Minutes February 18, 2015

Total Page:16

File Type:pdf, Size:1020Kb

Minutes February 18, 2015 MAYOR: TOWNSHIP OF GUTTENBERG BOARD MEMBERS: GERALD DRASHEFF COUNCILWOMAN OINT PLANNING ONING OARD J / Z B MONICA FUNDORA CHAIRMAN: 6808 PARK AVENUE COMMISSIONERS: NICHOLAS FLORIO BRIAN GUASCHINO GUTTENBERG, NJ 07093 MARTA GONZALEZ (201) 868 – 2315 Ext. 151 LUZ SHAH VICE - CHAIRMAN: Fax: (201) 854 – 0216 WILLIAM HOKIEN SANFORD SIMON ROBERT THOLEN BOARD ATTORNEY: BOARD ALTERNATES: MARIA GESUALDI MAYRA AMARAL – 2 (201) 295 - 0700 EZEQUIEL GONZALEZ – 3 RUBEN GALAN – 4 BOARD ENGINEER: CARL JENNE (908) 698 – 2890 COURT RECORDER: ELIZET ALEQUIN BOARD SECRETARY: GERRY BAKER MINUTES FEBRUARY 18, 2015 PLEASE BE ADVISED THAT THE GUTTENBERG JOINT ZONING/PLANNING BOARD WILL MEET ON WEDNESDAY, FEBRUARY 18, 2015 AT 7:30 PM IN THE SECOND FLOOR COUNCIL CHAMBER OF THE MUNICIPAL BUILDING LOCATED AT 6808 PARK AVENUE, GUTTENBERG, NEW JERSEY 07093. OPENING OF MEETING *SALUTE TO THE FLAG IN COMPLIANCE WITH THE OPEN PUBLIC MEETINGS ACT, THE GUTTENBERG JOINT ZONING/PLANNING BOARD HAS NOTIFIED THE JOURNAL DISPATCH OF THIS MEETING AND NOTICE HAS BEEN POSTED ON THE BULLETIN BOARD FOR PUBLIC INSPECTION * ROLL CALL *AGENDA *ZB-2013-3 6807-6819 JFK BOULEVARD EAST BLOCK 38 LOT 4 CARRIED TO MARCH 16TH 2015 SITE PLAN TO DEMOLISH AN EXISTING NURSING HOME WITH THE CONSTRUCTION OF A 15 STORY RESIDENTIAL HIGH-RISE BUILDING, CONSISTING OF 168 UNITS WITH 107 PARKING SPACES, ALONG WITH APPROVAL FOR 3 SIGNS APPLICANT 6819 JFK HOLDING, LLC 6819 GUTTENBERG, LLC 35 JOURNAL SQUARE STE. 1103 JERSEY CITY, N.J. 07306 ATTORNEY STEPHEN P. SINISI TWO SEARS DRIVE P.O. BOX 1458 PARAMUS, N.J. 07653-1458 ARCHITECT WILLY L. ZAMBRANO ZAMBRANO ARCHITECTURAL DESIGN, LLC 410 ATLANTIC AVENUE FREEPORT, N.Y. 11530 CIVIL ENGINEER PETER K. KORZEN KORZEN ENGINEERING, LLC 26 BERKSHIRE STREET WHIPPANY, NJ 07981 TRAFFIC ENGINEER JOE STAIGAR STAIGAR & PEREGOY, LLC 17 TREMONT DRIVE EAST HANOVER, N.J. 07936 PLANNER BRIGETTE BOGART BRIGETTE BOGART PLANNING & DESIGN PROFESSIONALS 366 HARVEY COURT WYCKOFF, N.J. 07481 *ZB 2014-3 7014-18 JACKSON STREET MOVED TO A SPECIAL MEETING ON MARCH 11TH BLOCK 8 LOTS 6 AND 7 SITE PLAN FOR THE CONSTRUCTION OF A NEW RESIDENTIAL MULTIFAMILY BUILDING CONSISTING OF 21 UNITS WITH 24 PARKING SPACES APPLICANT SETH TERPANJIAN 7014 JACKSON STREET LLC 1512 PALISADE AVENUE FORT LEE, NEW JERSEY 07024 ATTORNEY J. ALVARO ALONSO 6121 KENNEDY BOULEVARD NORTH BERGEN, NEW JERSEY 07047 ARCHITECT CPA ARCHITECTURE 5600 KENNEDY BOULEVARD WEST NEW YORK, NEW JERSEY 07093 * ZB 2014-4 152 70TH. STREET CONTINUED TO MARCH 16TH BLOCK 31 LOT 43 SITE PLAN FOR THE INSTALLATION OF AN FCC LICENSED SMALL NETWORK NODE APPLICANT NEW YORK SMSA LIMITED PARTNERSHIP d/b/a VERIZON WIRELESS 141 INDUSTRIAL PARKWAY BRANCHBURG, N.J. 08876 ATTORNEY FRANK