Attachment 1-4 Minutes of Meeting (3Rd Steering Committee
Total Page:16
File Type:pdf, Size:1020Kb
Attachment 1-4 Minutes of Meeting (3rd Steering Committee) & Discussion materials 3rd Steering Committee on Water Supply System Development Project in Santiago, Cape Verde (JICA-II Project) June 7, 2010 at Praia Toyo Engineering Corporation Ingérosec Corporation UNICO International Corporation 1 Topics and Modification after 2nd Committee 1. Critical Issues 2. Project Work Shop 3. IEE Work Shop 4. Modification after 2nd Steering Committee 4-1. Water Demand and Frame Work 4-2. System Development Approach 4-3. Water Supply System 4-4. Cost Comparison 5. Ground Water utilization and Boron content 6. Basic Data and Design Philosophy 7. Way Forward to Interim Report 2 Critical Issues z To solve the critical issues of the JICA project attending - Minister of Tourism, Industry and Energy - Minister of Finance - Minister of Environment Rural Development and Maritime Resources with JICA Study Team on 3rd June, 2010 in Praia. z Solution of Critical issues: 1. Desalination will be installed at Calheta Sao Miguel and Palmarejo with inter-municipality network. 2. Other projects, which are considered regarding JICA Study, - Spanish cooperation project (5,000m3/day desalination expansion), and - World Bank cooperation project (5,000m3/day newly installed). 