List of Schemes

This document lists some minor road and traffic construction schemes within . It is not a comprehensive list of all schemes. For information on other highway and traffic projects please follow the links on our webpage.

We cannot guarantee that the information contained in this list is complete and up to date; it is subject to change and is provided as a general guide only. It is not intended to be a substitute for conducting a property search. For advice and assistance on conducting a search against a specific property please visit: www.warwickshire.gov.uk/highwaysearches

So far as is permissible by law, Warwickshire County Council will not accept any liability for any claim, loss, damage or inconvenience arising out of or in connection with the use of this information.

Should you have any queries relating to the schemes listed here then please contact Design Services via 01926 410410. Last updated: 11/05/2021

Start Date of End date of Works Promoter Reference Street Locality Town Works Description Works Works PC020MODKINTON01-TTRO-02 DASSETT ROAD BURTON DASSETT 17-May-21 31-May-21 PC020MODKINTON01-TTRO-02 DASSETT ROAD BURTON DASSETT 17-May-21 31-May-21 STRATFORD-UPON- PC02072463778 KNIGHTS LANE TIDDINGTON AVON 20-Jun-21 29-Oct-21 STRATFORD-UPON- PC02072463778 KNIGHTS LANE TIDDINGTON AVON 20-Jun-21 29-Oct-21 PC020GLASSHSE-LEYES-DD LEYES LANE New Traffic Signals at Junction & Toucan Crossing 30-Sep-21 30-May-22 PC020GLASSHSE-DENEWOOD DENEWOOD WAY KENILWORTH S278 New Footway 30-Sep-21 30-May-22 PC020GLASSHSE-RAWNSLEYDR RAWNSLEY DRIVE KENILWORTH New Traffic Signals at Junction & Toucan Crossing 30-Sep-21 30-May-22 PC020GLASSHSE-DENCERDR DENCER DRIVE KENILWORTH New Traffic Signals at Junction & Toucan Crossing 30-Sep-21 30-May-22 PC020GLASSHSE-LEYES-GHL LEYES LANE KENILWORTH New dropped kerbs and paving 30-Sep-21 30-May-22 S278 New 2.5m footway from Glasshouse Lane into PC020GLASSHSE-EDWARDSGR EDWARDS GROVE KENILWORTH Edwards Grove on nothern side of carraigeway 30-Sep-21 30-May-22 PC020GLASSHSE-LEYES-W LEYES LANE KENILWORTH S278 New shared westbound Footway/Cycleway 30-Sep-21 30-May-22 S278 New Toucan Crossings, School entrance and PC020GLASSHOUSELANE GLASSHOUSE LANE KENILWORTH exit, footway and cycleway improvements 30-Sep-21 30-May-22 PC020GALLOWS-STRAWBERRY1 GALLOWS HILL S278 Junction Improvement/Signalisation 30-Sep-21 29-Jun-22 WARWICK TECHNOLOGY PC020GALLOWS-STRAWBERRY2 PARK WARWICK S278 Junction Improvement/Signalisation 30-Sep-21 29-Jun-22 Construction of new roundabout. Work to include carriageway widening, footway construction, PC020_GLH_BANBURYNORTH BANBURY ROAD LIGHTHORNE drainage and street lighting. 10-Jan-22 30-Jun-22 New entrance at Greys Mallory Police Station and PC020EUROPASOUTH EUROPA WAY WARWICK dualling of Europa Way to William Freeman Way 01-Jan-22 30-Aug-22 BISHOPS New traffic signal junction at The Asps development PC020EUROPABANBURY BANBURY ROAD TACHBROOK site 31-Aug-21 31-Dec-22 Junction improvements to include new traffic signals and new right turn lanes from Ashlawn Road onto PC020B4429BARBY_ASHJCT03 BARBY ROAD CALDECOTT RUGBY Barby Road and Onley Road 01-Nov-21 04-Mar-22 Junction improvements to include new traffic signals and new right turn lanes from Ashlawn Road onto PC020B4429BARBY_ASHJCT02 ASHLAWN ROAD PADDOX RUGBY Barby Road and Onley Road 01-Nov-21 04-Mar-22 Junction improvements to include new traffic signals and new right turn lanes from Ashlawn Road onto PC020B4429BARBY_ASHJCT04 ONLEY