The London Gazette, 26 November, 1912

Total Page:16

File Type:pdf, Size:1020Kb

The London Gazette, 26 November, 1912 9018 THE LONDON GAZETTE, 26 NOVEMBER, 1912. In Parliament.—Session 1913. Railway (No. 4), in the "parish and metro- politan borough of Hammersmith and county of London, and the parish and urban CENTRAL LONDON RAILWAY. district of Chiswick and county of Middlesex commencing at the point of termination of (New Railways and Works; Provisions as to Railways Nos. 1 and 2, and terminating at a Underpinning; Acquisition of Lands and point under High-road, Chiswick, at or near Use of Subsoil; Working and other Agree- •its junction with Sutton-lane. ments with the London and South-Western Railway Company; Agreements with other Railway (No. 5), in the parishes and urban Railway Companies as to Communication be- districts of Chiswick and Acton and county tween Stations; Fares, Rates and Charges; of Middlesex, commencing at the point of Additional Capital; Application of Funds; termination of Railway No. 4 and termina- Interest during Construction; Amendment ting by a junction with the railway of the London and South-Western Railway Com- of Acts.) pany on the north-western side of Gunners- OTICE is hereby given, that application bury Station at a point 50 yards; or there- is intended to be made to Parliament in abouts measured in a south-westerly direction the ensuing Session by the Central London from the footbridge at tlhat station. Railway Company (hereinafter called " the 2. To incorporate with and extend and make Company ") for an Act to effect all or some of applicable with or without modification or the purposes following (that is to say) : — alteration to the intended railways and works 1. To empower the Company to make and all or some of the provisions of the Central maintain the underground railways and works London Railway Acts, 1891 to 1911, with hereinafter described or some part or parts reference to the mode of construction of the thereof with all proper and necessary stations, intended works, the working of the railway by platforms, sidings, approaches, stairs, pas- electrical power, the retention and sale of lands, sages, subways, tunnel shafts, lifts, escalators, the power to underpin and all other usual pro- stagings, buildings, apparatus, generating visions, and so far as may be necessary to alter plant, depots, machinery, appliances, works and amend the provisions of those Acts with and conveniences (that is to say): — reference thereto. 3. To empower the Company on and subject Railway (No. 1), wholly in the parish and to such terms and conditions as may be pre- metropolitan borough of Hammersmith and scribed by the intended Act to stop up, break county of London, commencing by a junc- up, open, and use, whethejvtemporarily or per- tion with the existing railway of the Com- manently, the surface of the following roads pany under Uxbridge-road at a point 16 or places or some part or parts thereof: — yards or thereabouts east of Providence- place and terminating under Goldhawk-road (a) Shepherd's Bush Common, Uxbridge- at a point 22 yards or thereabouts west road, and Shepherd's Bush Green, at or of Bamborough-gardens. near the junction of those roads; (b) Caxton-road and Uxbridge-road at or Railway (No. 2), wholly in the parish and near the junction of those roads; metropolitan borough of Hammersmith and county of London, commencing by a junction (c) Goldhawk-road and Godolphin-road at with the existing railway of the Company or near the junction of those roads; under Uxbridge-road at a point 58 (d) Stamford Brook-road and Stamford- yards or thereabouts west of Providence- gardens at or near the junction of those place and terminating at the point of termi- roads; nation of Railway (No. 1). (e) Acton Green, Bath-road, Turnham Railway (No. 3), wholly in the parish and Green-terrace, The Avenue and Woodstock- metropolitan borough of Hammersmith and road at or near the junction of those roads; county of London, commencing by a junc- and tion with Railway (No. 1) under Shepherd's (f) Turnham Green, High-road Chiswick, Bush Common at a point 20 yards or and Heathfield-terrace at or near the junc- thereabouts north of the northern end of tion of those roads. Camden-gardens and terminating by a junc- 4. For the purposes of the said intended tion with the existing railway of the Com- railways it is intended to acquire compulsorily pany under Caxton-road at a point 33 certain lands which are or are reputed to be yards or thereabouts north of Uxbridge- common or commonable lands or easements road. therein or thereunder (that is to say) : — Estimated area required Name of 'Common or Parish in which lands Area within limits of or in or under which Commonable land. are situate. deviation about easements required. a. r. p. a. r. p. Shepherds' Bush Common - Hammersmith - 306 0 1 25 Acton Green Chiswick - 047 0 1 1 Back Common, otherwise Chiswick - 070- 0 1 14 Chiswick Common. Turnham Green Chiswick - 0 0 33 0 0 18.
Recommended publications
  • Uncovering the Underground's Role in the Formation of Modern London, 1855-1945
    University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known.