FERRARO FERRARO AND STAMOS LLP 22 PARIS AVENUE SUITE 105 ROCKLEIGH, N.J. 07647 ARCHITECT PHILIP BURTNER PE NB AND C ENGINEERING 1777 SENTRY PARKWAY WEST DUBLIN HALL SUITE 210 BLUE BELL, PENNSYLVANIA *PB 2015-1 62-68 69TH STREET MOVED TO A SPECIAL MEETING ON MARCH 11TH BLOCK 35 LOTS 26 & 27 CONSTRUCTION OF A 39 UNIT RESIDENTIAL BUILDING WITH 39 PARKING SPACES APPLICANT 69TH STREET EAST, LLC ECHEVARRIA 5600 KENNEDY BLVD. WEST NEW YORK, NJ 07093 ATTORNEY J. ALVARO ALONSO 6121 KENNEDY BOULEVARD NORTH BERGEN, NJ 07047 ARCHITECT ALAN HOROWITZ AIA G3 ARCHITECTURE 669 RIVER DRIVE ELMWOOD PARK, NJ EDWIN REIMON PE MEDINA CONSULTANTS 1100 VALLEY BROOK AVENUE LYNDHURST, NJ JOHN PAVLOUCH JOHN MCDONOUGH PP 101 GIBRALTER DRIVE STE 1A MORRIS PLAINS, NJ RESOLUTIONS/ANY OTHER MATTER PROPERLY PRESENTED TO THE BOARD FORMAL ACTION MAY BE TAKEN .
Recommended publications
  • New Jersey Jitney Routes
    Paramus Limited Service to Englewood To Paterson Route 4 Tenalfy & Bergenfield Paramus Rd Main & B'wayBroadway LemoineGeorge Washington Garden State PlazaRiver Edge George Washington Bridge Plaza Bridge Anderson Main Teaneck George Washington Route 4 Bridge Bus Station Elmwood Rochelle Palisades Center Saddle Park Main Paterson Park Brook Park Maywood Englewood Broad Fort Lee Hackensack To George Washington Bridge Ridgefield Garfield Clifton Fairview Passaic Main Anderson Van Houten Paterson Routes Fairview Cliffside River Road Park Route 21 Route Route 3 Nungessers Woodcliff North Bergen To Port Authority Edgewater Kennedy Bergenline Boulevard East Bergenline 8th Ave 8th Guttenberg Boulevard East 42nd St 61st West New York Port Authority Tonelle Ave 60th To Paterson Bus Terminal Palisade 41st St New Jersey Paterson-Port Authority Bergenline Ave Kennedy Blvd-Port Authority 48th Jitney Routes Gates 51 & 56 Route 3 Paterson Newport Mall - Journal Square - Port Imperial New York 31st Bergenline - 40th St Boulevard East George Washington Bridge Park 30th Kennedy Boulevard - PABT Midtown Manhattan Lincoln Tunnel Boarding Locations Kennedy Boulevard Bergenline Lincoln Harbor Weehawken Bergenline - PABT Willow Port Authority Fairview Avenue 2nd 14th St Viaduct Bus Terminal Congress Paterson Plank Bayonne - Journal Square Hudson County Routes 9th St Paterson - PABT Hoboken Central Kennedy Boulevard East - PABT 2nd St To Newark Palisade West New York - River Road - Fort Lee Journal Square Hoboken Terminal Summit New York City Paterson - Transportation Center Pavonia To Midtown George Washington Bridge 10th Central - PABT (am only) Newport Newark Palisade - PABT (rush only) Jersey City 6th Marin Harsimus Cove Hudson-Bergen Light Rail Kennedy Harboside Financial Center Grove St PATH Exchange Place To Kennedy Boulevard Jersey Ave & 2nd St Bayonne Marin Blvd © Axel Hellman 2018 Essex St World Trade Center.
