Cross Hudson Project Confidential Trade Secret Critical Infrastructure CROSS HUDSON PROJECT ENVIRONMENTAL MANAGEMENT AND CONSTRUCTION PLAN ATTACHMENT B Other Permits and Approvals s-r U.S. Army Corps of Engineers Permit B-2 NYS Office of General Services Use and Occupancy Agreement 02:OO2398_CC12_Q4..B2311 B-1 R_EMCP Hud30D River SegIIEnI.doc·2129iUS Confidential Trade Secret Critical Infrastructure CROSS HUDSON PROJECT ENVIRONMENTAL MANAGEMENT AND CONSTRUCTION PLAN ATTACHMENT s-r u.s. Army Corps of Engineers Permit 02:002398_CCI2_04-B2JII B-3 R F.MCP Hudsnn Ri_r Sclffienu1oc._?.fN,{),Il DEPARTMENT OFTHE ARMY NEW YORK DISTRICT, CORPSOF ENGINEERS JACOBK. JAVITSFEDERAL BUILDING NEW YORK, N.Y. 10278-l1090 OCT 292007 REPLY TO ATTENTION Of; Regulatory Branch SUBJECT: Permit Application Number NAN-2001-01201-5-EJE by Cross Hudson Corporation Cross Hudson Corporation Attention: Harold W. Borden 500 North Wood Avenue, Suite 2 Linden, NJ 07036 Dear Mr. Borden: Enclosed is a Department of the Army permit for your work. You are required to submit to this office the dates of commencement and completion of your work. Enclosed are two forms for you to use to submit the required dates. If for any reason, a change in your plans or construction methods is found necessary, please contact us immediately to discuss modification of your permit. Any changes must be approved before they are undertaken. Enclosures cc: Joe Forti ecology and environment, inc. 368 Pleasant View Drive Lancaster, NY 14086 B-5 DEPARTMENT OFTHE ARMY PERMIT Permittee: Cross Hudson Corporation 500 North Wood Avenue, Suite 2 Linden, NJ 07036 (908) 926-2224 Permit No.: NAN-2001-01201-5-EJE Issuing Office: New yJiP DUt~t Corps of Engineers NOTE: The term ·you· and its derivatives, &s used in this permit, means the per.mdttee or any future transferee. The term -this office- refers to the appropriate district or division office of the Corps of Kngineers baving jurisdiction over the parm.1tted activity or the appropriate official of that office acting under the authority of the commanding officer. You are authorized to perform work in accordance with the te~ and conditions specified below. Project Description, Construction of a 670 MW, 345 kV alternating current (AC) electric generator lead connecting the Bergen Generating Station in Ridgefield, NJ to the ConEd West 49'· Street Substation in New York City. The project shall include: installation of three (3) .. electric and associated communication and temperature sensing cables bundled together in the Hudson River; drilling of a maximum 66-inch diameter borebole by horizontal directional drilling (HDD) from a drill pit in Edgewater, NJ into the Hudson River; installation of a cofferdam at the seaward end of the HOD borehole at the New Jorsey side prior to the beginning of the HDD borehole construction; installation of conduits for the cable system in the borehole; drilling of a maximum 66-inch diameter borehol~_l:>y_]lDD.. f~Q ..lll__a drill pit in the northern portion of the Pier 94 Convention Center parking lot in New York City, NY into the Hudson River; installation of a cofferdam at the seaward end of the HOD borehole at the New York side prior to the beginning of the HOD borehole construction; dredging of sediment inside the NY and NJ cofferdams to a depth of 60-feet below mean lower low water (MLLW) for a total of approximately 9,000 cubic yards (CY); and installation of a submarine cable system in a single trench by jet plow embedment to a minimum depth of approximately 15-feet below the present bottom of the Federal Channel and to a depth of approximately 10-feet below the river bottom outside of the Federal Channel. All work shall be performed in accordance with the attached drawings and special conditions (A) through (R) which are hereby made part of this permit, and the New Jersey Department of Environmental Protection Permit No. 0000-02-0045.1 WFD 070001, incorporating the Section 401 Water Quality Certificates, and the State of New York public Service Commission Case NO. 01-T-1474 Certificate of Environmental Compatibility and Public Need as currently amended, which are hereby made a part of this permit. Project Location: IN: Hudson River AT: Township of Edgewater, Bergen County, New Jersey and Borough of Manhattan, New York County, New York ENG FORM 1721, Ngy 86 EDITION OFSEP 82 ISOBSOlETE. (JJ CFRJ25(Appmdis,4) 1145 -2-303b (//) B-6 '"!' .', ff I, ~ • ',PERMtTrEE: Cross Hudson Corporat1on PERMIT NO.:NAN-2001-01201-5-EJE OCT 262007 Permit Conditions: General Conditions: 1. The time limit for completing the work. authorized ends on MAR 222009 If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may mak.e a good faith transfer to a third party in compliance with General Condition. below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or.if the site is eligible for listing in the National Register of Historic Places. •. