,250.00 (Min.) RM821,250.00 (Max.) • Type A1 (23 Units - 689 sq ft) – RM757,500.00 (Min.) RM843,750.00 (Max.) • Type B (23 Units - 807 sq ft) – RM868,750.00 (Min.) RM958,750.00 (Max.) • Type C (91 Units - 829 sq ft) – RM890,000.00 (Min.) RM980,000.00 (Max.) • Type D (46 Units - 915 sq ft) RM970,000.00 (Min.) RM1,067,500 (Max.) • Type E (23 Units - 1,087 sq ft) RM1,126,250.00 (Min.) RM1,217,500.00 (Max.) • Type F (23 Units - 926 sq ft) RM981,250.00 (Min.) RM1,071,250.00 (Max.) • Type G (23 Units - 1,076 sq ft) RM1,116,250.00 (Min.) RM1,207,500.00 (Max.) • Type H (22 Units - 850 sq ft) RM910,000.00 (Min.) RM1,000,000.00 (Max.) Type I (46 Units - 1,216 sq ft) RM1,238,750.00 (Min.) RM1,328,750.00 (Max.) • Bumiputra Discount: 5% • Restriction in Interest: N/A. IKLAN INI TELAH DILULUSKAN OLEH JABATAN PERUMAHAN NEGARA.
    [Show full text]
  • Greater Kuala Lumpur: Bridge Between Asia and the World Why Greater Kuala Lumpur Is the Ideal Business Hub for Regional and Global Companies
    www.pwc.com/my Greater Kuala Lumpur: Bridge between Asia and the world Why Greater Kuala Lumpur is the ideal business hub for regional and global companies July 2017 This publication has been prepared for general guidance on matters of interest only, and does not constitute professional advice. You should not act upon the information contained in this publication without obtaining specific professional advice. No representation or warranty (express or implied) is given as to the accuracy or completeness of the information contained in this publication, and, to the extent permitted by law, PwC, its members, employees and agents do not accept or assume any liability, responsibility or duty of care for any consequences of you or anyone else acting, or refraining to act, in reliance on the information contained in this publication or for any decision based on it. ©2017 PwC. All rights reserved. “PricewaterhouseCoopers” and/or “PwC” refers to the individual members of the PricewaterhouseCoopers organisation in Malaysia, each of which is a separate and independent legal entity. Please see www.pwc. com/structure for further details. 2 Greater Kuala Lumpur: Bridge between Asia and the world Foreword Asia remains the world’s growth driver, and Greater Kuala Lumpur is at the heart of it In PwC’s World in 2050 report, released earlier this year, Foreign investors are particularly interested in using we continue to foresee the shift in global economic power Malaysia and Greater KL as their regional operational away from established advanced economies towards hub to tap into the growing opportunities in emerging emerging economies in Asia.
    [Show full text]
  • Pejabat Pilihan Raya Negeri Wilayah Persekutuan Kuala Lumpur & Putrajaya
    PEJABAT PILIHAN RAYA NEGERI WILAYAH PERSEKUTUAN KUALA LUMPUR & PUTRAJAYA SENARAI TEMPAT PAMERAN RANG DAFTAR PEMILIH BAGI PARLIMEN BATU UNIT PENDAFTARAN TEMPAT PAMERAN Kampong Selayang Lama Dewan Masyarakat Desa (115/00/01) Taman Batu Muda Kuala Lumpur Taman Wahyu Dewan Masyarakat Desa (115/00/02) Taman Batu Muda Kuala Lumpur Pekan Batu Pejabat Persatuan Penduduk Taman Kaya Spring Fields (115/00/03) Jalan St. Thomas, Bt. 3 1/2 Jalan Ipoh Kuala Lumpur Taman Batu Muda Dewan Masyarakat Desa (115/00/04) Taman Batu Muda Kuala Lumpur Changkat Pusat Rukun Tetangga Sektor (115/00/05) Taman Melewar Kuala Lumpur Batu Muda Pejabat Persatuan Penduduk Taman Kaya Spring Fields (115/00/06) Jalan St. Thomas, Bt. 3 1/2 Jalan Ipoh Kuala Lumpur Kampong Padang Balang Pusat Rukun Tetangga Sektor (115/00/07) Taman Melewar Kuala Lumpur Jinjang Tempatan Keduabelas Pejabat Kecil Dewan Bandaraya (DBKL) (115/00/08) Cawangan Kepong, Jinjang Kuala Lumpur Batu Kantomen Pejabat Persatuan Penduduk Taman Kaya Spring Fields (115/00/09) Jalan St. Thomas, Bt. 3 1/2 Jalan Ipoh Kuala Lumpur Taman Rainbow Pejabat Persatuan Penduduk Taman Kaya Spring Fields (115/00/10) Jalan St. Thomas, Bt. 3 1/2 Jalan Ipoh Kuala Lumpur Sentul Pasar Pondok Kawalan Rukun Tetangga (115/00/11) Pangsapuri Fasa 3, Bandar Baru Sentul, Kuala Lumpur 1 | Page PEJABAT PILIHAN RAYA NEGERI WILAYAH PERSEKUTUAN KUALA LUMPUR & PUTRAJAYA SENARAI TEMPAT PAMERAN RANG DAFTAR PEMILIH BAGI PARLIMEN BATU UNIT PENDAFTARAN TEMPAT PAMERAN Sentul Tengah Pondok Kawalan Rukun Tetangga (115/00/12) Pangsapuri Fasa 3, Bandar
    [Show full text]