List of Schemes
Total Page:16
File Type:pdf, Size:1020Kb
List of Schemes This document lists some minor road and traffic construction schemes within Warwickshire. It is not a comprehensive list of all schemes. For information on other highway and traffic projects please follow the links on our webpage. We cannot guarantee that the information contained in this list is complete and up to date; it is subject to change and is provided as a general guide only. It is not intended to be a substitute for conducting a property search. For advice and assistance on conducting a search against a specific property please visit: www.warwickshire.gov.uk/highwaysearches So far as is permissible by law, Warwickshire County Council will not accept any liability for any claim, loss, damage or inconvenience arising out of or in connection with the use of this information. Should you have any queries relating to the schemes listed here then please contact Design Services via 01926 410410. Last updated: 11/05/2021 Start Date of End date of Works Promoter Reference Street Locality Town Works Description Works Works PC020MODKINTON01-TTRO-02 DASSETT ROAD BURTON DASSETT 17-May-21 31-May-21 PC020MODKINTON01-TTRO-02 DASSETT ROAD BURTON DASSETT 17-May-21 31-May-21 STRATFORD-UPON- PC02072463778 KNIGHTS LANE TIDDINGTON AVON 20-Jun-21 29-Oct-21 STRATFORD-UPON- PC02072463778 KNIGHTS LANE TIDDINGTON AVON 20-Jun-21 29-Oct-21 PC020GLASSHSE-LEYES-DD LEYES LANE KENILWORTH New Traffic Signals at Junction & Toucan Crossing 30-Sep-21 30-May-22 PC020GLASSHSE-DENEWOOD DENEWOOD WAY KENILWORTH S278 New Footway 30-Sep-21 30-May-22 PC020GLASSHSE-RAWNSLEYDR RAWNSLEY DRIVE KENILWORTH New Traffic Signals at Junction & Toucan Crossing 30-Sep-21 30-May-22 PC020GLASSHSE-DENCERDR DENCER DRIVE KENILWORTH New Traffic Signals at Junction & Toucan Crossing 30-Sep-21 30-May-22 PC020GLASSHSE-LEYES-GHL LEYES LANE KENILWORTH New dropped kerbs and paving 30-Sep-21 30-May-22 S278 New 2.5m footway from Glasshouse Lane into PC020GLASSHSE-EDWARDSGR EDWARDS GROVE KENILWORTH Edwards Grove on nothern side of carraigeway 30-Sep-21 30-May-22 PC020GLASSHSE-LEYES-W LEYES LANE KENILWORTH S278 New shared westbound Footway/Cycleway 30-Sep-21 30-May-22 S278 New Toucan Crossings, School entrance and PC020GLASSHOUSELANE GLASSHOUSE LANE KENILWORTH exit, footway and cycleway improvements 30-Sep-21 30-May-22 PC020GALLOWS-STRAWBERRY1 GALLOWS HILL WARWICK S278 Junction Improvement/Signalisation 30-Sep-21 29-Jun-22 WARWICK TECHNOLOGY PC020GALLOWS-STRAWBERRY2 PARK WARWICK S278 Junction Improvement/Signalisation 30-Sep-21 29-Jun-22 Construction of new roundabout. Work to include carriageway widening, footway construction, PC020_GLH_BANBURYNORTH BANBURY ROAD LIGHTHORNE drainage and street lighting. 10-Jan-22 30-Jun-22 New entrance at Greys Mallory Police Station and PC020EUROPASOUTH EUROPA WAY WARWICK dualling of Europa Way to William Freeman Way 01-Jan-22 30-Aug-22 BISHOPS New traffic signal junction at The Asps development PC020EUROPABANBURY BANBURY ROAD TACHBROOK site 31-Aug-21 31-Dec-22 Junction improvements to include new traffic signals and new right turn lanes from Ashlawn Road onto PC020B4429BARBY_ASHJCT03 BARBY ROAD CALDECOTT RUGBY Barby Road and Onley Road 01-Nov-21 04-Mar-22 Junction improvements to include new traffic signals and new right turn lanes from Ashlawn Road onto PC020B4429BARBY_ASHJCT02 ASHLAWN ROAD PADDOX RUGBY Barby Road and Onley Road 01-Nov-21 04-Mar-22 Junction improvements to include new traffic signals and new right turn lanes from Ashlawn Road onto PC020B4429BARBY_ASHJCT04 ONLEY LANE RUGBY Barby Road and Onley Road 01-Nov-21 04-Mar-22 Junction improvements to include new traffic signals and new right turn lanes from Ashlawn Road onto PC020B4429BARBY_ASHJCT01 ASHLAWN ROAD CALDECOTT RUGBY Barby Road and Onley Road 01-Nov-21 04-Mar-22 PC02090366817 JUBILEE STREET NEW BILTON RUGBY New Roundabout Construction 31-May-21 01-Dec-21 PC02085697272 LAWFORD ROAD NEW BILTON RUGBY New Roundabout Construction 31-May-21 01-Dec-21 PC02092904032 PINFOLD STREET NEW BILTON RUGBY New Roundabout Construction 31-May-21 01-Dec-21 PC02059732529 NEWLAND