    [Show full text]
  • 128 Bus Time Schedule & Line Route
    128 bus time schedule & line map 128 North Bergen-Blvd East-NY View In Website Mode The 128 bus line (North Bergen-Blvd East-NY) has 2 routes. For regular weekdays, their operation hours are: (1) New York: 4:35 AM - 2:48 PM (2) North Bergen Via Blvd East: 2:25 PM - 11:42 PM Use the Moovit App to ƒnd the closest 128 bus station near you and ƒnd out when is the next 128 bus arriving. Direction: New York 128 bus Time Schedule 31 stops New York Route Timetable: VIEW LINE SCHEDULE Sunday 7:45 AM - 2:45 PM Monday 4:35 AM - 2:48 PM Boulevard East at Palisade Ave Tuesday 4:35 AM - 2:48 PM Boulevard East at Palisade Ave Wednesday 4:35 AM - 2:48 PM Boulevard East 528'N Of Riverview Dr. N Thursday 4:35 AM - 2:48 PM Boulevard East 8350 Friday 4:35 AM - 2:48 PM John F. Kennedy Boulevard East, North Bergen Saturday 6:15 AM - 2:15 PM County Road 693 7855 Boulevard East 7623 7623 Boulevard East, North Bergen 128 bus Info Boulevard East at 75th St Direction: New York 7501 Boulevard East, North Bergen Stops: 31 Trip Duration: 27 min Blvd East at 74th St Line Summary: Boulevard East at Palisade Ave, 74th Street, North Bergen Boulevard East at Palisade Ave, Boulevard East 528'N Of Riverview Dr. N, Boulevard East 8350, Boulevard East 7002 County Road 693 7855, Boulevard East 7623, 7201 Boulevard East, North Bergen Boulevard East at 75th St, Blvd East at 74th St, Boulevard East 7002, Boulevard East at Bellevue Boulevard East at Bellevue Ave Ave, Boulevard East at 69th St, Boulevard East at 7005 Boulevard East, Guttenberg 67th St, John Fitzgerald Kennedy Boulevard
    [Show full text]
  • State of New Jersey Medicaid Fraud Division Provider Exclusion Report
    State of New Jersey 1 Medicaid Fraud Division Provider Exclusion Report Updated on: 8/23/2021 **ADDITIONAL NPI NUMBERS MAY BE ASSOCIATED WITH THE LISTED INDIVIDUALS/ENTITIES** PROVIDER NAME TITLE DATE OF NPI NUMBER STREET CITY STA ZIP ACTION EFFECTIVE EXPIRATION BIRTH TE DATE DATE 2258 PHARMACY, INC. 2258 THIRD AVENUE NEW YORK NY 10035 SUSPENSION 7/20/2003 6522 VENTNOR AVE. 6522 VENTNOR AVENUE VENTNOR NJ 08406 DISQUALIFICATION PHARMACY, INC. ABARCA, CHERYL R. LPN 8/15/1962 528 3RD STREET NEWARK NJ 07107 SUSPENSION 6/20/2005 ABASHKIN, ROMAN CHHA 12/21/1981 72 RIDGEVIEW TERRACE WAYNE NJ 07470 DISQUALIFICATION 5/29/2015 ABASHKIN, ROMAN CHHA 12/21/1981 72 RIDGEVIEW TERRACE WAYNE NJ 07470 DISQUALIFICATION 6/3/2016 ABBASSI, JADAN MD 9/19/1944 1194807255 1618 MAIN AVENUE CLIFTON NJ 07011 DISQUALIFICATION 11/21/2016 PERMANENT ABBASSI, JADAN MD 9/19/1944 1194807255 115 NELLIS DRIVE WAYNE NJ 07470 DISQUALIFICATION 6/20/2018 PERMANENT