LANE RUGBY Barby Road and Onley Road 01-Nov-21 04-Mar-22 Junction improvements to include new traffic signals and new right turn lanes from Ashlawn Road onto PC020B4429BARBY_ASHJCT01 ASHLAWN ROAD CALDECOTT RUGBY Barby Road and Onley Road 01-Nov-21 04-Mar-22 PC02090366817 JUBILEE STREET NEW BILTON RUGBY New Roundabout Construction 31-May-21 01-Dec-21 PC02085697272 LAWFORD ROAD NEW BILTON RUGBY New Roundabout Construction 31-May-21 01-Dec-21 PC02092904032 PINFOLD STREET NEW BILTON RUGBY New Roundabout Construction 31-May-21 01-Dec-21 PC02059732529 NEWLAND STREET NEW BILTON RUGBY New Roundabout Construction 31-May-21 01-Dec-21 PC02095143998 ADDISON ROAD NEW BILTON RUGBY New carriageway construction 31-Aug-21 01-Mar-22 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02078696011 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02051547039 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02083346456 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02025552051 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 150metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02075575152 ST GEORGES WAY NUNEATON 20:00 10-Oct-21 07-Nov-21 Footway, Carriageway, Verge, Cycleway, New works to establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town Centre. A 60metre 2-way traffic management will be set up on a 24hrs a day basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02066644096 ST GEORGES WAY NUNEATON 18:00) 01-Oct-21 31-Oct-21 To establish a shared cycleway/footpath connecting established cycles routes leading to Nuneaton Town Centre. A 2-way traffic management system will be set-up on a 24h a basis with the lights being managed at peak times (07:00 to 09:30 and 15:00 to PC02059352632 ST GEORGES WAY NUNEATON 18:00). 01-Oct-21 31-Oct-21 To establish a shared cycleway/footpath connecting established cycle routes leading to Nuneaton Town PC02027143171 ST GEORGES WAY NUNEATON Centre. 28-May-21 25-Jun-21 Narrowing the carriageway with a new kerbline to provide shared use footway / cycleway (Segregated), along most of the route. Overlay of existing carriageway. Removal & reinstatement of pedestrian refuges. Tree planting. Plans available here PC02060837518 THE LONG SHOOT NUNEATON https://www.warwickshire.gov.uk/longshootcycling 03-Jan-22 30-Apr-22 3 segments of remedial works to be carried out along A426, Crick Road, Rugby which can be identifiable PC020A426_CRICKRD_REM CRICK ROAD HILLMORTON RUGBY TM drawings. 14-Jun-21 25-Jun-21 STRATFORD-UPON- Carriageway widening, junction improvements to PC020B4632CLFLN_JCT02 CLIFFORD ROAD AVON include speed reduction measures 04-Oct-21 24-Dec-21 CLIFFORD Carriageway widening, junction improvements to PC020B4632CLFLN_JCT01 CLIFFORD ROAD CHAMBERS include speed reduction measures 04-Oct-21 24-Dec-21 Road widening to 5.5m and footway construction STRATFORD-UPON- works as part of the Taylor Wimpey / Spitfire Homes PC02072463778 KNIGHTS LANE TIDDINGTON AVON housing development. 20-Jun-21 29-Oct-21 Realign junction,kerbs and upgrade traffic lights PC02009563842 HEATH END ROAD NUNEATON system at Tenlons Road/Heath End Road. 21-Jul-21 27-Sep-21 PC020MODKINTON01-TTRO-RV BANBURY ROAD BURTON DASSETT Carriageway Surfacing 17-May-21 31-May-21 Carriageway widening and upgrade of existing traffic PC020A426-B4429DUNCOW04 COVENTRY ROAD THE GREEN DUNCHURCH signals infrastructure 07-Jun-21 10-Sep-21 Carriageway widening and upgrade of existing traffic PC020A426-B4429DUNCOW03 ROAD DUNCHURCH signals infrastructure 