A Senior Quantity Surveyor with Over 40 Years of Experience in Oil & Gas
Total Page:16
File Type:pdf, Size:1020Kb
QUALIFICATIONS ACInstCES HNC Building (with Quantities) Stockport College of Technology Senior Quantity Surveyor - Claims, Senior Cost Engineer, Contracts (1975) Administrator HNC (Supplementary) Economics of Industry CAREER SUMMARY Construction Law Stockport College of Technology A Senior Quantity Surveyor with over 40 years of experience in Oil & Gas, Power Generation and Transmission, Highways, Rail, Pharmaceutical, Civil Engineering, Airport, Building Construction, MEMBERSHIPS & ACCREDITATIONS Chemical Process, Nuclear and Water Industries. ACInstCES Skills include the following: Associate Member, Chartered Institute of Civil Benchmark Estimating Software and Roadworks Estimator Engineering Surveyors SAP 4.6/4.7 Cost Management Systems (BNFL/AZ/Siemens) ICEPAC/CATOBilling software (F&G) EMPLOYMENT HISTORY VAS Computer Billing and Cost Reporting software (BB) MS Office Professional February 2016 Apple Mac Programs 24+ years’ experience of various programmes. January 2016 to February 2016 KPMG-HPR Netherlands SELECTED PROJECT EXPERIENCE October 2015 to December 2015 KPMG-HPR As an Advisory Manager/Quantum Claims Analyst South Africa Assigned to Royal Dutch Shell Audit Team in the Netherlands as an SME June 2014 to October 2015 High-Point Rendel (HPR) (Subject Matter Expert), to assist the Shell Global auditing Team in a South Africa review of the End to End Global Estimating systems used by Shell. Senior Quantity Surveyor Based in Johannesburg, South Africa reviewing and assessing the quantum submissions in connection with the mechanically biased 2007 to May 2014 Ltd Company(Freelance) Access Claims submitted by the Main Contractors. Contracts being UK and Suriname, South based on FIDIC Yellow Book Conditions. All claims were associated with America the Medupi Project in Limpopo Province. Senior Project Quantity Surveyor Transferred over to a newly established team, assessing quantum and 2000 to 2007 relevance of the Main Contractor’s claims made against Eskom (Client). Faithful & Gould Emphasis being placed on claims in respect of Access, Force Majeure, UK Damage, Preservation and Design Changes (VO’s) from primarily Managing Surveyor/Cost Alstom, Mitsubishi-Hitachi, MPSJV etc. with a view to establishing the Engineer merit in counter claiming under the FIDIC Red and Yellow Books by 2000 establishing the culpable parties responsible for the causation of the Balfour Beatty Construction Ltd claims, in the first instance. Civil Engineering Division Subsequent findings being highlighted and reported to the Forensic UK Quantity Surveyor Planning and Legal Group, in order to establish the validity of a counter claim against those parties responsible, under the heading of ‘Employers Claims’(Ref:-Clause 2.5 FIDIC Yellow Book). 1993 to 1999 Information enabling the assessments being provided, broadly, using Kvaerner Process (formally John Brown Engineers data received from the various Engineering Package Managers files & Constructors) based at the Medupi Power Station Site, and also those maintained by UK the Eskom Office at Sanhill Park, Johannesburg. Project Quantity Surveyor/ Prior to this I had been involved in projects using the FIDIC and NEC Contract Administrator suite of Contracts in the Highways, Nuclear, Water, Power, Pharmaceutical and Rail Industries in the UK and Overseas. 1986 to 1993 Ove Arup & Partners UK Freelance Senior Project Quantity Surveyor – Ltd Company Senior Project Quantity Surveyor/Senior Measurement Egis International/FIRM Engineering (JV) - Assigned to Suriname, South Engineer America from October 2009 up until June 2014 as project SPQS for the 1984 to 1986 Suriname Government on a 140km major Highway Project (MACR) Delkins Ltd. (Lonrho) linking French and Dutch Guyana using Dutch, Chinese and Local Lusaka, Zambia, Africa Contractors, based in Paramaribo, Suriname. Contract was operated Senior Quantity Surveyor using the FIDIC Red Book Bank Harmonised Edition. Close co-operation 1977 to 1984 with the funding agencies namely AIDB, EU and AFD in order to Foster Wheeler Energy maintain suitable cash flow for the projects. Value of the work was Saudi Arabia and UK approximately (US$160m) Contracts Engineer/Quantity EC Harris/Turner & Townsend JV - Assigned to Sellafield Cumbria in the Surveyor role of Senior Cost Engineer. Previous roles were EC Harris 1976 to 1977 ‘Benchmarking Estimator’ assigned to United Utilities work, together Pritchard Rhodes (Skikda) with a scheme for Northern Ireland Water. (US$ 8m – US$ 30m) Algeria Benchmark Estimating (UK) - Senior Estimator working specifically on Construction Engineer Highways Agency work tasked with formulating estimated costs of all 1975 to 1976 major national and regional projects up to 2020, tasked with building a Peter Lind & Co computer model estimate for ATM (Active Traffic Management) UK projects using in house ‘Benchmark Software’ Construction Engineer Currie & Brown UK Ltd - Preparation of tender documentation for D1 1973 to 1975 Oils Bio Diesel Project at Bromborough and commercial executive for Z&W Wade Siemens Power transmission and distribution on Greater London UK substations at Beddington, Rowdown and Elstree using NEC Forms of Planning Engineer Contract on framework agreements. 