Hantsfile Name: Transport Statement Live Scheme List Last Updated: December 2013

Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) New railway station - adjacent New Road car park including pedestrian/cycle link to Walking & To be Strategic NFDC0001 HYTHE & HYTHE & DIBDEN £15,000,000 School Road Cycling Investigated

The builder’s yard adjoining St John’s Street car park is allocated for an extension to the Parking Control To be Strategic NFDC0002 HYTHE & DIBDEN HYTHE & DIBDEN car park to replace public car parking lost in New Road car park, in the event of the & Management Investigated proposed rail station being developed.

The premises fronting the New Road car park is allocated for an extension to the car Parking Control To be Strategic NFDC0003 HYTHE & DIBDEN HYTHE & DIBDEN park to replace public car parking lost in New Road car park, in the event of the & Management Investigated proposed rail station being developed.

FAWLEY, HYTHE, FAWLEY, HYTHE, Public & Reinstatement of Waterside Passenger Rail Line connecting Fawley, Hythe Feasibility Strategic NFDC0004 MARCHWOOD, MARCHWOOD, TOTTON Community and Totton underway TOTTON & ELING & ELING Transport Public & Plantation Drive: New railway station £15m (TD) for the reintroduction of passenger Feasibility Strategic NFDC0005 MARCHWOOD MARCHWOOD Community services on the Waterside branch line underway Transport Public & Hounsdown New Station £15m (TD) for the reintroduction of passenger services on the Feasibility Strategic NFDC0006 TOTTON & ELING TOTTON & ELING Community Waterside branch line underway Transport

Highways Agency propose to provide an additional westbound lane on the A31 so that the existing slip lane from the A31/A338 roundabout creates a new running lane. This Highway Pre feasibility Strategic NFDC0007 RINGWOOD would require the closure of West Street access onto A31. £11,700,000 Scheme scoping

Totton Western Bypass: A35 - Michigan Way Junction to Cocklydown Lane junction: junction improvements Totton Western Bypass: Junction improvements on the A326, Highway Feasibility Strategic NFDC0008 TOTTON & ELING TOTTON & ELING including signalisation at the junctions with Ringwood Road and Fletchwood Lane and £4,000,000 Scheme complete enhancements to existing layouts at remaining junctions.

Local Access - Near Improved tracks / footpath (by clearing disused railway line) near to Breamore Primary Pre feasibility NFDC0009 - BREAMORE Walking £20,000 Scheme Primary School School scoping

Improved lining and signing, footway improvement, uncontrolled crossing near the Public HCC Capital Local Access NFDC0010 - BRANSGORE - Near PH House, anti skid surfacing and speed reduction measures to improve pedestrian safety Walking Programme £15,000 Scheme near to Bransgore CoE Primary School 2013/14

HCC Capital Local Access BRANSGORE - to Thorney To provide a footway link from Bransgore Village to Thorney Hill. Part of this is within the NFDC0011 - BRANSGORE Walking Programme £50,000 Scheme Hill New Forest National Park 2014/15 HCC Capital Local Access NFDC0012 - Pedestrian refuge on Church Lane near junction with Mill End Walking Programme £15,000 Scheme DAMERHAM 2014/15 Local Access FAWLEY - Long Lane to Long Lane to Cadland Road: short section connecting existing bridleway to existing Pre feasibility NFDC0013 - FAWLEY Cycling £3,000 Scheme Cadland Road adjacent to road cycle route. scoping

Local Access FAWLEY - Newlands Road Newlands Road and Blackfield Road: On road cycle route with short section of adjacent Pre feasibility NFDC0014 - FAWLEY Cycling £16,000 Scheme & Blackfield Road to road along Fawley Road scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access Pre feasibility NFDC0015 - FAWLEY FAWLEY - Rollestone Road Rollestone Road: Strategic on-road cycle route Cycling £7,000 Scheme scoping

Local Access FAWLEY- Church Lane to Pre feasibility NFDC0016 - FAWLEY Church Lane to Road (via The Square): on road route through Fawley Cycling £6,000 Scheme Calshot Road scoping Public & Local Access Pre feasibility NFDC0018 - FAWLEY FAWLEY - School Road Bus stop improvements on School Road southern side; provision of raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access FAWLEY - Blackfield Road Pre feasibility NFDC0020 - FAWLEY Bus stop improvements on Blackfield Rd north of Dark Lane; provision of raised kerbs Community £1,500 Scheme north of Dark Lane scoping Transport Public & Local Access FAWLEY - Hampton Lane Bus stop improvements on Hampton Lane north bound (western side) near junction with Pre feasibility NFDC0023 - FAWLEY Community £3,500 Scheme nr junction with Lea Road Lea Rd; Provision of new bus shelter and raised kerbs scoping Transport FAWLEY Hampton Lane nr Public & Local Access Bus stop improvements on Hampton Lane (western side) near junction with Newlands Pre feasibility NFDC0026 - FAWLEY junction with Newlands Community £2,000 Scheme Rd; provision of raised kerbs and benches scoping Road Transport Public & Local Access FAWLEY - Foxcott Drive nr Bus stop improvements on Foxcroft Drive (eastern side) near Great Elms Close; Pre feasibility NFDC0029 - FAWLEY Community £2,000 Scheme Great Elms Close provision of raised kerbs and hardstanding scoping Transport FAWLEY - Foxcott Drive nr Public & Local Access Bus stop improvements on Foxcroft Drive (western side) near southern junction with Pre feasibility NFDC0030 - FAWLEY southerns junction with Community £600 Scheme Studley Avenue provision of hardstanding scoping Studley Ave Transport Public & Local Access FAWLEY Foxcott Drive nr Bus stop improvements on Foxcroft Drive (northern side) nr junction with Lime Kiln Lane; Pre feasibility NFDC0031 - FAWLEY Community £2,000 Scheme junction with Lime Kiln Lane provision of raised kerbs and hardstanding scoping Transport

