(Fec) Approved Contracts October – December, 2014

Total Page:16

File Type:pdf, Size:1020Kb

(Fec) Approved Contracts October – December, 2014 FEDERAL EXECUTIVE COUNCIL (FEC) APPROVED CONTRACTS OCTOBER – DECEMBER, 2014 FEDERAL MINISTRY OF TRANSPORT NAME OF IMPLEMENTING S/N PROJECT NAME PROJECT COST SOURCE OF DATE DURATION COMPANY AGENCY LOCATION FUND 1 Contract for the Design, Messrs CNR Federal Ministry N1,111,681,250.00 2014-SURE-P 08/10/14 10 Months Manufacture and Dalian of Transport exclusive of local Appropriation Commissioning of 2No. Locomotives taxes Diesel/Electric & Rolling Locomotives with built- Stock Co. in-power cars for Limited/CCE standard gauge C C(Nigeria) (1435mm) track ex- Limited works for the Nigerian Railway Corporation (NRC) 2 Augmentation of Messrs Federal Ministry Kano Revised Contract 2014 08/10/14 36 Months Contract for the Dantata and of Works Sum Appropriation/ Construction of Kano Sawoe N22,773,806,219.93 2015 Budget Western By-pass in Construction proposal Kano State Company (Nigeria) Limited 3 USD59,690,106.00 Prefunded by inclusive of all taxes, the at the prevailing Concessionair exchange rate at the e time of payment, for Award of Contract for Messrs the Construction of the Construction of Greenview Federal Ministry the project within Berth 21 at Terminal ‘E’ Developmen 17/12/14 18 Months of Transport Lagos the unexpired term Lagos Port Complex, t (Nigeria) of the company’s Apapa Limited Concession period of 25 years on Design, Build, Operate and transfer (DBOT) basis 4 Messrs 2014 Award of Contract for Evomec Federal Ministry Appropriation the Construction of Global of Makurdi N3,807,933,178.75 of NIWA 17/12/14 18 Months Inland River Port at Services Transport/NIWA Makurdi, Benue State Limited FEDERAL MINISTRY OF WORKS NAME OF IMPLEMENTING S/N PROJECT NAME PROJECT COST SOURCE OF DATE DURATION COMPANY AGENCY LOCATION FUND 1 Augmentation of Messrs Dantata Federal Ministry Kano Revised Contract 2014 08/10/14 36 Months Contract for the and Sawoe of Works Sum Appropriation/ Construction of Kano Construction N22,773,806,219.93 2015 Budget Western By-pass in Company proposal Kano State (Nigeria) Limited 2 Award of Contract for the Rehabilitation of Outstanding section Messrs RCC Federal Ministry Enugu 2014 N24,243,308,789.82 17/12/14 36 Months of Onitsha – Enugu (Nigeria) Limited of Works Appropriation/ expressway : 2014 SURE-P Amansea – Enugu in Enugu State 3 Award of Contracts for the Construction and Rehabilitation of 17No. Roads and Bridges (categories A &B) RECOMMEMDED IMPLEMENTING CONTRACT AMOUNT COMPLETEION S/N PROJECT NAME SOURCE OF DATE CONTRACTOR AGENCY (N) FUND PERIOD 1 Lot A1: Construction of Messrs Julius 120,326,960,132.49 58 Months Bodo-Bony Road with Berger Plc Bridges across Opobo Channel Route 430 in Rivers State 2 Lot A2: Dualization of Messrs CCECC 26,498,476,426.25 30 Months Yenegwe Road Junction Nig. Ltd – Kolo – Otuoke – Bayelsa Palm (20km) Federal 2014 3 Lot A3: Dualization of Messrs CGC Ministry of 64,876,412,558.50 Appropriation/ 03/12/14 30 Months Sapele – Ewu Road, Nigeria Ltd Works SURE-P Section I: Sapele-Agbor in Delta State 4 Lot A4: Dualization of Messrs Setraco 47,948,569,920.17 36 Months Sapele – Ewu Road Nig. Ltd Section II: Agbor- Ewu in Delta State 5 Lot A5: Rehabilitation