Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0102 1 15 $259.51 $858,200.67 3,307.000 DA N MAINTENANCE OF TRAFFIC 0102 3 4 $41.39 $100,763.68 2,434.300 CY N COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 $36.28 $18,610.96 513.000 SY N PEDESTRIAN SPECIAL DETOUR 0102 14 2 $60.10 $31,251.60 520.000 HR N TRAFFIC CONTROL OFFICER 0102 60 14 $.29 $76,871.99 268,334.000 ED N WORK ZONE SIGN 0102 61 2 $70.31 $3,234.48 46.000 EA N BUSINESS SIGN 0102 62 1 $1.50 $360.00 240.000 ED N BARRIER MOUNTED WORK ZONE SIGN- INDEX 11871/700-013 0102 71 13 2 $53.55 $92,423.80 1,726.000 LF N TEMPORARY BARRIER, F&I, LOW PROFILE, 0102 71 15 4 $49.22 $190,767.20 3,876.000 LF N TEMPORARY BARRIER, F&I, ANCHORED 0102 71 16 1 $67.01 $38,530.75 575.000 LF N TEMPORARY BARRIER, F&I, FREE STANDING 0102 71 23 2 $10.61 $7,428.40 700.000 LF N TEMPORARY BARRIER, RELOCATE, LOW PROFILE CONCRETE 0102 71 25 2 $16.05 $41,031.40 2,556.000 LF N TEMPORARY BARRIER, RELOCATE, ANCHORED 0102 73 1 $7.00 $10,780.00 1,540.000 LF N TEMPORARY GUARDRAIL 0102 74 1 14 $.11 $245,773.99 2,165,570.000 ED N CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD 0102 76 5 $6.01 $2,901.15 483.000 ED N ARROW BOARD / ADVANCE WARNING ARROW PANEL 0102 78 9 $4.03 $105,347.67 26,165.000 EA N TEMPORARY RETROREFLECTIVE PAVEMENT MARKER 0102 89 1 4 $2,394.44 $43,100.00 18.000 LO N TEMPORARY CRASH CUSHION, REDIRECTIVE OPTION 0102 99 13 $13.22 $100,228.40 7,583.000 ED N PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY 0102104 1 $9.80 $2,940.00 300.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 1 $9.80 $2,940.00 300.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION

08/24/2020 Page: 1 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0102115 1 $.60 $33.60 56.000 ED N TYPE III BARRICADE 0102150 1 5 $6.71 $7,032.00 1,048.000 ED N PORTABLE REGULATORY, SIGN 0102150 2 5 $7.15 $7,497.50 1,048.000 ED N RADAR SPEED DISPLAY UNIT 0104 1 3 $1.97 $19,549.00 9,919.000 SY N ARTIFICIAL COVERINGS /ROLLED PRODUCTS 0104 6 1 $1.75 $10,473.75 5,985.000 LF N TEMPORARY SLOPE DRAIN / RUNOFF CONTROL STRUCTURE 0104 10 3 10 $3.56 $219,446.84 61,593.000 LF N SEDIMENT BARRIER 0104 11 3 $21.86 $32,569.10 1,490.000 LF N FLOATING TURBIDITY BARRIER 0104 12 3 $7.72 $5,978.98 774.000 LF N STAKED TURBIDITY BARRIER- NYLON REINFORCED PVC 0104 15 3 $2,080.00 $31,200.00 15.000 EA N TRACKING PREVENTION DEVICE 0104 18 7 $176.19 $43,167.68 245.000 EA N INLET PROTECTION SYSTEM 0107 1 13 $12.37 $100,904.64 8,155.080 AC N LITTER REMOVAL 0107 2 13 $12.17 $90,307.69 7,418.350 AC N MOWING 0108 1 2 $52,912.57 $105,825.14 2.000 EA N MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING 0108 2 1 $100,000.00 $100,000.00 1.000 EA N MONITOR EXISTING STRUCTURES- VIBRATION MONITORING 0110 1 1 11 $7,394.35 $1,490,257.12 201.540 AC N CLEARING & GRUBBING 0110 2 2 1 $25,000.00 $6,000.00 .240 AC N SELECTIVE CLEARING AND GRUBBING, AREAS WITH TREES TO REMAIN 0110 3 4 $39.20 $383,299.88 9,779.000 SF N REMOVAL OF EXISTING STRUCTURES/BRIDGES 0110 4 10 8 $20.70 $84,692.59 4,091.000 SY N REMOVAL OF EXISTING CONCRETE 0110 7 1 2 $117.65 $13,765.22 117.000 EA N MAILBOX, F&I SINGLE

08/24/2020 Page: 2 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0120 1 7 $4.46 $2,287,892.29 512,736.600 CY N REGULAR EXCAVATION 0120 2 2 6 $16.95 $210,618.31 12,422.400 CY N BORROW EXCAVATION, TRUCK MEASURE 0120 4 2 $10.25 $26,793.30 2,615.000 CY N EXCAVATION 0120 6 2 $2.99 $822,107.00 275,357.700 CY N 0120 71 1 $24,004.94 $24,004.94 1.000 LS N REGULAR EXCAVATION (3-R PROJECTS ONLY) 0125 1 1 $100.00 $8,300.00 83.000 CY N EXCAVATION FOR STRUCTURES 0145 2 3 $11.94 $10,828.45 907.000 SY N GEOSYNTHETIC REINFORCED OVER SOFT SOIL 0160 4 5 $2.08 $832,251.86 399,403.000 SY N TYPE B STABILIZATION 0173 71 1 $291.26 $11,650.40 40.000 EA N DRILLING HOLES FOR PRESSURE GROUTING 0173 76 1 $29.13 $52,434.00 1,800.000 LF N PIPE INSTALLATION 0173 77 1 1 $221.36 $92,971.20 420.000 CY N SUBSURFACE PRESSURE GROUTING, CEMENT 0285701 4 $7.07 $486,157.13 68,809.000 SY N OPTIONAL BASE, BASE GROUP 01 0285705 1 $56.00 $8,064.00 144.000 SY N OPTIONAL BASE, BASE GROUP 05 0285706 5 $23.74 $577,757.52 24,333.000 SY N OPTIONAL BASE, BASE GROUP 06 0285709 1 $13.88 $2,992,958.28 215,631.000 SY N OPTIONAL BASE, BASE GROUP 09 0285741 1 $86.00 $13,760.00 160.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 18" FOR PROJECT 443503-1-52-01 0285745 1 $100.45 $32,144.00 320.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 20" FOR PROJECT 421878-3-52-01