3. Ground water will not be utilized for potable after JICA project completion. 4. Boron content in potable water will follow to EU standard of less than 1.0mg/l. 3 Project Work Shop The work shop was conducted inviting MTIE, INGRH, and Camara Municipals on 31st May, 2010 in Praia. z Topics: 1. JICA Study, its objective, time schedule, and methodology 2. Water demand estimation with population horizon in Santiago island 3. Water supply system with layout, production, reservoir, and transmission 4. Scope of JICA and GoCV z Discussion Items: 1. System development approach was confirmed. 2. Ground water utilization and Boron removal were discussed. 3. Main reservoir capacity was discussed. 4. Holding company idea in Santiago island was discussed. 5. Production cost and tariff were discussed. 4 IEE Work Shop z Output: 1. Inter-Municipal Meeting for Environmental Issues was conducted inviting MTIE, DGA, and Camara Municipals on 25th May, 2010 in Praia. 2. Subjects discussed: 1) Definition of category of JBIC guideline 2) EIA mandate based on category. 3) General issues to be considered in each municipality for formulation of Project 4) Forthcoming EIA study z Confirmed Items: 1. JICA will categorize the Project based on IEE. 2. Each Municipality Environment Plan shall be considered as the opinion of local stakeholders for F/S and IEE stage. 