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. 5, If a ccndi t Loned water quality certification has been issued for your project, you must comply wi th the conditions specified in the certification as special conditions to this pennit. For your convenience, a copy of the certification is attached if it contains such conditions. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Special Conditions: (A) The peDnittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice form the Corps of Engineers, to remove, relocate. or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal Or alteration. (B) The cable shall be installed at a minimum depth of 38-feet below mean low water (MLW) in the Hudson River Federal Navigation Channel, where the current authorized depth is 30-feet below MLW. (C) The permittee would be required to relocate the cable should it ENG FORM 1721. Nov 88 EDITION OFSEP82IS OBSOlETE. (33CFR 31S(App",,!i:< A)) B-7 2 I " \'~ ,I • . PERMITTEE: Cross Hudson Corporation • PERMIT NO. :NAN-200l-0l20l-S-EJE OCT 262007 become necessary to maintain the full authorized depth of the 48-feet below MLW in the Federal Navigation Channel area. (D) A minimum three (3) weeks advance notice prior to construction activity, the permittee must submit two (2) finalized sets of construction drawings to William Gas Pipeline-Transco (WGP­ Transco) offices. The drawings must include the information requested in WGP-Transco's letter dated 22 April 2002. (E) A minimum vertical clearance of 15-feet is recommended between the bottom of the electric generation lead and the top of any WGP-Transco facility. A lesser clearance that will not adversely affect any WGP-Transco facility is authorized. (F) The permittee must notify WGP-Transco five (5) working days before commencing construction activities. (G) The permittee shall submit to the office of the u.s. Army Corps of Engineers-New York District (USACE-NYD) a copy of an approved Environmental Management and Construction Plan for review and comment in accordance with Condition 23 of the State of New York Public Service Commission Opinion and Order No. 01-T-1474 dated October 21, 2004. (H) The permittee shall submit diagrams showing the actual location of the cable system within six (6) months of installation to the appropriate state and federal agencies. (I) The permittee shall perform a hydrographic/side scan sonar survey along the cable route approximately nine (9) to twelve (12) months after the cable system has been installed to verify that benthic profile recovery has been achieved. This survey shall be submitted to the USACE-NYD and the National Marine Fisheries Service (NMFS) for review. If NMFS and USACE-NYD determine that benthic recovery is adequately achieved based on the results of the first survey, no further surveys shall be required. If NMFS and USACE-NYD determine that benthic profile recovery is not adequately achieved after the first survey event, additional hydrographic surveys will be undertaken at approximately 12-month intervals after the first survey until it has been determined that recovery has been achieved. Prior to undertaking the surveys, a benthic profile recovery plan would be coordinated with USACE-NYD and NMFS.
Recommended publications
  • The Millennial Revolution in Electrical Transmission
    I N S I D E T H E M I N D S Complying with Energy and Natural Resources Regulations Leading Lawyers on US Energy Markets and Regulators’ Attempts to Provide Oversight 2014 Thomson Reuters/Aspatore All rights reserved. Printed in the United States of America. No part of this publication may be reproduced or distributed in any form or by any means, or stored in a database or retrieval system, except as permitted under Sections 107 or 108 of the U.S. Copyright Act, without prior written permission of the publisher. This book is printed on acid free paper. Material in this book is for educational purposes only. This book is sold with the understanding that neither any of the authors nor the publisher is engaged in rendering legal, accounting, investment, or any other professional service. Neither the publisher nor the authors assume any liability for any errors or omissions or for how this book or its contents are used or interpreted or for any consequences resulting directly or indirectly from the use of this book. For legal advice or any other, please consult your personal lawyer or the appropriate professional. The views expressed by the individuals in this book (or the individuals on the cover) do not necessarily reflect the views shared by the companies they are employed by (or the companies mentioned in this book). The employment status and affiliations of authors with the companies referenced are subject to change. For customer service inquiries, please e-mail [email protected]. If you are interested in purchasing the book this chapter was originally included in, please visit www.west.thomson.com.