of Messrs CGC 32,317,082,596.26 24 Months Enugu – Port Harcourt Nigeria Limited Expressway, Section III: Enugu-Lokpanta 6 Lot A6: Rehabilitation of Messrs CCECC 34,047,096,919.17 30 Months Enugu – Port Harcourt Nig. Ltd Expressway, Section IV: Aba – Port Harcourt 7 Lot A7: Construction of Messrs Borini 1,141,025,424.00 12 Months access road to NNPC Prono & Co Ltd Depot (Mosimi) along Ikorodu-Shagamu Road (Rigid Pavement) in Lagos State 8 Lot A9: Construction of Messrs GR 17,563,264,407.15 12 Months Agaie-Katcha-Baro Road Building and (Rigid Pavement) in Construction Nig. Niger State Ltd 9 Lot A10: Construction of Messrs Fada Federal 6,544,620,043.50 2014 24 Months Ikom Bridge in Cross Construction Ltd Ministry of Appropriation/ 03/12/14 River State Works SURE-P 10 Lot B1: Rehabilitation of Messrs Fik Global 8,193,930,303.25 18 Months Damaturu-Biu Road in Resources Ltd Yobe/Borno States 11 Lot B2: Design and Messrs Infiquest 15,638,377,142.86 36 Months Construction of Birnin International Ltd Gwari – Dan Gulbi Road in Kaduna/Zamfara States 12 Lot B3: Construction of Messrs Uniglobe 14,217,920,900.06 24 Months Wamba – Wase Road in Construction Nasarawa State Engineering Ltd 13 Lot B4: Design and Messrs 9,999,171,491.93 30 Months Dualization of Utukpo Rockbridge Township Road (General Construction Hospital to Enugu Nigeria Ltd roundabout) 14 Lot B5: Rehabilitation of Messrs Scoa 7,497,172,077.78 18 Months Okene – Itobe Road in Nigeria Ltd Kogi State 15 Lot B6: Completion of Messrs Triacta 7,256,623,914.54 30 Months Gombe-Numan-Yola Nig. Ltd Federal 2014 Road Phase II (Gombe- Ministry of Appropriation/ 03/12/14 Kaltungo) in Gombe Works SURE-P State 16 Lot B7: Rehabilitation of Messrs Welltown 7,037,990,821.31 18 Months Ogoja (Mbok Junction)- Stone Nig Ltd Abuochichie in Cross River State 17 Lot B8: Rehabilitation of Messrs Sermatec 9,168,931,117.50 24 Months Alesi – Ugep (Iyamoyung Nig. Ltd – Ugep) Section in Cross River State 4 Award of Contracts for the Rehabilitation of Sokoto- Tambuwa l-Jega-Birnin Yauri-Kontagora-Makera Road in Sokoto, Kebbi and Niger States and Vandeikya-Obudu Road in Benue and Cross River States Phase II CONTRACT COMPLETION S/N PROJECT DESCRIPTION CONTRACTOR SOURCE OF DATE AMOUNT PERIOD FUND 1 Award of Contract for the Rehabilitation of Sokoto – Revised Contract Messrs Triacta Tambuwal – Jega - Birnin Sum 36 Months (Nigeria) Limited Yauri Road: Jega - Birnin Yauri N30,459,183,038.00 (186km) in Kebbi State 2014 2 Award of Contract for the Appropriation Rehabilitation of Sokoto – Messrs CRCC Revised Contract Jega – Kontagora – Makera Construction Sum 30 Months 17/12/14 Road : Kontagora – Makera Company Ltd N19,566,758,401.95 (85km) in Niger State 3 Award of Contract for the Rehabilitation of Vandeikya- Revised Contract Obudu Cattle Ranch Messrs CCECC Sum 18 Months (completion of outsdtanding (Nigeria) Limited N6,686,554,420.40 12.5km) in Benue/Cross River States FEDERAL CAPITAL TERRITORY NAME OF IMPLEMENTING S/N PROJECT NAME PROJECT COST SOURCE OF DATE DURATION COMPANY AGENCY LOCATION FUND 1 Award of Contract for Messrs Arab Federal Capital Abuja N2,579,711,395.80 2014 FCT 15/10/14 12 Months the Phase II of the Contractors Territory Statutory ongoing Contract for the (OAO) Nigeria Ltd Administration Budget Resurfacing of the