3. GoCV will prepare TORs for EIA based on recommendation of IEE. 5 1. Critical Issues 2. Project Work Shop 3. IEE Work Shop 4. Modification after 2nd Steering Committee 4-1. Water Demand and Frame Work 4-2. System Development Approach 4-3. Water Supply System 4-4. Cost Comparison 5. Ground Water utilization and Boron content 6. Basic Data and Design Philosophy 7. Way Forward to Interim Report 6 Demand and Frame work at 2nd Committee 㪪㫆㫌㫋㪿 㪥㫆㫉㫋㪿 㪫㫆㫋㪸㫃 㪫㫆㫋㪸㫃 㪞㫉㪸㫅㪻 㪧㫉㪸㫀㪸 㪩㫀㪹㪼㫀㫉㪸 㪪㪸㫆 㪫㪸㫉㫉㪸㪽㪸㫃 㪪㪸㫆 㪪㪪㩷㪻㫆 㪪㪸㫅㫋㪸 㪪㪸㫆 㪪㪸㫅㫋㪸 㪪㫆㫌㫋㪿 㪥㫆㫉㫋㪿 㪫㫆㫋㪸㫃 㪞㫉㪸㫅㪻㪼 㪛㫆㫄㫀㫅㪾㫆㫊 㪤㫀㪾㫌㪼㫃 㪤㫌㫅㪻㫆 㪚㫉㫌㫑 㪣㫆㫌㫉㪼㫅㪺㫆 㪚㪸㫋㪸㫉㫀㫅㪸 㩿㪸㪀 㪫㪸㫉㪾㪼㫋㩷㪰㪼㪸㫉㩷㩿㪉㪇㪉㪇㪀㩷㪧㫆㫇㫌㫃㪸㫋㫀㫆㫅 㪈㪎㪎㪃㪎㪈㪏 㪐㪃㪌㪎㪉 㪈㪌㪃㪌㪋㪉 㪉㪇㪉㪃㪏㪊㪉 㪊㪈㪃㪍㪊㪎 㪈㪐㪃㪈㪈㪇 㪈㪊㪃㪇㪈㪊 㪊㪌㪃㪍㪈㪎 㪈㪇㪃㪐㪏㪍 㪌㪎㪃㪊㪍㪐 㪈㪍㪎㪃㪎㪊㪉 㪊㪎㪇㪃㪌㪍㪋 㪸㪄㪈 㩷㪬㫉㪹㪸㫅 㪈㪎㪎㪃㪇㪇㪎 㪈㪃㪌㪉㪉 㪉㪃㪏㪐㪈 㪈㪏㪈㪃㪋㪉㪇 㪈㪈㪃㪇㪋㪈 㪎㪃㪉㪇㪋 㪈㪃㪏㪊㪌 㪈㪌㪃㪎㪋㪊 㪉㪃㪊㪈㪏 㪉㪊㪃㪎㪌㪈 㪍㪈㪃㪏㪐㪉 㪉㪋㪊㪃㪊㪈㪉 㪸㪄㪉 㩷㪩㫌㫉㪸㫃 㪎㪈㪈 㪏㪃㪇㪌㪇 㪈㪉㪃㪍㪌㪈 㪉㪈㪃㪋㪈㪉 㪉㪇㪃㪌㪐㪍 㪈㪈㪃㪐㪇㪍 㪈㪈㪃㪈㪎㪏 㪈㪐㪃㪏㪎㪋 㪏㪃㪍㪍㪏 㪊㪊㪃㪍㪈㪏 㪈㪇㪌㪃㪏㪋㪇 㪈㪉㪎㪃㪉㪌㪉 㩿㪹㪀 㪪㪼㫉㫍㫀㪺㪼㩷㪚㫆㫍㪼㫉㪸㪾㪼㩷㩿㩼㪀 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㩿㪺㪀 㪪㪼㫉㫍㪼㪻㩷㪧㫆㫇㫌㫃㪸㫋㫀㫆㫅 㪈㪎㪎㪃㪎㪈㪏 㪐㪃㪌㪎㪉 㪈㪌㪃㪌㪋㪉 㪉㪇㪉㪃㪏㪊㪉 㪊㪈㪃㪍㪊㪎 㪈㪐㪃㪈㪈㪇 㪈㪊㪃㪇㪈㪊 㪊㪌㪃㪍㪈㪎 㪈㪇㪃㪐㪏㪍 㪌㪎㪃㪊㪍㪐 㪈㪍㪎㪃㪎㪊㪉 㪊㪎㪇㪃㪌㪍㪋 㪺㪄㪈 㩷㪬㫉㪹㪸㫅 㪈㪎㪎㪃㪇㪇㪎 㪈㪃㪌㪉㪉 㪉㪃㪏㪐㪈 㪈㪏㪈㪃㪋㪉㪇 㪈㪈㪃㪇㪋㪈 㪎㪃㪉㪇㪋 㪈㪃㪏㪊㪌 㪈㪌㪃㪎㪋㪊 㪉㪃㪊㪈㪏 㪉㪊㪃㪎㪌㪈 㪍㪈㪃㪏㪐㪉 㪉㪋㪊㪃㪊㪈㪉 㪺㪄㪉 㩷㪩㫌㫉㪸㫃 㪎㪈㪈 㪏㪃㪇㪌㪇 㪈㪉㪃㪍㪌㪈 㪉㪈㪃㪋㪈㪉 㪉㪇㪃㪌㪐㪍 㪈㪈㪃㪐㪇㪍 