Edim Otop Gully Erosion Site in Calabar Municipality, Cross River State

Total Page:16

File Type:pdf, Size:1020Kb

Edim Otop Gully Erosion Site in Calabar Municipality, Cross River State FEDERAL REPUBLIC OF NIGERIA Public Disclosure Authorized THE NIGERIA EROSION AND WATERSHED MANAGEMENT PROJECT (NEWMAP) Public Disclosure Authorized FINAL REPORT OF THE ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) FOR EDIM OTOP GULLY EROSION SITE IN CALABAR Public Disclosure Authorized MUNICIPALITY, CROSS RIVER STATE Public Disclosure Authorized State Project Management Unit (SPMU) Cross River State, Calabar TABLE OF CONTENTS Cover Page i Table of Contents ii List of Tables vii List of Figures viii List of Plates ix Executive Summary xi CHAPTER ONE – INTRODUCTION 1 1.1 Background 1 1.2 Description of the Proposed Intervention 3 1.3 Rationale for the Study 5 1.4 Scope of Work 5 CHAPTER TWO - INSTITUTIONAL AND LEGAL FRAMEWORK 7 2.1 Background 7 2.2 World Bank Safeguard Policies 8 2.2.1 Environmental Assessment (EA) OP 4.01 9 2.2.2 Natural Habitats (OP 4.04) 9 2.2.3 Pest Management (OP 4.09) 10 2.2.4 Forest (OP 4.36) 10 2.2.5 Physical Cultural Resources (OP 4.11) 11 2.2.6 Involuntary Resettlement (OP 4.12) 11 2.2.7 Safety of Dams OP 4.37 12 2.2.8 Projects on International Waterways OP 7.50 12 2.3 National Policy, Legal, Regulatory and Administrative Frameworks 13 2.3.1 The Federal Ministry of Environment (FMENV) 13 2.3.2 The National Policy on the Environment (NPE) of 1989 14 2.3.3 Environmental Impact Assessment Act No. 86, 1992 (FMEnv) 14 2.3.4 The National Guidelines and Standards for Environmental Pollution Control in Nigeria 14 2.3.5 The National Effluents Limitations Regulation 15 ii 2.3.6 The NEP (Pollution Abatement in Industries and Facilities Generating Waste) Regulations 15 2.3.7 The Management of Solid and Hazardous Wastes Regulations 15 2.3.8 National Guidelines on Environmental Management Systems (1999) 15 2.3.9 National Guidelines for Environmental Audit 15 2.3.10 National Policy on Flood and Erosion Control 2006 (FMEnv) 16 2.3.11 National Air Quality Standard Decree No. 59 of 1991 16 2.3.12 The National Environmental Standards and Regulations Enforcement Agency Act 2007 (NESREA Act) 16 2.3.13 The National Oil Spill Detection and Response Agency Act 2005 (NOSDRA ACT) 16 2.4 Other Relevant Acts and Legislations at Federal and State Levels 16 2.4.1 Land Use Act of 1978 16 2.4.2 Forestry Act of the Nation 17 2.4.3 Criminal Code 18 2.4.4 Inland Waterways Authority (NIWA) 18 2.5 State Legislations 18 2.5.1 Rivers State Ministry of Environment 19 CHAPTER THREE - ENVIRONMENTAL AND SOCIAL BASELINE CONDITION 21 3.1 Description of the Proposed Intervention Project Area 21 3.2 General Environment of the Project Location 26 3.2.1 Climate and Meteorology 26 3.3 Air Quality and Noise 29 3.3.1 Ambient Air Quality 29 3.3.2 Ambient Noise Levels 31 3.3.3 Geology and Hydrogeology of the Project Area 32 3.3.4 Soil Quality of the Proposed Project Area 34 3.3.5 Metal Content of the Soils 36 3.3.6 Surface Water 38 3.3.7 Ground Water 42 iii 3.4 Ecosystem 43 3.4.1 Vegetation 44 3.4.1.1 Plant Characterization / Identification 45 3.4.1.2 Plant Physiognomy 45 3.4.1.3 Inventory of economic crops 46 3.4.2 Fauna and wildlife resources 47 CHAPTER FOUR - SOCIO-ECONOMIC CHARACTERISTICS AND CONSULTATION 50 4.1 Background 50 4.2 Methodology 50 4.3 Settlement and Population Characteristics of the Proposed Project Area 54 4.3.1 Population Estimation and Projection 55 4.4 Socio-Demographic Characteristics of Sampled Individuals and Households 57 4.4.1 Age and Gender Profile of Respondents 58 4.4.2 Current Marital Status of Respondents 59 4.4.3 Educational Status of Respondents 60 4.4.4 Occupation of Respondents 62 4.4.5 Residential Status and Duration of