Public & Local Access Bus stop improvement on Drove (northern side) near junction with Long Lane; Pre feasibility NFDC0033 - FAWLEY FAWLEY - Holbury Drove Community £2,500 Scheme provision of raised kerbs and footway widening scoping Transport Public & Local Access Bus stop improvement on Holbury Drove (southern side) near junction with Long Lane Pre feasibility NFDC0034 - FAWLEY FAWLEY - Holbury Drove Community £1,500 Scheme provision of raised kerbs scoping Transport Public & Local Access FAWLEY - Long Lane / Bus stop improvement on Long Lane/Waltons Avenue; provision of raised kerbs, Pre feasibility NFDC0035 - FAWLEY Community £2,500 Scheme Waltons Ave hardstanding and footpath over island scoping Transport Public & Local Access Bus stop improvement on Long Lane (western side) near Southbourne Avenue; provision Pre feasibility NFDC0038 - FAWLEY FAWLEY - Long Lane Community £2,500 Scheme of raised kerbs, hardstanding and footpath over island scoping Transport FAWLEY - Long Lane Public & Local Access (western side) between Bus stop improvement on Long Lane (western side) between Lime Kiln Lane and Main Pre feasibility NFDC0041 - FAWLEY Community £1,850 Scheme Lime Kiln Lane and Main Rd; provision of flag pole including timetable and raised kerbs scoping Transport Rd FAWLEY - Fawley Rd, Public & Local Access Bus stop improvement on Fawley Rd, (eastern side) near Hardley Lane; provision of Pre feasibility NFDC0043 - FAWLEY (eastern side) near Hardley Community £1,500 Scheme raised kerb scoping Lane Transport Local Access FAWLEY - Hardley Highway Pre feasibility NFDC0044 - FAWLEY Hardley Industrial Estate. Lorry turning area (at Southern end of Industrial Estate) £45,000 Scheme Industrial Estate Scheme scoping

Local Access FAWLEY - Blackfield Uncontrolled crossings at Blackfield Road/Fawley Road junction to assist pedestrians Walking & Pre feasibility NFDC0045 - FAWLEY £90,000 Scheme Road/Fawley Road junction and cyclists. Cycling scoping FAWLEY - junction of Local Access Highway Pre feasibility NFDC0046 - FAWLEY Holbury Drive and Long Speed reduction measures at junction of Holbury Drive and Long Lane £35,000 Scheme Scheme scoping Lane Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived)

FAWLEY - Rollestone Road Local Access at approach to junction with Speed reduction measures on Rollestone Road at approach to junction with Long Copse Pre feasibility NFDC0047 - FAWLEY Cycling £100,000 Scheme Long Copse and Hampton and Hampton Lane (Flat topped tables similar to Water Lane, Totton as cycle route) scoping Lane

FAWLEY - Hampton Lane Local Access Speed reduction measures on Hampton Lane from junction with Long Copse to Pre feasibility NFDC0048 - FAWLEY from junction with Long Cycling £120,000 Scheme Newlands Close (Flat topped tables similar to Water Lane, Totton as cycle route) scoping Copse to Newlands Close

Provision of Closed Circuit Television (CCTV) for Traffic Monitoring: Local Access FAWLEY - junct of Highway Pre feasibility NFDC0049 - FAWLEY • 1 no. junct of A326/C97 Fawley Road £35,000 Scheme A326/C97 Fawley Road Scheme scoping

FAWLEY - A326 in vicinity Local Access Provision of Closed Circuit Television (CCTV) for Traffic Monitoring: Highway Pre feasibility NFDC0050 - FAWLEY of Southbourne Ave, £35,000 Scheme • 1 no. A326 in vicinity of Southbourne Ave, Holbury Scheme scoping Holbury FAWLEY - A326 north of Provision of Automatic Number Plate Recognition (ANPR) devices Local Access Highway Pre feasibility NFDC0051 - FAWLEY junction with C97 Fawley • 2 no. A326 north of junction with C97 Fawley Road £24,000 Scheme Scheme scoping Road FAWLEY - A326 south of Provision of Automatic Number Plate Recognition (ANPR) devices Local Access Highway Pre feasibility NFDC0052 - FAWLEY junction with C97 Fawley • 2 no. A326 south of junction with C97 Fawley Road £24,000 Scheme Scheme scoping Road Local Access FAWLEY - B3053 Fawley B3053 Fawley Road/Church Lane Junction: Close western leg to form lower speed "T" Highway Feasibility NFDC0053 - FAWLEY £12,000 Scheme Road/Church Lane Junction junction and modify eastern leg to accommodate larger left turning vehicles. Scheme complete

Local Access FAWLEY - Church Highway Feasibility NFDC0054 - FAWLEY Church Lane/Marsh Lane Junction: Speed reduction measures £5,000 Scheme Lane/Marsh Lane Junction Scheme complete

Chapel Lane/Fawley Road Junction: Junction improvement to improve safety for HCC Capital Local Access FAWLEY - Chapel Walking & NFDC0055 - FAWLEY pedestrians and cyclists crossing Chapel Lane including footway widening kerb Programme £10,000 Scheme Lane/Fawley Road Junction Cycling realignment, road markings and signage. 2013/14

HCC Capital Local Access FAWLEY - Fawley Road / Provision of footway on corner of Fawley Road / Blackfield Road and widening of exisitng NFDC0056 - FAWLEY Walking Programme £4,000 Scheme Blackfield Road footpath including some localised widening 2014/15 - Marl Lane to Station Road, Local Access Pre feasibility NFDC0057 - FORDINGBRIDGE Ashford: on and off road Marl Lane to Station Road, Ashford: on and off road cycle route via Falconwood Close Cycling £74,000 Scheme scoping cycle route via Falconwood Close FORDINGBRIDGE -Pennys FORDINGBRIDGE -Pennys Lane to Marl Lane cycle route (crossing Road) Local Access Walking & Pre feasibility NFDC0058 - FORDINGBRIDGE Lane to Marl Lane cycle via Avon Meade, Parsonage Park Drive and along former railway line. Link through £55,000 Scheme Cycling scoping route. residential area with link to school off Burnham Road.