㪈㪈㪃㪈㪎㪏 㪈㪐㪃㪏㪎㪋 㪏㪃㪍㪍㪏 㪊㪊㪃㪍㪈㪏 㪈㪇㪌㪃㪏㪋㪇 㪈㪉㪎㪃㪉㪌㪉 㩿㪻㪀 㪧㪼㫉㪄㪚㪸㫇㫀㫋㪸㩷㪛㪼㫄㪸㫅㪻㩷㩿㪣㪚㪛㪀 㪻㪄㪈 㩷㪬㫉㪹㪸㫅 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪈㪇㪇 㪻㪄㪉㩷㪩㫌㫉㪸㫃 㪌㪇㪌㪇㪌㪇㪌㪇㪌㪇㪌㪇㪌㪇㪌㪇㪌㪇㪌㪇㪌㪇㪌㪇 㩿㪼㪀 㪛㫆㫄㪼㫊㫋㫀㪺㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪈㪎㪃㪎㪊㪍 㪌㪌㪌 㪐㪉㪉 㪈㪐㪃㪉㪈㪊 㪉㪃㪈㪊㪋 㪈㪃㪊㪈㪍 㪎㪋㪉 㪉㪃㪌㪍㪏 㪍㪍㪌 㪋㪃㪇㪌㪍 㪈㪈㪃㪋㪏㪈 㪊㪇㪃㪍㪐㪋 㪼㪄㪈 㩷㪬㫉㪹㪸㫅 㪈㪎㪃㪎㪇㪈 㪈㪌㪉 㪉㪏㪐 㪈㪏㪃㪈㪋㪉 㪈㪃㪈㪇㪋 㪎㪉㪇 㪈㪏㪋 㪈㪃㪌㪎㪋 㪉㪊㪉 㪉㪃㪊㪎㪌 㪍㪃㪈㪏㪐 㪉㪋㪃㪊㪊㪈 㪼㪄㪉 㩷㪩㫌㫉㪸㫃 㪊㪍 㪋㪇㪊 㪍㪊㪊 㪈㪃㪇㪎㪈 㪈㪃㪇㪊㪇 㪌㪐㪌 㪌㪌㪐 㪐㪐㪋 㪋㪊㪊 㪈㪃㪍㪏㪈 㪌㪃㪉㪐㪉 㪍㪃㪊㪍㪊 㩿㪽㪀 㪥㫆㫅㪄㪛㫆㫄㪼㫊㫋㫀㪺㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪉㪃㪈㪇㪇 㪇 㪇 㪉㪃㪈㪇㪇 㪉㪌㪇 㪉㪇㪇 㪇 㪊㪇㪇 㪇 㪈㪃㪏㪇㪇 㪉㪃㪌㪌㪇 㪋㪃㪍㪌㪇 㪽㪄㪈 㩷㪫㫆㫌㫉㫀㫑㫄㩷㪛㪼㫄㪸㫅㪻 㪍㪇㪇 㪇 㪇 㪍㪇㪇 㪌㪇 㪈㪇㪇 㪇 㪈㪇㪇 㪇 㪊㪇㪇 㪌㪌㪇 㪈㪃㪈㪌㪇 㪽㪄㪈㪄㪈 㩷㩷㩷㩷㩷㪥㫌㫄㪹㪼㫉㩷㫆㪽㩷㪫㫆㫌㫉㫀㫊㫋㫊㩷㩷㩿㪛㪸㫀㫃㫐㪀 㪉㪋㪇㪇 㪇 㪇 㪉㪃㪋㪇㪇 㪉㪇㪇 㪋㪇㪇 㪇 㪋㪇㪇 㪇 㪈㪉㪇㪇 㪉㪃㪉㪇㪇 㪋㪃㪍㪇㪇 㪽㪄㪈㪄㪉 㩷㩷㩷㩷㩷㪧㪼㫉㪄㪚㪸㫇㫀㫋㪸㩷㪛㪼㫄㪸㫅㪻㩷㩿㪣㪚㪛㪀 㪉㪌㪇 㪇 㪇 㪉㪌㪇 㪉㪌㪇 㪉㪌㪇 㪇 㪉㪌㪇 㪇 㪉㪌㪇 㪈㪃㪇㪇㪇 㪈㪃㪉㪌㪇 㪽㪄㪉 㪦㫋㪿㪼㫉㫊 㪈㪌㪇㪇 㪇 㪇 㪈㪃㪌㪇㪇 㪉㪇㪇 㪈㪇㪇 㪇 㪉㪇㪇 㪇 㪈㪌㪇㪇 㪉㪃㪇㪇㪇 㪊㪃㪌㪇㪇 㩿㪾㪀 㪥㪼㫋㩷㪮㪸㫋㪼㫉㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪈㪐㪃㪏㪊㪍 㪌㪌㪌 㪐㪉㪉 㪉㪈㪃㪊㪈㪊 㪉㪃㪊㪏㪋 㪈㪃㪌㪈㪍 㪎㪋㪉 㪉㪃㪏㪍㪏 㪍㪍㪌 㪌㪃㪏㪌㪍 㪈㪋㪃㪇㪊㪈 㪊㪌㪃㪊㪋㪋 㩿㪿㪀㪣㪼㪸㫂㪸㪾㪼㩷㪩㪸㫋㫀㫆㩷㩿㩼㪀 㪉㪋㪉㪇㪈㪇㪉㪊㪉㪋㪈㪍㪉㪇㪉㪏㪈㪇㪉㪏㪉㪌㪉㪋 㩿㫀㪀 㪛㪸㫐㩷㪘㫍㪼㫉㪸㪾㪼㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪉㪍㪃㪈㪇㪇 㪍㪐㪊 㪈㪃㪇㪉㪇 㪉㪎㪃㪏㪈㪊 㪊㪃㪈㪊㪎 㪈㪃㪏㪇㪋 㪐㪉㪏 㪊㪃㪐㪏㪊 㪎㪊㪍 㪏㪃㪈㪊㪊 㪈㪏㪃㪎㪉㪉 㪋㪍㪃㪌㪊㪌 㩿㫁㪀 㪪㪼㪸㫊㫆㫅㪸㫃㩷㪧㪼㪸㫂㩷㪝㪸㪺㫋㫆㫉 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㪈㪅㪊 㩿㫂㪀 㪛㪸㫐㩷㪤㪸㫏㫀㫄㫌㫄㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪊㪊㪃㪐㪊㪇 