    [Show full text]
  • Thames Tideway Tunnel Interim Measures to Reduce Infraction Fines
    Thames Tideway Tunnel Interim measures to reduce infraction fines. Working draft 5th February 2013 Report By Professor Chris Binnie MA, DIC, HonDEng, FREng, FICE, FCIWEM 2013 Brockwell, Wootton Courtenay, Minehead Somerset TA24 8RN Tideway tunnel interim scheme 28 8 12 1 Executive summary Any long term solution to the Thames Tideway CSO problems would take many years to implement, so I propose interim measures to much improve the Tideway within two to three years. The European Commission has taken out infraction proceedings against the UK for slow implementation of the UWWTD. The European Court of Justice has found against the UK on the Thames Tideway. Thus it is likely that infraction fines will be imposed. My information is that these could be substantial, based on the current tunnel completion date of 2023 as high as Euros 2.0 bn. I am advised that they would be based partly on the “Environmental impact of non-compliance “. A reduction of one point out of five points on the “environmental impact of non-compliance” or “member state conduct”might save as much as Euro 200 million, about £160m. Standards for ecology, aesthetics, and health impact have been set for the Tideway. The current STW improvements, and the Lee Tunnel would reduce the spill volume from 39Mm3/year to about 18Mm3/years, a long way to achieving the dissolved oxygen standards. However the Thames Tideway Tunnel will not be operational until about 2023. Thus interim measures could be implemented to reduce “the environmental impact of non-compliance” until the tunnel is operational. The object of these interim measures would not be to meet the standards set for the Tideway but to mitigate the environmental impact to the extent that the substantial fines would be reduced.
    [Show full text]
  • Biology Powerhouse Raises Railway Alarm
    NEWS IN FOCUS to enrol all participants by 2018. Certain factors make researchers optimis- tic that the British study will succeed where the US one failed. One is the National Health Service, which provides care for almost all pregnant women and their children in the United Kingdom, and so offers a centralized means of recruiting, tracing and collecting medical information on study participants. In the United States, by contrast, medical care is provided by a patchwork of differ- ent providers. “I think that most researchers in the US recognize that our way of doing population-based research here is simply different from the way things can be done in the UK and in Europe, and it will almost always be more expensive here,” says Mark Klebanoff, a paediatric epidemiologist at Nationwide Children’s Hospital in Colum- bus, Ohio, who was involved in early dis- cussions about the US study. The Francis Crick Institute sits at the nexus of three central London railway hubs. At one stage, US researchers had planned to knock on doors of random houses looking URBAN SCIENCE for women to enrol before they were even pregnant. “It became obvious that that wasn’t going to be a winning formula,” says Philip Pizzo, a paediatrician at Stanford University Biology powerhouse in Palo Alto, California, who co-chaired the working group that concluded that the National Children’s Study was not feasible. raises railway alarm “The very notion that someone was going to show up on your doorstep as a representa- tive from a govern­ment-funded study and Central London’s Francis Crick Institute fears that proposed say ‘Are you thinking of getting pregnant?’ train line will disrupt delicate science experiments.
    [Show full text]
  • Network Closures Weekend of 29/30 March
    Transport for London Network closures weekend of 29/30 March Chesham Watford Junction Epping Chalfont & Latimer Watford High Street Theydon Bois Watford High Barnet Cockfosters Debden Amersham Bushey Totteridge & Whetstone Oakwood Chorleywood Croxley Loughton Carpenders Park Rickmansworth Moor Park Woodside Park Southgate Buckhurst Hill Roding Grange Hatch End Valley Hill Northwood Mill Hill East West Finchley Arnos Grove West Ruislip Headstone Lane Edgware Chigwell Northwood Hills Stanmore Bounds Green Hillingdon Ruislip Harrow & Hainault Ruislip Manor Burnt Oak Finchley Central Pinner Wealdstone Canons Park Wood Green Woodford Uxbridge Ickenham Colindale Fairlop Eastcote North Harrow East Finchley Harringay Kenton Queensbury Turnpike Lane South Woodford Green Lanes Barkingside Harrow- Hendon Central Northwick Preston Highgate South Tottenham Snaresbrook on-the-Hill Park Road Kingsbury Rayners Lane Manor House Newbury Park Ruislip Gardens Brent Cross Blackhorse Gospel Archway Crouch Hill Seven Sisters Road West South Kenton Redbridge Harrow Golders Green Oak Hampstead Upper Holloway North Wembley Neasden Heath Tottenham Walthamstow South Ruislip South Harrow Hampstead Tufnell Park Wanstead Gants Wembley Hale Central Hill Upminster Wembley Central Park Dollis Hill Arsenal Finsbury Park Leytonstone Finchley Road Walthamstow Upminster Bridge Stonebridge Park Willesden Green & Frognal Kentish Kentish Leyton Leytonstone Town West Holloway Road Queen’s Road Midland Road High Road Northolt Sudbury Hill Belsize Park Town Hornchurch Harlesden Kilburn Kensal Brondesbury Caledonian Road Highbury & Chalk Farm Leyton Willesden Junction Rise Park West Hampstead Islington Dalston Camden Stratford Elm Park Road Kingsland International Greenford Wanstead Park Sudbury Town Brondesbury Finchley Road Camden Town Caledonian Dagenham East Kensal Green Road & Canonbury Swiss Cottage Barnsbury Homerton Dagenham Heathway Queen’s Park Kilburn South Mornington Dalston Junction Stratford High Road Hampstead St.