Residence of Respondents 63 4.4.6 Size of Sampled Households 65 4.5 Assessment of Health Status of Respondents 66 4.5.1 Health Management Records of Respondents 66 4.5.2 Ailments/Diseases Affecting Respondents in the Proposed Project Area 67 4.6 Standard of Living of Sampled Individuals and Households 68 4.6.1 Household Monthly Income 69 4.6.2 Housing Characteristics of Proposed Project Affected Communities 69 4.6.3 Solid Waste Management 71 4.6.4 Accessible Sources of Water 71 4.6.5 Assessment of Standard of Living 72 4.7 Assessment of Social and Environmental Issues 74 4.7.1 Impacts of Existing Gully 76 4.7.2 Potential Impacts of the Proposed Intervention Project 79 iv 4.8 Most Pressing Socio-Economic Concerns 81 CHAPTER FIVE - POTENTIAL IMPACTS AND ANALYSIS OF ALTERNATIVES 82 5.1 Assessment of Potential Impacts of the Proposed Intervention 82 5.1.1 Potential Positive Impacts 82 5.1.2 Potential Negative Impacts 84 5.2 Social Impacts 87 5.2.1 Cultural Impacts 88 5.2.2 Impact on Agriculture, Settlements and Community Facilities 88 5.2.3 Solid Waste Management 89 5.2.4 Health Issues 89 5.2.5 Safety Issues 89 5.3 Analysis of Alternatives 90 5.3.1 No-Action Alternative 90 5.3.2 The Use of Civil Works 91 CHAPTER SIX - ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN 94 6.1 Mitigation Measures 94 6.1.1 Mitigation Measures at the Pre-Construction Phase 94 6.1.2 Mitigation Measures at the Construction Phase 95 6.1.3 Operation and Maintenance Phase 103 6.2 Institutional Responsibilities and Accountabilities 111 6.2.1 Pre-construction Phase 111 6.2.2 Construction Phase 112 6.2.3 Operational and Maintenance Phase 114 6.3 Environment and Social Monitoring Plan Measures 116 6.3.1 Flora and Fauna Management Plan 116 6.3.2 Waste Management Plan 118 6.3.3 Erosion and Sedimentation Management Plan 119 6.3.4 Employment, Training, and Awareness Management Plan 122 6.3.5 Water Management Plan 122 v 6.3.6 Air Quality Management Plan 123 6.3.7 Vegetation Clearing and Biomass Management Plan 123 6.3.8 Emergency Response and Incident Management Plan 124 6.3.9 Cultural Heritage Management Plan 125 6.3.10 Traffic and Vehicle Management Plan 126 6.3.11 Social Investment Plan 126 6.3.12 Health, Safety, and Security Management Plan 127 6.3.13 Community Health & Safety Plan 129 6.3.14 Stakeholders‟ Engagement Plan 130 6.3.15 Resettlement Action Plan (RAP) 131 6.3.16 Training Programmes 132 6.4 Monitoring and Evaluation 133 6.5 Implementation Schedule 135 6.6 ESMP Costing and Cost Analysis 136 CHAPTER SEVEN - SUMMARY, RECOMMENDATIONS AND CONCLUSION 138 7.1 Summary of Findings 138 7.2 Recommendations 140 7.3 Conclusions 141 References 142 Appendix I 146 Appendix I 152 vi LIST OF TABLES Table 3.1: Some Precipitation and Temperature Characteristics of the Project Area 27 Table 3.2: Ambient Air Quality Results 31 Table 3.3: Physico-Chemical Properties of Top Soil (0 -15 cm) 34 Table 3.4: Physico-Chemical Properties of Sub Soils (15 -30 cm) 35 Table 3.5: Basic and Heavy Metal Concentrations of the Top Soil (0–15 cm) 37 Table 3.6: Basic and Heavy Metal Concentrations of the Sub Soil (15–30 cm) 37 Table 3.7: Physico-Chemical Parameters of Surface Water Samples from the Study Area in Calabar 40 Table 3.8: Concentrations of Cations and Anions in Surface Water Samples 40 Table 3.9: Heavy Metal Concentrations in Surface Water Samples 41 Table 3.10: Comparison of the Borehole Ground Water Quality with the World Health Organization (WHO) Standards for Potable Water 43 Table 3.11: List of crops and fruits planted in the project area 46 Table 3.12: List of Economic crops and trees 46 Table 3.13: List of bird species identified in the project area 48 Table 3.14: Butterfly taxonomy in the project area 48 Table 4.1: Details of the Sampling Methodology and the