08/24/2020 Page: 3 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0285752 1 $44.43 $3,998.70 90.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 16" FOR PROJECT 217909-3-52-01 0286 1 4 $19.30 $132,167.81 6,849.000 SY N TURNOUT CONSTRUCTION/DRIVEWAY BASE- OPTIONAL MATERIALS 0327 70 1 2 $1.37 $200,440.30 145,831.000 SY N MILLING EXIST ASPH PAVT, 1" AVG DEPTH 0327 70 5 1 $5.00 $4,415.00 883.000 SY N MILLING EXIST ASPH PAVT, 2" AVG DEPTH 0327 70 6 4 $2.35 $417,828.90 178,016.000 SY N MILLING EXIST ASPH PAVT, 1 1/2" AVG DEPTH 0327 70 12 2 $2.24 $67,756.60 30,201.000 SY N MILLING EXIST ASPH PAVT, 1 1/4" AVG DEPTH 0327 70 13 1 $2.36 $13,780.04 5,839.000 SY N MILLING EXIST ASPH PAVT, 1 3/4" AVG DEPTH 0327 70 15 1 $4.29 $132,410.85 30,865.000 SY N MILLING EXIST ASPH PAVT, 2 3/4" AVG DEPTH 0327 70 19 3 $3.74 $32,781.50 8,757.000 SY N MILLING EXIST ASPH PAVT, 3/4" AVG DEPTH 0334 1 52 6 $112.26 $3,143,779.21 28,005.600 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, PG76-22 0334 1 53 2 $104.78 $5,956,251.31 56,847.900 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 0334 1 54 2 $304.67 $66,204.92 217.300 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC D, PG76-22 0337 7 25 4 $149.26 $2,174,614.39 14,569.100 TN N ASPHALT CONCRETE COURSE, INC BIT, FC-5, PG 76-22 0337 7 26 1 $212.05 $203,355.95 959.000 TN N ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, HIGH POLYMER 0337 7 80 4 $109.99 $2,432,236.98 22,112.500 TN N ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-9.5, PG 76-22 0337 7 81 1 $122.00 $65,660.40 538.200 TN N ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, PG 76-22 0339 1 5 $250.20 $52,042.56 208.000 TN N MISCELLANEOUS ASPHALT PAVEMENT 0400 2 4 1 $1,115.00 $253,216.50 227.100 CY N CONC CLASS II, BRIDGE SUPERSTRUCTURE 0400 2 10 2 $573.29 $122,855.00 214.300 CY N CONCRETE CLASS II, APPROACH SLABS

08/24/2020 Page: 4 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0400 4 4 1 $600.00 $150,360.00 250.600 CY N CONCRETE CLASS IV, SUPERSTRUCTURE 0400 4 5 2 $1,401.07 $283,717.50 202.500 CY N CONCRETE CLASS IV, BRIDGE SUBSTRUCTURE 0400 4 8 1 $1,000.00 $180,100.00 180.100 CY N CONC CLASS IV, BULKHEAD 0400128 1 $24.00 $2,160.00 90.000 LF N GROUTING PRECAST DECK PANELS, NON-SHRINK GROUT 0400147 1 $1,400.00 $10,500.00 7.500 CF N COMPOSITE NEOPRENE PADS 0400148 1 $1,000.00 $11,500.00 11.500 CF N PLAIN NEOPRENE BEARING PADS 0400153 1 $300.00 $34,290.00 114.300 CF N NON SHRINK GROUT, F&I, MISCELLANEOUS- STRUCTURES REHAB 0401 70 3 1 $2,469.33 $34,570.62 14.000 CF N RESTORE SPALLED AREAS, LATEX MODIFIED MORTAR- ACRYLIC 0411 1 1 $316.58 $1,582.90 5.000 GA N EPOXY MATERIAL FOR CRACK INJECTION- STRUCTURES REHAB 0411 2 1 $120.29 $16,840.60 140.000 LF N CRACKS INJECT & SEAL- STRUCTURES REHAB 0415 1 4 2 $1.39 $125,930.10 90,453.000 LB N REINFORCING STEEL - BRIDGE SUPERSTRUCTURE 0415 1 5 3 $1.35 $46,535.30 34,491.000 LB N REINFORCING STEEL- BRIDGE SUBSTRUCTURE 0415 1 6 1 $.58 $1,243.52 2,144.000 LB N REINFORCING STEEL- MISCELLANEOUS 0415 1 8 1 $2.00 $20,842.00 10,421.000 LB N REINFORCING STEEL- BULKHEAD 0415 1 9 2 $1.48 $61,397.20 41,480.000 LB N REINFORCING STEEL- APPROACH SLABS 0415 2 5 1 $5.00 $3,085.00 617.000 LB N STAINLESS REINFORCING STEEL, SUBSTRUCTURE 0415 10 5 1 $5.00 $34,865.00 6,973.000 LF N FIBER REINFORCED POLYMER BARS, #5 BAR 0425 1361 1 $5,859.93 $11,719.86 2.000 EA N INLETS, CURB, TYPE P-6, <10' 0425 1471 1 $6,139.54 $6,139.54 1.000 EA N INLETS, CURB, TYPE 7, <10' 0425 1521 2 $4,151.33 $70,572.68 17.000 EA N INLETS, DT BOT, TYPE C,<10'

08/24/2020 Page: 5 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0425 1523 1 $6,147.27 $12,294.54 2.000 EA N INLETS, DT BOT, TYPE C,JBOT, <10' 0425 1541 1 $4,426.88 $66,403.20 15.000 EA N INLETS, DT BOT, TYPE D, <10' 0425 1549 1 $8,151.87 $24,455.61 3.000 EA N INLETS, DT BOT, TYPE D, MODIFY 0425 1551 1 $4,464.46 $281,260.98 63.000 EA N INLETS, DT BOT, TYPE E, <10' 0425 1553 1 $7,734.95 $69,614.55 9.000 EA N INLETS, DT BOT, TYPE E, J BOT, <10' 0425 1589 1 $10,597.81 $31,793.43 3.000 EA N INLETS, DT BOT, TYPE H, MODIFY 0425 1701 2 $4,529.59 $221,950.15 49.000 EA N INLETS, GUTTER, TYPE S, <10' 0425 1702 1 $7,855.83 $7,855.83 1.000 EA N INLETS, GUTTER, TYPE S, >10' 0425 1703 2 $11,423.98 $79,967.85 7.000 EA N INLETS, GUTTER, TYPE S, J BOTTOM <10' 0425 1711 1 $4,236.21 $88,960.41 21.000 EA N INLETS, GUTTER, TYPE V, <10' 0425 2 43 1 $5,393.82 $5,393.82 1.000 EA N MANHOLES, P-7, PARTIAL 0425 2 61 1 $2,793.91 $53,084.29 19.000 EA N MANHOLES, P-8, <10' 0425 2 62 1 $4,445.92 $4,445.92 1.000 EA N MANHOLES, P-8, >10' 0425 2 71 1 $6,801.34 $6,801.34 1.000 EA N MANHOLES, J-7, <10' 0425 2 91 1 $5,078.67 $25,393.35 5.000 EA N MANHOLES, J-8, <10' 0425 2 92 1 $12,687.98 $50,751.92 4.000 EA N MANHOLES, J-8, >10' 0425 5 1 $2,350.47 $9,401.88 4.000 EA N MANHOLE, ADJUST 0425 5 1 1 $3,557.89 $7,115.78 2.000 EA N MANHOLE, ADJUST, UTILITIES 0425 6 1 $2,005.14 $28,071.96 14.000 EA N VALVE BOXES, ADJUST 0430173130 1 $149.21 $19,248.09 129.000 LF N PIPE CULVERT OPTIONAL MATERIAL, ROUND, 30", GUTTER DRAIN