㪐㪇㪈 㪈㪃㪊㪉㪌 㪊㪍㪃㪈㪌㪎 㪋㪃㪇㪎㪏 㪉㪃㪊㪋㪍 㪈㪃㪉㪇㪍 㪌㪃㪈㪎㪏 㪐㪌㪎 㪈㪇㪃㪌㪎㪊 㪉㪋㪃㪊㪊㪏 㪍㪇㪃㪋㪐㪌 㪍㪇㩼 㪋㪇㩼 㪈㪇㪇㩼 Estimated daily maximum demand: 60,000m3/day. - Northern area is 24,000m3/day (40% of island), and 3 - Southern area is 36,000m /day (60% of island). 7 Demand and Frame work modified 㪪㫆㫌㫋㪿 㪥㫆㫉㫋㪿 㪩㫀㪹㪼㫀㫉㪸 㪪㪸㫆 㪪㫆㫌㫋㪿㩷㫋㫆㫋㪸㫃 㪪㪪㩷㪻㫆 㪪㪸㫅㫋㪸 㪪㪸㫅㫋㪸 㪪㪸㫆 㪥㫆㫉㫋㪿㩷㫋㫆㫋㪸㫃 㪫㫆㫋㪸㫃 㪻㪸㫋㪸㩷㫊㫆㫌㫉㪺㪼 㫀㫋㪼㫄㫊 㪧㫉㪸㫀㪸 㪫㪸㫉㫉㪸㪽㪸㫃 㪪㪸㫆㩷㪤㫀㪾㫌㪼㫃 㪞㫉㪸㫅㪻㪼 㪛㫆㫄㫀㫅㪾㫆㫊 㪤㫌㫅㪻㫆 㪚㪸㫋㪸㫉㫀㫅㪸 㪚㫉㫌㫑 㪣㫆㫌㫉㪼㫅㪺㫆 㪸㪅 㪫㪸㫉㪾㪼㫋㩷㪰㪼㪸㫉㩷㩿㪉㪇㪉㪇㪀㩷㪧㫆㫇㫌㫃㪸㫋㫀㫆㫅㩷㩿㫇㪼㫉㫊㫆㫅㪀 㪈㪌㪎㪃㪐㪎㪏 㪈㪈㪃㪌㪍㪉 㪈㪎㪃㪊㪊㪈 㪈㪏㪍㪃㪏㪎㪈 㪉㪏㪃㪌㪎㪎 㪉㪈㪃㪈㪊㪎 㪈㪊㪃㪈㪌㪎 㪌㪏㪃㪊㪉㪈 㪊㪍㪃㪈㪇㪉 㪈㪈㪃㪈㪌㪋 㪈㪍㪏㪃㪋㪋㪏 㪊㪌㪌㪃㪊㪈㪐 㪠㫅㫊㫋㫀㫋㫌㫋㪼㩷㪥㪸㪺㫀㫆㫅㪸㫃㩷㪻㪼㩷㪜㫊㫋㪸㫋㫀㫊㫋㫀㪺㪸㩷㩿㪠㪥㪜㪀 㪸㪈 㩷㩷㪄㩷㪬㫉㪹㪸㫅 㪈㪌㪌㪃㪍㪇㪐 㪈㪃㪎㪋㪍 㪉㪃㪎㪎㪉 㪈㪍㪇㪃㪈㪉㪎 㪐㪃㪎㪈㪎 㪎㪃㪊㪐㪏 㪈㪃㪎㪎㪍 㪈㪏㪃㪍㪍㪊 㪈㪋㪃㪋㪋㪈 㪉㪃㪉㪊㪈 㪌㪋㪃㪉㪉㪍 㪉㪈㪋㪃㪊㪌㪊 㪠㪥㪜 㪸㪉 㩷㩷㪄㩷㪩㫌㫉㪸㫃 㪉㪃㪊㪍㪐 㪐㪃㪏㪈㪍 㪈㪋㪃㪌㪌㪐 㪉㪍㪃㪎㪋㪋 㪈㪏㪃㪏㪍㪇 㪈㪊㪃㪎㪊㪐 㪈㪈㪃㪊㪏㪈 㪊㪐㪃㪍㪌㪏 㪉㪈㪃㪍㪍㪈 㪏㪃㪐㪉㪊 㪈㪈㪋㪃㪉㪉㪉 㪈㪋㪇㪃㪐㪍㪍 㪠㪥㪜 㪹㪅 㪦㫍㪼㫉㪸㫃㫃㩷㪧㫀㫇㪼㫃㫀㫅㪼㩷㪪㪼㫉㫍㫀㪺㪼㩷㪚㫆㫍㪼㫉㪸㪾㪼㩷㩿㩼㪀 㪐㪐㪅㪇㩼 㪏㪇㪅㪇㩼 㪏㪇㪅㪇㩼 㪐㪇㪅㪇㩼 㪎㪌㪅㪇㩼 㪍㪇㪅㪇㩼 㪏㪇㪅㪇㩼 㪏㪌㪅㪇㩼 㪎㪇㪅㪇㩼 㪪㫋㫌㪻㫐㩷㫋㪼㪸㫄 㫀㫅㩷㪉㪇㪇㪎 㪋㪎㪅㪊㩼 㪈㪇㪅㪐㩼 㪐㪅㪐㩼 㪍㪋㪅㪈㩼 㪌㪊㪅㪎㩼 㪈㪌㪅㪋㩼 㪋㪏㪅㪏㩼 㪎㪍㪅㪐㩼 㪋㪊㪅㪐㩼 㪠㪥㪜 㪺㪅 㪪㪼㫉㫍㪼㪻㩷㪧㫆㫇㫌㫃㪸㫋㫀㫆㫅 㪚㫆㫅㫅㪼㪺㫋㫀㫆㫅㩷㫉㪸㫋㫀㫆㩷㫀㫅㩷㪬㫉㪹㪸㫅㪃㩷㪻㪸㫋㪸㩷㪹㫐㩷㪠㪥㪞㪩㪟 㪈㪇㪇 㩼 㪺㪈㩷㪔㪸㩷㫏㩷㪹 㪦㫍㪼㫉㪸㫃㫃㩷㫇㫆㫇㫌㫃㪸㫋㫀㫆㫅㩷㫊㪼㫉㫍㪼㪻㩷㪹㫐㩷㫇㫀㫇㪼㩷㫅㪼㫋㫎㫆㫉㫂 㪈㪌㪍㪃㪊㪐㪏 㪐㪃㪉㪌㪇 㪈㪊㪃㪏㪍㪌 㪈㪎㪐㪃㪌㪈㪊 㪉㪌㪃㪎㪈㪐 㪈㪌㪃㪏㪌㪊 㪎㪃㪏㪐㪋 㪋㪍㪃㪍㪌㪎 㪊㪇㪃㪍㪏㪎 㪎㪃㪏㪇㪏 㪈㪊㪋㪃㪍㪈㪏 㪊㪈㪋㪃㪈㪊㪇 㪚㫆㫅㫅㪼㪺㫋㫀㫆㫅㩷㫉㪸㫋㫀㫆㩷㩿㪬㫉㪹㪸㫅㩷㪫㫆㫋㪸㫃㪀 㪺㪉㩷㪔㩷㪸㪈㩷㫏㩷㪚㪦㪥㪜㩷㩼 㩷㩷㪄㩷㪬㫉㪹㪸㫅㪃㩷㫎㫀㫋㪿㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪈㪌㪌㪃㪍㪇㪐 