FORDINGBRIDGE - Disused railway (Marl Lane) Disused railway (Marl Lane) to Station Road, Fordingbridge, along Marl Lane (existing Local Access To be NFDC0059 - FORDINGBRIDGE to Station Road, bridleway 80). Cycleway along bridleway. Existing on road recommended route. Surface Cycling £13,000 Scheme Investigated Fordingbridge, along Marl to be improved. Lane (existing bridleway 80) Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access FORDINGBRIDGE - Marl Marl Lane: Upgrade to cycleway (rural 1.75km) - existing bridleway 80. Existing on road Feasibility NFDC0060 - FORDINGBRIDGE Cycling £8,000 Scheme Lane recommended route. Surface to be improved. complete

Local Access FORDINGBRIDGE - Cycleway (rural 1.1km) along Puddleslosh Lane. Existing on road recommended route. Feasibility NFDC0061 - FORDINGBRIDGE Cycling £19,000 Scheme Puddleslosh Lane Surface to be improved. complete

FORDINGBRIDGE - Ashford to Normandy Way along Station Road. Cycleway along Station Road to town Local Access Pre feasibility NFDC0062 - FORDINGBRIDGE Ashford to Normandy Way centre, including adjacent to road section on Station Rd and on road route along Victoria Cycling £77,000 Scheme scoping along Station Road Road FORDINGBRIDGE - Local Access Recreation Ground to Mill via U119. Cycleway (0.6km) across rural open land Pre feasibility NFDC0063 - FORDINGBRIDGE Recreation Ground to Cycling £176,000 Scheme with on road section linking to town centre scoping Bickton Mill via U119 Avon Meade to Green Lane: On and off road cycle route including sections along Avon Local Access FORDINGBRIDGE - Avon Pre feasibility NFDC0064 - FORDINGBRIDGE Meade, Parsonage Park Drive and across existing footpath route from Meadow Ave to Cycling £31,000 Scheme Meade to Green Lane scoping Green Lane and on road route along Green Lane.

Local Access FORDINGBRIDGE - Whitsbury Road: On road route (existing recommended route), cycle signs and road Pre feasibility NFDC0065 - FORDINGBRIDGE Cycling £7,000 Scheme Whitsbury Road markings required. scoping

Fordingbridge town centre bus stop improvements, including: bus boarders (raised Public & Local Access FORDINGBRIDGE - Pre feasibility NFDC0066 - FORDINGBRIDGE kerbs/footway at bus boarding point), bus stop clearway/boxes, replacement surfacing, Community £9,100 Scheme Fordingbridge town centre scoping tactile paving, dropped kerbs, seating. Transport

FORDINGBRIDGE - railway line from Whitsbury Road to Provision of footpath using former railway line from Whitsbury Road to Avon Valley, with Local Access Pre feasibility NFDC0067 - FORDINGBRIDGE Avon Valley, with links to links to Bedford Close, Hertford Close and Dudley Ave. Includes an uncontrolled Walking £52,000 Scheme scoping Bedford Close, Hertford crossing on Whitsbury Road Close and Dudley Ave FORDINGBRIDGE - Local Access Improved footpath route from Flaxfields End (off Station Road) linking to play area and Pre feasibility NFDC0068 - FORDINGBRIDGE Flaxfields End (off Station Walking £6,000 Scheme residential development on Reeder Close scoping Road) Local Access FORDINGBRIDGE - Green Junction improvement at Green Lane/The Bartons to assist access to commercial Highway Pre feasibility NFDC0070 - FORDINGBRIDGE £20,000 Scheme Lane/The Bartons premises Scheme scoping

FORDINGBRIDGE - HCC Capital Local Access Junction improvements at the Street junction with Green Lane including Highway NFDC0071 - FORDINGBRIDGE Salisbury Street junction Programme £5,789 Scheme footway widening to assist pedestrians near Post Office. Scheme with Green Lane 2013/14

Local Access FORDINGBRIDGE - Round Highway Pre feasibility NFDC0072 - FORDINGBRIDGE Pedestrianisation of Round Hill £50,000 Scheme Hill Scheme scoping Public & Local Access FORDINGBRIDGE - High Provision of a single screen journey planning kiosk detailing bus arrival/departure Pre feasibility NFDC0073 - FORDINGBRIDGE Community £24,000 Scheme Stret information in Fordingbridge. To be located on High Street. scoping Transport Automatic Number Plate Recognition (ANPR) : £12K per site Local Access • 1 no. A338 n/b north of junct with C159 Highway Pre feasibility NFDC0074 - FORDINGBRIDGE FORDINGBRIDGE £48,000 Scheme • 1 no. A338 s/b south of junct with B3078 Scheme scoping • 2 no. A338 at county border