Questionnaires Administered 51 Table 4.2: Sickness/Ailment Affecting Sampled Households and Individuals 68 Table 4.3: Housing Characteristics of Proposed Project Affected Communities 70 Table 4.4: Accessible Sources of Water 72 Table 4.5: Impacts of Proposed Intervention Project 80 Table 5.1: Assessment of the „No Action‟ Alternative and Use of Civil Works 92 Table 6.1: Mitigation Measures for Pre-Construction Phase 98 Table 6.2: Mitigation Measures for the Environmental Impacts in the Construction Phase 99 Table 6.3: Mitigation Measures for the Biological Impacts in the Construction Phase 104 Table 6.4: Mitigation Measures for the Socioeconomic Impacts in the Construction Phase 105 Table 6.5: Mitigation Measures for the Public Health Impacts in the Construction Phase 107 Table 6.6: Mitigation Measures for Operation Phase 109 Table 6.7: Environment and Social Monitoring Plan Measures 131 Table 6.8: Institutional Capacity Strengthening Programme 132 vii Table 6.9: Monitoring and Evaluation Plan 135 Table 6.10: ESMP Implementation Schedule 136 Table 6.11: Cost Analysis of the Proposed Edim Otop Intervention Project 137 viii LIST OF FIGURES Fig.3.1: Cross River State Showing Calabar Municipality 22 Fig.3.2: Erosion and watershed Map of Calabar 23 Fig.3.3: Edim Otop Gully Topography 24 Fig.3.4: Private and Commercial Buildings and Public Infrastructure within the Edim Otop Gully and Watershed 25 Fig.3.5: Monthly Frequency of Occurrence of Sea Breeze Days 28 Fig.3.6: Air Quality Sample Points in the Study Area 30 Fig.3.7: Noise Level Sample Points in the Project Area 31 Fig.3.8: The Calabar Flank and Associated Formations 32 Fig.3.9: Soil Sample Points of the Proposed Project Area 39 Fig.3.10: Vegetation of the Project Area 45 Fig.4.1: Population Estimation and Projection of Cross River State 56 Fig.4.2: Population Estimation and Projection of Calabar Municipality LGA 57 Fig.4.3: Age of Respondents 58 Fig.4.4: Sex of Respondents 59 Fig.4.5: Marital Status of Respondents 60 Fig.4.6: Educational Status of Respondents 61 Fig.4.7: Occupation of Respondents 63 Fig.4.8: Residential Status of Respondents 64 Fig.4.9: Duration of Residence in the Area 65 Fig.4.10: Size of Sampled Households 66 Fig.4.11: Health
Recommended publications
  • Human Migratory Pattern: an Appraisal of Akpabuyo, Cross River State, Nigeria
    IOSR Journal Of Humanities And Social Science (IOSR-JHSS) Volume 22, Issue 7, Ver. 16 (July. 2017) PP 79-91 e-ISSN: 2279-0837, p-ISSN: 2279-0845. www.iosrjournals.org Human Migratory Pattern: An Appraisal of Akpabuyo, Cross River State, Nigeria. 1Iheoma Iwuanyanwu, 1Joy Atu (Ph.D.), 1Chukwudi Njoku, 1TonyeOjoko (Arc.), 1Prince-Charles Itu, 2Frank Erhabor 1Department of Geography and Environmental Science, University of Calabar, Calabar, Cross River State, Nigeria 2Department of Geography and Environmental Management, Ahmadu Bello University, Zaria, Kaduna State, Nigeria Corresponding Author: IheomaIwuanyanwu ABSTRACT: This study assessed migration in Akpabuyo Local Government Area (LGA) of Cross River State, Nigeria. The source regions of migrants in the area were identified; the factors that influence their movements, as well as the remittances of migrants to their source regions were ascertained. A total of 384 copies of questionnaires were systematically administered with a frequency of 230 and 153 samples for migrants and non-migrants respectively. Amongst other findings from the analyses, it was established that Akpabuyo is home to migrants from other LGAs and States, especially BakassiLGA and EbonyiState. There were also migrants from other countries such as Cameroon and Equatorial Guinea. The Pearson‟s correlation analysis depicted significant relationship (P = 0.012) between distance to Akpabuyo and the number of migrants that come into the area, implying that distance significantly influences migration to Akpabuyo. Furthermore, the Correspondence Analysis (CA) showed a weak association between the pull and push factors in the area, buttressed by the chi-square testwhich showed insignificant statistical similarity (p = 0.118). It was also established that migrants remitted 74% of their income to their source regions.