08/24/2020 Page: 6 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0430174115 2 $267.16 $10,419.19 39.000 LF N PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 15"SD 0430174118 4 $60.24 $225,184.34 3,738.000 LF N PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 18"SD 0430174124 2 $55.30 $34,560.74 625.000 LF N PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 24"SD 0430174130 1 $199.50 $3,990.00 20.000 LF N PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 30"SD 0430174136 1 $92.57 $17,403.16 188.000 LF N PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 36"SD 0430174215 1 $167.73 $10,063.80 60.000 LF N PIPE CULVERT, OPTIONAL MATERIAL, OTHER SHAPE - ELLIP/ARCH, 15"SD 0430175118 3 $52.25 $712,095.92 13,629.000 LF N PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 18"S/CD 0430175124 1 $68.25 $679,360.50 9,954.000 LF N PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 24"S/CD 0430175130 1 $94.24 $374,792.48 3,977.000 LF N PIPE CULVERT, OPT MATERIAL, ROUND, 30"S/CD 0430175136 2 $113.56 $195,428.45 1,721.000 LF N PIPE CULVERT, OPT MATERIAL, ROUND, 36"S/CD 0430175142 1 $142.45 $10,113.95 71.000 LF N PIPE CULVERT, OPT MATERIAL, ROUND, 42"S/CD 0430175148 2 $158.50 $64,035.32 404.000 LF N PIPE CULVERT, OPT MATERIAL, ROUND, 48"S/CD 0430175218 1 $74.40 $21,724.80 292.000 LF N PIPE CULVERT,OPTIONAL MATERIAL,OTHER-ELIP/ARCH, 18"S/CD 0430175236 1 $184.88 $27,916.88 151.000 LF N PIPE CULVERT, OPT MATERIAL, OTHER SHAPE - ELIP/ARCH, 36"S/CD 0430185118 1 $271.55 $23,624.85 87.000 LF N PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 18" , STORM AND CROSS DRAIN 0430185124 1 $352.09 $184,847.25 525.000 LF N PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 24", STORM AND CROSS DRAIN

08/24/2020 Page: 7 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0430185130 1 $453.02 $90,604.00 200.000 LF N PIPE CULVERT,OPTIONAL MATERIAL,ROUND, JACK & BORE, 30", STORM AND CROSS DRAIN 0430611125 1 $3,150.00 $6,300.00 2.000 EA N U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:4 SLOPE, 18"PIPE 0430611129 1 $4,528.52 $9,057.04 2.000 EA N U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:4 SLOPE, 24"PIPE 0430611133 1 $5,137.20 $5,137.20 1.000 EA N U-ENDWALL WITH BAFFLES, INDEX 261/430-011,1:4 SLOPE,30"PIPE 0430611225 1 $3,150.00 $3,150.00 1.000 EA N U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:3 SLOPE, 18"PIPE 0430611229 1 $4,370.72 $4,370.72 1.000 EA N U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:3 SLOPE, 24"PIPE 0430611233 1 $4,536.04 $9,072.08 2.000 EA N U-ENDWALL, INDEX 261/430-011, BAFFLES, 1:3 SLOPE, 30"PIPE 0430611329 1 $4,370.72 $4,370.72 1.000 EA N U-ENDWALL WITH BAFFLES, INDEX 261/430-011, 1:2 SLOPE, 24"PIPE 0430611333 1 $4,986.91 $4,986.91 1.000 EA N U-ENDWALL, BAFFLES, INDEX 261/430-011, 1:2 SLOPE, 30"PIPE 0430950 1 $164.26 $9,527.08 58.000 CY N DESILTING CONCRETE BOX CULVERT 0430982123 1 $3,344.41 $3,344.41 1.000 EA N MITERED END SECTION, OPTIONAL ROUND, 15" CD 0430982125 2 $1,788.68 $62,603.73 35.000 EA N MITERED END SECTION, OPTIONAL ROUND, 18" CD 0430982129 2 $1,829.34 $21,952.04 12.000 EA N MITERED END SECTION, OPTIONAL ROUND, 24" CD 0430982133 2 $3,005.01 $27,045.10 9.000 EA N MITERED END SECTION, OPTIONAL ROUND, 30" CD 0430982138 1 $3,472.74 $10,418.22 3.000 EA N MITERED END SECTION, OPTIONAL ROUND, 36" CD 0430982140 1 $5,065.20 $5,065.20 1.000 EA N MITERED END SECTION, OPTIONAL ROUND, 42" CD 0430982625 1 $1,845.14 $7,380.56 4.000 EA N MITERED END SECTION, OPTIONAL - ELLIPTICAL / ARCH, 18" CD 0430982638 1 $4,273.79 $4,273.79 1.000 EA N MITERED END SECTION, OPTIONAL - ELLIPTICAL / ARCH, 36" CD 0430984123 2 $1,539.73 $6,158.92 4.000 EA N MITERED END SECTION, OPTIONAL ROUND, 15" SD