07-Jun-21 10-Sep-21 Carriageway widening and upgrade of existing traffic PC020A426-B4429DUNCOW02 ROAD THE SQUARE DUNCHURCH signals infrastructure 07-Jun-21 10-Sep-21 Carriageway widening and upgrade of existing traffic PC020A426-B4429DUNCOW01 RUGBY ROAD DUNCHURCH signals infrastructure 07-Jun-21 10-Sep-21 Section 278 Works including carriageway widening, overlay existing carriageway, construction of new STRATFORD-UPON- footway, installation of new kerbdrain units, changes PC020SEVENMEADOWS SEVEN MEADOWS ROAD AVON to roundabout with Shipston Road. 30-May-21 01-Feb-22 Section 278 Works including carriageway widening, overlay existing carriageway, construction of new footway, installation of new kerbdrain units, changes STRATFORD-UPON- to roundabouts with Shipston Road and Seven PC020TRINITYWAY TRINITY WAY AVON Meadows Road. 30-May-21 01-Feb-22 Section 278 Works including carriageway widening, overlay existing carriageway, removal of existing retaining wall, construction of new footway, construction of new sheet piled retaining wall, installation of new kerbdrain units, changes to STRATFORD-UPON- roundabouts with Shipston Road and Seven PC020CLIFFORDLANE CLIFFORD ROAD AVON Meadows Road. 30-May-21 01-Feb-22 Section 278 Works including carriageway widening, overlay existing carriageway, construction of new footway, installation of new kerbdrain units, changes STRATFORD-UPON- to roundabouts with Shipston Road and Seven PC020SHIPSTONRD SHIPSTON ROAD AVON Meadows Road. 30-May-21 01-Feb-22 Construction of new roundabout to provide access to STRATFORD-UPON- the new Miller Homes / Taylor Wimpey housing PC02044147835 PARTRIDGE ROAD WEAVERS GREEN AVON development. 09-Jun-21 01-Dec-21 Construction of a ghost island right turn lane to provide access to the new Bloor Homes / Gallagher PC02072327686 ROAD Estates housing development. 13-Jun-21 15-Oct-21 PC020COCKROBINRBT_4 RUGBY ROAD DUNCHURCH New crossing facilities on Cock Robin Rbt (S278) 25-Oct-21 28-Jan-22 PC020COCKROBINRBT_3 RUGBY ROAD COCK ROBIN ISLAND DUNCHURCH New crossing facilities on Cock Robin Rbt (S278) 25-Oct-21 28-Jan-22 PC020COCKROBINRBT-2 DUNCHURCH ROAD BILTON RUGBY New crossing facilities on Cock Robin Rbt (S278) 25-Oct-21 28-Jan-22 PC020COCKROBINRBT_1 ASHLAWN ROAD DUNCHURCH New crossing facilities on Cock Robin Rbt (S278) 25-Oct-21 28-Jan-22 Work at splitter island in connection with new traffic PC020GALLOWSHILL_LHF_01 EUROPA WAY WARWICK signal junction on Gallows Hill 06-Sep-21 13-May-22 Construction of new traffic-signal controlled PC020GALLOWSHILL_LHF_02 GALLOWS HILL WARWICK crossroads junction at development accesses 06-Sep-21 13-May-22 PC020-9-2-104-001-03 CHURCH ROAD ANSTY 12-Jul-21 03-Dec-21 PC020-9-2-104-001-02 MAIN ROAD ANSTY 12-Jul-21 03-Dec-21 PC020-9-2-104-001-01 BRINKLOW ROAD ANSTY 12-Jul-21 03-Dec-21 Construction of a new roundabout to provide a link STRATFORD-UPON- to the new Miller Homes / Taylor Wimpey housing PC02010547005 BISHOPTON LANE AVON development. 09-Jun-21 01-Dec-21 New 4 way traffic signalisation nand carriageway PC020_GLH_CHEST_HARB_04 HARBURY LANE CHESTERTON widening on all 4 approaches 06-Jun-21 03-Dec-21 BISHOPS New 4 way traffic signalisation nand carriageway PC020_GLH_CHEST_HARB_03 HARBURY LANE TACHBROOK widening on all 4 approaches 06-Jun-21 03-Dec-21 New 4 way traffic signalisation nand carriageway PC020_GLH_CHEST_HARB_02 FOSSE WAY HARBURY widening on all 4 approaches 06-Jun-21 03-Dec-21 New 4 way traffic signalisation nand carriageway PC020_GLH_CHEST_HARB_01 FOSSE WAY CHESTERTON widening on all 4 approaches 06-Jun-21 03-Dec-21 The works consist of the construction of a new signalised ghost right turn junction for the Callendar PC020CALLENDARFARM THE LONG SHOOT NUNEATON Farm development. 