    [Show full text]
  • TO LET Second Floor Offices 8,400 Sq Ft (780.3 Sq M)
    23 Eyot Gardens Stamford Brook W6 9TR Second floor offices 8,400 sq ft (780.3 sq m) TO LET LOCATION STAMFORD A219 BROOK The building is prominently located on the A4 at its junction with Eyot Gardens. It is RAVENSCOURT approximately 7 minutes walk from TURNHAM PARK GREEN Stamford Brook(District Line Station) .It is A315 well situated for the nearby pubs by the 5 river – The Black Lion and The Old Ship. The 1 2 14 HAMMERSMITH Cross Keys and Carpenters Arms 3 13 4 Restaurants are also nearby in Black Lion 12 KI RD 6 NG STREET 16 A315 H Lane. King Street is a 5 minute walk, where CHISWICK HIGH 7 A sandwich shops, banks and other restaurants are available. The A4/M4 HAMMERSMITH provides access to central London and the 8 West of England. A4 A316 B A219 C 10 11 9 DIRECTORY 15 EATING & DRINKING: 1 Artisan Coffee THAMES RIVER A306 2 Tosa Japanese Restaurant 3 Azou Restaurant FULHAM 4 Michael Nandras 5 Polti Indian Restaurant 6 The Hampshire Hog 7 The Carpenters Arms PALACE R 8 The Cross Keys 9 The Black Lion Chiswick 10 The Old Ship Eyot 11 The Dove A316 OAD SUPERMARKETS & AMENITIES: 12 Sainsbury’s Local 13 Tesco Metro 14 Post Office ENTERTAINMENT: 15 The Eventim Apollo 16 Lyric Theatre LOCAL BUSINESSES: B Kelly Hoppen A Lifschutz Davidson Sandilands (Architects) Legendary (Film Company) Frost Meadowcroft (Property Consultants) C British Grove Recording Studios 2nd floor DESCR IPTION Eyot Gardens House is a four story building, the available space is situated on the second floor.
    [Show full text]
  • 2. Borough Transport Objectives
    Chapter Two Objectives 2. Borough Transport Objectives 2.1 Introduction This chapter sets out Hammersmith & Fulham’s Borough Transport Objectives for the period 2011 - 2014 and beyond, reflecting the timeframe of the revised MTS. The structure is as follows: • Sections 2.2 and 2.5 describe the local context firstly providing an overview of the borough characteristics and its transport geography, and then summarising the London- wide, sub-regional and local policy influences which have informed the preparation of this LIP. • Section 2.6 sets out Hammersmith & Fulham’s problems, challenges and opportunities in the context of the Mayor’s transport goals and challenges for London, and looks at the main issues which need to be addressed within the borough in order to deliver the revised MTS goals. • Finally section 2.7 sets out our Borough Transport Objectives for this LIP, which have been created by the issues identified in Sections 2.2 to 2.6. 2.2 About Hammersmith & Fulham The borough of Hammersmith & Fulham is situated on the western edge of inner London in a strategic location on the transport routes between central London and Heathrow airport. The orientation of the borough is north to south, with most major transport links, both road and rail, carrying through-traffic from east to west across the borough. Some of the busiest road junctions in London are located in the borough at Hammersmith Broadway, Shepherds Bush Green and Savoy Circus and the borough suffers disproportionately from the effects of through-traffic. North-south transport links in the borough are not as good as east-west links.