㪈㪃㪎㪋㪍 㪉㪃㪎㪎㪉 㪈㪍㪇㪃㪈㪉㪎 㪐㪃㪎㪈㪎 㪎㪃㪊㪐㪏 㪈㪃㪎㪎㪍 㪈㪏㪃㪍㪍㪊 㪈㪋㪃㪋㪋㪈 㪉㪃㪉㪊㪈 㪌㪋㪃㪉㪉㪍 㪉㪈㪋㪃㪊㪌㪊 㪈㪇㪇㩼 㪺㪊㩷㪔㩷㪺㪈㪄㪺㪉 㩷㩷㪄㩷㪩㫌㫉㪸㫃㪃㩷㫎㫀㫋㪿㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪎㪏㪐 㪎㪃㪌㪇㪋 㪈㪈㪃㪇㪐㪊 㪈㪐㪃㪊㪏㪍 㪈㪍㪃㪇㪇㪉 㪏㪃㪋㪌㪌 㪍㪃㪈㪈㪏 㪉㪎㪃㪐㪐㪋 㪈㪍㪃㪉㪋㪍 㪌㪃㪌㪎㪎 㪏㪇㪃㪊㪐㪉 㪐㪐㪃㪎㪎㪎 㪚㫆㫅㫅㪼㪺㫋㫀㫆㫅㩷㫉㪸㫋㫀㫆㩷㩿㪩㫌㫉㪸㫃㩷㪫㫆㫋㪸㫃㪀 㪺㪋㩷㪔㩷㪸㪄㪺㪈 㪦㫍㪼㫉㪸㫃㫃㩷㫇㫆㫇㫌㫃㪸㫋㫀㫆㫅㪃㩷㪥㪦㪫㩷㫊㪼㫉㫍㪼㪻㩷㪹㫐㩷㫇㫀㫇㪼 㪈㪃㪌㪏㪇 㪉㪃㪊㪈㪉 㪊㪃㪋㪍㪍 㪎㪃㪊㪌㪏 㪉㪃㪏㪌㪏 㪌㪃㪉㪏㪋 㪌㪃㪉㪍㪊 㪈㪈㪃㪍㪍㪋 㪌㪃㪋㪈㪌 㪊㪃㪊㪋㪍 㪊㪊㪃㪏㪊㪇 㪋㪈㪃㪈㪏㪐 㪎㪈㩼 㪺㪌㩷㪔㩷㪸㪈㪄㪺㪉 㩷㩷㪄㩷㪬㫉㪹㪸㫅㪃㩷㫎㫀㫋㪿㫆㫌㫋㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪺㪍㩷㪔㩷㪸㪉㪄㪺㪊 㩷㩷㪄㩷㪩㫌㫉㪸㫃㪃㩷㫎㫀㫋㪿㫆㫌㫋㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪈㪃㪌㪏㪇 㪉㪃㪊㪈㪉 㪊㪃㪋㪍㪍 㪎㪃㪊㪌㪏 㪉㪃㪏㪌㪏 㪌㪃㪉㪏㪋 㪌㪃㪉㪍㪊 㪈㪈㪃㪍㪍㪋 㪌㪃㪋㪈㪌 㪊㪃㪊㪋㪍 㪊㪊㪃㪏㪊㪇 㪋㪈㪃㪈㪏㪐 㪻㪅 㪧㪼㫉㪄㪚㪸㫇㫀㫋㪸㩷㪘㫍㪼㫉㪸㪾㪼㩷㪛㪼㫄㪸㫅㪻㩷㩿㫃㫀㫋㫋㪼㫉㪆㫇㪼㫉㫊㫆㫅㪆㪻㪸㫐㪀 㪻㪈 㩷㩷㪄㩷㪬㫉㪹㪸㫅㪃㩷㫎㫀㫋㪿㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪈㪌㪇 㪈㪌㪇 㪈㪌㪇 㪈㪌㪇 㪈㪌㪇 㪈㪌㪇 㪈㪌㪇 㪈㪌㪇 㪈㪌㪇 㪠㪥㪞㪩㪟 㪻㪉 㩷㩷㪄㩷㪩㫌㫉㪸㫃㪃㩷㫎㫀㫋㪿㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪏㪇 㪏㪇 㪏㪇 㪏㪇 㪏㪇 㪏㪇 㪏㪇 㪏㪇 㪏㪇 㪠㪥㪞㪩㪟 㪻㪊 㩷㩷㪄㩷㪬㫉㪹㪸㫅㪃㩷㫎㫀㫋㪿㫆㫌㫋㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪠㪥㪞㪩㪟 㪻㪋 㩷㩷㪄㩷㪩㫌㫉㪸㫃㪃㩷㫎㫀㫋㪿㫆㫌㫋㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪌㪇 㪠㪥㪞㪩㪟 㪼㪅 㪛㫆㫄㪼㫊㫋㫀㪺㩷㪻㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪼㪈㩷㪔㩷㪺㪉㩷㫏㩷㪻㪈 㩷㩷㪄㩷㪬㫉㪹㪸㫅㪃㩷㫎㫀㫋㪿㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪉㪊㪃㪊㪋㪈 㪉㪍㪉 㪋㪈㪍 㪉㪋㪃㪇㪈㪐 㪈㪋㪌㪏 㪈㪈㪈㪇 㪉㪍㪍 㪉㪎㪐㪐 㪉㪈㪍㪍 㪊㪊㪌 㪏㪃㪈㪊㪋 㪊㪉㪃㪈㪌㪊 㪼㪉㩷㪔㩷㪺㪊㩷㫏㩷㪻㪉 