1972 to 1973 Sir Alfred McAlpine & Son As Managing Surveyor/Cost Engineer for Faithful & Gould, UK UK Student Construction Engineer Astra Zeneca Pharmaceutical - Secondment as Managing Surveyor acting on behalf of the Client in an Alliancing role on a US$ 53m LANGUAGES development of laboratories at Alderley Edge, Cheshire English (fluent) Atkins Rail - Secondment as Project Commercial Manager for the SWIM French (limited) and LSE Project for Network Rail (18 months) as part of the West Coast Main Line YEAR OF BIRTH BNG (formally BNFL) – Seconded to the position of Senior Cost Engineer 1951 at Risley, Cheshire on Decommissioning of EPS3 Project, Legacy Ponds and Silos and Security Projects associated with Sellafield Nuclear, based at both Cumbria and Warrington, Cheshire. Responsible to relevant BNFL Project Managers for cost reporting, forecasting and analysis of costs in order to maintain defined annual budgets and delivery targets Earlier secondments include providing support services for Network Rail working on the ‘Station Regeneration Programme’, track refurbishment and station maintenance. Prepared and maintained cost reports, feasibility estimates including value engineering, tender evaluations and agreement of interim and final valuations with framework contractors. Contracts generally based upon NEC target cost reimbursable and GMP ICE Green Book contracts (US$ 0.3m to US$ 5.3m) Periodic work for MBNA Bank Chester and Manchester Airport Vortex Project carrying out pre and post contract works. Greater Manchester Tramways Ltd (Consortium)- Seconded in April 2003 to assist as cost engineer working in the ‘bid team’ for the 25 year concession to operate and expand the Metrolink Tram System in Greater Manchester, assessing tenders and collating cost information from various members of the consortia (US$ 604 m). Additional F+G duties include the position of internal QA auditor and user champion for the ‘Railtrack Team’ within F+G. As Senior Quantity Surveyor for Balfour Beatty Construction Civil Engineering Division, UK Employed as a Project Senior Quantity Surveyor to carry out main contractors quantity surveying duties including progress reporting, agreement and preparation of interim and final valuations, variation accounts and payment of sub-contractors on a new industrial development feeder road in St Helens for the local authority (US$ 0.7m) and the initial corridor works for the regeneration of Manchester Piccadilly Gardens forming part of a Hard and Soft Landscaping Project for Manchester City Council (US$ 9m). As Project Quantity Surveyor/Contract Administrator for Kvaerner Process (formally John Brown Engineers & Constructors), UK Undertook the dual role of Project Quantity Surveyor and Sub-Contract Administrator, maintaining responsibility for the tender preparation, analysis, issue and operational control of the pre and post-award contract documentation, including variation account agreements, cost reporting and budgetary control through to the final account stage. Responsibilities at Glaxo (Ulverston) (US$ 7m), Haarman & Reimer (Selby) (US$ 3m), Medeva Pharma (Speke) (US$ 12m). Involved in all aspects of civil engineering, building, mechanical, electrical and piping works, with a client base mainly involved in the chemical, process and pharmaceutical industries including Pharma clean room technology. As Senior Project Quantity Surveyor/Senior Measurement Engineer for Ove Arup & Partners, UK Fulfilled a Senior Project Quantity Surveyor role carrying responsibility for all the post contract activities including cost reporting, management of contractors accounts for all civil engineering subcontracts on a major infra-structure project at Salford Quays on behalf of the consulting engineer. Provided cost management services to the Client (Salford City Council) in order to recover by substantiation, DOE grants for the project for year on year rollover funding (US$ 7m/annum), primarily subsidised by EU development grants. Pioneered the use of available computer software (Supercalc) in order to closely monitor the subcontract accounts running at one time, servicing various contractors on the project. AS Senior Quantity Surveyor for Delkins Ltd. (LONRHO), Lusaka, Zambia, Africa Fulfilled a main contractor’s senior quantity surveying function