    [Show full text]
  • New York City Comprehensive Waterfront Plan
    NEW YORK CITY CoMPREHENSWE WATERFRONT PLAN Reclaiming the City's Edge For Public Discussion Summer 1992 DAVID N. DINKINS, Mayor City of New lVrk RICHARD L. SCHAFFER, Director Department of City Planning NYC DCP 92-27 NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN CONTENTS EXECUTIVE SUMMA RY 1 INTRODUCTION: SETTING THE COURSE 1 2 PLANNING FRA MEWORK 5 HISTORICAL CONTEXT 5 LEGAL CONTEXT 7 REGULATORY CONTEXT 10 3 THE NATURAL WATERFRONT 17 WATERFRONT RESOURCES AND THEIR SIGNIFICANCE 17 Wetlands 18 Significant Coastal Habitats 21 Beaches and Coastal Erosion Areas 22 Water Quality 26 THE PLAN FOR THE NATURAL WATERFRONT 33 Citywide Strategy 33 Special Natural Waterfront Areas 35 4 THE PUBLIC WATERFRONT 51 THE EXISTING PUBLIC WATERFRONT 52 THE ACCESSIBLE WATERFRONT: ISSUES AND OPPORTUNITIES 63 THE PLAN FOR THE PUBLIC WATERFRONT 70 Regulatory Strategy 70 Public Access Opportunities 71 5 THE WORKING WATERFRONT 83 HISTORY 83 THE WORKING WATERFRONT TODAY 85 WORKING WATERFRONT ISSUES 101 THE PLAN FOR THE WORKING WATERFRONT 106 Designation Significant Maritime and Industrial Areas 107 JFK and LaGuardia Airport Areas 114 Citywide Strategy fo r the Wo rking Waterfront 115 6 THE REDEVELOPING WATER FRONT 119 THE REDEVELOPING WATERFRONT TODAY 119 THE IMPORTANCE OF REDEVELOPMENT 122 WATERFRONT DEVELOPMENT ISSUES 125 REDEVELOPMENT CRITERIA 127 THE PLAN FOR THE REDEVELOPING WATERFRONT 128 7 WATER FRONT ZONING PROPOSAL 145 WATERFRONT AREA 146 ZONING LOTS 147 CALCULATING FLOOR AREA ON WATERFRONTAGE loTS 148 DEFINITION OF WATER DEPENDENT & WATERFRONT ENHANCING USES
    [Show full text]
  • Testimony of Edward N. Krapels, Ceo of Anbaric Development Partners, Before the Energy Subcommittee of the House Energy and Commerce Committee, May 10, 2018
    5/7/2018 11:30:31 AM TESTIMONY OF EDWARD N. KRAPELS, CEO OF ANBARIC DEVELOPMENT PARTNERS, BEFORE THE ENERGY SUBCOMMITTEE OF THE HOUSE ENERGY AND COMMERCE COMMITTEE, MAY 10, 2018 Mr. Chairman, distinguished members of the Energy Subcommittee of the House Energy and Commerce Committee. Thank you for inviting me to testify on the State of Electric Transmission: Investment, Planning, Development and Alternatives. My name is Ed Krapels and I am the founder and CEO of Anbaric. We build the electric businesses of the future. We helped spearhead two high-voltage, direct current buried transmission lines between New Jersey and New York, increasing market efficiency and saving ratepayers hundreds of millions of dollars as a result. This high-voltage direct current technology is common world-wide but not used much in the US – its small size makes it well suited to linking markets in congested areas of the country where construction is difficult. An article I have just published in The Electricity Journal, reviews why -- even though everyone agrees these kinds of interregional transmission links are useful and more are needed -- both existing and new interregional projects are choked off by well-intentioned but unproductive regulations. That article is part of my written testimony. We come here this morning, however, to discuss an extremely important new opportunity in our power industry. Federal energy and environmental policy can accelerate what promises to be a once-in-a-generation chance to launch a new domestic industry – offshore wind -- if we do it smartly and thoughtfully from the start. The key to success is to plan, design and build shared, independent offshore transmission systems – OceanGrids – in each of the participating coastal states.