14-Jun-21 22-Oct-21 S278 works include constructing new bell mouth and right turn lane and pedestrian refuge island to serve the new development to the north of Road. The proposed junction is located 110m to the west from the roundabout of Bedworth Road and Severn Road. The works include carriageway, PC020BEDWORTHRD BEDWORTH ROAD BULKINGTON BEDWORTH footway and bus stop lay-by improvements. 16-May-21 05-Aug-21 S278 - New Ghost Right Turn Junction and PC020_GLH_VLLAGECENT_05 WINYATES ROAD LIGHTHORNE HEATH LIGHTHORNE Pedestrian / Cyclist toucan crossing facility 07-Jun-21 10-Jan-22 LIGHTHORNE S278 - new ghost right tun lane junction and PC020_GLH_VILLAGECENT_08 THE AVENUE HEATH pedestrian/cyclist toucan crossing facility 07-Jun-21 10-Jan-22 LIGHTHORNE S278 - New Ghost Right Turn Junction and PC020_GLH_VILLAGECENT_07 WILLOUGHBY PLACE BANBURY ROAD HEATH Pedestrian / Cyclist toucan crossing facility 07-Jun-21 10-Jan-22 LIGHTHORNE S278 - new ghost right tun lane junction and PC020_GLH_VILLAGECENT_06 CHESTNUT CLOSE BANBURY ROAD HEATH pedestrian/cyclist toucan crossing facility 07-Jun-21 10-Jan-22 S278 - New Ghost Right Turn Junction and PC020_GLH_VILLAGECENT_04 SOUTHAM CRESCENT LIGHTHORNE HEATH LIGHTHORNE Pedestrian / Cyclist toucan crossing facility 07-Jun-21 10-Jan-22 LIGHTHORNE S278 - New Ghost Right Turn Junction and PC020_GLH_VILLAGECENT_03 BRIDLE ROAD BANBURY ROAD HEATH Pedestrian / Cyclist toucan crossing facility 07-Jun-21 10-Jan-22 LIGHTHORNE S278 - New Ghost Right Turn Junction and PC020_GLH_VILLAGECENT_02 BIRDHAVEN CLOSE BANBURY ROAD HEATH Pedestrian / Cyclist toucan crossing facility 07-Jun-21 10-Jan-22 S278 - new ghost right turn lane junction and PC020_GLH_VILLAGECENT_01 BANBURY ROAD LIGHTHORNE pedestrian / cyclist toucan crossing facility 07-Jun-21 10-Jan-22 The works consist of improvement works to the existing southern footway at the junction of Arden Street to the junction of Windsor Street carpark. The existing footway will be improved into a shared footway cycleway. The realignment of the kerbline will mean resurfacing works are required along the Birmingham Road and Windsor Street. Further STRATFORD-UPON- information relating to the scheme will be provided PC020BIRMINGHAMRD_ BIRMINGHAM ROAD AVON once applying for the PA. 06-Sep-21 12-Nov-21 The works consist of the widening of the existing footway to enable it to be used as a STRATFORD-UPON- footway/cycleway. This includes kerbing and PC020BIRMINGHAMRD WINDSOR STREET AVON resurfacing works of the existing carriageway. 06-Sep-21 12-Nov-21 New traffic signal junction that connects Taylor Wimpey and Crest Nicholson development accesses. SHIPSTON-ON- Works include changes to road alignment, four PC02066583935 CAMPDEN ROAD STOUR controlled crossings, drainage works, etc. 06-Jun-21 10-Dec-21 STRATFORD-UPON- Construction of a ghost island right turn and access PC02048868417 ALCESTER ROAD AVON to the Bloor Homes Shottery housing development. 06-Jun-21 08-Oct-21 STRATFORD-UPON- PC02078421197 TOWNSEND ROAD TIDDINGTON AVON Surfacing and footway tie in works within bellmouth. 20-Jun-21 28-Oct-21 PC020MODKINTON01-TTRO-02 DASSETT ROAD BURTON DASSETT carriageway resurfacing 17-May-21 31-May-21 Traffic and pedestrian signals to be replaced and updated using ELV signal equipment to a PC02073898471 HEATH END ROAD NUNEATON configuration shown on attached drawing. 