Status of Major Projects from Previous
Total Page:16
File Type:pdf, Size:1020Kb
Delaware Valley Regional Planning Commission (DVRPC) Major Project Status Report State Transportation Improvement Program (STIP) for Pennsylvania (FY2013 - 2016) Federal regulations require that the STIP list major projects from the previous STIP and identify any significant delays in the planned implementation. The following is a list of major projects from the FY2011-14 STIP. MPMS# County Project Name Project Status The Signal Modernization Program is ongoing. Doylestown, Warminister, and Chestnut Hill East lines have been modernized. The Norristown and Regional Rail Signal Chestnut Hill West lines are under construction. 60255 SEPTA Modernization Program The Cynwyd line is in design. Implementation of the Positive Train Control (PTC) system is underway with completion scheduled in December 2015. The 2008-2011 Bus Purchase Program is SEPTA Bus Purchase Program - 60286 SEPTA complete. The 2012-2015 Bus Purchase Program 40' is included in MPMS #90512. The System Improvements program is currently active. SEPTA continues to make improvements to the information technology infrastructure. Design of the Route 101/102 Trolley Lines Positive Train Control (PTC) System is scheduled to begin in Fall of 2012. The Radio Narrowbanding project is 60557 SEPTA System Improvements currently underway with completion scheduled in 2013. The Route 13 Chester Avenue and Street Track projects are complete. Construction of the Girard Avenue Route 15 Trolley Trackage and Wire Relocation Project, which is part of PennDOT's I-95 Girard Avenue Interchange project, is underway. A vendor contract for the New Payment Fare Collection System/ New 60611 SEPTA Technologies project was awarded in November Payment Technologies 2011 and construction is underway. Elwyn to Wawa Rail This project is on the Illustrative Unfunded list as 60636 SEPTA Improvements funding is not available. MPMS# County Project Name Project Status The 33rd and Dauphin Bus Facility is currently in design with construction scheduled to begin in Fall of 2012. The Escalator Program, Primos Station, Ardmore Avenue and Wayne Junction Intermodal Transit and Regional Rail Facility projects are in construction. The 77183 SEPTA Station Program Cheltenham/Ogontz Bus Loop, Parkside Bus Loop, Olney Station (BSS), and Ryers Station projects have been completed. Additional station projects (Hatboro, Noble and Willow Grove) are on the Illustrative Unfunded list as funding is not available. Infrastructure Safety and This ongoing project is currently active, and is now 90515 SEPTA Renewal Program - part of MPMS #90497. Communication and Signals Infrastructure Safety and This ongoing project is currently active, and is now 90509 SEPTA Renewal Program - Building part of MPMS #90497. and Bridges Infrastructure Safety and This ongoing project is currently active, and is now 90528 SEPTA Renewal Program - Power part of MPMS #90497. This project is on the Illustrative Unfunded List as 12923 Bucks Bristol Road Extension funding is not available. This project is on the Illustrative Unfunded List as 12965 Bucks Lawn Avenue funding is not available. Geigel Hill Road Bridge Over 13167 Bucks This project was let for construction on 12/16/2010. Tinicum Creek I-95, PA Turnpike Interchange This project is currently active in the Final Design 13347 Bucks (TPK)- STAGE 1 phase This project is on the Illustrative Unfunded List as 13549 Bucks US 1 (Bridges) funding is not available. PA 413, New Rodgers Road 13576 Bucks This project was let for construction on 2/17/2011. Corridor Improvements 13611 Bucks Street Rd: Brstl- Wll Pnn This project has been completed. 13745 Bucks US 13, Bristol Pike (Signals) This project has been completed. Route 13/Bristol Pike, PA 413 This project currently active in Final Design and 47392 Bucks to Levittown Parkway scheduled to be let September 2012. Restoration US 202 Parkway, Pickertown 47395 Bucks This project is complete. Rd to PA 611 (Sec. 721) US 202 Parkway, PA 463 to 47396 Bucks This project was let 9/10/2009 Pickertown Rd (Sec. 711) This project is on the Illustrative Unfunded List as 49315 Bucks Portzer Road Connector funding is not available. MPMS# County Project Name Project Status PA 263, Old York Road Concrete This project is currently active in the Final 50633 Bucks Rehabilitation and Overlay Design phase. County Line Road Restoration This project is currently active in the Preliminary 50634 Bucks (M04)(3R) Engineering phase. US 202 Wetland Mitigation 50728 Bucks This project is complete. Section 700 This project is currently active in the Final 57619 Bucks Route 313 Corridor Improvements Design phase. 