Local Access - Everton to Everton to Everton Road, Hordle. Strategic on road cycle route between Everton and Pre feasibility NFDC0075 - HORDLE Cycling £11,000 Scheme Everton Road, Hordle Hordle (including section on Frys Lane) scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) HORDLE AND - Lower Ashley Local Access HORDLE AND NEW New Milton to Hordle: Cycle route between Lower Ashley Road and Stopples Lane via Pre feasibility NFDC0076 - Road and Stopples Lane Cycling £14,000 Scheme MILTON Hare Lane, Lavender Road, Heath Road. On and off road sections. scoping via Hare Lane, Lavender Road, Heath Road HORDLE, AND NEW MILTON - Local Access HORDLE, MILFORD ON Downton to Stopples Lane via Hordle Lane linking to Merville Gardens, Hordle. Strategic Pre feasibility NFDC0077 - Downton to Stopples Lane Cycling £13,000 Scheme SEA AND NEW MILTON on road cycle route scoping via Hordle Lane linking to Merville Gardens, Hordle HORDLE AND MILFORD Local Access HORDLE AND Pre feasibility NFDC0078 - ON SEA - Wainsford Road Wainsford Road to A337: On and off road route linking to Milford routes Cycling £14,000 Scheme MILFORD ON SEA scoping to A337 HORDLE - Sky End Lane Local Access Sky End Lane (connecting Hordle Lane to Everton Road): On road route linking to Pre feasibility NFDC0079 - HORDLE (connecting Hordle Lane to Cycling £5,000 Scheme Everton Road route scoping Everton Road) Public & Local Access HORDLE - Ashley Lane, Bus stop improvement, near WI Hall, Ashley Lane, Hordle including a bus lay-by, raised Feasibility NFDC0081 - HORDLE Community £5,000 Scheme Hordle kerbs and bus shelter underway Transport Local Access Footpath link from footpath No 738 to Stopples Lane. Link to be provided if Woodlands Pre feasibility NFDC0082 - HORDLE HORDLE - Stopples Lane Walking £14,000 Scheme caravan park is redeveloped scoping HORDLE - Everton Rd Local Access Highway Pre feasibility NFDC0083 - HORDLE crossroad with Hordle Lane Sight line improvements at Everton Rd crossroad with Hordle Lane and Woodcock Lane £15,000 Scheme Scheme scoping and Woodcock Lane Local Access HORDLE - Everton Rd Highway Pre feasibility NFDC0084 - HORDLE Sight line improvements at Everton Rd junction with Fry's Lane £15,000 Scheme junction with Fry's Lane Scheme scoping HORDLE - Vaggs Lane Local Access leading to the recreation Footway improvements along Vaggs Lane leading to the recreation ground, from the Pre feasibility NFDC0085 - HORDLE Walking £6,000 Scheme ground, from the junction junction with Ashley Lane scoping with Ashley Lane HORDLE - Woodcock Lane Local Access up to Sheldrake Gardens Footway improvements along Woodcock Lane up to Sheldrake Gardens from junction Pre feasibility NFDC0086 - HORDLE Walking £60,000 Scheme from junction with Everton with Everton Rd scoping Rd HORDLE - Hare Lane: Hare Lane: Close eastern leg junction with Ashley Lane creating a cul-de-sac on Hare HCC Capital Local Access Highway NFDC0087 - HORDLE Close eastern leg junction Lane rather than a one way leg. A Prohibition of Driving Traffic Regulations Order would Programme £5,000 Scheme Scheme with Ashley Lane be required to close the eastern access of Hare Lane. 2013/14

HORDLE AND MILFORD Everton: Milford Road (A337)/ Road (B3058) -installation of a signalised Local Access HORDLE AND ON SEA - Everton: Milford Highway Feasibility NFDC0088 - junction (HCC Feasibility study published 2005).Traffic signals incorporating controlled £200,000 Scheme MILFORD ON SEA Road (A337)/Lymington Scheme complete crossing facilities for pedestrians and cyclists on the eastern side of the junction Road (B3058

Local Access HORDLE - A337 junct with Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0089 - HORDLE £35,000 Scheme B3058 • 1 no. A337 junct with B3058 Scheme scoping HORDLE - A337 e/b east of Automatic Number Plate Recognition (ANPR) : £12K per site Local Access junct with B3058 • 1 no. A337 e/b east of junct with B3058 Highway Pre feasibility NFDC0090 - HORDLE £24,000 Scheme A337 w/b west of junct with • 1 no. A337 w/b west of junct with B3058 Scheme scoping B3058 HYTHE & DIBDEN - Local Access Claypits Lane to Challenger Way: Signing improvements and lighting of existing route Walking & Pre feasibility NFDC0091 - HYTHE & DIBDEN Claypits Lane to Challenger £30,000 Scheme required. Cycling scoping Way HYTHE & DIBDEN - North Local Access Oakland Way to Dibden Local Centre: Cycle route - On and off road route (sections Pre feasibility NFDC0093 - HYTHE & DIBDEN Road to Dibden Local Cycling £59,000 Scheme already existing) scoping Centre Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived)

HYTHE & DIBDEN - Dibden Local Centre: Incorporate ped. & cycle access to footpath on SW boundary; Local Access Walking & Pre feasibility NFDC0094 - HYTHE & DIBDEN Cosworth Drive and upgrade path to cycleway between site access and Challenger Way: Access for £55,000 Scheme Cycling scoping Cumberland Way. pedestrians and cyclists, link through to Cosworth Drive and Cumberland Way.

Local Access HYTHE & DIBDEN - New Walking & Pre feasibility NFDC0095 - HYTHE & DIBDEN New Road to South Street: Footpath/Cycleway link and short on road section on South St £12,000 Scheme Road to South Street Cycling scoping

HYTHE & DIBDEN - South Street to Wild Ground Schools (via Hobart Drive, South Street to Wild Ground Schools (via Hobart Drive, Knightwood Road, Ladycross Local Access Knightwood Road, Feasibility NFDC0096 - HYTHE & DIBDEN Road, Dukeswood Drive, Heatherstone Avenue, Armitage Ave) On and off road Cycling £85,000 Scheme Ladycross Road, underway route.New proposal that provides a connection through Hythe Dukeswood Drive, Heatherstone Avenue, Armitage Ave)

HYTHE & DIBDEN - Butts HCC Capital Local Access Butts Ash Lane and Arnewood Ave: On road cycle routes linking to existing route. Cycle NFDC0097 - HYTHE & DIBDEN Ash Lane and Arnewood Cycling Programme £22,000 Scheme Route covers Local Plan Policy: DW-T10.23. Ave 2013/14

HYTHE & DIBDEN - Heatherstone Avenue to Local Access existing route on Water Heatherstone Avenue to existing route on Water Lane on road route (via Partridge Road, Pre feasibility NFDC0098 - HYTHE & DIBDEN Cycling £6,000 Scheme Lane on road route (via Whitewater Rise, Mullins Lane). Cycle Route proposal linking to existing route. scoping Partridge Road, Whitewater Rise, Mullins Lane

HYTHE & DIBDEN - Local Access Prospect Place and Promenade: On and off road route. Saved Local Plan Policy HD-3 Pre feasibility NFDC0099 - HYTHE & DIBDEN Prospect Place and Cycling £10,000 Scheme covers part of route linking existing routes in the town centre scoping Promenade