Existing Roads and Remedial Works on Bridges in Wuse 1 and Garki 1 Districts 2 Upward review of the Messrs Arab Federal Capital Abuja Revised Contract 2014 FCT 12/11/14 20 Months Contract Sum for the Contractors Territory Sum Statutory Provision of Engineering (O.A.O) Nig. Ltd Administration N43,112,427,967.6 Budget Infrastructure at Wuye 7 District 3 Award of Contract for Messrs Salini Nig. Federal Capital Abuja N7,179,322,294.15 2014 FCT 12/11/14 24 Months the Construction of One Ltd. Territory Statutory Service Carriageway Administration Budget (14KM) of Inner Northern Expressway (INEX) from Ring Road III (RRIII) to Ring Road IV (RRIV) (Abuja Industrial Park) 4 Award of Contract for Messrs Sal- Federal Capital Abuja N388,147,078.13 2014 12/11/14 Consultancy Services for Consults Territory Appropriatio the Review of the Administration n Designs, Monitoring and Full Quantity Surveying Services for the construction of the Nigerian Cultural Centre and Millennium Tower Project 5 Award of Contract for Messrs Sageto Federal Capital Abuja N1,794,778,172.88 2014 FCT 12/11/14 17 Months the Provision of Access Limited Territory Statutory Road and Engineering Administration Budget Infrastructure to Plot 1458 and adjourning plots around Hot 98 FM in Gudu District, Abuja 6 Award of Contract for Messrs CGC Federal Capital Abuja N43,458,849,973.9 2014 FCT 12/11/14 30 Months the Extension of Inner (Nigeria) Limited Territory 4 Statutory Southern Expressway Administration Budget (ISEX) from Southern Parkway (S8/S9) to Ring Road II in the Federal Capital City (FCC), Abuja 7 Award of Contract for Messrs Ladiom Federal Capital Abuja N272, 737, 710.00 2014 FCT 19/11/14 12 Months the Consultancy Services Associates Territory Statutory for the Feasibility Study Administration Budget and Conceptual Design of Lots 4, 5 and 6 of the Abuja Rail Mass Transit Network for Federal Capital Territory 8 Award of Contract for Messrs Federal Capital Abuja N60,887,492,656.6 2014 26/11/14 60 Months the Provision of Mangrovetech Territory 5 Appropriatio Engineering Construction & Administration n/FCT 2014 Infrastructure to Kyami Engineering Nig. Statutory District, Abuja Ltd (Kakatar CE Budget Ltd) 9 Award of Contracts for the Post Contract Supervisions of Engineering Infrastructure to some satellite towns in the Federal Capital Territory (FCT) LOT RECOMMEMDED CONTRACT COMPLETEION S/N PROJECT DESCRIPTION SOURCE OF DATE NO. CONSULTANT AMOUNT (N) PERIOD FUND 1 Provision of primary water Messrs POSEIDON EPC1A 117,062,950.12 30 Months supply to Karshi Satelite Technologies 2 Provision of Engineering 2014 Messrs Teamwork EPC2A Infrastructure to Gidan Daya 225,261,000.00 Appropriation 03/12/14 36 Months Global Associates Urban Renewal Site 3 Provision of Engineering Messrs Multiplan EPC7A Infrastructure to Karshi 160,793,500.00 36 Months Consultants Satelite Town (District 1&2) SPECIAL DUTIES AND INTER GOVERNMENTAL AFFAIRS NAME OF IMPLEMENTING S/N PROJECT NAME PROJECT COST SOURCE OF DATE DURATION COMPANY AGENCY LOCATION FUND 1a Award of Contracts for Messrs China Ministry of USD2,788,386.76 Trust Fund 15/10/14 3 Months the manufacture and Sports Special Duties payable at the Remittance supply of branded International and Inter- prevailing exchange Account sporting equipment for Co.