    [Show full text]
  • HVDC Hudson Transmission Project in New York (US)
    Issue 13/12 http://www.siemens.com/FACTS HVDC/FACTS - Highlights http://www.siemens.com/HVDC HVDC Hudson Transmission Project in New York (US) Successfully in operation since 3rd of June, 2013 New York is the biggest city in the US with approximately 8.3 million inhabitants. This megacity is growing by 160,000 people each year followed by an increasing energy demand. In satisfying this hunger for energy, the New York Power Authority (NYPA) turned to a solution proposed by Hudson Transmission Partners to transmit power from the neighboring grid of PJM in New Jersey to New York City and to upgrade and reinforce New Jersey’s grid. Benefits by the HVDC Hudson Transmission Project Especially in the hot summer period, the energy demand rises due to increased use of air conditioning systems. Fortunately the Hudson high voltage direct current transmission system (HVDC) was set in operation 42 days ahead of schedule, just before the peak summer period in New York. Thanks to the excellent teamwork of all involved companies, the Hudson HVDC is now providing access to additional electricity and its fast control function provides stabilization to the connected grids, which is a key benefit in the event of grid disturbances or blackouts. “The Hudson Transmission Project will provide enhanced transmission reliability and energy security and access to an additional pool of energy resources,” said New York’s Governor Andrew M. Cuomo. “The new line will also result in substantial economic savings to New York consumers. These are significant benefits that
    [Show full text]
  • Cross Hudson Project
    Confidential Trade Secret Critical Infrastructure CROSS HUDSON PROJECT ENVIRONMENTAL MANAGEMENT AND CONSTRUCTION PLAN ATTACHMENT H Spill Prevention Plan 02:OO2398_CC12_04-B2311 H-l R_EMCP Hudson River Segmenl.doc-2n9108 SPILL PREVENTION PLAN Cross Hudson Project Manhattan, New York ENSR Corporation February 2008 Document No.: 10923~12·100 H-3 H-4 Spill Prevention Plan ENSR' AECOM Cross Hudson Project February 2008 TABLE OF CONTENTS SECTION CROSS REFERENCE CHECKUST III SPP REVIEW LOG VII CONSTRUCTION ADMINISTRATOR APPROVAL VIII PROFESSIONAL ENGINEER CERTIACATION VIII DISCHARGE RESPONSE REPORTING - QUICK REFERENCE SUMMARY .IX 1.0 INTRODUCTION 1 2.0 SITE DESCRIPTION 1 3.0 FAOUTY DRAINAGE AND MANAGEMENT OF RUNOFF 2 3.1 Topography 2 3.2 Surface Water 3 3.3 Direction of Flow 3 3.3.1 Upland Segment 3 3.3.2 Hudson River 4 4.0 OIL STORAGE OPERATIONS 4 4.1 Refueling Protocols 5 4.1.1 Land-Based Equipment 5 4.1.2 Marine Equipment 5 4.2 In-Process Use Oils 6 4.2.1 cable Installation 6 5.0 LOADING/UNLOADING PROCEDURES 7 5.1 Bulk Fuel Transfer 7 5.2 Drum Transfers 8 6.0 INSPECTIONS AND RECORDS 9 7.0 SECURITY 9 8.0 PERSONNEL TRAINING 10 9.0 EMERGENCY RESPONSE 10 9.1 Emergency Equipment 10 9.2 Emergency Procedures 11 10.0 NOTIFICATIONS 13 10.1 Oral Notifications 14 10.2 Written Notifications 14 H-5 Spill Prevention Plan ENSR I AECOM Cross Hudson Project February 2008 11.0 SUBSTANTIAL HARM 16 12.0 PLAN AMENDMENTS 16 12.1 Plan Review 16 12.2 Professional Engineer (PEl certification 16 13.0 ENGINEERING DEACIENOES 17 APPENDICES Appendix A sampleInspection and Reporting Forms & Spill Response Equipment AppendiX B Sample SPP Training Outline Appendix C certification of the Applicability of the Substantial Harm Criteria Appendix D Tables Table 1-1 Emergency Contacts Table 4-1 Oil Source Summary Appendix E Site Plan Figure ii H-6 Spill Prevention Plan ENSR I AECOM Cross Hudson Project February 2008 CROSS REFERENCE CHECKUST 4OCFIl112 Reclulrilmenbl spp 5ectIon .