HYTHE & DIBDEN - Fawley Public & Local Access Bus stop improvement on Fawley Rd (western side) opp junction with Hardley Lane: Pre feasibility NFDC0100 - HYTHE & DIBDEN Rd (western side) opp Community £1,500 Scheme Raised kerbs scoping junction with Hardley Lane Transport

HYTHE & DIBDEN - Fawley Public & Local Access Bus stop improvement on Fawley Rd (western side) nr junction with Frost Lane: Raised Pre feasibility NFDC0101 - HYTHE & DIBDEN Rd (western side) nr Community £1,500 Scheme kerbs scoping junction with Frost Lane Transport

HYTHE & DIBDEN - Fawley Public & Local Access Bus stop improvement on Fawley Rd (eastern side) nr junction with Frost Lane: Raised Pre feasibility NFDC0102 - HYTHE & DIBDEN Rd (eastern side) nr Community £1,500 Scheme kerbs scoping junction with Frost Lane Transport

HYTHE & DIBDEN - Public & Local Access Langdown Lawn (western Bus stop improvement on Langdown Lawn (western side) nr junction with Butts Bridge Pre feasibility NFDC0103 - HYTHE & DIBDEN Community £2,000 Scheme side) nr junction with Butts Hill: Raised kerbs and bench scoping Transport Bridge Hill

HYTHE & DIBDEN - South Public & Local Access Pre feasibility NFDC0104 - HYTHE & DIBDEN Street (western side) opp Bus stop improvement on South Street (western side) opp Langdown Rd: Raised kerbs Community £1,500 Scheme scoping Langdown Rd Transport

HYTHE & DIBDEN - South Public & Local Access Pre feasibility NFDC0105 - HYTHE & DIBDEN Street (eastern side) opp Bus stop improvement on South Street (eastern side) opp Coat Gardens: Raised kerbs Community £1,500 Scheme scoping Coat Gardens Transport Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) HYTHE & DIBDEN - Public & Local Access Pre feasibility NFDC0106 - HYTHE & DIBDEN Prospect Place (eastern Bus stop improvement on Prospect Place (eastern side): ferry bus interchange pole Community £2,000 Scheme scoping side) Transport HYTHE & DIBDEN - Jones Public & Local Access Bus stop improvement on Jones Lane (northern side): nr Ewart Court: raised kerbs and Pre feasibility NFDC0107 - HYTHE & DIBDEN Lane (northern side): nr Community £2,000 Scheme bench scoping Ewart Court Transport

HYTHE & DIBDEN - Public & Local Access Bus stop improvement on Rd (northern side) nr Jones Lane: bench, raised Pre feasibility NFDC0108 - HYTHE & DIBDEN Southampton Rd (northern Community £2,500 Scheme kerbs and hardstanding scoping side) nr Jones Lane Transport

HYTHE & DIBDEN - Public & Local Access Pre feasibility NFDC0109 - HYTHE & DIBDEN Southampton Rd (southern Bus stop improvement on Southampton Rd (southern side) nr Jones Lane: raised kerbs Community £1,500 Scheme scoping side) nr Jones Lane Transport

HYTHE & DIBDEN - Public & Local Access Southampton Rd (northern Bus stop improvement on Southampton Rd (northern side) opp junction with West Pre feasibility NFDC0110 - HYTHE & DIBDEN Community £1,500 Scheme side) opp junction with Street: raised kerbs scoping Transport West Street

HYTHE & DIBDEN - Public & Local Access Southampton Rd (southern Bus stop improvement on Southampton Rd (southern side) opp junction with West Pre feasibility NFDC0111 - HYTHE & DIBDEN Community £2,000 Scheme side) opp junction with Street: hardstanding and raised kerbs scoping Transport West Street HYTHE & DIBDEN - Public & Local Access Southampton Rd (northern Bus stop improvement on Southampton Rd (northern side) near junction with Mountfield: Pre feasibility NFDC0112 - HYTHE & DIBDEN Community £1,500 Scheme side) near junction with raised kerbs scoping Transport Mountfield HYTHE & DIBDEN - Public & Local Access Southampton Rd (southern Bus stop improvement on Southampton Rd (southern side) near junction with Mountfield: Pre feasibility NFDC0113 - HYTHE & DIBDEN Community £1,500 Scheme side) near junction with raised kerbs scoping Transport Mountfield

HYTHE & DIBDEN - Public & Local Access Bus stop improvement on Claypits Lane, nr junction with Main Rd (nr Home Farm): Pre feasibility NFDC0114 - HYTHE & DIBDEN Claypits Lane, nr junction Community £1,500 Scheme raised kerbs scoping with Main Rd Transport

HYTHE & DIBDEN - Public & Local Access Claypits Lane (southside), Bus stop improvement on Claypits Lane (southside), east of junction with Challenger Pre feasibility NFDC0115 - HYTHE & DIBDEN Community £2,000 Scheme east of junction with Way: raised kerbs and hardstanding scoping Transport Challenger Way

HYTHE & DIBDEN - Public & Local Access Claypits Lane (northside), Bus stop improvement on Claypits Lane (northside), east of junction with Challenger Pre feasibility NFDC0116 - HYTHE & DIBDEN Community £1,100 Scheme east of junction with Way: hardstanding and bench scoping Transport Challenger Way

HYTHE & DIBDEN - Public & Local Access Bus stop improvement on Claypits Lane (northside), nr junction with Cabot Drive: raised Pre feasibility NFDC0117 - HYTHE & DIBDEN Claypits Lane (northside), Community £2,000 Scheme kerbs and path to hardstanding scoping nr junction with Cabot Drive Transport

HYTHE & DIBDEN - Public & Local Access Bus stop improvement on Claypits Lane (southside), nr junction with Cabot Drive: raised Pre feasibility NFDC0118 L100 HYTHE & DIBDEN Claypits Lane (southside), Community £2,000 Scheme kerbs and hardstanding scoping nr junction with Cabot Drive Transport Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived)