    [Show full text]
  • LONDON BOROUGH of HAMMERSMITH and FULHAM UPDATED SURFACE WATER MANAGEMENT PLAN 47065080 April 2015 I
    London Borough of Hammersmith and Fulham Updated Surface Water Management Plan April 2015 UNITED KINGDOM & IRELAND Prepared for: 47065080 REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved by 1 December Draft for client comment Danielle Skilton Emily Craven Jon Robinson 2013 Flood Risk Principal Operations Consultant Consultant Director 2 January Final Draft Danielle Skilton Emily Craven Jon Robinson 2014 Flood Risk Principal Operations Consultant Consultant Director 3 May 2014 Final Danielle Skilton Emily Craven Jon Robinson Flood Risk Principal Operations Consultant Consultant Director 4 June 2014 Final Revision Danielle Skilton Jon Robinson Jon Robinson Flood Risk Operations Operations Consultant Director Director 5 April 2015 Updated with revised Sarah Littlewood Matthew Ince Michael Timmins modelling for client comment Consultant Principal Flood Technical Director Risk Consultant URS Infrastructure & Environment UK Ltd. 6-8 Greencoat Place London SW1P 1PL United Kingdom Telephone: +44(0)20 7798 5000 Fax: +44(0)20 7798 5001 LONDON BOROUGH OF HAMMERSMITH AND FULHAM UPDATED SURFACE WATER MANAGEMENT PLAN 47065080 April 2015 i Limitations Please note that, as of October 2014, AECOM and URS have joined together as one company. Whilst AECOM and URS have become one company, contracting entities (all of which are now wholly owned by AECOM) and lines of communication currently remain the same unless specifically agreed or communicated otherwise. Capita and URS Infrastructure & Environment UK Limited (“Capita URS”) has prepared this Report for the sole use of the Royal Borough of Kensington and Chelsea and the London Borough of Hammersmith and Fulham (“Client”) in accordance with the Agreement under which our services were performed (September 2012).
    [Show full text]
  • Findings 1 Some Key Facts
    Transforming central London’s railway viaduct Volume 1: main findings 1 Some Key Facts: - The length of railway viaducts in the London South Central area is approximately 10km, making it the biggest building in London - The combined length of the 90 tunnels that can be travelled through is 4km - There are approx 1000 business units available to let in the adjoining arches - In London South Central, there are nearly 260,000 square metres of potential redevelopment space under the viaduct, with potential to create or retain over 10,000 jobs. - London Bridge is the oldest station, opening in 1836, and running to Greenwich. - The remaining viaducts were all built in the following 50 years, between 1836-1886. - The seven wards that the railway viaduct straddles are within the 20% most deprived in the country. - There is only one route north-south which avoids passing through the viaduct – via Mepham Street, immediately in front of Waterloo Station. - There are 97 million separate pedestrian journeys made through the tunnels every year FFoorrwwaarrdd ttoo VVoolluummee OOnnee This report offers a practical and affordable programme that will see the railway tunnels from Vauxhall to London Bridge transformed over the next few years, offering a clear way forward for all the partners involved. Light at the End of the Tunnel presents a strategic opportunity to transform a physical barrier through creative, positive partnership action. The barrier will become a community asset, a place of work, and the site of varied and stimulating public spaces. Over the past eight years, Cross River Partnership has focussed its attention on making the river a less formidable barrier.
    [Show full text]
  • London and Its Main Drainage, 1847-1865: a Study of One Aspect of the Public Health Movement in Victorian England
    University of Nebraska at Omaha DigitalCommons@UNO Student Work 6-1-1971 London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England Lester J. Palmquist University of Nebraska at Omaha Follow this and additional works at: https://digitalcommons.unomaha.edu/studentwork Recommended Citation Palmquist, Lester J., "London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England" (1971). Student Work. 395. https://digitalcommons.unomaha.edu/studentwork/395 This Thesis is brought to you for free and open access by DigitalCommons@UNO. It has been accepted for inclusion in Student Work by an authorized administrator of DigitalCommons@UNO. For more information, please contact [email protected]. LONDON .ML' ITS MAIN DRAINAGE, 1847-1865: A STUDY OF ONE ASPECT OP TEE PUBLIC HEALTH MOVEMENT IN VICTORIAN ENGLAND A Thesis Presented to the Department of History and the Faculty of the Graduate College University of Nebraska at Omaha In Partial Fulfillment of the Requirements for the Degree Master of Arts by Lester J. Palmquist June 1971 UMI Number: EP73033 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a complete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. Dissertation Publishing UMI EP73033 Published by ProQuest LLC (2015). Copyright in the Dissertation held by the Author. Microform Edition © ProQuest LLC.