ABDALLA, IZZELDIN 4/5/1967 1116 ANNE STREET ELIZABETH NJ 07201 DISQUALIFICATION 11/10/1999 ABDELGANI, AMIR ALLENWOOD USP WHITE DEER PA 17887 DISQUALIFICATION 11/26/2001 ABDELGANI, FADIL TERRE HAUTE USP TERRE HAUTE IN 47808 DISQUALIFICATION 11/26/2001 ABDELHAMID, MANAL RPH 5/28/1969 7100 BOULEVARD EAST, 11G GUTTENBERG NJ 07093 DEBARMENT 3/15/2001 ABDOLLAHI, MITRA DMD 8/31/1966 1033329230 646 N. SARATOGA DRIVE MOORESTOWN NJ 08057 DISQUALIFICATION 11/5/2007 7/19/2019 ABERBACH, STEVEN RPH 8/5/1944 23 STONEGATE DRIVE WATCHUNG NJ 07069 DEBARMENT 12/19/2003 ABOOD, ABDOLMAID S. 1/20/1966 64 BEVAN STREET JERSEY CITY NJ 07306 SUSPENSION 5/7/1997 ABOODS MEDICAL LIVERY 64 BEVAN STREET JERSEY CITY NJ 07306 DISQUALIFICATION 5/22/1994 ABOUELHODA, AHMED RPH 3/23/1974 33-17 60TH STREET, APT.
    [Show full text]
  • Traffic Rules and Regulations/"Green Book" (PDF, 220
    TRAFFIC RULES AND REGULATIONS For the Holland Tunnel Lincoln Tunnel George Washington Bridge Bayonne Bridge Goethals Bridge Outerbridge Crossing Revised September 2016 The Port Authority of New York and New Jersey is a self-supporting agency of the States of New York and New Jersey. It was created by a compact between the two States in 1921 for the development of transportation facilities and the promotion and protection of commerce in the New York/New Jersey metropolitan region. At the top of the organization is the twelve-member Board of Commissioners, appointed by the Governors of New York and New Jersey. There are six members from each state who serve for six-year overlapping terms. The Commissioners serve with-out pay as a public service. They report directly to the Governors of the two States, who have veto power over Commissioners’ actions. A career staff of more than 7,000 employees, headed by the Executive Director, is responsible to the Board of Commissioners. Over the years the Port Authority, at the direction of the States of New York and New Jersey has developed airports, marine terminals, bridges and tunnels, bus terminals, the PATH rapid transit system, the World Trade Center and other facilities of commerce and transportation. All of this has been accomplished without burden to the taxpayers. These undertakings are public projects; all are built with moneys borrowed solely on the Port Authority’s credit. There is no power to tax, or to pledge the credit of the States. i FOREWORD This booklet is intended to provide the users of Port Authority tunnels and bridges with detailed and specific information concerning rules, regulations and toll rates established by the Port Authority to regulate the conduct of traffic moving in or upon these vehicular crossings.