    [Show full text]
  • Heavy Metal Profiles in Various Matrices of the Bonny/New Calabar River Estuary, Niger Delta, Nigeria
    DOI: http://dx.doi.org/10.4314/gjes.v12i1.1 GLOBAL JOURNAL OF ENVIRONMENTAL SCIENCES VOL. 12, 2013: 1-11 1 COPYRIGHT© BACHUDO SCIENCE CO. LTD PRINTED IN NIGERIA ISSN 1596-6194 www.globaljournalseries.com , Email: [email protected] HEAVY METAL PROFILES IN VARIOUS MATRICES OF THE BONNY/NEW CALABAR RIVER ESTUARY, NIGER DELTA, NIGERIA B. B. BABATUNDE, F. D. SIKOKI, M. C. ONOJAKE, R. U. AKPIRI AND D. AKPULOMA ABSTRACT A study of the concentrations of Ca, Mg, K, Zn, Pb, Cd, Co, Cr, Cu, Fe, Ni and Na in the sediment, sea water, fish and crab of the Bonny/New Calabar River Estuary in Niger Delta, Nigeria was carried out using atomic absorption spectrophotometer A-100 for two consecutive years. The contamination levels of the respective metals varied between 2011 and 2012and the range of mean values for all metals in mg/kg were presented along with variations at statistically significant level (P <0.05) between the two years studied. Only K, Zn and Co exhibited variation in their concentrations in water samples between the two years at a statistical significant level (P <0.05) probability. In sediment, only Cr varied between the two years at a statistically significant level (P = 0.05). All metals concentrations were higher in sediment than in water samples.Bioaccumulation factor (BF) indicated a more potent source of metals from sediment than water with organisms accumulating Zn, Fe and Ni in the magnitude of 10, 6 and 5 times more from sediment than from water. Some metals were more accumulated in fish than crab and vice versa.
    [Show full text]
  • Nigeria's Constitution of 1999
    PDF generated: 26 Aug 2021, 16:42 constituteproject.org Nigeria's Constitution of 1999 This complete constitution has been generated from excerpts of texts from the repository of the Comparative Constitutions Project, and distributed on constituteproject.org. constituteproject.org PDF generated: 26 Aug 2021, 16:42 Table of contents Preamble . 5 Chapter I: General Provisions . 5 Part I: Federal Republic of Nigeria . 5 Part II: Powers of the Federal Republic of Nigeria . 6 Chapter II: Fundamental Objectives and Directive Principles of State Policy . 13 Chapter III: Citizenship . 17 Chapter IV: Fundamental Rights . 20 Chapter V: The Legislature . 28 Part I: National Assembly . 28 A. Composition and Staff of National Assembly . 28 B. Procedure for Summoning and Dissolution of National Assembly . 29 C. Qualifications for Membership of National Assembly and Right of Attendance . 32 D. Elections to National Assembly . 35 E. Powers and Control over Public Funds . 36 Part II: House of Assembly of a State . 40 A. Composition and Staff of House of Assembly . 40 B. Procedure for Summoning and Dissolution of House of Assembly . 41 C. Qualification for Membership of House of Assembly and Right of Attendance . 43 D. Elections to a House of Assembly . 45 E. Powers and Control over Public Funds . 47 Chapter VI: The Executive . 50 Part I: Federal Executive . 50 A. The President of the Federation . 50 B. Establishment of Certain Federal Executive Bodies . 58 C. Public Revenue . 61 D. The Public Service of the Federation . 63 Part II: State Executive . 65 A. Governor of a State . 65 B. Establishment of Certain State Executive Bodies .