08/24/2020 Page: 8 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0430984125 5 $1,708.72 $258,017.40 151.000 EA N MITERED END SECTION, OPTIONAL ROUND, 18" SD 0430984129 4 $1,909.01 $61,088.40 32.000 EA N MITERED END SECTION, OPTIONAL ROUND, 24" SD 0430984133 2 $3,492.52 $10,477.57 3.000 EA N MITERED END SECTION , OPTIONAL ROUND, 30" SD 0430984138 1 $4,959.48 $44,635.32 9.000 EA N MITERED END SECTION , OPTIONAL ROUND, 36" SIDE DRAIN 0430984623 1 $1,842.06 $3,684.12 2.000 EA N MITERED END SECTION, OPTIONAL OTHER - ELLIP/ARCH, 15" SD 0450 1 1 1 $225.00 $241,875.00 1,075.000 LF N PRESTRESSED BEAMS, TYPE II 0455 14 23 1 $475.00 $1,185,125.00 2,495.000 LF N CONCRETE SHEET PILING, CFRP/GFRP 10" X 30" w/FRP STRAND & REINFORCING 0455 34 5 2 $99.14 $326,360.00 3,292.000 LF N PILING, 24" SQ 0455 87 1 $500.00 $16,000.00 32.000 EA N ANCHOR BAR, STEEL 0455133 2 1 $50.00 $51,600.00 1,032.000 SF N SHEET PILING STEEL, TEMPORARY-CRITICAL 0455133 3 1 $40.00 $535,080.00 13,377.000 SF N SHEET PILING STEEL, F&I PERMANENT 0455143 5 2 $173.75 $139,000.00 800.000 LF N TEST PILES-PRESTRESSED CONCRETE,24" SQ 0458 1 11 2 $62.46 $11,555.00 185.000 LF N BRIDGE DECK EXPANSION JOINT, NEW CONSTRUCTION, F&I POURED JOINT WITH BACKER ROD 0458 1 21 1 $53.00 $2,173.00 41.000 LF N BRIDGE DECK EXPANSION JOINT, REHABILITATION, POURED JOINT WITH BACKER ROD 0458 2 1 $4,000.00 $10,400.00 2.600 CF N POLYMER NOSING FOR BRIDGE DECK EXPANSION JOINT 0460 1 15 1 $19.00 $3,515.00 185.000 LB N STRUCTURAL STEEL - REHABILITATION, MISCELLANEOUS 0460 2 15 1 $16.84 $10,000.00 594.000 LB N STRUCT STEEL, MISCELLANEOUS

08/24/2020 Page: 9 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0462 2 12 1 $22.00 $40,282.00 1,831.000 LB N POST TENSIONING TENDONS, SUPERSTRUCTURE BAR WITH GROUT 0470 1 1 $18,450.00 $55,350.00 3.000 MB N TREATED TIMBER, STRUCTURAL 0510 1 1 $12,514.60 $62,573.00 5.000 LS N NAVIGATION LIGHTS- FIXED BRIDGE, SYSTEM 0510 1 4 1 $1,044.00 $1,044.00 1.000 EA N NAVIGATION LIGHTS- FIXED BRIDGE, REPAIR/REHAB 0515 1 2 1 $85.00 $11,050.00 130.000 LF N PIPE HANDRAIL - GUIDERAIL, ALUMINUM 0520 1 7 2 $30.63 $113,013.16 3,690.000 LF N CONCRETE CURB & GUTTER, TYPE E 0520 3 1 $23.42 $12,154.98 519.000 LF N VALLEY GUTTER- CONCRETE 0520 5 11 1 $65.77 $7,103.16 108.000 LF N TRAFFIC SEPARATOR CONCRETE-TYPE I, 4' WIDE 0520 6 3 $26.07 $200,339.70 7,685.000 LF N SHOULDER GUTTER- CONCRETE 0521 5 13 2 $198.33 $151,920.00 766.000 LF N CONCRETE TRAFFIC RAILING- BRIDGE, 36" SINGLE-SLOPE 0521 8 7 1 $267.66 $181,741.14 679.000 LF N CONCRETE BARRIER, WITH JUNCTION SLAB, 36" SINGLE SLOPE 0522 1 4 $49.29 $121,411.02 2,463.000 SY N CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICK 0522 2 3 $62.16 $35,805.08 576.000 SY N CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK 0524 1 1 2 $62.79 $63,475.92 1,011.000 SY N CONCRETE DITCH PAVT, NON REINFORCED, 3" 0524 1 2 2 $75.43 $40,055.13 531.000 SY N CONCRETE DITCH PAVEMENT, NON REINFORCED, 4" 0524 1 4 1 $134.20 $21,069.40 157.000 SY N CONCRETE DITCH PAVEMENT, NON REINFORCED, 6" 0527 2 1 $61.29 $2,880.63 47.000 SF N DETECTABLE WARNINGS 0530 1 2 $404.00 $47,430.00 117.400 CY N , SAND-CEMENT 0530 3 3 1 $90.00 $199,503.00 2,216.700 TN N RIPRAP- RUBBLE, BANK AND SHORE 0530 3 4 6 $129.31 $86,575.56 669.500 TN N RIPRAP, RUBBLE, F&I, DITCH LINING

08/24/2020 Page: 10 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0530 3 5 1 $85.00 $336,404.50 3,957.700 TN N RIPRAP- RUBBLE, COASTAL SHORE- LARGE BOULDERS 0530 5 1 1 $63.55 $746,077.00 11,740.000 SY N , UP TO 1 FOOT THICKNESS 0530 74 2 $73.62 $168,348.80 2,286.600 TN N BEDDING STONE 0536 1 1 5 $20.00 $90,182.64 4,510.000 LF N GUARDRAIL -ROADWAY, GENERAL TL-3 0536 7 3 1 $122.59 $245.18 2.000 EA N SPECIAL GUARDRAIL POST- ENCASED POST FOR SHALLOW MOUNT 0536 8 13 4 $2,729.21 $30,021.32 11.000 EA N APPROACH TRANSITION CONNECTION TO RIGID BARRIER, FURNISH AND INSTALL, TL-3 0536 73 5 $2.34 $8,663.25 3,705.000 LF N GUARDRAIL REMOVAL 0536 85 20 3 $1,268.00 $6,339.98 5.000 EA N GUARDRAIL END TREATMENT- TRAILING ANCHORAGE 0536 85 24 5 $2,649.48 $42,391.72 16.000 EA N GUARDRAIL END TREATMENT- PARALLEL APPROACH TERMINAL 0538 1 1 $10.00 $250.00 25.000 LF N GUARDRAIL RESET 0546 71 1 2 $518.73 $8,299.60 16.000 EA N RAISED RUMBLE STRIP SET- PERMANENT 0546 71 2 1 $473.40 $3,787.20 8.000 EA N RAISED RUMBLE STRIP SET- SHORT TERM 0546 72 1 1 $54,000.00 $15,336.00 .284 GM N GROUND-IN RUMBLE STRIPS, 16" 0546 72 2 2 $2,582.72 $19,912.80 7.710 GM N GROUND-IN RUMBLE STRIPS, 8" CYLINDRICAL 0548 12 1 $51.15 $726,330.00 14,200.000 SF N SYSTEM, PERMANENT, EXCLUDING BARRIER 0550 10120 1 $25.00 $800.00 32.000 LF N FENCING, TYPE A, 5.1-6.0, STANDARD 0550 10220 1 $45.00 $11,250.00 250.000 LF N FENCING, TYPE B, 5.1-6.0', STANDARD 0550 10221 1 $60.00 $15,000.00 250.000 LF N FENCING, TYPE B, 5.1-6.0', W/ BARB WIRE ATTMT 0550 10222 1 $40.00 $800.00 20.000 LF N FENCING, TYPE B, 5.1-6.0, W/ VINYL COATING