HYTHE & DIBDEN - Public & Local Access Bus stop improvement on Claypits Lane (southside), opp Rowhill Drive: raised kerbs and Pre feasibility NFDC0119 L101 HYTHE & DIBDEN Claypits Lane (southside), Community £2,000 Scheme bench scoping opp Rowhill Drive Transport

HYTHE & DIBDEN - Public & Local Access Bus stop improvement on Claypits Lane (northside), nr Rowhill Drive: raised kerbs and Pre feasibility NFDC0120 L102 HYTHE & DIBDEN Claypits Lane (northside), Community £2,000 Scheme bench scoping nr Rowhill Drive Transport HYTHE & DIBDEN - Public & Local Access Challenger Way (northside), Bus stop improvement on Challenger Way (northside), nr junction with Cosworth Drive: Pre feasibility NFDC0121 L103 HYTHE & DIBDEN Community £1,500 Scheme nr junction with Cosworth raised kerbs scoping Transport Drive HYTHE & DIBDEN - Challenger Way (southwest Public & Local Access Bus stop improvement on Challenger Way (southwest bound), opposite Challenger Pre feasibility NFDC0122 L104 HYTHE & DIBDEN bound), opposite Community £1,500 Scheme Place (nr The Sylvans): raised kerbs scoping Challenger Place (nr The Transport Sylvans) HYTHE & DIBDEN - Challenger Way Public & Local Access Bus stop improvement on Challenger Way (northbound), between Pennine Gardens and Pre feasibility NFDC0123 L105 HYTHE & DIBDEN (northbound), between Community £1,000 Scheme Beechwood Way: flag pole and hardstanding scoping Pennine Gardens and Transport Beechwood Way HYTHE & DIBDEN - Challenger Way Public & Local Access Bus stop improvement on Challenger Way (westbound), between Pennine Gardens and Pre feasibility NFDC0124 L106 HYTHE & DIBDEN (westbound), between Community £600 Scheme Oaklands Way: hardstanding scoping Pennine Gardens and Transport Oaklands Way HYTHE & DIBDEN - Challenger Way Public & Local Access Bus stop improvement on Challenger Way (eastbound), between Pennine Gardens and Pre feasibility NFDC0125 L107 HYTHE & DIBDEN (eastbound), between Community £600 Scheme Oaklands Way: hardstanding scoping Pennine Gardens and Transport Oaklands Way HYTHE & DIBDEN - Public & Local Access Challenger Way (southeast Bus stop improvement on Challenger Way (southeast bound), between Kiln Close and Pre feasibility NFDC0126 L108 HYTHE & DIBDEN Community £1,500 Scheme bound), between Kiln Close Upper Mullins Lane: raised kerbs scoping Transport and Upper Mullins Lane

HYTHE & DIBDEN - Mullins Public & Local Access Bus stop improvement on Mullins Lane (north bound) opp Golden Hind Park: raised Pre feasibility NFDC0127 L109 HYTHE & DIBDEN Lane (north bound) opp Community £1,500 Scheme kerbs scoping Golden Hind Park Transport HYTHE & DIBDEN - Mullins Public & Local Access Bus stop improvement on Mullins Lane (south bound) opp Braehead raised kerbs and Pre feasibility NFDC0128 L110 HYTHE & DIBDEN Lane (south bound) opp Community £2,000 Scheme bench (north of above) scoping Braehead Transport

HYTHE & DIBDEN - Public & Local Access Beaulieu Rd (westbound) nr Bus stop improvement on Beaulieu Rd (westbound) nr roundabout with Whitewater Rise: Pre feasibility NFDC0129 L111 HYTHE & DIBDEN Community £3,500 Scheme roundabout with Whitewater raised kerbs, dropped kerbs and bench scoping Transport Rise

HYTHE & DIBDEN - Beaulieu Rd (eastbound) Public & Local Access Bus stop improvement on Beaulieu Rd (eastbound) between roundabout with Mullins Pre feasibility NFDC0130 L112 HYTHE & DIBDEN between roundabout with Community £2,000 Scheme Lane and Highlands Way: raised kerbs and bench scoping Mullins Lane and Highlands Transport Way Public & Local Access Bus stop improvement on Beaulieu Rd (westbound) by Hythe Hospital: raised kerbs, Pre feasibility NFDC0131 L113 HYTHE & DIBDEN HYTHE & DIBDEN Community £2,700 Scheme hardstanding, flagpole and access to raised kerb scoping Transport Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Public & Local Access Bus stop improvement on Beaulieu Rd (eastbound) by Hythe Hospital: raised kerbs, Pre feasibility NFDC0132 L114 HYTHE & DIBDEN HYTHE & DIBDEN Community £3,500 Scheme dropped kerbs, bench scoping Transport Public & Local Access Bus stop improvement on Beaulieu Rd (northbound) nr Noads Way, at approach to Pre feasibility NFDC0133 L115 HYTHE & DIBDEN HYTHE & DIBDEN Community £3,000 Scheme roundabout: raised kerbs, dropped kerbs scoping Transport Public & Local Access Bus stop improvement on Beaulieu Rd (southbound) nr Noads Way: raised kerbs, Pre feasibility NFDC0134 L116 HYTHE & DIBDEN HYTHE & DIBDEN Community £3,000 Scheme dropped kerbs scoping Transport Public & Local Access Pre feasibility NFDC0135 L117 HYTHE & DIBDEN HYTHE & DIBDEN Bus stop improvement on Beaulieu Rd (NEbound) nr roundabout with A326: raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Bus stop improvement on Beaulieu Rd (SWbound) nr roundabout with A326: raised Pre feasibility NFDC0136 L118 HYTHE & DIBDEN HYTHE & DIBDEN Community £2,000 Scheme kerbs and hardstanding scoping Transport Bus ferry interchange improvements: moving/improving of bus bay/taxi rank and ferry Public & Local Access Feasibility NFDC0137 L119 HYTHE & DIBDEN HYTHE & DIBDEN access. Including resurfacing, new bus shelter, ferry ticket office Community £83,000 Scheme complete improvement/replacement will be permitted Transport