57626 Bucks Trenton Road This project is complete. This project is currently active in the Final 64779 Bucks County Line Road Widening Design, Utility, and Right of Way phases. This project has been dropped from the TIP mostly due to controversy surrounding any upgrading of roadway features. PennDOT 64780 Bucks Swamp Road Corridor maintenance will continue to deal with the condition of the roadway for the foreseeable future 69827 Bucks Street Road (Bridge) This project is complete. US 1 over PA 213 Maple Avenue 84086 Bucks This project was let 10/27/2011. Bridge Replacement Tyburn Road Bridges (1) Over This project currently in Final Design, 90197 Bucks Amtrak/Conrail scheduled for September 2012 letting. This project is currently active in the Final 93446 Bucks Route 1 Improvement Design phase. US 202, PA 252 to US 30 (Sec. This project is currently active in the Final 13945 Chester 300 Design) Design phase This project is complete. Infrastructure improvements may be identified and advanced 14484 Chester PA 41 Study if they are eligible improvements for the remaining earmarks. PA 100, Shoen Road to Gordon This project is currently active in the Final 14515 Chester Drive (02L) Design phase This project has had preliminary engineering US 30, Coatesville Downingtown 14532 Chester authorization, but is on the Illustrative Unfunded Bypass Reconstruction Design List as funding is not available for future phases. MPMS# County Project Name Project Status US 1 Expressway This project is on the Illustrative Unfunded List 14580 Chester Reconstruction as funding is not available. US 1 Expressway This project is on the Illustrative Unfunded List 14581 Chester Reconstruction as funding is not available. Chester Valley Trail (Sec 1/3) - 14663 Chester This project is complete. Phase 1 This project is on the Illustrative Unfunded List 14698 Chester US 422, Reconstruction (M2B) as funding is not available. US 202, Section 100 (ES1) - This project is currently active in the 15385 Chester Design Preliminary Engineering phase. US 422 Expressway This project is on the Illustrative Unfunded List 64220 Chester Reconstruction (M03) as funding is not available. US 422 Expressway 64222 Chester Reconstruction, Chester and This project was let 6/28/2012. Montgomery (M1A) US 202, Swedesford Road to PA 64494 Chester This project was let 12/9/2010. 29 (Section 320) US 202, Exton Bypass to Route This project is active in Final Design, expected 64498 Chester 29 (Section 330-Mainline) letting October 2012. This project has been deferred to later fiscal 70240 Chester US 30 Business years as funding is currently not available. Kenneth Square Closed Loop This project is active in Final Design with an 70241 Chester Signal System expected October 2012 let date. US 30, Coatesville Downingtown This project is on the Illustrative Unfunded List 84884 Chester Bypass (CWR-Western Section) as funding is not available. US 30, Coatesville Downingtown This project is on the Illustrative Unfunded List 87781 Chester Bypass (CER-Eastern Section) as funding is not available. This project is currently active in the Final 14747 Delaware US 322 Final Design Design phase. US 30, Lancaster Avenue Closed 14767 Delaware This project is complete. Loop Signals US 1, Baltimore Pike Interchange This project is currently active in the 15251 Delaware Improvements Preliminary Engineering phase. PA 452, Market Street Bridge This project is currently active in the Final 15406 Delaware Over Amtrak/SEPTA R-2 Rail Design phase. Line MPMS# County Project Name Project Status I-95/322/Conchester Hwy. This project is currently active in the 15477 Delaware Interchange/Impvts. (322) Preliminary Engineering phase. Baltimore Pike Closed Loop 57750 Delaware This project is complete. Signals Rt. 322/Comm Barry Bridge/I- 57780 Delaware This project is complete. 95 2nd St. Interchange Route 1, Upper Darby 68027 Delaware This project is complete. Township Closed Loop Signals South Creek Road Bridge Over This project is currently active in the 69665 Delaware Brandywine Creek Preliminary Engineering phase. US 322, Environmental This project currently active in the Final 69815 Delaware Mitigation (MIT) Design phase. US 322, US 1 to Featherbed This project currently active in the Right of 69816 Delaware Lane (Section 101) Way phase. US 322, Featherbed Lane to I- This project currently active in the Right of 69817 Delaware 95 (Section 102) Way phase. This project is on the Illustrative Unfunded List 79329 Delaware Bridgewater Road Extension as funding is not available. I-76 Ramps Phase 3, This project is on the Illustrative Unfunded List 16211 Montgomery Henderson/Gulph Rds. as funding is not available. Widening PA 611, Old York Road Over This project is currently active in the Final 16214 Montgomery SEPTA R3 Design phase. PA 73, Church Road This project is currently active in the 16334 Montgomery Intersection and Signal Preliminary Engineering phase. Improvements