08/24/2020 Page: 11 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0550 60211 1 $1,250.00 $1,250.00 1.000 EA N FENCE GATE, TYPE B, SINGLE, 0- 6.0' OPENING 0550 60233 1 $4,500.00 $4,500.00 1.000 EA N FENCE GATE, TYPE B, SLIDING/CANTILEVER, 12.1-18' OPENING 0570 1 1 2 $.35 $158,963.75 451,264.000 SY N PERFORMANCE TURF 0570 1 2 9 $2.90 $1,782,962.92 615,404.000 SY N PERFORMANCE TURF, SOD 0570 1 3 1 $2.50 $41,210.00 16,484.000 SY N PERFORMANCE TURF, SOD AND SOIL- SHOULDER TREATMENT INDEX 570-010 0571 1 11 1 $5.87 $194,502.45 33,135.000 SY N PLASTIC EROSION MAT, TURF REINFORCED MAT, TYPE 1 0630 2 11 4 $7.56 $163,035.28 21,555.000 LF N CONDUIT, FURNISH & INSTALL, OPEN 0630 2 12 2 $16.10 $34,528.72 2,144.000 LF N CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE 0630 2 14 1 $12.66 $519.06 41.000 LF N CONDUIT, FURNISH & INSTALL, ABOVEGROUND 0630 2 16 1 $8.00 $11,520.00 1,440.000 LF N CONDUIT, FURNISH & INSTALL, EMBEDDED CONCRETE BARRIERS AND TRAFFIC RAILINGS 0632 7 1 2 $4,296.41 $12,889.22 3.000 PI N SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL 0632 7 2 1 $5.95 $4,635.05 779.000 LF N SIGNAL CABLE- REPAIR/REPLACE/OTHER, FURNISH & INSTALL 0632 7 6 1 $356.25 $356.25 1.000 PI N SIGNAL CABLE, REMOVE- INTERSECTION 0633 1121 1 $6.33 $759.60 120.000 LF N FIBER OPTIC CABLE, F&I, UNDERGROUND,2-12 FIBERS 0633 2 31 1 $63.32 $253.28 4.000 EA N FIBER OPTIC CONNECTION, INSTALL, SPLICE 0633 2 32 1 $82.31 $987.72 12.000 EA N FIBER OPTIC CONNECTION, INSTALL, TERMINATION 0633 3 11 1 $1,899.47 $1,899.47 1.000 EA N FIBER OPTIC CONNECTION HARDWARE, F&I, SPLICE ENCLOSURE

08/24/2020 Page: 12 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0633 3 14 1 $253.26 $253.26 1.000 EA N FIBER OPTIC CONNECTION HARDWARE, F&I, BUFFER TUBE FAN OUT KIT 0633 3 16 1 $2,532.64 $2,532.64 1.000 EA N FIBER OPTIC CONNECTION HARDWARE, F&I, PATCH PANEL- FIELD TERMINATED 0634 4152 2 $1,587.90 $3,175.80 2.000 PI N SPAN WIRE ASSEMBLY, F&I, TWO POINT, DIAGONAL 0634 4153 1 $3,495.08 $3,495.08 1.000 PI N SPAN WIRE ASSEMBLY, F&I, TWO POINT, BOX OR DROP BOX 0634 4600 1 $506.78 $506.78 1.000 PI N SPAN WIRE ASSEMBLY, REMOVE- POLES REMAIN 0635 2 11 3 $712.94 $105,515.76 148.000 EA N PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE 0635 2 12 2 $1,307.71 $3,923.13 3.000 EA N PULL & SPLICE BOX, F&I, 24" X 36" COVER SIZE 0635 2 13 1 $2,026.12 $2,026.12 1.000 EA N PULL & SPLICE BOX, F&I, 30" X 60" RECTANGULAR OR 36" ROUND COVER SIZE 0635 3 13 1 $315.00 $3,780.00 12.000 EA N JUNCTION BOX, FURNISH & INSTALL, EMBEDDED 0639 1111 1 $1,456.26 $1,456.26 1.000 AS N ELECTRICAL POWER SERVICE, F&I, OVERHEAD, METER FURNISHED BY POWER COMPANY 0639 1112 2 $1,751.18 $3,502.35 2.000 AS N ELECTRICAL POWER SERVICE, F&I, OVERHEAD METER PURCHASED BY CONTRACTOR FROM POWER COMPANY 0639 1122 1 $1,392.21 $1,392.21 1.000 AS N ELECTRICAL POWER SERVICE, F&I, UNDERGROUND, METER PURCHASED BY CONTRACTOR 0639 1610 1 $5,000.00 $10,000.00 2.000 AS N ELECTRICAL POWER SERVICE, REMOVE OVERHEAD 0639 2 1 3 $3.95 $798.00 202.000 LF N ELECTRICAL SERVICE WIRE, FURNISH & INSTALL 0639 3 12 1 $356.25 $356.25 1.000 EA N ELECTRICAL SERVICE DISCONNECT, F&I, CABINET