STREET NEW BILTON RUGBY New Roundabout Construction 31-May-21 01-Dec-21 PC02095143998 ADDISON ROAD NEW BILTON RUGBY New carriageway construction 31-Aug-21 01-Mar-22 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02078696011 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02051547039 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02083346456 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02025552051 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02075575152 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 60metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02066644096 ST GEORGES WAY NUNEATON 18:00) 01-Oct-21 31-Oct-21 To establish a shared cycleway/footpath connecting established cycles routes leading to Nuneaton Town Centre. A 2-way traffic management system will be set-up on a 24h a basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02059352632 ST GEORGES WAY NUNEATON 18:00). 01-Oct-21 31-Oct-21 To establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town PC02027143171 ST GEORGES WAY NUNEATON Centre. 28-May-21 25-Jun-21 Narrowing the carriageway with a new kerbline to provide shared use footway / cycleway (Segregated), along most of the route. Overlay of existing carriageway. Removal & reinstatement of pedestrian refuges. Tree planting. Plans available here PC02060837518 THE LONG SHOOT NUNEATON https://www.warwickshire.gov.uk/longshootcycling 03-Jan-22 30-Apr-22 3 segments of remedial works to be carried out along A426, Crick Road, Rugby which can be identifiable PC020A426_CRICKRD_REM CRICK ROAD HILLMORTON RUGBY TM drawings. 14-Jun-21 25-Jun-21 STRATFORD-UPON- Carriageway widening, junction improvements to PC020B4632CLFLN_JCT02 CLIFFORD ROAD AVON include speed reduction measures 04-Oct-21 24-Dec-21 CLIFFORD Carriageway widening, junction improvements to PC020B4632CLFLN_JCT01 CLIFFORD ROAD CHAMBERS include speed reduction measures 04-Oct-21 24-Dec-21 Road widening to 5.5m and footway construction STRATFORD-UPON- works as part of the Taylor Wimpey / Spitfire Homes PC02072463778 KNIGHTS LANE TIDDINGTON AVON housing development. 20-Jun-21 29-Oct-21 Realign junction,kerbs and upgrade traffic lights PC02009563842 HEATH END ROAD NUNEATON system at Tenlons Road/Heath End Road. 21-Jul-21 27-Sep-21 PC020MODKINTON01-TTRO-RV BANBURY ROAD BURTON DASSETT Carriageway Surfacing 17-May-21 31-May-21 Carriageway widening and upgrade of existing traffic PC020A426-B4429DUNCOW04 COVENTRY ROAD THE GREEN DUNCHURCH signals infrastructure 07-Jun-21 10-Sep-21 Carriageway widening and upgrade of existing traffic PC020A426-B4429DUNCOW03 SOUTHAM ROAD DUNCHURCH signals infrastructure 07-Jun-21 10-Sep-21 Carriageway widening and upgrade of existing traffic PC020A426-B4429DUNCOW02 DAVENTRY ROAD THE SQUARE DUNCHURCH signals infrastructure 07-Jun-21 10-Sep-21 Carriageway widening and upgrade of existing traffic PC020A426-B4429DUNCOW01 RUGBY ROAD DUNCHURCH signals infrastructure 07-Jun-21 10-Sep-21 Section 278 Works including carriageway widening, overlay existing carriageway, construction of new STRATFORD-UPON- footway, installation of new kerbdrain units, changes PC020SEVENMEADOWS SEVEN MEADOWS ROAD AVON to roundabout with Shipston Road. 30-May-21 01-Feb-22 Section 278 Works including carriageway widening, overlay existing carriageway, construction of new footway, installation of new kerbdrain units, changes STRATFORD-UPON- to roundabouts with Shipston Road and Seven PC020TRINITYWAY TRINITY WAY AVON Meadows Road. 30-May-21 01-Feb-22 Section 278 Works including carriageway widening, overlay existing carriageway, removal of existing retaining wall, construction of new footway, construction of new sheet piled retaining wall, installation of new kerbdrain units, changes to STRATFORD-UPON- roundabouts with Shipston Road and Seven PC020CLIFFORDLANE CLIFFORD ROAD AVON Meadows Road. 30-May-21 01-Feb-22 Section 278 Works including carriageway widening, overlay existing carriageway, construction of new footway, installation of new kerbdrain units, changes STRATFORD-UPON- to roundabouts with Shipston Road and Seven PC020SHIPSTONRD SHIPSTON ROAD AVON Meadows Road.