㩷㩷㪄㩷㪩㫌㫉㪸㫃㪃㩷㫎㫀㫋㪿㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪍㪊 㪍㪇㪇 㪏㪏㪎 㪈㪃㪌㪌㪈 㪈㪉㪏㪇 㪍㪎㪍 㪋㪏㪐 㪉㪉㪋㪇 㪈㪊㪇㪇 㪋㪋㪍 㪍㪃㪋㪊㪈 㪎㪃㪐㪏㪉 㪼㪊㩷㪔㩷㪺㪌㩷㫏㩷㪻㪊 㩷㩷㪄㩷㪬㫉㪹㪸㫅㪃㩷㫎㫀㫋㪿㫆㫌㫋㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪇 㪼㪋㩷㪔㩷㪺㪍㩷㫏㩷㪻㪋 㩷㩷㪄㩷㪩㫌㫉㪸㫃㪃㩷㫎㫀㫋㪿㫆㫌㫋㩷㫇㫀㫇㪼㩷㪺㫆㫅㫅㪼㪺㫋㫀㫆㫅 㪎㪐 㪈㪈㪍 㪈㪎㪊 㪊㪍㪏 㪈㪋㪊 㪉㪍㪋 㪉㪍㪊 㪌㪏㪊 㪉㪎㪈 㪈㪍㪎 㪈㪃㪍㪐㪉 㪉㪃㪇㪌㪐 㪘㪅㩷㪔㩷㪼㪈㪂㪼㪉㪂㪼㪊㪂㪼㪋 㪛㫆㫄㪼㫊㫋㫀㪺㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪉㪊㪃㪋㪏㪊 㪐㪎㪏 㪈㪃㪋㪎㪎 㪉㪌㪃㪐㪊㪏 㪉㪃㪏㪏㪈 㪉㪃㪇㪌㪇 㪈㪃㪇㪈㪐 㪌㪃㪍㪉㪉 㪊㪃㪎㪊㪎 㪐㪋㪏 㪈㪍㪃㪉㪌㪎 㪋㪉㪃㪈㪐㪌 㪽㪅㩷 㪫㫆㫌㫉㫀㫑㫄㩷㪛㪼㫄㪸㫅㪻 㪽㪈 㪥㫌㫄㪹㪼㫉㩷㫆㪽㩷㪙㪼㪻㫊㩷㩿㪹㪼㪻㫊㪀 㪉㪃㪋㪇㪇 㪈㪇㪇 㪈㪇㪇 㪉㪃㪍㪇㪇 㪉㪇㪇 㪈㪇㪇 㪇 㪌㪇㪇 㪉㪇㪇 㪇 㪈㪃㪇㪇㪇 㪊㪃㪍㪇㪇 㪤㪫㪠㪜㩿㪫㫆㫌㫉㫀㫊㫄㩷㪻㪼㫇㫋㪀㩷㪂㩷㪪㫋㫌㪻㫐㩷㫋㪼㪸㫄 㪽㪉 㪜㫏㫇㪼㪺㫋㪼㪻㩷㪘㫍㪼㫉㪸㪾㪼㩷㪦㪺㫌㫇㫇㪸㫅㪺㫐 㪎㪇㩼 㪎㪇㩼 㪎㪇㩼 㪎㪇㩼 㪎㪇㩼 㪎㪇㩼 㪎㪇㩼 㪎㪇㩼 㪎㪇㩼 㩷㪪㫋㫌㪻㫐㩷㫋㪼㪸㫄 㪽㪊 㪧㪼㫉㪄㪚㪸㫇㫀㫋㪸㩷㪛㪼㫄㪸㫅㪻㩷㩿㫃㫀㫋㫋㪼㫉㪆㪹㪼㪻㪆㪻㪸㫐㪀 㪊㪇㪇 㪊㪇㪇 㪊㪇㪇 㪊㪇㪇 㪊㪇㪇 㪊㪇㪇 㪊㪇㪇 㪊㪇㪇 㪊㪇㪇 㪤㪫㪠㪜㩿㪫㫆㫌㫉㫀㫊㫄㩷㪻㪼㫇㫋㪀㩷㪂㩷㪪㫋㫌㪻㫐㩷㫋㪼㪸㫄 㪽㩷㪔㩷㪽㪈㩷㫏㩷㪽㪉㩷㫏㩷㪽㪊 㪫㫆㫌㫉㫀㫊㫄㩷㪪㫌㪹㩷㫋㫆㫋㪸㫃㩷㩿㫄㪊㪆㪻㪀 㪌㪇㪋 㪉㪈 㪉㪈 㪌㪋㪍 㪋㪉 㪉㪈 㪇 㪈㪇㪌 㪋㪉 㪇 㪉㪈㪇 㪎㪌㪍 㪾㪅㩷㪠㫅㪻㫌㫊㫋㫉㫀㪼㫊㪃㩷㫆㪽㪽㫀㪺㪼㪃㩷㪿㫆㫊㫇㫀㫋㪸㫃㪃㩷㫆㫋㪿㪼㫉㫊㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪊㪃㪇㪇㪇 㪇 㪌㪇 㪊㪃㪇㪌㪇 㪌㪇 㪈㪇㪇 㪇 㪌㪇㪇 㪈㪇㪇 㪇 㪎㪌㪇 㪊㪃㪏㪇㪇 㪤㪫㪠㪜㩿㪠㫅㪻㫌㫊㫋㫉㫐㩷㪻㪼㫇㫋㪀㩷㪂㩷㪪㫋㫌㪻㫐㩷㫋㪼㪸㫄 㪙㩷㪔㩷㪽㩷㪂㩷㪾 㪥㫆㫅㪄㪛㫆㫄㪼㫊㫋㫀㪺㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪊㪃㪌㪇㪋 㪉㪈 㪎㪈 㪊㪃㪌㪐㪍 㪐㪉 㪈㪉㪈 㪇 㪍㪇㪌 㪈㪋㪉 㪇 㪐㪍㪇 㪋㪃㪌㪌㪍 㪚㩷㪔㩷㪘㩷㪂㩷㪙 㪫㫆㫋㪸㫃㩷㪥㪼㫋㩷㪮㪸㫋㪼㫉㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪉㪍㪃㪐㪏㪎 㪐㪐㪐 㪈㪃㪌㪋㪏 㪉㪐㪃㪌㪊㪋 㪉㪃㪐㪎㪊 㪉㪃㪈㪎㪈 㪈㪃㪇㪈㪐 㪍㪃㪉㪉㪎 㪊㪃㪏㪎㪐 㪐㪋㪏 㪈㪎㪃㪉㪈㪎 㪋㪍㪃㪎㪌㪈 㪿㪅 