    [Show full text]
  • ULI Hudson Park Case Study
    September 2018 ULI Case Studies Tri–State Land Use Council Hudson Park QUICK FACTS Location Yonkers, New York Project Type Multifamily Rental Site Size 8 acres Land Uses Multifamily Rental Housing, Open Space, Retail, Restaurants, Office Keywords/Special Features Transit-oriented development, Waterfront development, Riverfront development, Infill development, Redevelopment, Public/private development Website www.livehudsonpark.com Project Address Hudson Park 1 Alexander Street Yonkers, NY 10701 COLLINS ENTERPRISES A view of Hudson Park from the air prior to the start of phase III. Phase I includes the three mid-rise buildings Developers on the right, phase II includes the two towers on the left and the parking structure, and the phase III tower Collins Enterprises (phases I and II) is currently under construction on the green space between the parking garage and the Hudson River. Old Greenwich, Connecticut Downtown Yonkers is in the background. www.collins-llc.com Strategic Capital (phase III) PROJECT SUMMARY Jersey City, New Jersey www.chinaconstruction.us Hudson Park is a transit-oriented multifamily rental development—adjacent Equity Capital Sources Simpson Housing LLLP to the Yonkers Metro-North train station in the heart of Yonkers, New York— AIG Global Real Estate consisting of four separate buildings built in three phases over a 17-year Berkshire Property Advisors Strategic Capital period. The project is located on a former industrial site of eight acres Debt Capital Sources located between the train station and the Hudson River. The first phase Key Bank HSBC includes 266 apartments in two separate nine-story buildings, the second Union Bank Greystone phase includes 294 apartments in one building with two towers of 12 and Wells Fargo/Freddie Mac 14 stories, and the third phase includes 213 apartments in one 24-story Prudential/Fannie Mae Master Planner tower.
    [Show full text]
  • Hudson Transmission Announcement
    Starwood Energy announces the Hudson Transmission project December 4, 2006 – The New York Power Authority (“NYPA”) has approved a proposal by Hudson Transmission Partners, LLC (“Hudson”) of Fairfield, Connecticut, to provide up to 660 megawatts of new electric transmission capacity using a 345 kilovolt line that Hudson will develop, finance, and build between Ridgefield, New Jersey and midtown Manhattan. The Hudson-sponsored project will include approximately eight miles of buried transmission cable, four miles of which will be installed beneath the Hudson River, and a converter station in Ridgefield that will convert alternating current (“AC”) power into direct current (“DC”) power for purposes of efficient transmission, and back to AC power for distribution to NYPA’s New York City customers. The line will connect to Con Edison’s West 49th Street substation. NYPA selected the Hudson proposal, along with a proposal from FPL Energy, LLC, to provide 500 MW of electric generating capacity via the Hudson line from the AES Red Oak natural gas-fired power plant in Sayreville, New Jersey. FPL Energy is a leading competitive energy supplier with power generation projects in 24 states, and is a subsidiary of FPL Group (NYSE:FPL). Together, the Hudson and FPL Energy joint proposal allows NYPA to meet reliability standards for New York City, while establishing a link to electricity markets in the PJM Interconnection (“PJM”), the regional transmission organization that coordinates electric utilities and power producers in 12 states stretching from Pennsylvania to North Carolina and westward to Illinois. Hudson will be responsible for obtaining necessary permits and approvals for the transmission line and converter station, providing financing, constructing the facilities, and operating the line after completion.