22-Jul-21 27-Aug-21 New kerb works to the entrance to Sargasso Lane PC02076606388 SARGASSO LANE BERMUDA NUNEATON access from Bermuda Road. 10-Jun-21 30-Jul-21 New kerb works to the entrance to Radley Drive PC02036171322 RADLEY DRIVE BERMUDA NUNEATON access from Bermuda Road. 27-Jun-21 22-Jul-21 New kerbs works to the entrance to Shillingstone PC02031785023 SHILLINGSTONE DRIVE NUNEATON Drive access from Tenlons Road. 15-Jul-21 18-Aug-21 New kerb works to the entrance to Hazell Way access PC02068829132 HAZELL WAY BERMUDA NUNEATON from Bermuda Road. 31-May-21 16-Jul-21 New kerb works to the entrance of Shilligstone Drive PC02051619609 SHILLINGSTONE DRIVE NUNEATON access from Bermuda Road. 24-Jun-21 15-Jul-21 New kerbs to the entrance of Tenlons Road access PC02014748779 TENLONS ROAD BERMUDA NUNEATON from Bermuda Road. 01-Aug-21 27-Aug-21 New kerb works to the entrance of Tenlons Road PC02006072004 TENLONS ROAD BERMUDA NUNEATON access from Heath End Road 08-Jul-21 13-Aug-21 New kerb works to the entrance to Hazell Way access PC02004812788 HAZELL WAY BERMUDA NUNEATON from Bermuda Road. 31-May-21 16-Jul-21 Realignment of Tenlons Road to accommodate new kerb works at Tenlons Road/Heath End Road, Tenlons Road/Shillingstone Rosd and Tenlons PC02093868858 TENLONS ROAD BERMUDA NUNEATON Road/Bermuda Road. 21-Jul-21 27-Sep-21 Reconfiguration and signalisation of A3400 STRATFORD-UPON- Bridgefoot / Swans Nest / B4086 Tiddington road PC02087413635 SHIPSTON ROAD AVON junction 31-Aug-21 01-Mar-22 Carriageway widening on A3400 Bridgeway to create left turn lane into A3400 Bridgefoot. Existing STRATFORD-UPON- pedestrian crossings at Bridgeway/Bridgefoot PC02012290460 BRIDGEWAY AVON junction to be upgraded. 31-Aug-21 01-Mar-22 Reconfiguration and signalisation of A3400 STRATFORD-UPON- Bridgefoot / Swans Nest / B4086 Tiddington road PC02065976839 SWANS NEST LANE AVON junction 31-Aug-21 01-Mar-22 Reconfiguration and signalisation of A3400 STRATFORD-UPON- Bridgefoot / Swans Nest / B4086 Tiddington road PC02034390012 TIDDINGTON ROAD AVON junction 31-Aug-21 01-Mar-22 i)Carriageway widening on A3400 Bridgeway to create left turn lane into A3400 Bridgefoot. Existing pedestrian crossings at Bridgeway/Bridgefoot junction to be upgraded. ii) Resurfacing across Clopton bridge. iii) Reconfiguration and signalisation of A3400 STRATFORD-UPON- Bridgefoot / Swans Nest / B4086 Tiddington road PC02000270337 BRIDGEFOOT AVON junction 31-Aug-21 01-Mar-22 To construct a new S278 entrance into garden centre CLIFFORD including road widening, footpaths and bus stop PC020B4632CAMPDENGARD CAMPDEN ROAD CHAMBERS provisions 27-Jun-21 01-Oct-21 Construction of a new roundabout as part of the Bloor Homes Shottery housing development. Works STRATFORD-UPON- include the replacement of the existing culvert PC02037996869 BORDON HILL AVON beneath the Evesham road. 03-Oct-21 27-Oct-22 Construction of new roundabout to provide access to new link road as part of the Bloor Homes housing STRATFORD-UPON- Shottery development. Works include replacement PC02068756600 LUDDINGTON ROAD AVON of existing culvert beneath Evesham Road. 03-Oct-21 27-Oct-22 Construction of new roundabout to provide access to new link road as part of the Bloor Homes housing STRATFORD-UPON- Shottery development. Works include replacement PC02032438863 EVESHAM ROAD AVON of existing culvert beneath Evesham Road. 03-Oct-21 27-Oct-22