Recommended publications
  • Edim Otop Gully Erosion Site in Calabar Municipality, Cross River State
    FEDERAL REPUBLIC OF NIGERIA Public Disclosure Authorized THE NIGERIA EROSION AND WATERSHED MANAGEMENT PROJECT (NEWMAP) Public Disclosure Authorized FINAL REPORT OF THE ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) FOR EDIM OTOP GULLY EROSION SITE IN CALABAR Public Disclosure Authorized MUNICIPALITY, CROSS RIVER STATE Public Disclosure Authorized State Project Management Unit (SPMU) Cross River State, Calabar TABLE OF CONTENTS Cover Page i Table of Contents ii List of Tables vii List of Figures viii List of Plates ix Executive Summary xi CHAPTER ONE – INTRODUCTION 1 1.1 Background 1 1.2 Description of the Proposed Intervention 3 1.3 Rationale for the Study 5 1.4 Scope of Work 5 CHAPTER TWO - INSTITUTIONAL AND LEGAL FRAMEWORK 7 2.1 Background 7 2.2 World Bank Safeguard Policies 8 2.2.1 Environmental Assessment (EA) OP 4.01 9 2.2.2 Natural Habitats (OP 4.04) 9 2.2.3 Pest Management (OP 4.09) 10 2.2.4 Forest (OP 4.36) 10 2.2.5 Physical Cultural Resources (OP 4.11) 11 2.2.6 Involuntary Resettlement (OP 4.12) 11 2.2.7 Safety of Dams OP 4.37 12 2.2.8 Projects on International Waterways OP 7.50 12 2.3 National Policy, Legal, Regulatory and Administrative Frameworks 13 2.3.1 The Federal Ministry of Environment (FMENV) 13 2.3.2 The National Policy on the Environment (NPE) of 1989 14 2.3.3 Environmental Impact Assessment Act No. 86, 1992 (FMEnv) 14 2.3.4 The National Guidelines and Standards for Environmental Pollution Control in Nigeria 14 2.3.5 The National Effluents Limitations Regulation 15 ii 2.3.6 The NEP (Pollution Abatement in Industries and Facilities Generating Waste) Regulations 15 2.3.7 The Management of Solid and Hazardous Wastes Regulations 15 2.3.8 National Guidelines on Environmental Management Systems (1999) 15 2.3.9 National Guidelines for Environmental Audit 15 2.3.10 National Policy on Flood and Erosion Control 2006 (FMEnv) 16 2.3.11 National Air Quality Standard Decree No.
    [Show full text]
  • Epidemiological Study of Intestinal Parasites in School Children in Vandeikya LGA, Benue State, Nigeria
    Asian Journal of Immunology 2(1): 1-8, 2019; Article no.AJI.52961 Epidemiological Study of Intestinal Parasites in School Children in Vandeikya LGA, Benue State, Nigeria T. S. Atsuwe1, V. U. Obisike2, J. I. Chikwendu1*, C. K. Kondo1, C. T. Tyoakoso1 and E. U. Amuta1 1Federal University of Agriculture, Makurdi, Nigeria. 2Abia State University, Uturu, Abia, Nigeria. Authors’ contributions This work was carried out in collaboration among all authors. Authors TSA, CKK and CTT designed the study and carried out the field research. Author EUA wrote the protocol and supervised the research. Author VUO performed the statistical analysis. Author JIC wrote the first draft of the manuscript and managed the literature searches. All authors read and approved the final manuscript. Article Information Editor(s): (1) Dr. Jaffu Othniel Chilongola, Department of Biochemistry and Molecular Biology, Kilimanjaro Christian Medical University College, Tumaini University, Tanzania. Reviewers: (1) Cristina Hegedüs, University of Agricultural Sciences and Veterinary Medicine Cluj-Napoca, România. (2) Shamala Moodley, Mangosuthu University of Technology, South Africa. Complete Peer review History: http://www.sdiarticle4.com/review-history/52961 Received 01 October 2019 Accepted 04 December 2019 Original Research Article Published 12 December 2019 ABSTRACT A study was conducted to determine the epidemiology of intestinal parasites in school children in Vandeikya LGA, Benue State, Nigeria. Two hundred and ninety three (293) stool samples from school children were examined in selected schools across the Local Government Area. 22 of 293 children were infected with parasites which include: Ascaris lumbricoides, Entamoeba histolytica, Hookworm, Strongyloides stercularis and Taenia spp. Hookworm had the highest prevalence rate of 9(3.1%), Entamoeba histolytica 7(2.3%), Taenia spp had 3(1.0%), Strongyloide stercolaris had 2(0.7%) while Ascaris lumbricoides recorded the least prevalence rate of 1(0.3%).