    [Show full text]
  • Mr. Lincoln's Tunnel
    PDHonline Course C750 (4 PDH) Mr. Lincoln’s Tunnel Instructor: J.M. Syken 2014 PDH Online | PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.PDHonline.org www.PDHcenter.com An Approved Continuing Education Provider Mr. Lincoln’s Tunnel 1 Table of Contents Slide/s Part Description 1 N/A Title 2 N/A Table of Contents 3~19 1 Midtown-Hudson Tunnel 20-50 2 Weehawken or Bust 51~89 3 The Road More Traveled 90~128 4 On the Jersey Side 129~162 5 Similar, But Different 163~178 6 Third Tube 179~200 7 Planning for the Future 2 Part 1 Midtown-Hudson Tunnel 3 Namesake 4 In 1912, there were very few good roads in the United States. The relatively few miles of improved road were around towns and cities (a road was “improved” if it was graded). That year, Carl Fisher (developer of Miami Beach and the Indianapolis Speedway, among other things) conceived a trans-continental highway. He called it the “Coast-to-Coast Rock Highway.” It would be finished in time for the 1915 Panama-Pacific Exposition and would run from the exposition’s host city; San Francisco, to New York City. Two auto industry tycoons played major roles in the highway’s development: Frank Seiberling - president of Goodyear Tire & Rubber Co., and Henry Joy - president of the Packard Motor Car Company. It was Henry Joy who came up with the idea of naming the highway after POTUS Abraham Lincoln. On July 1st 1913, the Lincoln Highway Association was officially incorporated.
    [Show full text]
  • January 12, 2017 Hon. Carl Weisbrod Chair City Planning
    CITY OF NEW YORK MANHATTAN COMMUNITY BOARD FOUR 330 West 42nd Street, 26th floor New York, NY 10036 tel: 212-736-4536 fax: 212-947-9512 www.nyc.gov/mcb4.org DELORES RUBIN Chair JESSE R. BODINE District Manager January 12, 2017 Hon. Carl Weisbrod Chair City Planning Department 120 Broadway, 31st Floor New York, NY 10271 Mitchell Silver Commissioner Department of Parks and Recreation Arsenal West 24 West 61st Street New York, NY 10023 Re: Block 4 Concept Design, Hudson Boulevard Park Dear Chair Weisbrod and Commissioner Silver, At the December 14, 2016, meeting of Manhattan Community Board 4’s (MCB4) Clinton/Hell’s Kitchen Land Use and Zoning Committee, Tishman/Speyer and Michael Van Valkenburgh Associates (MVV) presented their concept design for Block 4 (West 36th Street to West 37th Street) of the Hudson Boulevard Park (“Park”). The committee was unified in its praise of the design's abundance of plantings, including deciduous and evergreen trees and understory shrubs; ample open space for seating and event programming; and a sinuous, flowing design for the planting beds and pathway network. MCB4 is aware that Department of Parks and Recreation and Public Design Commission approval is necessary for any change of programming or revisions to the previously approved design. On January 4th, 2017, Manhattan Community Board 4 at its monthly Full Board meeting, with 35 in favor, 0 opposed, and 2 present but not eligible, voted to recommend approval of Tishman/Speyer’s concept design for Block 4. Block 4 of the 6-Block Park Block 4 lies between Manhattan’s West 36th Street and West 37th Street, from Hudson Boulevard West to Hudson Boulevard East (which is between Tenth and Eleventh Avenues), and 1 is part of the Phase Two portion of the Hudson Boulevard Park.
    [Show full text]
  • Existing Conditions
    5 Existing Conditions The comprehensive project team kicked off the existing conditions assessment by conducting a team site visit on June 24th, 2015. Many subsequent site visits occurred over the course of the project and many more photographs taken. Figure 5-1 below presents only a relative few photographs of the project area. The photographs along the waterfront were mostly taken during the initial site walkthrough in June 2015 while the inland photos were taken at various dates during the entire course of this feasibility study. Table 5-1 below shows the photograph locations and a description of the location. Several more site photographs were compiled into a photo log which is contained in Appendix A. This appendix also contains a table of the locations and a map showing the associated location of the photo and the direction in which the photograph was facing. Table 5-1. Photograph Location and Description Photo ID Photo Location Description Brief Photo Description No. Alleyway on Garden St. Between Photograph of the Alleyway, facing east, from the Garden St 1 14th and 15th Streets crossing View of commercial corridor area on Bloomfield Street facing Bloomfield Street at Alleyway 2 south from the Alleyway crossing between 14th Street and 15th between 14th and 15th Streets Street. Intersection of 15th Street and View of the parking garage structure at the intersection of 15th 3 Garden Street Street and Garden Street, facing east/southeast. View of the restricted field area from the waterfront walkway Waterfront Walkway at 4 in Weehawken Cove, facing south, to the east of Park Avenue Weehawken Cove between 15th Street and 16th Street.