    [Show full text]
  • Hunts Point Energy Strategy
    Presented to: Hunts Point Food Distribution Center Energy Strategy Plan- Phase1 Table of Contents - 1 Table of Contents Introduction Executive Summary Section 1: Site Investigation 1.1 Introduction 1.2 Tenant Site Investigation Summary 1.3 Electrical and Thermal Load Profiles 1.4 Conclusion Section 2: Energy Conservation Measures (ECMs) 2.1 Introduction 2.2 Summary of Potential ECMs by Tenant 2.3 Conclusion Section 3: Utility Assessment 3.1 Introduction 3.2 Electrical Assessment 3.3 Natural Gas Assessment 3.4 Conclusion Section 4: CHP Evaluation 4.1 Introduction 4.2 Combined Heat and Power (CHP) 4.3 Existing Energy Use and Costs 4.4 Methodology 4.5 Recommended CHP Technology 4.6 Permitting 4.7 Economic Analysis 4.8 Benefits and Incentives 4.9 Conclusion Section 5: Solar Evaluation 5.1 Introduction 5.2 Solar Photovoltaics 5.3 Solar Thermal 5.4 Regulatory Hurdles 5.5 Benefits 5.6 Conclusion Section 6: Fuel Cells Evaluation 6.1 Introduction 6.2 Benefits and Hurdles 6.3 Conclusion Hunts Point Food Distribution Center FINAL Energy Strategy Report- Phase 1 Table of Contents - 2 Section 7: Regulatory Impact 7.1 Introduction 7.2 Interconnection 7.3 Predevelopment Considerations for District Generation 7.4 Development Options for Distributed Generation 7.5 Transmission and Distribution Alternatives for District Generation 7.6 Conclusion Section 8: Potential Development 8.1 Introduction 8.2 FDC Vacant Sites and Development Projects 8.3 Conclusion Section 9: Appendix Appendix 1 Precedents Appendix 2 Con Edison Fault Map Appendix 3 CHP Utility Analysis Appendix 4 CHP Cost Estimates Appendix 5 Interconnection Application Process Schematic Hunts Point Food Distribution Center FINAL Energy Strategy Report- Phase 1 Introduction Introduction Introduction The New York City Economic Development Corporation (NYCEDC) teamed with DMJM Harris to produce a preliminary Energy Strategy Plan for the Hunts Point Food Distribution Center (FDC) located in the Bronx, New York.
    [Show full text]
  • The Poseidon Project Long Island’S Energy Future Begins with Transmission
    THE POSEIDON PROJECT LONG ISLAND’S ENERGY FUTURE BEGINS WITH TRANSMISSION. THE POSEIDON PROJECT LONG ISLAND’S ENERGY FUTURE BEGINS WITH TRANSMISSION. Poseidon Transmission LLC's Response to New York Energy Highway's Request For Information May 30, 2012 2 THE POSEIDON PROJECT LONG ISLAND’S ENERGY FUTURE BEGINS WITH TRANSMISSION. THE POSEIDON PROJECT EXECUTIVE SUMMARY THE POSEIDON PROJECT LONG ISLAND’S ENERGY FUTURE BEGINS WITH TRANSMISSION. The Poseidon Project is a 500MW submarine HVDC The Project also provides ratepayers with great value: interconnection from the heart of PJM’s bulk power grid to substantial benefits at a highly competitive cost, i.e. capacity the heart of Long Island’s T&D network. This 200 kV system- and energy prices well below new-build costs on Long Island. to-system link withdraws power from the Dean’s substation, The Project’s state-of-the art cable and converter stations offer one of PJM’s strongest interconnection points, and injects availability factors upward of 97% and virtually unsurpassed it into the Ruland Road substation, one of Long Island’s reliability. Cost, availability, and reliability combine with electric strongest interconnection points. For decades to come, this and environmental attributes to make this off-island cable grid-to-grid connection – at the heart of each system – will link a compelling part of a long-term economic development reduce congestion within Nassau and Suffolk counties and strategy. the downstate region, and enhance the diversity of generation sources supplying Long Island. Poseidon’s development team includes many of those who brought the Neptune Regional Transmission System (RTS) This controllable tie between the PJM and NYISO regions to Long Island five years ago, joined by Exelon Corporation.