08/24/2020 Page: 13 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0641 2 11 1 $1,398.03 $1,398.03 1.000 EA N PRESTRESSED CONCRETE POLE, F&I, TYPE P-II PEDESTAL 0641 2 12 2 $1,286.24 $2,572.47 2.000 EA N PRESTRESSED CONCRETE POLE, F&I, TYPE P-II SERVICE POLE 0641 2 17 2 $11,762.28 $47,049.10 4.000 EA N PRESTRESSED CONCRETE POLE, F&I, TYPE P-VII 0641 2 18 1 $14,562.88 $43,688.64 3.000 EA N PRESTRESSED CONCRETE POLE, F&I, TYPE P-VIII 0641 2 80 2 $4,116.80 $16,467.20 4.000 EA N PRESTRESSED CONCRETE POLE, COMPLETE POLE REMOVAL- POLE 30' AND GREATER 0641 3186 1 $31,657.92 $31,657.92 1.000 EA N CONCRETE CCTV POLE, FURNISH & INSTALL WITH LOWERING DEVICE, 86' 0650 1 11 1 $774.74 $4,648.44 6.000 AS N VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 1 SECTION, 1 WAY 0650 1 12 1 $1,781.15 $5,343.45 3.000 AS N VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 1 SECTION, 2-4 WAY 0650 1 14 1 $1,165.02 $6,990.12 6.000 AS N VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 3 SECTION, 1 WAY 0650 1 60 1 $69.91 $419.46 6.000 AS N VEHICULAR TRAFFIC SIGNAL, REMOVE- POLES TO REMAIN 0660 1105 1 $328.90 $657.80 2.000 EA N LOOP DETECTOR, INDUCTIVE, F&I, TYPE 5, 2CHANNEL, SOLID STATE, SHELF MOUNTED 0660 2101 1 $980.62 $5,883.72 6.000 AS N LOOP ASSEMBLY- F&I, TYPE A 0660 2102 1 $712.45 $1,424.90 2.000 AS N LOOP ASSEMBLY, F&I, TYPE B 0660 2106 2 $1,206.61 $4,826.44 4.000 AS N LOOP ASSEMBLY, F&I, TYPE F

08/24/2020 Page: 14 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0660 6121 1 $12,663.17 $12,663.17 1.000 EA N VEHICLE DETECTION SYSTEM- AVI, BLUETOOTH, FURNISH & INSTALL, CABINET EQUIPMENT 0660 6122 1 $8,864.22 $8,864.22 1.000 EA N VEHICLE DETECTION SYSTEM- AVI, BLUETOOTH, FURNISH & INSTALL, ABOVE GROUND EQUIPMENT 0670 4 1 1 $3,495.08 $3,495.08 1.000 AS N INTERSECTION CONTROL BEACON CONTROLLER ASSEMBLY, FURNISH & INSTALL 0670 5112 2 $29,405.65 $58,811.30 2.000 AS N TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA, 2 PREEMPTION 0670 5600 1 $844.64 $844.64 1.000 AS N TRAFFIC CONTROLLER ASSEMBLY, REMOVE CONTROLLER WITH CABINET 0676 2112 1 $11,396.84 $11,396.84 1.000 EA N ITS CABINET, FURNISH & INSTALL, POLE MOUNT, 336S, 24" W X 46" H X 22" D 0682 1113 1 $9,497.37 $9,497.37 1.000 EA N ITS CCTV CAMERA, F&I, DOME PTZ ENCLOSURE - PRESSURIZED, IP, HIGH DEFINITION 0684 1 1 1 $6,331.58 $6,331.58 1.000 EA N MANAGED FIELD ETHERNET SWITCH, FURNISH & INSTALL 0700 1 11 10 $314.29 $98,685.60 314.000 AS N SINGLE POST SIGN, F&I GROUND MOUNT, UP TO 12 SF 0700 1 12 4 $1,061.38 $62,621.50 59.000 AS N SINGLE POST SIGN, F&I GROUND MOUNT, 12-20 SF 0700 1 13 2 $1,597.27 $19,167.24 12.000 AS N SINGLE POST SIGN, F&I GROUND MOUNT, 21-30 SF 0700 1 50 7 $105.18 $3,155.47 30.000 AS N SINGLE POST SIGN, RELOCATE 0700 1 60 9 $34.41 $7,741.78 225.000 AS N SINGLE POST SIGN, REMOVE 0700 2 12 1 $3,350.00 $6,700.00 2.000 AS N MULTI- POST SIGN, F&I GROUND MOUNT, 12-20 SF 0700 2 13 3 $4,160.05 $33,280.36 8.000 AS N MULTI- POST SIGN, F&I GROUND MOUNT, 21-30 SF

08/24/2020 Page: 15 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0700 2 14 1 $4,575.00 $9,150.00 2.000 AS N MULTI- POST SIGN, F&I GROUND MOUNT, 31-50 SF 0700 2 15 1 $6,442.61 $19,327.83 3.000 AS N MULTI- POST SIGN, F&I GROUND MOUNT, 51-100 SF 0700 2 50 1 $116.50 $116.50 1.000 AS N MULTI- POST SIGN, GROUND MOUNT, RELOCATE 0700 2 60 2 $452.12 $9,946.57 22.000 AS N MULTI- POST SIGN, REMOVE 0700 3101 1 $189.95 $759.80 4.000 EA N SIGN PANEL, FURNISH & INSTALL GROUND MOUNT, UP TO 12 SF 0700 3201 2 $524.27 $3,145.62 6.000 EA N SIGN PANEL, FURNISH & INSTALL OVERHEAD MOUNT, UP TO 12 SF 0700 3501 4 $49.00 $1,274.00 26.000 EA N SIGN PANEL, RELOCATE, UP TO 12 SF 0700 3601 3 $51.08 $306.50 6.000 EA N SIGN PANEL, REMOVE, UP TO 12 SF 0700 11262 1 $19,000.00 $38,000.00 2.000 EA N ELECTRONIC DISPLAY SIGN, FURNISH & INSTALL GROUND MOUNT- SOLAR POWERED, SPEED FEEDBACK W/FLASHING BEACON, 12-20 SF 0700 12 11 1 $4,156.00 $8,312.00 2.000 AS N SIGN BEACON, F&I GROUND MOUNT- AC POWERED, ONE BEACON 0700 12 21 3 $6,990.00 $69,900.00 10.000 AS N SIGN BEACON, F&I GROUND MOUNT- SOLAR POWERED, ONE BEACON 0701 18101 7 $6,081.41 $333,869.27 54.900 GM N PROFILED THERMOPLASTIC,STANDARD- ASPHALT SURFACES, WHITE, SOLID,6" 0701 18201 6 $6,281.53 $181,253.47 28.855 GM N PROFILED THERMOPLASTIC,STANDARD- ASPHALT SURFACES, YELLOW, SOLID,6" 0705 10 1 4 $156.33 $6,565.68 42.000 EA N OBJECT MARKER, TYPE 1 0705 10 2 2 $135.55 $2,439.96 18.000 EA N OBJECT MARKER, TYPE 2 0705 11 1 2 $63.86 $2,618.16 41.000 EA N DELINEATOR, FLEXIBLE TUBULAR 0705 11 2 3 $62.92 $2,894.30 46.000 EA N DELINEATOR, NON-FLEXIBLE