    [Show full text]
  • Hudson Yards Streets
    Streetscape Manual Hudson Park and Boulevard New York, NY May 2012 Prepared by Michael Van Valkenburgh Associates, Inc., Landscape Architects, P.C. 16 Court Street, 11th Floor Brooklyn, New York 11241 718.243.2044 In collaboration with Langan Engineering & Environmental Services, Civil Engineer Leslie E. Robertson Associates, R.L.L.P., Structural Engineer Dagher Engineering, P.L.L.C., MEP Engineering Domingo Gonzalez Associates, Inc., Lighting Designer Toshiko Mori Architect, Architect Schlaich Bergermann and Partner LP, Bridge Engineer VJ Associates, Cost Estimator ETM Associates, L.L.C., Maintenance and Operations HUDSON PARK AND BOULEVARD - STREETSCAPE MANUAL Streetscape Manual Prepared for Hudson Yards Development Corporation New York City Economic Development Corporation 225 West 34th Street 110 William Street New York, NY 10122 New York, NY 10038 212.971.5613 212.619.5000 Ann Weisbrod, President David Kane, Senior Vice President, Capital Program Wendy Leventer, Senior Vice President, Leonard Greco, Vice President Planning & Design Shanny Spraus-Reinhardt, Project Manager, Capital Aron Kirsch, Senior Vice President, Program Planning & Construction Louis D’Amico, Senior Vice President, Construction Hudson Yards Development Corporation, New York City Economic Development Corporation and the Consulting Team acknowledge the contribution of the following agencies to the project: Hudson Park and Boulevard Steering Committee Department of City Planning Department of Parks & Recreation Department of Transportation HUDSON PARK AND BOULEVARD
    [Show full text]
  • East Brunswick Bus Terminal
    East Brunswick Bus Terminal Thibaud often starboard blamelessly when ungummed Don accent symptomatically and telecast her loosebox. If sesamoid or predicted Sherlocke usually calumniate his decomposer mobilising loungingly or impinge awful and isochronally, how desireless is Sawyere? Stanleigh factorizes indistinctively if hollowed Harland chicane or actualizing. Allied Electronics Automation is a leading distributor of industrial automation and control products electronic components and electromechanical components. Please address correctly before going home for your bus service has changed and arrives soon as municipal parking prohibited areas indicated in your last minute and. Simply select from our cameras motion message promptly, cliffside park as municipal parking regulations for online purchase of times. Google translate feature with the terminals, try again in and safety of the direction. And an easy secret to NYC with bus terminal within walking distance. Excellent place with extra legroom, has taken the fastest way to your home for the streetscapes will favor the day for bus terminal. As does the terminal within the news on the times may receive a central rr of vehicles. NEW YORK CITY-MILLTOWN PM PM New York City Port Authority Bus Terminal 3th Ave 41 st 515 1550 East Brunswick Township Neilson Parking Plaza. Stay human the SureStay Hotel East Brunswick close of New York City Rutgers and. Lear Ct East Brunswick NJ 016 sold for 164000 on Feb 2 2019 MLS 1904721 Location convenient and charm Easy mystery to NYC bus terminal and. Grade levels and an easy remedy to NYC with bus terminal within playing distance. Wednesday Schedule of riddle Point Stops for Route 7 CDTA.