    [Show full text]
  • Human Migratory Pattern: an Appraisal of Akpabuyo, Cross River State, Nigeria
    IOSR Journal Of Humanities And Social Science (IOSR-JHSS) Volume 22, Issue 7, Ver. 16 (July. 2017) PP 79-91 e-ISSN: 2279-0837, p-ISSN: 2279-0845. www.iosrjournals.org Human Migratory Pattern: An Appraisal of Akpabuyo, Cross River State, Nigeria. 1Iheoma Iwuanyanwu, 1Joy Atu (Ph.D.), 1Chukwudi Njoku, 1TonyeOjoko (Arc.), 1Prince-Charles Itu, 2Frank Erhabor 1Department of Geography and Environmental Science, University of Calabar, Calabar, Cross River State, Nigeria 2Department of Geography and Environmental Management, Ahmadu Bello University, Zaria, Kaduna State, Nigeria Corresponding Author: IheomaIwuanyanwu ABSTRACT: This study assessed migration in Akpabuyo Local Government Area (LGA) of Cross River State, Nigeria. The source regions of migrants in the area were identified; the factors that influence their movements, as well as the remittances of migrants to their source regions were ascertained. A total of 384 copies of questionnaires were systematically administered with a frequency of 230 and 153 samples for migrants and non-migrants respectively. Amongst other findings from the analyses, it was established that Akpabuyo is home to migrants from other LGAs and States, especially BakassiLGA and EbonyiState. There were also migrants from other countries such as Cameroon and Equatorial Guinea. The Pearson‟s correlation analysis depicted significant relationship (P = 0.012) between distance to Akpabuyo and the number of migrants that come into the area, implying that distance significantly influences migration to Akpabuyo. Furthermore, the Correspondence Analysis (CA) showed a weak association between the pull and push factors in the area, buttressed by the chi-square testwhich showed insignificant statistical similarity (p = 0.118). It was also established that migrants remitted 74% of their income to their source regions.
    [Show full text]
  • Market Place and Integration: Interrogating Obudu And
    International Journal of Integrative Humanism Vol. 12, No. 1, March. 2020 MARKET PLACE AND INTEGRATION: INTERROGATING OBUDU AND TIV WOMEN IN CROSS BORDER TRADE By IROM, OBAR AYAMI Department of History and International Studies University of Calabar Calabar - Nigeria [email protected], [email protected] 08066632945, 07086510451 Abstract Obudu and Tiv people share boundary with Obudu located on the northern side of Cross River State and Vandeikya on the southern side of Benue state. As neighbours, they have interacted among themselves although these interactions were sometimes friendly and other times hostile. In most discussions and researches around these areas, the emphasizes has been more on factors that have tended to disunite them like wars and ways of resolving them. Not much attention has been given to the market place which apart from being an economic device for the distribution of goods, also brings people of diverse ethnic, cultural, linguistic and religious affiliations. Why is the market place synonymous with women and why do they take so much risk across warring borders to market places? The paper relies on field work carried out in these areas to demonstrate how economic intercourse through the venue of the market place brought about integration of people, cultures and ideas in the area. The paper concludes that there is a need to reposition the market place to once again play its historic role as a center of unity in the midst of the challenges of cooperate existence facing these border communities and the nation at large. Key Words: Cross Border, Inter-group relations, Obudu, Tiv, Trade, Introduction The history of cross border trade among communities’ dates back to pre-colonial times.