    [Show full text]
  • Fear and Faith: Uncertainty, Misfortune and Spiritual Insecurity in Calabar, Nigeria Ligtvoet, I.J.G.C
    Fear and faith: uncertainty, misfortune and spiritual insecurity in Calabar, Nigeria Ligtvoet, I.J.G.C. Citation Ligtvoet, I. J. G. C. (2011). Fear and faith: uncertainty, misfortune and spiritual insecurity in Calabar, Nigeria. s.l.: s.n. Retrieved from https://hdl.handle.net/1887/22696 Version: Not Applicable (or Unknown) License: Leiden University Non-exclusive license Downloaded from: https://hdl.handle.net/1887/22696 Note: To cite this publication please use the final published version (if applicable). Fear and Faith Uncertainty, misfortune and spiritual insecurity in Calabar, Nigeria Inge Ligtvoet MA Thesis Supervision: ResMA African Studies Dr. Benjamin Soares Leiden University Prof. Mirjam de Bruijn August 2011 Dr. Oka Obono Dedicated to Reinout Lever † Hoe kan de Afrikaanse zon jouw lichaam nog verwarmen en hoe koelt haar regen je af na een tropische dag? Hoe kan het rode zand jouw voeten nog omarmen als jij niet meer op deze wereld leven mag? 1 Acknowledgements From the exciting social journey in Nigeria that marked the first part of this work to the long and rather lonely path of the final months of writing, many people have challenged, advised, heard and answered me. I have to thank you all! First of all I want to thank Dr. Benjamin Soares, for being the first to believe in my fieldwork plans in Nigeria and for giving me the opportunity to explore this fascinating country. His advice and comments in the final months of the writing have been really encouraging. I’m also grateful for the supervision of Prof. Mirjam de Bruijn. From the moment she got involved in this project she inspired me with her enthusiasm and challenged me with critical questions.
    [Show full text]
  • Rspo Notification of Proposed New Planting
    RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.otg/?q=page/535). It has also been posted on local on-site notice boards. Tick whichever is appropriate √ This is a completely new development and stakeholders may submit comments This is part of an ongoing planting and is meant for notifications only Company : Biase Plantation Limited (Calaro Extension) Subsidiary : Wilmar International Limited RSPO Membership No: 2-0017-05-000-00 on behalf Wilmar International Limited since on 15 August 2005 Location of Proposed New Planting: Atan Odot village and Uwet village, Odukpani and Akamkpa Local Government Area, Cross River State, Nigeria. GPS Reference: Calaro Extension Area of Biase Plantation Limited is geographically located on Latitude: 80 16‘51“to 80 21‘26“North and Longitude: 50 15‘ 30“ to 50 17‘ 47“ East. 1 RSPO New Planting Procedure Assessment Report CALARO Extension Estate of Biase Plantation Ltd – Cross River State, Nigeria Location of the Proposed New Planting Total area acquired by Biase Plantation Limited (BPL) according to the MoU between the government of Cross River State of Nigeria and Uwet & Atan Odot Communities / Ikot Eyidok dated on 10 January 2013 and MoU between the landlord communities and Biase Plantation Ltd dated on 10th December 2015 is 3,066.214ha (shown on survey plan no. RIU/CR/191/12). This included potential overlaps with the Uwet-Odot Forest Reserve and the Oban Forest Reserve. Subsequent re-demarcation has excluded the areas of overlap and reduced the total concession area to 2,368.94 Ha (Deed of grant between the government of Cross River State of Nigeria and Biase Plantations Ltd).