㪣㪼㪸㫂㪸㪾㪼㩷㪩㪸㫋㫀㫆㩷㩿㩼㪀 㪈㪌 㪈㪌 㪏 㪈㪌 㪈㪇 㪈㪌 㪈㪌 㪈㪌 㪏 㪈㪌 㪪㫋㫌㪻㫐㩷㫋㪼㪸㫄 㪥㪦㪮㪉㪋㪉㪇㪈㪇 㪉㪋㪈㪍㪉㪇㪉㪏㪉㪏㪈㪇 㪉㪋㪪㪘㪘㪪 㪛㩷㪔㩷㪚㩷㪆㩿㪈㪇㪇㩼㩷㪄㩷㪿㩼㪀 㪛㪸㫐㩷㪘㫍㪼㫉㪸㪾㪼㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪊㪈㪃㪎㪌㪇 㪈㪃㪈㪎㪌 㪈㪃㪍㪏㪉 㪊㪋㪃㪍㪇㪎 㪊㪃㪋㪐㪎 㪉㪃㪋㪈㪊 㪈㪃㪈㪐㪐 㪎㪃㪊㪉㪍 㪋㪃㪌㪍㪊 㪈㪃㪇㪊㪈 㪉㪇㪃㪇㪉㪏 㪌㪋㪃㪍㪊㪌 㫀㪅 㪪㪼㪸㫊㫆㫅㪸㫃㩷㪧㪼㪸㫂㩷㪝㪸㪺㫋㫆㫉㩷㩿㪫㫆㫌㫉㫀㫊㫄㪀 㪈㪅㪋 㪈㪅㪋 㪈㪅㪋 㪈㪅㪋 㪈㪅㪋 㪈㪅㪋 㪈㪅㪋 㪈㪅㪋 㪈㪅㪋 㪪㫋㫌㪻㫐㩷㫋㪼㪸㫄 㫁㪅 㪽㩷㫏㩷㩿㫀㪄㪈㪀㩷㪆㩷㩿㪈㪇㪇㩼㪄㪿㩼㪀 㪪㪼㪸㫊㫆㫅㪸㫃㩷㪘㪻㪻㫀㫋㫀㫆㫅㪸㫃㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪉㪊㪎 㪈㪇 㪐 㪉㪌㪍 㪉㪇 㪐 㪇 㪋㪐 㪉㪇 㪇 㪐㪏 㪊㪌㪋 㪜㩷㪔㩷㪛㩷㪂㩷㫁 㪛㪸㫀㫃㫐㩷㪤㪸㫏㫀㫄㫌㫄㩷㪛㪼㫄㪸㫅㪻㩷㩿㫄㪊㪆㪻㪸㫐㪀 㪊㪈㪃㪐㪏㪎 㪈㪃㪈㪏㪌 㪈㪃㪍㪐㪈 㪊㪋㪃㪏㪍㪊 㪊㪃㪌㪈㪎 㪉㪃㪋㪉㪉 㪈㪃㪈㪐㪐 㪎㪃㪊㪎㪌 㪋㪃㪌㪏㪊 㪈㪃㪇㪊㪈 㪉㪇㪃㪈㪉㪍㪌 㪋㪃㪐㪐㪇 㪌㪏㩼 㪉㩼 㪊㩼 㪍㪊㩼 㪍㩼 㪋㩼 㪉㩼 㪈㪊㩼 㪏㩼 㪉㩼 㪊㪎㩼 㪈㪇㪇㩼 㪉㪅㩷㪜㫏㫀㫊㫋㫀㫅㪾㩷㫇㫃㪸㫅㫋㪃㩷㫀㫅㪺㫃㫌㪻㫀㫅㪾㩷㫇㫃㪸㫅㫅㪼㪻㩷㫇㫃㪸㫅㫋 㪜㫏㫀㫊㫋㫀㫅㪾㩷㪛㪼㫊㪸㫃㫀㫅㪸㫋㫀㫆㫅㩷㪧㫃㪸㫅㫋 㪌㪃㪇㪇㪇 㩿㪧㪸㫃㫄㪸㫉㪼㫁㫆㪀 㪌㪃㪇㪇㪇 㪌㪇㪇 㪌㪇㪇 㪌㪃㪌㪇㪇 㪧㫃㪸㫅㫅㪼㪻㩷㫇㫃㪸㫅㫋 㩿㪘㪺㪿㪸㪻㪸㩷㪧㫆㫅㫋㪸㪀 㪹㫐㩷㪪㫇㪸㫅㫀㫊㪿㩷㪽㫌㫅㪻 㪌㪃㪇㪇㪇 㩿㪧㪸㫃㫄㪸㫉㪼㫁㫆㪀 㪌㪃㪇㪇㪇 㪇 㪌㪃㪇㪇㪇 㪹㫐㩷㪮㫆㫉㫃㪻㩷㪙㪸㫅㫂㩷㪽㫌㫅㪻 㪌㪃㪇㪇㪇 㩿㪧㪸㫃㫄㪸㫉㪼㫁㫆㪀 㪌㪃㪇㪇㪇 㪇 㪌㪃㪇㪇㪇 㪫㫆㫋㪸㫃 㪈㪌㪃㪇㪇㪇 㪌㪇㪇 㪈㪌㪃㪌㪇㪇 㪊㪅㩷㪥㪼㪺㪼㫊㫊㪸㫉㫐㩷㪸㪻㪻㫀㫋㫀㫆㫅㪸㫃㩷㫇㫃㪸㫅㫋㩷㩿㪈㪄㪉㪀 㪛㪼㫋㪸㫀㫃㩷㪽㫀㪾㫌㫉㪼㩷㩿㫄㪊㪆㪻㪀 㪈㪐㪃㪏㪍㪊 㪈㪐㪃㪍㪉㪍 㪊㪐㪃㪋㪐㪇 㪩㫆㫌㫅㪻㩷㪽㫀㪾㫌㫉㪼㩷㩿㫄㪊㪆㪻㪀 㪉㪇㪃㪇㪇㪇 㪉㪇㪃㪇㪇㪇 㪋㪇㪃㪇㪇㪇 Estimated daily maximum demand: 55,000m3/day. - Northern area is 20,000m3/day (36% of island), and 3 - Southern area is 35,000m /day (64% of island). 8 System Development Approach modification ¾ Served population and its distribution ¾ Natural condition and Power supply condition ¾ Construction cost and operation