Florida Department of Transportation Item Average Unit Cost from 2019/08/01 to 2020/07/31 Statewide
Total Page:16
File Type:pdf, Size:1020Kb
Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description 0102 1 15 $259.51 $858,200.67 3,307.000 DA N MAINTENANCE OF TRAFFIC 0102 3 4 $41.39 $100,763.68 2,434.300 CY N COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 $36.28 $18,610.96 513.000 SY N PEDESTRIAN SPECIAL DETOUR 0102 14 2 $60.10 $31,251.60 520.000 HR N TRAFFIC CONTROL OFFICER 0102 60 14 $.29 $76,871.99 268,334.000 ED N WORK ZONE SIGN 0102 61 2 $70.31 $3,234.48 46.000 EA N BUSINESS SIGN 0102 62 1 $1.50 $360.00 240.000 ED N BARRIER MOUNTED WORK ZONE SIGN- INDEX 11871/700-013 0102 71 13 2 $53.55 $92,423.80 1,726.000 LF N TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE 0102 71 15 4 $49.22 $190,767.20 3,876.000 LF N TEMPORARY BARRIER, F&I, ANCHORED 0102 71 16 1 $67.01 $38,530.75 575.000 LF N TEMPORARY BARRIER, F&I, FREE STANDING 0102 71 23 2 $10.61 $7,428.40 700.000 LF N TEMPORARY BARRIER, RELOCATE, LOW PROFILE CONCRETE 0102 71 25 2 $16.05 $41,031.40 2,556.000 LF N TEMPORARY BARRIER, RELOCATE, ANCHORED 0102 73 1 $7.00 $10,780.00 1,540.000 LF N TEMPORARY GUARDRAIL 0102 74 1 14 $.11 $245,773.99 2,165,570.000 ED N CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD 0102 76 5 $6.01 $2,901.15 483.000 ED N ARROW BOARD / ADVANCE WARNING ARROW PANEL 0102 78 9 $4.03 $105,347.67 26,165.000 EA N TEMPORARY RETROREFLECTIVE PAVEMENT MARKER 0102 89 1 4 $2,394.44 $43,100.00 18.000 LO N TEMPORARY CRASH CUSHION, REDIRECTIVE OPTION 0102 99 13 $13.22 $100,228.40 7,583.000 ED N PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY 0102104 1 $9.80 $2,940.00 300.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 1 $9.80 $2,940.00 300.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 08/24/2020 Page: 1 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description 0102115 1 $.60 $33.60 56.000 ED N TYPE III BARRICADE 0102150 1 5 $6.71 $7,032.00 1,048.000 ED N PORTABLE REGULATORY, SIGN 0102150 2 5 $7.15 $7,497.50 1,048.000 ED N RADAR SPEED DISPLAY UNIT 0104 1 3 $1.97 $19,549.00 9,919.000 SY N ARTIFICIAL COVERINGS /ROLLED EROSION CONTROL PRODUCTS 0104 6 1 $1.75 $10,473.75 5,985.000 LF N TEMPORARY SLOPE DRAIN / RUNOFF CONTROL STRUCTURE 0104 10 3 10 $3.56 $219,446.84 61,593.000 LF N SEDIMENT BARRIER 0104 11 3 $21.86 $32,569.10 1,490.000 LF N FLOATING TURBIDITY BARRIER 0104 12 3 $7.72 $5,978.98 774.000 LF N STAKED TURBIDITY BARRIER- NYLON REINFORCED PVC 0104 15 3 $2,080.00 $31,200.00 15.000 EA N SOIL TRACKING PREVENTION DEVICE 0104 18 7 $176.19 $43,167.68 245.000 EA N INLET PROTECTION SYSTEM 0107 1 13 $12.37 $100,904.64 8,155.080 AC N LITTER REMOVAL 0107 2 13 $12.17 $90,307.69 7,418.350 AC N MOWING 0108 1 2 $52,912.57 $105,825.14 2.000 EA N MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING 0108 2 1 $100,000.00 $100,000.00 1.000 EA N MONITOR EXISTING STRUCTURES- VIBRATION MONITORING 0110 1 1 11 $7,394.35 $1,490,257.12 201.540 AC N CLEARING & GRUBBING 0110 2 2 1 $25,000.00 $6,000.00 .240 AC N SELECTIVE CLEARING AND GRUBBING, AREAS WITH TREES TO REMAIN 0110 3 4 $39.20 $383,299.88 9,779.000 SF N REMOVAL OF EXISTING STRUCTURES/BRIDGES 0110 4 10 8 $20.70 $84,692.59 4,091.000 SY N REMOVAL OF EXISTING CONCRETE 0110 7 1 2 $117.65 $13,765.22 117.000 EA N MAILBOX, F&I SINGLE 08/24/2020 Page: 2 