Florida Department of Transportation Item Average Unit Cost from 2019/08/01 to 2020/07/31 Statewide

Florida Department of Transportation Item Average Unit Cost from 2019/08/01 to 2020/07/31 Statewide

Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description 0102 1 15 $259.51 $858,200.67 3,307.000 DA N MAINTENANCE OF TRAFFIC 0102 3 4 $41.39 $100,763.68 2,434.300 CY N COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 $36.28 $18,610.96 513.000 SY N PEDESTRIAN SPECIAL DETOUR 0102 14 2 $60.10 $31,251.60 520.000 HR N TRAFFIC CONTROL OFFICER 0102 60 14 $.29 $76,871.99 268,334.000 ED N WORK ZONE SIGN 0102 61 2 $70.31 $3,234.48 46.000 EA N BUSINESS SIGN 0102 62 1 $1.50 $360.00 240.000 ED N BARRIER MOUNTED WORK ZONE SIGN- INDEX 11871/700-013 0102 71 13 2 $53.55 $92,423.80 1,726.000 LF N TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE 0102 71 15 4 $49.22 $190,767.20 3,876.000 LF N TEMPORARY BARRIER, F&I, ANCHORED 0102 71 16 1 $67.01 $38,530.75 575.000 LF N TEMPORARY BARRIER, F&I, FREE STANDING 0102 71 23 2 $10.61 $7,428.40 700.000 LF N TEMPORARY BARRIER, RELOCATE, LOW PROFILE CONCRETE 0102 71 25 2 $16.05 $41,031.40 2,556.000 LF N TEMPORARY BARRIER, RELOCATE, ANCHORED 0102 73 1 $7.00 $10,780.00 1,540.000 LF N TEMPORARY GUARDRAIL 0102 74 1 14 $.11 $245,773.99 2,165,570.000 ED N CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD 0102 76 5 $6.01 $2,901.15 483.000 ED N ARROW BOARD / ADVANCE WARNING ARROW PANEL 0102 78 9 $4.03 $105,347.67 26,165.000 EA N TEMPORARY RETROREFLECTIVE PAVEMENT MARKER 0102 89 1 4 $2,394.44 $43,100.00 18.000 LO N TEMPORARY CRASH CUSHION, REDIRECTIVE OPTION 0102 99 13 $13.22 $100,228.40 7,583.000 ED N PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY 0102104 1 $9.80 $2,940.00 300.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 1 $9.80 $2,940.00 300.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 08/24/2020 Page: 1 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description 0102115 1 $.60 $33.60 56.000 ED N TYPE III BARRICADE 0102150 1 5 $6.71 $7,032.00 1,048.000 ED N PORTABLE REGULATORY, SIGN 0102150 2 5 $7.15 $7,497.50 1,048.000 ED N RADAR SPEED DISPLAY UNIT 0104 1 3 $1.97 $19,549.00 9,919.000 SY N ARTIFICIAL COVERINGS /ROLLED EROSION CONTROL PRODUCTS 0104 6 1 $1.75 $10,473.75 5,985.000 LF N TEMPORARY SLOPE DRAIN / RUNOFF CONTROL STRUCTURE 0104 10 3 10 $3.56 $219,446.84 61,593.000 LF N SEDIMENT BARRIER 0104 11 3 $21.86 $32,569.10 1,490.000 LF N FLOATING TURBIDITY BARRIER 0104 12 3 $7.72 $5,978.98 774.000 LF N STAKED TURBIDITY BARRIER- NYLON REINFORCED PVC 0104 15 3 $2,080.00 $31,200.00 15.000 EA N SOIL TRACKING PREVENTION DEVICE 0104 18 7 $176.19 $43,167.68 245.000 EA N INLET PROTECTION SYSTEM 0107 1 13 $12.37 $100,904.64 8,155.080 AC N LITTER REMOVAL 0107 2 13 $12.17 $90,307.69 7,418.350 AC N MOWING 0108 1 2 $52,912.57 $105,825.14 2.000 EA N MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING 0108 2 1 $100,000.00 $100,000.00 1.000 EA N MONITOR EXISTING STRUCTURES- VIBRATION MONITORING 0110 1 1 11 $7,394.35 $1,490,257.12 201.540 AC N CLEARING & GRUBBING 0110 2 2 1 $25,000.00 $6,000.00 .240 AC N SELECTIVE CLEARING AND GRUBBING, AREAS WITH TREES TO REMAIN 0110 3 4 $39.20 $383,299.88 9,779.000 SF N REMOVAL OF EXISTING STRUCTURES/BRIDGES 0110 4 10 8 $20.70 $84,692.59 4,091.000 SY N REMOVAL OF EXISTING CONCRETE 0110 7 1 2 $117.65 $13,765.22 117.000 EA N MAILBOX, F&I SINGLE 08/24/2020 Page: 2 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description 0120 