Local Access Pre feasibility NFDC0138 L120 HYTHE & DIBDEN HYTHE & DIBDEN Pedestrian Link between the Pier Head and Promenade incorporating boardwalk Walking £85,000 Scheme scoping

Pedestrian crossing improvements at Langdown Lawn, including: Pedestrian refuge nr junction with Mousehole Lane, footway link between Mousehole Lane and South Street. Local Access Crossing point opposite Langdown Crt - footway link to new crossing at South St, new Pre feasibility NFDC0140 L122 HYTHE & DIBDEN HYTHE & DIBDEN Walking £55,000 Scheme footway link west side of South St to Coat Gdns and new crossing point. Staggered scoping pedestrian crossing north of St Michaels Church (Langdown Lawn). Also pedestrian crossing facilities south of Deerleap Lane near The Croft public house

Challenger Way: southern side - provision of footway (50m x 1.8m path) from Local Access Feasibility NFDC0142 L124 HYTHE & DIBDEN HYTHE & DIBDEN Cumberland Way to existing path behind Capella Garden Garages Walking £7,000 Scheme complete Challenger Way: western side - provision of footway (95m x 1.8m) from opposite Corsair Local Access Feasibility NFDC0143 L125 HYTHE & DIBDEN HYTHE & DIBDEN Drive to pedestrian refuge Walking £13,000 Scheme complete Challenger Way: western side - provision of footway (135m x 1.8m) from pedestrian Local Access Feasibility NFDC0144 L126 HYTHE & DIBDEN HYTHE & DIBDEN refuge to existing, north of Cosworth Drive Walking £18,000 Scheme complete Challenger Way: western side - provision of footway (85m) between Cosworth Drive and Local Access Feasibility NFDC0145 L127A HYTHE & DIBDEN HYTHE & DIBDEN Challenger Place/The Orchard includes new bus stop and edging kerbs Walking £11,500 Scheme complete Challenger Way: western side – provision of footpath (47m x 1.8m) south of Challenger Local Access Feasibility NFDC0146 L127B HYTHE & DIBDEN HYTHE & DIBDEN Place/The Orchard connecting to existing Walking £7,000 Scheme complete Challenger Way: eastern side - provision of footway (145m x 1.8m) from Pennine Local Access Feasibility NFDC0147 L128 HYTHE & DIBDEN HYTHE & DIBDEN Gardens north to existing path opposite Beechwood Way Walking £15,000 Scheme complete Challenger Way: provision of footway (80m x 1.8m) along southern side of Challenger Local Access Feasibility NFDC0148 L129 HYTHE & DIBDEN HYTHE & DIBDEN Way to the east of Oaklands Way to Oaklands Drive Walking £11,000 Scheme complete Challenger Way: northern side - provision of footway (270m x 1.8m path) from link Local Access Feasibility NFDC0149 L130 HYTHE & DIBDEN HYTHE & DIBDEN behind Brecon Close to Kiln Close Walking £30,000 Scheme complete

Local Access Feasibility NFDC0150 L131 HYTHE & DIBDEN HYTHE & DIBDEN Provision of new footway (40m x 1.8m) on Main Rd near All Saints Church: Walking Scheme complete £14,500 Local Access Cumberland Way: Traffic Calming proposal to remove temporary build outs and replace Highway Feasibility NFDC0151 L132 HYTHE & DIBDEN HYTHE & DIBDEN Scheme with permanent build outs Scheme complete £19,000 Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access Roman Road South: Traffic Calming (speed management measures not already trialled) Highway Feasibility NFDC0152 L133 HYTHE & DIBDEN HYTHE & DIBDEN £61,000 Scheme between Beaulieu Rd/A326 roundabout and Butts Ash Lane Scheme complete

Local Access Claypits Lane to Cumberland Way central hatching road markings to visually narrow the Highway Pre feasibility NFDC0153 L134 HYTHE & DIBDEN HYTHE & DIBDEN £600 Scheme road Scheme scoping

Local Access Traffic Calming (chicanes/buildouts) near junction of Challenger Way and Beechwood Highway Pre feasibility NFDC0154 L135 HYTHE & DIBDEN HYTHE & DIBDEN £10,000 Scheme Way Scheme scoping

Local Access Traffic Calming (chicanes/buildouts) near footpath crossing on Challenger Way near Highway Pre feasibility NFDC0155 L136 HYTHE & DIBDEN HYTHE & DIBDEN £26,000 Scheme Malvern Drive Scheme scoping

Local Access Highway Pre feasibility NFDC0156 L137 HYTHE & DIBDEN HYTHE & DIBDEN Traffic Calming (chicanes/buildouts) on Mullins Lane at junction with Water Lane £24,000 Scheme Scheme scoping

Local Access Pre feasibility NFDC0157 L138 HYTHE & DIBDEN HYTHE & DIBDEN Noadswood School – Provision of a cycle entrance Cycling £20,000 Scheme scoping

Local Access Uncontrolled crossing on Main Rd to assist crossing of pedestrians and cyclists (near Walking & Pre feasibility NFDC0158 L139 HYTHE & DIBDEN HYTHE & DIBDEN £50,000 Scheme junction with A326) Cycling scoping

Local Access Automatic Number Plate Recognition (ANPR) : Highway Pre feasibility NFDC0159 L140 HYTHE & DIBDEN HYTHE & DIBDEN £24,000 Scheme • 2 no. A326 north of junct with C97 Main Road Scheme scoping

Local Access Automatic Number Plate Recognition (ANPR) : Highway Pre feasibility NFDC0160 L141 HYTHE & DIBDEN HYTHE & DIBDEN £24,000 Scheme • 2 no. A326 south of junct with C97 Main Road Scheme scoping