    [Show full text]
  • Violence in Nigeria's North West
    Violence in Nigeria’s North West: Rolling Back the Mayhem Africa Report N°288 | 18 May 2020 Headquarters International Crisis Group Avenue Louise 235 • 1050 Brussels, Belgium Tel: +32 2 502 90 38 • Fax: +32 2 502 50 38 [email protected] Preventing War. Shaping Peace. Table of Contents Executive Summary ................................................................................................................... i I. Introduction ..................................................................................................................... 1 II. Community Conflicts, Criminal Gangs and Jihadists ...................................................... 5 A. Farmers and Vigilantes versus Herders and Bandits ................................................ 6 B. Criminal Violence ...................................................................................................... 9 C. Jihadist Violence ........................................................................................................ 11 III. Effects of Violence ............................................................................................................ 15 A. Humanitarian and Social Impact .............................................................................. 15 B. Economic Impact ....................................................................................................... 16 C. Impact on Overall National Security ......................................................................... 17 IV. ISWAP, the North West and
    [Show full text]
  • Sustainability of the Niger State CDTI Project, Nigeria
    l- World Health Organization African Programme for Onchocerciasis Control FINAL RËPOftî ,i ={ Evaluation of the Sustainability of the Niger State CDTI Project, Nigeria N ove m ber- Decem ber 2004 Elizabeth Elhassan (Team Leader) Uwem Ekpo Paul Kolo William Kisoka Abraraw Tefaye Hilary Adie f'Ï 'rt\ t- I I I TABLE OF CONTENTS I Table of contents............. ..........2 Abbreviations/Acronyms ................ ........ 3 Acknowledgements .................4 Executive Summary .................5 *? 1. lntroduction ...........8 2. Methodology .........9 2.1 Sampling ......9 2.2 Levels and lnstruments ..............10 2.3 Protocol ......10 2.4 Team Composition ........... ..........11 2.5 Advocacy Visits and 'Feedback/Planning' Meetings........ ..........12 2.6 Limitations ..................12 3. Major Findings And Recommendations ........ .................. 13 3.1 State Level .....13 3.2 Local Government Area Level ........21 3.3 Front Line Health Facility Level ......27 3.4 Community Level .............. .............32 4. Conclusions ..........36 4.1 Grading the Overall Sustainability of the Niger State CDTI project.................36 4.2 Grading the Project as a whole .......39 ANNEXES .................40 lnterviews ..............40 Schedule for the Evaluation and Advocacy.......... .................42 Feedback and Planning Meetings, Agenda.............. .............44 Report of the Feedbacl</Planning Meetings ..........48 Strengths And Weaknesses Of The Niger State Cdti Project .. .. ..... 52 Participants Attendance List .......57 Abbrevi
    [Show full text]
  • LGA Agale Agwara Bida Borgu Bosso Chanchaga Edati Gbako Gurara
    LGA Agale Agwara Bida Borgu Bosso Chanchaga Edati Gbako Gurara Katcha Kontagora Lapai Lavun Magama Mariga Mashegu Mokwa Munya Paikoro Rafi Rijau Shiroro Suleja Tafa Wushishi PVC PICKUP ADDRESS Santali Road, After Lga Secretariat, Agaie Opposite Police Station, Along Agwara-Borgu Road, Agwara Lga Umaru Magajib Ward, Yahayas, Dangana Way, Bida Lga Borgu Lga New Bussa, Niger Along Leg Road, Opp. Baband Abo Primary/Junior Secondary Schoo, Near Divisional Police Station, Maikunkele, Bosso Lga Along Niger State Houseso Assembly Quarters, Western Byepass, Minna Opposite Local Govt. Secretariat Road Edati Lga, Edati Along Bida-Zungeru Road, Gbako Lga, Lemu Gwadene Primary School, Gawu Babangida Gangiarea, Along Loga Secretariat, Katcha Katcha Lga Near Hamdala Motors, Along Kontagora-Yauri Road, Kontagoa Along Minna Road, Beside Pension Office, Lapai Opposite Plice Station, Along Bida-Mokwa Road, Lavun Off Lga Secretariat Road, Magama Lga, Nasko Unguwan Sarki, Opposite Central Mosque Bangi Adogu, Near Adogu Primary School, Mashegu Off Agric Road, Mokwa Lga Munya Lga, Sabon Bari Sarkin Pawa Along Old Abuja Road, Adjacent Uk Bello Primary School, Paikoro Behind Police Barracks, Along Lagos-Kaduna Road, Rafi Lga, Kagara Dirin-Daji/Tungan Magajiya Road, Junction, Rijau Anguwan Chika- Kuta, Near Lag Secretariat, Gussoroo Road, Kuta Along Suleja Minna Road, Opp. Suleman Barau Technical Collage, Kwamba Beside The Div. Off. Station, Along Kaduna-Abuja Express Road, Sabo-Wuse, Tafa Lga Women Centre, Behind Magistration Court, Along Lemu-Gida Road, Wushishi. Along Leg Road, Opp. Baband Abo Primary/Junior Secondary Schoo, Near Divisional Police Station, Maikunkele, Bosso Lga.