    [Show full text]
  • Cross River STATE-WIDE RAPID HEALTH FACILITY ASSESSMENT
    Report of the Cross River STATE-WIDE RAPID HEALTH FACILITY ASSESSMENT In Preparation for Elimination of Mother-to-Child Transmission of HIV March 2013 Report of the Cross River STATE-WIDE RAPID HEALTH FACILITY ASSESSMENT In Preparation for Elimination of Mother-to-Child Transmission of HIV May 2013 This publication may be freely reviewed, quoted, reproduced, or translated, in full or in part, provided the source is acknowledged. The mention of specific organizations does not imply endorsement and does not suggest that they are recommended by the Cross River State Ministry of Health over others of a similar nature not mentioned. Copyright © 2013 Cross River State Ministry of Health, Nigeria Citation: Cross River State Ministry of Health and FHI 360. 2013. Cross River State-wide Rapid Health Facility Assessment, Nigeria: Cross River State Ministry of Health and FHI 360. The Cross River State-wide Rapid Health Facility Assessment was supported in part by the U.S. Agency for International Development (USAID). FHI 360 provided assistance to the Cross River State Government to conduct this assessment. Financial assistance was provided by USAID under the terms of the Cooperative Agreement AID-620-A-00002, of the Strengthening Integrated Delivery of HIV/ AIDS Services Project. This report does not necessarily reflect the views of FHI 360, USAID or the United States Government. Table of Contents Foreword ......................................................................................................................................................................................................
    [Show full text]
  • Nigeria - Accessibility to Emonc Facilities in the State of Cross River
    Nigeria - Accessibility to EmONC facilities in the State of Cross River Last Update: March 2016 Nigeria - Accessibility to EmONC facilities for the Cross River State Table of Contents Acknowledgements ..................................................................................................................... 4 1. Introduction ............................................................................................................................. 5 2. Measured indicators and assumptions .................................................................................... 5 3. Tool used for the different analyses: AccessMod 5.0 ............................................................. 7 4. Data and national norms used in the different analyses .......................................................... 8 4.1 Statistical Data ............................................................................................................... 9 4.1.1 LGA Number of pregnant women for 2010 and 2015 ........................................... 9 4.2 Geospatial Data ........................................................................................................... 12 4.2.1 Administrative boundaries and extent of the study area ...................................... 13 4.2.2 Geographic location of the EmONC facilities and associated information ......... 17 4.2.4 Transportation network ........................................................................................ 26 4.2.5 Hydrographic network ........................................................................................
    [Show full text]
  • Cross River State
    CROSS RIVER STATE Geopolitical Profile: The name Cross River State was given in 1976 to the former South Eastern State which was created on May 27, 1967 from the former Eastern Region of Nigeria. The current Cross River State is what remains of it when Akwa Ibom State was carved out on 23rd of September, 1987. As presently constituted, Cross River State has 18 Local Government Areas namely; Abi, Akamkpa, Akpabuyo, Bakassi, Bekwarra, Biase, Boki, Calabar Municipality, Calabar South, Etung, Ikom, Obanliku, Obubra, Obudu, Odukpani, Ogoja, Yakurr, and Yala; with the city of Calabar as the State capital. The State has land area of 23,000 square kilometres and a population of 2,888,966 in 2006. With a growth rate of 2.9 per cent per annum, the estimated population for 2014 stands at 3,631,328, and a population density of 1,579 persons per square kilometre. Located within the tropical rainforest belt of Nigeria, Cross River State lies between longitudes 7⁰ 50’ and 9⁰ 28’ East and latitudes 4⁰ 28’and 6⁰ 55’ North. It shares a common boundary with The Republic of Cameroun in the East, Benue State in the North, Ebonyi and Abia States in the West, Akwa Ibom State in the South West and The Atlantic Ocean in the South. Its international boundaries make it a security hotspot and an axis of international trade. Cross River State, like other States in the country, returned to democratic governance in 1999 after the interventions of the military. It has since been governed by the People’s Democratic Party (PDP).