    [Show full text]
  • Buses from Sherpherd's Bush
    UXBRIDGE HARLESDEN WILLESDEN CRICKLEWOOD HAYES LADBROKE GROVE EAST ACTON EALING ACTON TURNHAM GREEN Buses from Shepherd’s Bush HOUNSLOW BARNES 607 N207 Isleworth Brentford Gunnersbury Uxbridge UXBRIDGE Busch Corner Half Acre 316 Key Uxbridge Civic Centre Uxbridge Park Road Cricklewood 49 Day buses in black Bus Garage WILLESDEN CRICKLEWOOD N207 Night buses in blue HARLESDEN O Connections with London Underground Hillingdon Road The Greenway Harlesden Willesden Cricklewood — Central Middlesex Hospital Jubilee Clock Bus Garage Broadway ChildÕs Hill o Connections with London Overground 260 Hillingdon Lees Road HAYES Craven Park Willesden Cricklewood Golders R Connections with National Rail 228 Harlesden Green Kilburn Green B Connections with river boats South College Park Hayes End M Greenford South Early mornings and evenings only Willesden Junction Brondesbury Perivale Hampstead Chalk Farm G Daytimes only when Wetlands Centre is open Uxbridge 24 hour 31 24 hour 220 service County Court Greenford Park Royal 72 service 283 Swiss Cottage Camden Town L Not served weekday morning and evening peak hours Red Lion Hanger East Acton Lane ASDA Kilburn or Saturday shopping hours ROEHAMPTON Hayes Grapes Industrial Estate Scrubs Lane High Road DormerÕs Mitre Bridge N Limited stop Wells Lane Southall Ruislip Kilburn Park Trinity Road Lady Margaret Park Road s Road Royal Old Oak Common Lane QueenÕs Park The Fairway LADBROKE 95 Scrubs Lane 207 Southall Town Hall North Acton Mitre Way/Wormwood Scrubs 228 Southall Gypsy Corner GROVE Chippenham Road Police
    [Show full text]
  • The Central London Electric Train. 3
    THE CENTRAL LONDON ELECTRIC TRAIN 3 – CARRIAGES AND TRAINS by Piers Connor CHOICE OF DESIGN By the time that the Central London Railway (CLR) opened to the public on 30 July 1900, two other electric tube railways were running in London – the City & South London Railway (C&SLR) and the Waterloo & City Railway (W&C), so the Central London had some experience to look to in the development of its systems. In fact, since the CLR had adopted the same traction voltage as the W&C at 550 volts DC, they are recorded, in one of the company’s board meeting minutes, as having persuaded the W&C to allow them to test one of the locomotives on their railway. Quite how they did this is open to speculation, since the only way of getting a locomotive down into the W&C was by means of the vehicle lift at the line’s Waterloo terminus and this lift was limited to 30 tons capacity. Of course, the locomotive could have been partially dismantled and lowered in bits but most likely they took down the bogies first and then the body shell. No records of the results of the tests appear to have survived. Figure 1: A Central London Railway trailer car seen in Wood Lane depot shortly after delivery from the manufacturer. The open entrance platforms are clearly visible. A feature of all the cars when delivered is that externally visible vehicle numbers were not provided. Note also that the central window pillars are wider than those towards each end of the car.
    [Show full text]
  • London Transport Records at the Public Record Office
    CONTENTS Introduction Page 4 Abbreviations used in this book Page 3 Accidents on the London Underground Page 4 Staff Records Pages 6-7 PART A - List of former ‘British Transport Historical Records’ related to London Transport, which have been transferred to the Greater London Record Office - continued from Part One (additional notes regarding this location) Page 8 PART C - List of former ‘British Transport Historical Records’ related to London Transport, which are still at the Public Record Office - continued from Part One Pages 9-12 PART D - Other records related to London Transport including Government Departments - continued from Part One Pages 13-66 PART E - List of former ‘Department of Education and Science’ records transferred from the PRO to the Victoria & Albert Museum Pages 67 APPENDIX 1 - PRO Class AN2 Pages to follow APPENDIX 2 - PRO Class MT29 Page 51- (on disc) APPENDIX 3 - Other places which have LT related records Pages 68-71 PRO document class headings: AH (Location of Offices Bureau) Page 13 AN (Railway Executive Committee/BTC/British Railways Board) - continued from Part One Pages 14-26 AN2 (Railway Executive Committee, War of 1939. Records cover period from 1939-1947) Pages to follow AT (Department of the Environment and Predecessors) Page 27 AVIA (Ministry of Aviation/Ministry of Aircraft Production) Page 27 AY (Records of various research institutes) Page 27 BL (Council on Tribunals) Page 27 BT (Board of Trade) - continued from Part One Page 28-34 CAB (Cabinet Papers) Page 35-36 CK (Commission for Racial Equality/Race
    [Show full text]