    [Show full text]
  • Assented-To Motion of Counsel for The
    ATTORNEY GENERAL DEPARTME NT OF JUSTICE 33 CAPITOL STREET CONCORD, NEW HAMPSHIRE 03301-6397 JOSEPH A. FOSTER ANNM. RICE ATTORNEY GENERAL DEPUTY ATTORNEY GENERAL October 28, 2016 Pamela G. Monroe, Administrator New Hampshire Site Evaluation Committee 21 South Fruit Street, Suite 10 Concord, New Hampshire 03301 Re: SEC Docket No. 2015-04 Application of Public Service Company of New Hampshire d/b/a Eversource Energy ("Eversource") for a Certificate of Site and Facility for the Construction of a New 115 kV Transmission Line from Madbury Substation to Portsmouth Substation Dear Ms. Monroe: Enclosed you will find an original and one copy of an Assented-to Motion of Counsel for the Public for Leave to Retain ESS Group and for An Order Directing Eversource Energy to Bear the Costs Thereof for filing in above-referenced matter. Thank you for your attention to this matter. Please feel free to call with any questions. Sincerely, /}/~£~ &;;f:o;;;~. - Aslin Assistant Attorney General Environmental Protection Bureau (603) 271-3679 CGA/llm Enclosures cc: Distribution List ----- - Telephone 603-271-3658 • FAX 603-271-2110 • TDD Access: Relay NH 1-800-735-2964 - - - --- THE STATE OF NEW HAMPSHIRE SITE EVALUATION COMMITTEE No. 2015-04 Application of Public Service Company of New Hampshire d/b/a Eversource Energy ("Eversource") for a Certificate of Site and Facility for the Construction of a New 115 kV Transmission Line from Madbury Substation to Portsmouth Substation ASSENTED-TO MOTION OF COUNSEL FOR THE PUBLIC FOR LEAVE TO RETAIN ESS GROUP AND FOR AN
    [Show full text]
  • Hudson Transmission
    http://www.pfie.com © Reproduced by Thomson Reuters 2011 Hudson Transmission Powering the Hudson n May 23 2011, Hudson Transmission – Siemens and Prysmian (formerly Pirelli) – as Neptune, Partners , with sponsors Energy Hudson as well as the management team that will be imple- Investors Funds and Starwood Energy Transmission menting its development, construction and operation, Ed Group , successfully closed a US$716.5m Partners is Stern and his management team at PowerBridge LLC, O senior secured private placement which over the past few years has successfully man- financing in the institutional investor building on aged the development, construction and operation of Nep- market to support the construction of a 660MW high volt- tune. age direct current transmission system. The project the success of Once completed, the Hudson transmission project involves a submarine transmission line under the Hud- Neptune will provide several benefits to the New York and New Jer- son River interconnecting Public Service Electric and Gas sey transmission systems as well as to the region gener- Company’s Bergen substation in Ridgefield, New Jer- Regional ally. The benefits include providing a much-needed link sey, with New York City at Consolidated Edison Compa- Transmission between the NYISO and PJM transmission systems, which ny’s West 49th Street substation, a few blocks from will enhance the security and reliability of both and Times Square. to bring reduce transmission constraints. Involving project costs of approximately US$850m additional It will also create a pathway for New York customers and a completion date in 2013, the successful closing and to PJM’s more diverse fleet of energy resources – com- initial funding of the financing is the culmination of a electricity to pared with New York City’s Zone J which is limited to oil process more than six years in the making by the spon- New York and natural gas, PJM has a variety of coal, nuclear, solar, sors involved.
    [Show full text]
  • State of New York Public Service Commission
    CH-08 Page 1 STATE OF NEW YORK PUBLIC SERVICE COMMISSION ------------------------------------------------------------------- x : In the Matter of : : WEST POINT PARTNERS, LLC : Case 13-T-0292 : Application of West Point Partners, LLC for a : Certificate of Environmental Compatibility and Public : Need Pursuant to Article VII of the Public Service Law : : ------------------------------------------------------------------- x WEST POINT PARTNERS, LLC RESPONSE TO NYPA-1 INFORMATION REQUEST NYPA-1: Cable Engineering In reference to the Applicant’s proposed cable system: 1. Please describe in full detail the cable type selected for the proposed project. RESPONSE: The cables for the West Point project are described in detail in Exhibit E-1 of the Application, with additional information provided in Applicant’s Response to Deficiency Item Number 12, which is attached for reference. 2. Please provide the basis for selecting the cable type for the project. RESPONSE: The cables will be manufactured and installed by Prysmian, an experienced global provider of cable systems who has served as cable contractor for affiliates of the Applicant on two HVDC submarine cable projects in the recent past. We accept Prysmian’s representation that the cable system it has selected for the West Point project will serve its purpose as intended. 3. Please provide operational data for all submarine cable installations similar or identical to that selected for the project, including a discussion of technology, voltage, transfer capacity and insulation. Provide the location, circuit length, number of cable splices and operation date for the installations discussed in the response to this request. CH-08 Page 2 RESPONSE: The Applicant’s affiliate, PowerBridge, LLC, has been directly responsible for two submarine cable installations: a.
    [Show full text]