    [Show full text]
  • NIGERIA: Registration of Cameroonian Refugees September 2019
    NIGERIA: Registration of Cameroonian Refugees September 2019 TARABA KOGI BENUE TAKUM 1,626 KURMI NIGERIA 570 USSA 201 3,180 6,598 SARDAUNA KWANDE BEKWARA YALA DONGA-MANTUNG MENCHUM OBUDU OBANLIKU ENUGU 2,867 OGOJA AKWAYA 17,301 EBONYI BOKI IKOM 1,178 MAJORITY OF THE ANAMBRA REFUGEES ORIGINATED OBUBRA FROM AKWAYA 44,247 ABI Refugee Settlements TOTAL REGISTERED YAKURR 1,295ETUNG MANYU REFUGEES FROM IMO CAMEROON CROSS RIVER ABIA BIOMETRICALLY BIASE VERIFIED 35,636 3,533 AKAMKPA CAMEROON Refugee Settlements ODUKPANI 48 Registration Site CALABAR 1,058MUNICIPAL UNHCR Field Office AKWA IBOM CALABAR NDIAN SOUTH BAKASSI667 UNHCR Sub Office 131 58 AKPABUYO RIVERS Affected Locations 230 Scale 1:2,500,000 010 20 40 60 80 The boundaries and names shown and the designations used on this map do not imply official Kilometers endorsement or acceptance by the United Nations. Data Source: UNHCR Creation Date: 2nd October 2019 DISCLAIMER: The boundaries and names shown, and the designations used on this map do not imply official endorsement or acceptance by the United Nations. A technical team has been conducting a thorough review of the information gathered so as to filter out any data discrepancies. BIOMETRICALLY VERIFIED REFUGEES REGISTRATION TREND PER MONTH 80.5% (35,636 individuals) of the total refugees 6272 counteded at household level has been 5023 registered/verified through biometric capture of iris, 4025 3397 fingerprints and photo. Refugee information were 2909 2683 2371 also validated through amendment of their existing 80.5% information, litigation and support of national 1627 1420 1513 1583 586 VERIFIED documentations. Provision of Refugee ID cards will 107 ensure that credible information will effectively and efficiently provide protection to refugees.
    [Show full text]
  • Calabar Municipal Recreation Centre Expression Of
    CALABAR MUNICIPAL RECREATION CENTRE EXPRESSION OF INDIGENOUS CONTEXT IN RECREATIONAL FACILITY DESIGN BY EkpaAyahambemNtan DEPARTMENT OF ARCHITECTURE, AHMADU BELLO UNIVERSITY, ZARIA NIGERIA MAY 2014 1 CALABAR MUNICIPAL RECREATION CENTRE EXPRESSION OF INDIGENOUS CONTEXT IN RECREATIONAL FACILITY DESIGN BY EkpaAyahambemNtan B.sc Arch (ABU 2007) M.sc/ENV-DESIGN/01787/2006–2007 A DISSERTATION SUBMITTED TO THE SCHOOL OF POSTGRADUATE STUDIES, AHMADU BELLO UNIVERSITY, ZARIA NIGERIA IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF MASTER OF SCIENCE DEGREE IN ARCHITECTURE DEPARTMENT OF ARCHITECTURE, AHMADU BELLO UNIVERSITY, ZARIA NIGERIA MAY 2014. 2 DECLARATION I declare that the work in the dissertation entitled „CALABAR MUNICIPAL RECREATION CENTRE EXPRESSION OF INDIGENOUS CONTEXT, IN RECREATIONAL FACILITY DESIGN‟ has been performed by me in the Department of Architecture under the supervision of Dr. S. N Oluigbo and Dr. A. Ango The information derived from the literature has duly been acknowledged in the text and a list of references provided. No part of this dissertation was previously presented for another degree or diploma at any university. EkpaAyahambemNtan May, 2014 Name of student Signature Date 3 CERTIFICATION This dissertation entitled “CALABAR MUNICIPAL RECREATION CENTRE EXPRESSION OF INDIGENOUS CONTEXT, IN RECREATIONAL FACILITY DESIGN” by Ekpa .A. Ntan, meets the regulations governing the award of the degree of Master of Science of Ahmadu Bello University, Zaria, and is approved for its contribution to knowledge and literary presentation. _____________________________ ________________ Dr S. N. Oluigbo Date Chairman, Supervisory Committee _____________________________ ________________ Dr. A. Ango Date Member, Supervisory Committee __________________________ __________________ Dr. M.L. Sagada Date Member, Supervisory Committee _____________________________ ________________ Arc.