1 7 $4.46 $2,287,892.29 512,736.600 CY N REGULAR EXCAVATION 0120 2 2 6 $16.95 $210,618.31 12,422.400 CY N BORROW EXCAVATION, TRUCK MEASURE 0120 4 2 $10.25 $26,793.30 2,615.000 CY N SUBSOIL EXCAVATION 0120 6 2 $2.99 $822,107.00 275,357.700 CY N EMBANKMENT 0120 71 1 $24,004.94 $24,004.94 1.000 LS N REGULAR EXCAVATION (3-R PROJECTS ONLY) 0125 1 1 $100.00 $8,300.00 83.000 CY N EXCAVATION FOR STRUCTURES 0145 2 3 $11.94 $10,828.45 907.000 SY N GEOSYNTHETIC REINFORCED FOUNDATION OVER SOFT SOIL 0160 4 5 $2.08 $832,251.86 399,403.000 SY N TYPE B STABILIZATION 0173 71 1 $291.26 $11,650.40 40.000 EA N DRILLING HOLES FOR PRESSURE GROUTING 0173 76 1 $29.13 $52,434.00 1,800.000 LF N GROUT PIPE INSTALLATION 0173 77 1 1 $221.36 $92,971.20 420.000 CY N SUBSURFACE PRESSURE GROUTING, SAND CEMENT 0285701 4 $7.07 $486,157.13 68,809.000 SY N OPTIONAL BASE, BASE GROUP 01 0285705 1 $56.00 $8,064.00 144.000 SY N OPTIONAL BASE, BASE GROUP 05 0285706 5 $23.74 $577,757.52 24,333.000 SY N OPTIONAL BASE, BASE GROUP 06 0285709 1 $13.88 $2,992,958.28 215,631.000 SY N OPTIONAL BASE, BASE GROUP 09 0285741 1 $86.00 $13,760.00 160.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 18" FOR PROJECT 443503-1-52-01 0285745 1 $100.45 $32,144.00 320.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 20" FOR PROJECT 421878-3-52-01 08/24/2020 Page: 3 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Obs? Description 0285752 1 $44.43 $3,998.70 90.000 SY N OPTIONAL BASE- GRADED AGGREGATE, 16" FOR PROJECT 217909-3-52-01 0286 1 4 $19.30 $132,167.81 6,849.000 SY N TURNOUT CONSTRUCTION/DRIVEWAY BASE- OPTIONAL MATERIALS 0327 70 1 2 $1.37 $200,440.30 145,831.000 SY N MILLING EXIST ASPH PAVT, 1" AVG DEPTH 0327 70 5 1 $5.00 $4,415.00 883.000 SY N MILLING EXIST ASPH PAVT, 2" AVG DEPTH 0327 70 6 4 $2.35 $417,828.90 178,016.000 SY N MILLING EXIST ASPH PAVT, 1 1/2" AVG DEPTH 0327 70 12 2 $2.24 $67,756.60 30,201.000 SY N MILLING EXIST ASPH PAVT, 1 1/4" AVG DEPTH 0327 70 13 1 $2.36 $13,780.04 5,839.000 SY N MILLING EXIST ASPH PAVT, 1 3/4" AVG DEPTH 0327 70 15 1 $4.29 $132,410.85 30,865.000 SY N MILLING EXIST ASPH PAVT, 2 3/4" AVG DEPTH 0327 70 19 3 $3.74 $32,781.50 8,757.000 SY N MILLING EXIST ASPH PAVT, 3/4" AVG DEPTH 0334 1 52 6 $112.26 $3,143,779.21 28,005.600 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, PG76-22 0334 1 53 2 $104.78 $5,956,251.31 56,847.900 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 0334 1 54 2 $304.67 $66,204.92 217.300 TN N SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC D, PG76-22 0337 7 25 4 $149.26 $2,174,614.39 14,569.100 TN N ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, PG 76-22 0337 7 26 1 $212.05 $203,355.95 959.000 TN N ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, HIGH POLYMER 0337 7 80 4 $109.99 $2,432,236.98 22,112.500 TN N ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-9.5, PG 76-22 0337 7 81 1 $122.00 $65,660.40 538.200 TN N ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, PG 76-22 0339 1 5 $250.20 $52,042.56 208.000 TN N MISCELLANEOUS ASPHALT PAVEMENT 0400 2 4 1 $1,115.00 $253,216.50 227.100 CY N CONC CLASS II, BRIDGE SUPERSTRUCTURE 0400 2 10 2 $573.29 $122,855.00 214.300 CY N CONCRETE CLASS II, APPROACH SLABS 08/24/2020 Page: 4 Florida Department of Transportation Item Average Unit Cost From 2019/08/01 to 2020/07/31 Statewide Market Area: 02 Contract Type: CC Displaying: VALID ITEMS WITH HITS From: 0102 1 To: 9999999 No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us