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description 0120 1 7 $4.46 $2,287,892.29 512,736.600 CY N REGULAR EXCAVATION 0120 2 2 6 $16.95 $210,618.31 12,422.400 CY N BORROW EXCAVATION, TRUCK MEASURE 0120 4 2 $10.25 $26,793.30 2,615.000 CY N SUBSOIL EXCAVATION 0120 6 2 $2.99 $822,107.00 275,357.700 CY N EMBANKMENT 0120 71 1 $24,004.94 $24,004.94 1.000 LS N REGULAR EXCAVATION (3-R PROJECTS ONLY) 0125 1 1 $100.00 $8,300.00 83.000 CY N EXCAVATION FOR STRUCTURES 0145 2 3 $11.94 $10,828.45 907.000 SY N GEOSYNTHETIC REINFORCED FOUNDATION OVER SOFT SOIL 0160 4 5 $2.08 $832,251.86 399,403.000 SY N TYPE B STABILIZATION 0173 71 1 $291.26 $11,650.40 40.000 EA N DRILLING HOLES FOR PRESSURE GROUTING 0173 76 1 $29.13 $52,434.00 1,800.000 LF N GROUT PIPE INSTALLATION 0173 77 1 1 $221.36 $92,971.20 420.000 CY N SUBSURFACE PRESSURE GROUTING, SAND CEMENT 0285701 4 $7.07 $486,157.13 68,809.000 SY N OPTIONAL BASE, BASE GROUP 01 0285705 1 $56.00 $8,064.00 144.000 SY N OPTIONAL BASE, BASE GROUP 05 0285706 5 $23.74 $577,757.52 24,333.000 SY N OPTIONAL BASE, BASE GROUP 06 0285709 1 $13.88 $2,992,958.28 215,631.000 SY N OPTIONAL BASE, BASE GROUP 09 0285741 1 $86.00 $13,760.00 160.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 18" FOR PROJECT 443503-1-52-01 0285745 1 $100.45 $32,144.00 320.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 20" FOR PROJECT 421878-3-52-01 08/24/2020 Page: 3 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description 0285752 1 $44.43 $3,998.70 90.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 16" FOR PROJECT 217909-3-52-01 0286 1 4 $19.30 $132,167.81 6,849.000 SY N TURNOUT CONSTRUCTION/DRIVEWAY BASE- OPTIONAL MATERIALS 0327 70 1 2 $1.37 $200,440.30 145,831.000 SY N MILLING EXIST ASPH PAVT, 1" AVG DEPTH 0327 70 5 1 $5.00 $4,415.00 883.000 SY N MILLING EXIST ASPH PAVT, 2" AVG DEPTH 0327 70 6 4 $2.35 $417,828.90 178,016.000 SY N MILLING EXIST ASPH PAVT, 1 1/2" AVG DEPTH 0327 70 12 2 $2.24 $67,756.60 30,201.000 SY N MILLING EXIST ASPH PAVT, 1 1/4" AVG DEPTH 0327 70 13 1 $2.36 $13,780.04 5,839.000 SY N MILLING EXIST ASPH PAVT, 1 3/4" AVG DEPTH 0327 70 15 1 $4.29 $132,410.85 30,865.000 SY N MILLING EXIST ASPH PAVT, 2 3/4" AVG DEPTH 0327 70 19 3 $3.74 $32,781.50 8,757.000 SY N MILLING EXIST ASPH PAVT, 3/4" AVG DEPTH 0334 1 52 6 $112.26 $3,143,779.21 28,005.600 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, PG76-22 0334 1 53 2 $104.78 $5,956,251.31 56,847.900 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 0334 1 54 2 $304.67 $66,204.92 217.300 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC D, PG76-22 0337 7 25 4 $149.26 $2,174,614.39 14,569.100 TN N ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, PG 76-22 0337 7 26 1 $212.05 $203,355.95 959.000 TN N ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, HIGH POLYMER 0337 7 80 4 $109.99 $2,432,236.98 22,112.500 TN N ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-9.5, PG 76-22 0337 7 81 1 $122.00 $65,660.40 538.200 TN N ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, PG 76-22 0339 1 5 $250.20 $52,042.56 208.000 TN N MISCELLANEOUS ASPHALT PAVEMENT 0400 2 4 1 $1,115.00 $253,216.50 227.100 CY N CONC CLASS II, BRIDGE SUPERSTRUCTURE 0400 2 10 2 $573.29 $122,855.00 214.300 CY N CONCRETE CLASS II, APPROACH SLABS 08/24/2020 Page: 4 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No.