08/24/2020 Page: 16 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0705 11 3 1 $214.51 $1,287.06 6.000 EA N DELINEATOR, FLEXIBLE HIGH VISIBILITY MEDIAN 0706 1 1 4 $3.33 $16,691.50 5,016.000 EA N RAISED PAVEMENT MARKER, TYPE B WITHOUT FINAL SURFACE MARKINGS 0709 12119 1 $11,900.00 $60,321.10 5.069 GM N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, WHITE, SOLID, 6", PROJECT 445312-1-52-15 0709 12120 1 $15,200.00 $19,106.40 1.257 GM N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, WHITE, SOLID 8" FOR INTERCH & URBAN ISLAND, PROJECT 445312-1-52-15 0709 12121 1 $6.00 $720.00 120.000 LF N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK, PROJECT 445312-1-52-15 0709 12122 1 $9.00 $17,613.00 1,957.000 LF N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, WHITE, SOLID, 18" FOR DIAGONAL OR CHEVRON, PROJECT 445312-1-52-15 0709 12123 1 $12.00 $2,160.00 180.000 LF N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, WHITE, SOLID, 24" FOR CROSSWALK, PROJECT 445312-1-52-15 0709 12124 1 $15,000.00 $345.00 .023 GM N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, WHITE, SKIP, 6", PROJECT 445312-1-52-15 0709 12125 1 $13,500.00 $42,673.50 3.161 GM N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, YELLOW, SOLID, 6", PROJECT 445312-1-52-15 0709 12126 1 $15,200.00 $2,371.20 .156 GM N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, YELLOW, SOLID 8" FOR INTERCH & URBAN ISLAND, PROJECT 445312-1-52-15

08/24/2020 Page: 17 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0709 12127 1 $9.00 $3,006.00 334.000 LF N TRAFFIC STRIPE-TWO REACTIVE COMPONENTS, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRON, PROJECT 445312-1-52-15 0710 11101 12 $950.90 $119,213.03 125.369 GM N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" 0710 11102 3 $1,176.64 $2,934.54 2.494 GM N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR INTERCHANGE AND URBAN ISLAND, 8" 0710 11103 1 $3,064.43 $594.50 .194 GM N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR INTERCHANGE MARKINGS, 12" 0710 11123 1 $.61 $522.77 857.000 LF N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR CROSSWALK AND ROUNDABOUT, 12" 0710 11124 3 $.31 $1,120.22 3,580.000 LF N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR DIAGONAL OR CHEVRON, 18" 0710 11125 6 $1.48 $2,375.45 1,603.000 LF N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" 0710 11131 4 $668.19 $25,028.36 37.457 GM N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SKIP, 10-30 OR 3-9 SKIP, 6" WIDE 0710 11133 1 $674.16 $68.09 .101 GM N PAINTED PAVEMENT MARKING, STANDARD,WHITE, 3'-9' SKIP DROP LINE AND APPROACH TO TOLL PLAZA, 12" WIDE, 0710 11141 5 $677.07 $2,339.97 3.456 GM N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION, 6"

08/24/2020 Page: 18 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0710 11160 3 $36.69 $697.16 19.000 EA N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, MESSAGE OR SYMBOL 0710 11170 2 $39.24 $14,126.40 360.000 EA N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, ARROWS 0710 11190 1 $2.33 $81.55 35.000 SF N PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, ISLAND NOSE 0710 11201 12 $1,089.07 $136,901.08 125.704 GM N PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID, 6" 0710 11202 1 $1,106.67 $26.56 .024 GM N PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID FOR INTERCHANGE AND URBAN ISLAND, 8" 0710 11224 3 $.66 $1,584.14 2,386.000 LF N PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID FOR DIAGONAL OR CHEVRON, 18" 0710 11231 2 $756.53 $15,374.87 20.323 GM N PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SKIP, 6" 0710 11241 4 $639.00 $1,166.17 1.825 GM N PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, 2-4 DOTTED GUIDELINE/6-10 DOTTED EXTENSION, 6" 0710 11290 4 $2.67 $1,285.54 481.000 SF N PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, ISLAND NOSE 0710 90 9 $22,317.06 $200,853.58 9.000 LS N PAINTED PAVEMENT MARKINGS, FINAL SURFACE 0711 11102 1 $4,841.81 $348.61 .072 GM N THERMOPLASTIC, STANDARD, WHITE, SOLID, 8" FOR INTERCHANGE AND URBAN ISLAND 0711 11103 1 $12,870.62 $1,248.45 .097 GM N THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR INTERCHANGE MARKINGS 0711 11123 2 $3.59 $3,525.76 981.000 LF N THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT

08/24/2020 Page: 19 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0711 11124 3 $3.69 $12,582.10 3,411.000 LF N THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR DIAGONALS AND CHEVRONS 0711 11125 6 $6.27 $8,457.55 1,349.000 LF N THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK 0711 11141 5 $2,363.95 $4,489.14 1.899 GM N THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" 0711 11160 4 $121.74 $1,826.04 15.000 EA N THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL 0711 11170 5 $80.51 $24,556.52 305.000 EA N THERMOPLASTIC, STANDARD, WHITE, ARROW 0711 11180 1 $5.00 $350.00 70.000 LF N THERMOPLASTIC, STANDARD, WHITE, YIELD LINE 0711 11224 4 $4.55 $6,955.40 1,528.000 LF N THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRON 0711 11241 3 $2,264.75 $3,034.77 1.340 GM N THERMOPLASTIC, STANDARD, YELLOW, 2-4 DOTTED GUIDE LINE /6-10 DOTTED EXTENSION LINE, 6" 0711 11421 1 $1.00 $615.00 615.000 LF N THERMOPLASTIC, STANDARD, BLUE, SOLID,6" 0711 12101 2 $3,105.97 $22,791.60 7.338 GM N THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 6" 0711 12170 1 $60.00 $720.00 12.000 EA N THERMOPLASTIC, REFURBISH, WHITE, ARROWS 0711 12201 3 $3,402.64 $19,367.80 5.692 GM N THERMOPLASTIC, REFURBISHMENT, YELLOW, SOLID, 6" 0711 12224 1 $3.00 $1,161.00 387.000 LF N THERMOPLASTIC, REFURBISHMENT, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRON, MAINTENANCE USE ONLY 0711 12231 3 $1,675.14 $13,603.80 8.121 GM N THERMOPLASTIC, REFURBISHMENT, YELLOW, SKIP, 6"