    [Show full text]
  • Case Study of Bekwarra Local Government Area, Cross River State
    Journal of Public Administration and Governance ISSN 2161-7104 2019, Vol. 9, No. 3 Funding and Implementation of National Programme on Immunization in Nigeria: Case Study of Bekwarra Local Government Area, Cross River State Adie, Hilary Idiege Department of Public Administration, University of Calabar, Calabar-Nigeria Enang, Agnes Ubana Department of Public Administration University of Calabar, Calabar-Nigeria Received: Aug. 9, 2017 Accepted: Jun. 22, 2019 Online published: Jul. 17, 2019 doi:10.5296/jpag.v9i3.15111 URL: https://doi.org/10.5296/jpag.v9i3.15111 Abstract This study investigated how funding has affected effective implementation of National Programme on Immunization (NPI) in Bekwarra Local Government of Cross River State, Nigeria from 2003-2016. To achieve this objective, a research hypothesis was formulated. A total of 200 Health workers were randomly selected using survey inferential research design from the population of 320 Health workers in the study area. A well validated Likert type scale instrument called Immunization Related Issues Questionnaire (IRIQ) consisting of 22 items with a reliability index of 0.84 was the instrument for data collection. Data collected from the respondents were subjected to the Chi-Suare statistics to test the hypothesis in the study. The result of the test was significant at 0.05 level and it was concluded that funding significantly influences effective implementation of immunization programme in Bekwarra Local Government Area. The study noted that adequate funds are not provided for effective implementation of National Programme on Immunization (NPI), and whenever funds are provided, it is often mismanaged. Also, it was revealed that non-governmental organization (NGOs) should assist in funding immunization programme by providing logistics and technical equipment for effective programme implementation.
    [Show full text]
  • Fear and Faith: Uncertainty, Misfortune and Spiritual Insecurity in Calabar, Nigeria Ligtvoet, I.J.G.C
    Fear and faith: uncertainty, misfortune and spiritual insecurity in Calabar, Nigeria Ligtvoet, I.J.G.C. Citation Ligtvoet, I. J. G. C. (2011). Fear and faith: uncertainty, misfortune and spiritual insecurity in Calabar, Nigeria. s.l.: s.n. Retrieved from https://hdl.handle.net/1887/22696 Version: Not Applicable (or Unknown) License: Leiden University Non-exclusive license Downloaded from: https://hdl.handle.net/1887/22696 Note: To cite this publication please use the final published version (if applicable). Fear and Faith Uncertainty, misfortune and spiritual insecurity in Calabar, Nigeria Inge Ligtvoet MA Thesis Supervision: ResMA African Studies Dr. Benjamin Soares Leiden University Prof. Mirjam de Bruijn August 2011 Dr. Oka Obono Dedicated to Reinout Lever † Hoe kan de Afrikaanse zon jouw lichaam nog verwarmen en hoe koelt haar regen je af na een tropische dag? Hoe kan het rode zand jouw voeten nog omarmen als jij niet meer op deze wereld leven mag? 1 Acknowledgements From the exciting social journey in Nigeria that marked the first part of this work to the long and rather lonely path of the final months of writing, many people have challenged, advised, heard and answered me. I have to thank you all! First of all I want to thank Dr. Benjamin Soares, for being the first to believe in my fieldwork plans in Nigeria and for giving me the opportunity to explore this fascinating country. His advice and comments in the final months of the writing have been really encouraging. I’m also grateful for the supervision of Prof. Mirjam de Bruijn. From the moment she got involved in this project she inspired me with her enthusiasm and challenged me with critical questions.
