Nabunturan March 5th 1) Review targets 2) Review/propose technical solutions 3) Establish priority actions

• Community • Evacuation Centers / Temporary Relocation Sites • Spontaneous Settlements • Temporary Learning Spaces

The pre Pablo data given below was derived from Total Households with Percentage with recovered documents Location number of sanitary toilet sanitary toilet households facilities facilities from , and Boston and Boston 2,740 2,264 83% represents the most recent data recorded by Cateel 5,731 3,847 67% the Sanitary Inspectors with respect to coverage Baganga 12,250 11,005 90% across each Municipality. Total 20,721 17,116 80%

Sanitary Inspectors, CBC 12,000

10,000

8,000 Total number of households

6,000

4,000 Households with sanitary toilet

2,000 facilities

0 Boston Cateel Baganga Households with Percentage with According to the surveillance Total number sanitary toilet sanitary toilet of households done by the Local facilities facilities Governmental Units (LGU) Compostela 16,524 14,367 87% each year, the percentage of Laak 14,266 11,242 78% households with sanitary 21,665 20,286 93% toilet facilities is over 82% 8,935 6,661 75% New 9,812 7,559 77% TOTAL 71,202 60,115 82%

On the other side, Solid Source: PHO ComVal, LGU Scorecard 2011 Waste Management was 25,000 already a concern before 20,000 Pablo, with lack of enough 15,000 Total number of means and difficulties for 10,000 households graphs finding adequate final 5,000 Households with sanitary toilet facilities disposal sites, especially in 0

Main activity is the provision of reconstruction kits (HRC, CRS) to households where the superstructure of the latrine may be damaged and the system is effectively still functional

HRC has distributed 30 sets of latrine kits 69,923 houses have been partially or totally damaged (DSWD)

Municipality Total Compostela Laak Monkayo Montevista New Bataan # affected 82,669 20,130 13,606 26,198 10,291 12,444 families # houses partially 42,091 9,649 8,758 12,951 4,878 5,855 damaged # houses totally 27,832 8,883 4,848 8,023 3,933 2,145 damaged

Huge need of reconstruction of sanitary toilets at household level • Targets: damage assessment results? data in relation to the number of damaged or destroyed latrines is available?

• Technical solutions? DOH designs?

• Priority actions? The responsibility for reconstruction or rehabilitation of sanitation facilities will likely fall with the affected households, there is a need to provide assistance on the correct construction, placement and design of suitable systems.

 Following Typhoon Pablo, the response in relation to sanitation was primarily targeted around the provision of emergency Latrines especially at the location of Transitional Relocation Sites (TRS).  The type of systems constructed are mainly sealed pit latrines Toilets are sufficient

50 40 30

EC 20 10 Compostela 0 Insuffic Valley Sufficie Insuffic ient No (1808 fam) nt ient with toilets urge… Toilets are 40 5 2 28 sufficient

Toilets are sufficient

2

Davao 1 EC 0 Oriental Insuf Insuf No Suffi ficie (411 fam) ficie toile cient nt nt ts wit… Toilets are 1 0 0 2 sufficient • Targets: 100% EC/TRS?

• Technical solutions? HRC, DSDW?

• Priority actions? Reaching WASH Cluster standards?

• Displaced family or families who live collectively outside of the government designated evacuation centres or transitional sites

• CCCM Cluster carrying out an specific assessment

• Increasing (Laak, Monkayo) • Targets: IOM information?

• Technical solutions?

• Priority actions? Need specific strategy/standards?

Total Total # of DISTRICT/ SCHOOL No. of Students TLS COMPOSTELA VALLEY

New Bataan District TOTAL Elem & Sec (26 schools) 9340 214

Compostela District TOTAL Elem & Sec (24 schools) 19499 338

Montevista District TOTAL Elem & Sec (24 schools) 6509 124

Laak District TOTAL Elem & Sec (48 schools) 3884 68

Monkayo District TOTAL Elem & Sec (48 schools) 20297 355

TOTAL 59,529 1,099

Total Total # of DISTRICT/ SCHOOL No. of Students TLS ORIENTAL Boston District TOTAL Elem & Sec (13 schools) 3259 74

Cateel District 1 TOTAL Elem & Sec (7 schools) 3440 58 Cateel District 2 TOTAL Elem & Sec (20 schools) 5963 119

Baganga North District TOTAL Elem & Sec (9 schools) 5915 98

Baganga South District TOTAL Elem & Sec (15 schools) 7079 114

TOTAL 25,656 463 • DepEd responsible for permanent reconstruction including WASH facilities

• WASH Cluster responsibility to provide temporary emergency solutions

• School classes finalising end of March • Targets: 100% TLS?

• Technical solutions:?

• Priority actions? Reaching WASH Cluster standards?