08/24/2020 Page: 20 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0711 14125 1 $15.93 $6,897.69 433.000 LF N THERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" FOR CROSSWALK 0711 14160 3 $184.88 $3,882.55 21.000 EA N THERMOPLASTIC, PREFORMED, WHITE, MESSAGE 0711 14170 3 $117.56 $2,468.83 21.000 EA N THERMOPLASTIC, PREFORMED, WHITE, ARROW 0711 14560 1 $750.00 $4,500.00 6.000 EA N THERMOPLASTIC, PREFORMED, WHITE WITH BLACK CONTRAST ON CONCRETE PAVEMENT, MESSAGE OR SYMBOL 0711 14570 1 $750.00 $9,000.00 12.000 EA N THERMOPLASTIC, PREFORMED, WHITE WITH BLACK CONTRAST, ARROW ON CONCRETE SURFACE 0711 15101 4 $4,891.04 $32,745.50 6.695 GM N THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES WHITE, SOLID, 6" 0711 15102 2 $5,168.32 $9,008.38 1.743 GM N THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, WHITE, SOLID, 8" 0711 15131 4 $2,259.74 $47,899.73 21.197 GM N THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, WHITE, SKIP, 6",10-30 SKIP OR 3-9 LANE DROP 0711 15201 4 $4,787.15 $32,519.14 6.793 GM N THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, YELLOW, SOLID, 6" 0711 15202 1 $5,126.25 $123.03 .024 GM N THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES YELLOW, SOLID, 8" 0711 16101 8 $4,605.85 $48,458.16 10.521 GM N THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" 0711 16102 2 $5,258.93 $1,178.00 .224 GM N THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 8"

08/24/2020 Page: 21 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0711 16131 1 $2,267.69 $961.50 .424 GM N THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SKIP, 6",10-30 SKIP OR 3-9 LANE DROP 0711 16133 1 $2,267.65 $115.65 .051 GM N THERMOPLASTIC, STANDARD-OTHER SURFACES WHITE, SKIP, 12"- APPROACH TO TOLL PLAZA OR 3-9 LANE DROP 0711 16201 6 $4,535.20 $67,769.47 14.943 GM N THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" 0711 16231 3 $2,338.45 $16,656.80 7.123 GM N THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SKIP, 6" 0711 17 1 3 $1.29 $41,221.60 32,074.000 SF N THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT MARKINGS- SURFACE TO REMAIN 0713103101 3 $26,735.47 $4,839.12 .181 GM N PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGES 0713103131 1 $9,240.00 $720.72 .078 GM N PERMANENT TAPE, WHITE, SKIP/DOTTED, 6" FOR CONCRETE SURFACES 0713103201 2 $25,615.14 $2,843.28 .111 GM N PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGES 0713103231 1 $9,408.00 $329.28 .035 GM N PERMANENT TAPE, YELLOW, 10-30 SKIP/ 3-9 DOTTED, 6" FOR CONCRETE SURFACES 0713103331 1 $9,240.00 $748.44 .081 GM N PERMANENT TAPE, BLACK, SKIP/DOTTED, 6" FOR CONCRETE SURFACES 0715 1 12 1 $1.25 $73,318.75 58,655.000 LF N LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 0715 1 13 1 $1.99 $60,565.65 30,435.000 LF N LIGHTING CONDUCTORS, F&I, INSULATED, NO 4 TO NO 2 0715 1 60 1 $.48 $32,303.52 67,299.000 LF N LIGHTING CONDUCTORS, REMOVE & DISPOSE, CONTRACTOR OWNS 0715 4 12 1 $5,862.00 $5,862.00 1.000 EA N LIGHT POLE COMPLETE, FURNISH & INSTALL STANDARD POLE STANDARD FOUNDATION, 35' MOUNTING HEIGHT

08/24/2020 Page: 22 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0715 4 13 2 $5,242.15 $665,753.21 127.000 EA N LIGHT POLE COMPLETE, FURNISH & INSTALL STANDARD POLE STANDARD FOUNDATION, 40' MOUNTING HEIGHT 0715 4 70 3 $1,198.43 $141,414.51 118.000 EA N LIGHT POLE COMPLETE, REMOVE POLE AND FOUNDATION 0715 5 51 1 $545.95 $3,275.70 6.000 EA N LUMINAIRE & BRACKET ARM, REMOVE LUMINAIRE AND ARM; POLE REMAINS 0715 7 11 1 $11,166.17 $22,332.34 2.000 EA N LOAD CENTER, F&I, SECONDARY VOLTAGE 0715 7 41 1 $818.93 $1,637.86 2.000 EA N LOAD CENTER, REMOVE, SECONDARY VOLTAGE 0715 11118 1 $750.00 $1,500.00 2.000 EA N LUMINAIRE, F&I, ROADWAY, FLOOD 0715 11125 1 $2,344.00 $9,376.00 4.000 EA N LUMINAIRE, F&I, UNDER DECK, WALL MOUNT 0715 11500 1 $285.00 $1,140.00 4.000 EA N LUMINAIRE, REMOVE 0715 11600 1 $485.00 $9,700.00 20.000 EA N LUMINAIRE, REPAIR & REINSTALL 0715 21 6 1 $110.00 $4,400.00 40.000 EA N LUMINAIRE, NAVIGATION LIGHTS, REMOVE 0715500 1 1 $455.16 $54,164.04 119.000 EA N POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL, CONVENTIONAL 0715516115 1 $5,850.00 $11,700.00 2.000 EA N LIGHT POLE COMPLETE-SPECIAL DESIGN, F&I, POLE TOP MOUNT, ALUMINUM, 15' 0715518115 1 $6,250.00 $12,500.00 2.000 EA N LIGHT POLE COMP- SPECIAL DESIGN, F&I, DOUBLE ARM, POLE TOP MOUNT, ALUMINUM, 15' 0715550000 1 $1,000.00 $4,000.00 4.000 EA N LIGHT POLE COMPLETE- SPECIAL DESIGN, REMOVE 0751 6 1 $22,000.00 $22,000.00 1.000 LS N ARCHITECTURAL- HVAC

08/24/2020 Page: 23 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide

Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999

No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description

0751 7 1 $13.57 $38,000.00 2,800.000 SF N ARCHITECTURAL- ROOF REPAIRS 0999 20 1 1 $3,900.00 $54,600.00 14.000 DA N DISPUTES REVIEW BOARD, MEETING- DO NOT BID 0999 20 2 1 $4,500.00 $9,000.00 2.000 EA N DISPUTES REVIEW BOARD, HEARING- DO NOT BID 0999 25 14 $37,527.22 $600,435.59 16.000 LS N INITIAL CONTINGENCY AMOUNT, DO NOT BID

08/24/2020 Page: 24