    [Show full text]
  • Rspo Notification of Proposed New Planting
    RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.otg/?q=page/535). It has also been posted on local on-site notice boards. Tick whichever is appropriate √ This is a completely new development and stakeholders may submit comments This is part of an ongoing planting and is meant for notifications only Company : Biase Plantation Limited (Calaro Extension) Subsidiary : Wilmar International Limited RSPO Membership No: 2-0017-05-000-00 on behalf Wilmar International Limited since on 15 August 2005 Location of Proposed New Planting: Atan Odot village and Uwet village, Odukpani and Akamkpa Local Government Area, Cross River State, Nigeria. GPS Reference: Calaro Extension Area of Biase Plantation Limited is geographically located on Latitude: 80 16‘51“to 80 21‘26“North and Longitude: 50 15‘ 30“ to 50 17‘ 47“ East. 1 RSPO New Planting Procedure Assessment Report CALARO Extension Estate of Biase Plantation Ltd – Cross River State, Nigeria Location of the Proposed New Planting Total area acquired by Biase Plantation Limited (BPL) according to the MoU between the government of Cross River State of Nigeria and Uwet & Atan Odot Communities / Ikot Eyidok dated on 10 January 2013 and MoU between the landlord communities and Biase Plantation Ltd dated on 10th December 2015 is 3,066.214ha (shown on survey plan no. RIU/CR/191/12). This included potential overlaps with the Uwet-Odot Forest Reserve and the Oban Forest Reserve. Subsequent re-demarcation has excluded the areas of overlap and reduced the total concession area to 2,368.94 Ha (Deed of grant between the government of Cross River State of Nigeria and Biase Plantations Ltd).
    [Show full text]
  • Cross River STATE-WIDE RAPID HEALTH FACILITY ASSESSMENT
    Report of the Cross River STATE-WIDE RAPID HEALTH FACILITY ASSESSMENT In Preparation for Elimination of Mother-to-Child Transmission of HIV March 2013 Report of the Cross River STATE-WIDE RAPID HEALTH FACILITY ASSESSMENT In Preparation for Elimination of Mother-to-Child Transmission of HIV May 2013 This publication may be freely reviewed, quoted, reproduced, or translated, in full or in part, provided the source is acknowledged. The mention of specific organizations does not imply endorsement and does not suggest that they are recommended by the Cross River State Ministry of Health over others of a similar nature not mentioned. Copyright © 2013 Cross River State Ministry of Health, Nigeria Citation: Cross River State Ministry of Health and FHI 360. 2013. Cross River State-wide Rapid Health Facility Assessment, Nigeria: Cross River State Ministry of Health and FHI 360. The Cross River State-wide Rapid Health Facility Assessment was supported in part by the U.S. Agency for International Development (USAID). FHI 360 provided assistance to the Cross River State Government to conduct this assessment. Financial assistance was provided by USAID under the terms of the Cooperative Agreement AID-620-A-00002, of the Strengthening Integrated Delivery of HIV/ AIDS Services Project. This report does not necessarily reflect the views of FHI 360, USAID or the United States Government. Table of Contents Foreword ......................................................................................................................................................................................................
    [Show full text]
  • Grain Price Seasonality in Kebbi State, Nigeria Patrick Hatzenbuehler, George Mavrotas, Mohammad Abubakar Maikasuwa, and Abdulrahaman Aliyu
    STRATEGY SUPPORT PROGRAM | POLICY NOTE 47 | July 2018 Synopsis: Grain price seasonality in Kebbi state, Nigeria Patrick Hatzenbuehler, George Mavrotas, Mohammad Abubakar Maikasuwa, and Abdulrahaman Aliyu RESEARCH OVERVIEW will readjust that price back toward its prior level. Recent studies found the extent of food price Hence, trade stabilizes prices. seasonality in sub-Saharan Africa to be two to Likewise, storage, which allows supply in the three times greater than that observed on global current period to be carried over to the next, can markets. This implies that, despite decades of stabilize prices, but only under certain conditions. market liberalization in many countries, there Storage can reduce the probability of a steep price remains much progress to be made to improve decline because consumers and traders increase general food marketing conditions throughout purchases of grain to place into storage as prices Africa. This issue deserves research because the decline. Similarly, storage can also reduce the movements of prices during a crop year influence likelihood of price spikes, since traders and farmers the consumption decisions of households, the will sell their stored stocks when prices are rising – production decisions of farmers, and the marketing there is a lower likelihood of a steep rise in prices decisions of traders.1 if there are stocks in storage available to sell. A practical matter that emerges from these However, the ability to prevent price spikes is observations is what is the proper scale at which to conditional on the availability of stocks to sell and study the issue so that policy interventions can be the ability of traders and farmers to facilitate trade.
    [Show full text]