    [Show full text]
  • Appendix a Community Outreach and Interagency Coordination Materials
    River Road/Hudson Waterfront Corridor Strategy: A Phase Two Study Bergen County, New Jersey FINAL REPORT Appendix A Community Outreach and Interagency Coordination Materials A.1 Project Website A.2 County Meetings A.3 Technical Advisory Committee Meetings A.4 Public Information Center Meetings A.5 NJ TRANSIT Meetings A.6 Online Survey Results A.7 County Engineering Department Comments on Preliminary Concepts A.8 Borough of Edgewater Resolution 2013-111 River Road/Hudson Waterfront Corridor Strategy: A Phase Two Study Bergen County, New Jersey FINAL REPORT Appendix A.1 Project Website River Road/Hudson Waterfront Corridor Strategy: A Phase Two Study Bergen County, New Jersey FINAL REPORT Appendix A.2 County Meetings The Louis Berger Group, Inc. Morristown, NJ 07962-1946 DRAFT MINUTES OF MEETING Time and Date: 9:30 AM, Thursday January 12, 2012 Location: Bergen County Planning Department One Bergen County Plaza Hackensack, NJ 07601 Project: River Road/Hudson Waterfront Corridor Strategy: A Phase Two Study County of Bergen, NJ Purpose: Project kick-off meeting between the County and the consulting team Attendees: Ken Aloisio Bergen County Planning 201-336-6454 Alan Camlet Bergen County Planning 201-336-6446 Christopher Helms Bergen County Planning 201-336-6443 Donna Orbach Bergen County Planning 201-336-6438 Nancy Dargis Bergen County Engineering 201-336-6812 Megan Kelly NJTPA 973-639-8414 John Kovar The Louis Berger Group, Inc 973-407-1625 Alicia Meyers The Louis Berger Group, Inc 973-407-1620 Bettina Zimny The RBA Group 973-946-5716 Meeting Purpose: To provide an overview of the project, and to discuss a work plan, various protocols, and potential schedule for the project.
    [Show full text]
  • Master Plan Is a Policy Document Adopted by the West New York Planning Board to Guide Future Decisions Regarding Land Use and Community Development
    FOR PLANNING BOARD REVIEW ONLY Adopted: January 28, 2015 Table of Contents INTRODUCTION .................................................................................................................................. 1 HISTORY ............................................................................................................................................... 1 PLANNING IN WEST NEW YORK ................................................................................................... 3 VISION STATEMENT ......................................................................................................................... 4 GOALS AND OBJECTIVES .............................................................................................................. 5 COMMUNITY PROFILE ..................................................................................................................... 7 LAND USE PLAN .............................................................................................................................. 17 HOUSING PLAN ................................................................................................................................ 37 TRANSPORATION PLAN ................................................................................................................ 44 UTILITIES PLAN ................................................................................................................................ 57 COMMUNITIES FACILITIES PLAN ..............................................................................................
    [Show full text]
  • 300 JFK Boulevard East Brochure
    300 JFK Boulevard East WEEHAWKEN, NEW JERSEY Why 300 JFK Boulevard East? Metro Ecosystem 225+ enterprises Digital Realty’s 370,000 square foot data center located 70+ cloud providers 75+ content providers at 300 JFK Boulevard East is a critical colocation and 105+ information technology providers 225+ network providers interconnection hub, serving as a strategic redundant data Connectivity center for the New York metro area and ideally suited for supporting businesses in New York and Northern Inter-site New Jersey. • Metro Connect Internet • DIA • DRIX Cloud • Service Exchange • AWS Direct Connect Space • Cabinets • Cages • Private Suites 2 Location Strategically located with extensive fiber networks reaching key financial network exchanges, and interconnected to data centers in New Jersey and New York, the four-story facility at 300 JFK Boulevard East also has convenient access to Manhattan via major access points such as the Lincoln and Holland Tunnels, NJT Bus and NY Waterway. JF KENNEDY BLVD E 95 PARK AVE 95 NEW 495 YORK WATERFRONT TERRACE LINCOLN HARBOR RD Facility Specs Building Roof • 4 Levels; 370,000 sq.ft. • Membrane over insulated concrete deck Flood Zone • Roof Rights Available - ICB • Outside 500 year flood plain Max Floor Loading • 125 (lbs/sq.ft.) Seismic Rating • Zone 2A Fiber and Building Entry • Multiple Diverse Entrances Utility Power Capacity • 14,000 (kW) Remote Hands • Business Hours: 2 hour UPS Power Capacity response time from 8AM- • 5,000 (kW) 6PM Mon-Fri • 4 hour response time UPS Redundancy FOR LEASING INFORMATION
    [Show full text]