    [Show full text]
  • Conflict Incident Monthly Tracker
    Conflict Incident Monthly Tracker Cross River State: February - M a rch 20 1 8 B a ck gro und Municipal. Others: In February, Cameroonian Criminality was a driver of Violence Affecting gendarmes reportedly killed three fishermen This monthly tracker is designed to update Women and Girls (VAWG) in the state during and injured two others in a border Peace Agents on patterns and trends in the period. In January, for instance, a female community in Ikom LGA. The incident conflict risk and violence, as identified by the medical doctor was abducted in Calabar happened while the gendarmes were in Integrated Peace and Development Unit Municipal. Separately, in January, a female pursuit of separatists agitating for (IPDU) early warning system, and to seek medical doctor was kidnapped in Akamkpa Ambazonia Republic in Southern Cameroon. feedback and input for response to mitigate LGA. areas of conflict. Gang/Cult Violence: In January, four people Recent Incidents or Patterns and Trends were reportedly killed during a rival cult Issues, March 2018 D ec 2 01 7 -Fe b 20 1 8 clash between Bendeghe Mafia and another local cult group in Boki LGA. A policeman Incidents reported during the month related According to Peace Map data (see Figure 1), was reportedly injured during a shootout mainly to communal tensions, criminality, incidents reported during this period with the cultists. Separately, a man was and cult violence. included communal violence, criminality, reportedly shot dead by members of a cult Communal Tensions: Eight people were militancy, cult violence, and child trafficking. group, known as the King Crackers during a reportedly killed during a clash over a land Communal Violence: In February, a political assembly in Calabar South LGA.
    [Show full text]
  • Diatoms and Dinoflagellates of an Estuarine Creek in Lagos
    JournalSci. Res. Dev., 2005/2006, Vol. 10,73‐82 Diatoms and Dinoflagellates of an Estuarine Creek in Lagos. I.C. Onyema*, D.I. Nwankwo and T. Oduleye Department of Marine Sciences, University of Lagos, Akoka‐Yaba, Lagos, Nigeria. ABSTRACT The diatoms and dinoflagellates phytoplankton of an estuarine creek in Lagos was investigated at two stations between July and December, 2004. A total of 37 species centric diatom (18 species) pennate diatoms (12 species) and 7 species of dinoflagellates were recorded. Values of species diversity (1 ‐ 14), abundance (10 ‐ 800 individuals), species richness (0 ‐ 2.40) and Shannon and Weiner index (0 ‐ 2.8f) were higher in the wet period (July ‐ October) than the dry season (November ‐ December). These bio‐indices were higher in station A than Bfor most of the study period. Almost all the diatoms and dinoflagellates recorded for this investigation have been reported by earlier workers for the Lagos lagoon, associated tidal creeks and offshore Lagos. The source of recruitment of the lagoonal dinoflagellates is probably the adjacent sea as most reported species were warm water oceanic forms. Keywords: diatoms, dinoflagellates, plankton, hydrology, salinity. INTRODUCTION In Nigeria there are few studies on the diatoms and dinoflagellates of marine and coastal aquatic ecosystems. Some of these studies are Olaniyan (1957), Nwankwo (1990a), Nwankwo and Kasumu‐Iginla (1997), Nwankwo (1991) and Nwankwo (1997). Other works such as Chindah and Pudo (1991), Nwankwo (1986, 1996), Chindah (1998), Kadiri (1999), Onyema et al. (2003, 2007), Onyema (2007, 2008) have investigated phytoplankton assemblages and pointed out the dominance of diatoms. Diatoms and dinoflagellates are important components of the photosynthetic organisms that form the base of the aquatic food chain (Davis, 1955; Sverdrop et al., 2003).
    [Show full text]