Local Access Automatic Number Plate Recognition (ANPR) : Highway Pre feasibility NFDC0161 L142 HYTHE & DIBDEN HYTHE & DIBDEN £24,000 Scheme • 2 no. A326 north of junct with C97 Sizer Way Scheme scoping

Local Access Automatic Number Plate Recognition (ANPR) : Highway Pre feasibility NFDC0162 L143 HYTHE & DIBDEN HYTHE & DIBDEN £24,000 Scheme • 2 no. A326 south of junct with C97 Sizer Way Scheme scoping

Local Access Automatic Number Plate Recognition (ANPR) : Highway Pre feasibility NFDC0163 L144 HYTHE & DIBDEN HYTHE & DIBDEN £24,000 Scheme • 2 no. A326 north of junct with B3054 Beaulieu Road Scheme scoping

Local Access Automatic Number Plate Recognition (ANPR) : Highway Pre feasibility NFDC0164 L145 HYTHE & DIBDEN HYTHE & DIBDEN £24,000 Scheme • 2 no. A326 south of junct with B3054 Beaulieu Road Scheme scoping

Local Access Traffic Information Variable Message Signs (VMS) : 160mm Character height: Highway Pre feasibility NFDC0165 L146 HYTHE & DIBDEN HYTHE & DIBDEN £15,000 Scheme • 1 no. s/b on A326 approach to junct with B3054 Scheme scoping

Local Access Traffic Information Variable Message Signs (VMS) : 160mm Character height: Highway Pre feasibility NFDC0166 L147 HYTHE & DIBDEN HYTHE & DIBDEN £15,000 Scheme • 1 no. n/b on A326 approach to junct with B3054 Scheme scoping

Local Access Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0167 L148 HYTHE & DIBDEN HYTHE & DIBDEN £35,000 Scheme • 1 no. junct of A326/C97 Sizer Way Scheme scoping

Local Access Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0168 L149 HYTHE & DIBDEN HYTHE & DIBDEN £35,000 Scheme • 1 no. junct of A326/B3054 Beaulieu Road Scheme scoping

Local Access HYTHE & DIBDEN; HYTHE & DIBDEN; Public Right of Way Footpath 10: Reconstruct footway (240m) Hythe Close to Pre feasibility NFDC0169 L150a Walking £18,500 Scheme MARCHWOOD MARCHWOOD Marchwood scoping

Local Access LYMINGTON & LYMINGTON & St Thomas's Street to Belmore Lane via Church Lane and off road section to Powlett Rd: Feasibility NFDC0170 L150b Cycling £19,000 Scheme PENNINGTON PENNINGTON on and off road cycle route linking to existing route complete HCC Capital Local Access LYMINGTON & LYMINGTON & Pennington to Highfield via Priestlands Road and The Bunny Run: Footpath to Cycleway NFDC0171 L151 Cycling Programme £112,000 Scheme PENNINGTON PENNINGTON (0.12km); On Road and off road sections 2013/14 Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access LYMINGTON & LYMINGTON & Pennington Cross to via Ancient Highway: Upgrade footpath to cycleway on Feasibility NFDC0173 L153 Cycling £4,000 Scheme PENNINGTON PENNINGTON "Ancient Highway" - on road route complete

Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0174 L154 Marsh Lane to Ampress Park: Short off road section adjacent to electricity sub station Cycling £21,000 Scheme PENNINGTON PENNINGTON scoping

St Thomas's Street to Bridge Road via High Street, Street, Station Street & Local Access LYMINGTON & LYMINGTON & Waterloo Road: Strategic on road cycle route, St Thomas's Street to Bridge Road Pre feasibility NFDC0175 L155 Cycling £30,000 Scheme PENNINGTON PENNINGTON incorporating traffic calming measures along Waterloo Road scoping

Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0176 L156 Bath Road to Railway Station via Mill Lane: On road route with dismount section Cycling £5,000 Scheme PENNINGTON PENNINGTON scoping

Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0177 L157 Pennington - Gordleton via Ramley Road: Strategic on road cycle route. Cycling £9,000 Scheme PENNINGTON PENNINGTON scoping LYMINGTON & LYMINGTON & HCC Capital Local Access Pennington to Everton via Wainsford Road (section outside National Park): Strategic on NFDC0178 L158 PENNINGTON AND PENNINGTON AND Cycling Programme £18,474 Scheme road cycle route, Pennington to Everton HORDLE HORDLE 2013/14 Local Access LYMINGTON & LYMINGTON & Priestlands Place to Buckland via Southampton Road and Eastern Road: Strategic on Feasibility NFDC0179 L159 Cycling £8,000 Scheme PENNINGTON PENNINGTON road cycle route complete

Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0180 L160 Avenue Road (western end): Strategic on road cycle route Cycling £5,000 Scheme PENNINGTON PENNINGTON scoping

Local Access LYMINGTON & LYMINGTON & Avenue Road to Lymington Town Centre via Barfields: Completion of strategic cycle Pre feasibility NFDC0181 L161 Cycling £45,158 Scheme PENNINGTON PENNINGTON route linking Ampress to and through Town Centre scoping

Local Access LYMINGTON & LYMINGTON & Feasibility NFDC0182 L162 Marsh Lane to Bridge Road: On road cycle route along Marsh Lane Cycling £94,000 Scheme PENNINGTON PENNINGTON underway

Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0184 L164 Pennington Square/South Street to Pound Road: Strategic off road cycle route link Cycling £9,000 Scheme PENNINGTON PENNINGTON scoping

Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0185 L165 Bridge Road to Undershore Road: Strategic on road cycle route Cycling £7,000 Scheme PENNINGTON PENNINGTON scoping

A337 / Alexandra Road junction: Improve accessibility for pedestrians through provision Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0186 L166 of an uncontrolled crossing facility incorporating a central pedestrian refuge and tactile Walking £20,000 Scheme PENNINGTON PENNINGTON scoping paving to the north of existing roundabout to assist pedestrians crossing the highway.

Improvements at Lymington Bus Interchange; Public & Local Access LYMINGTON & LYMINGTON & (this includes: Bus boarders (raised kerbs/footway at bus boarding point), replacement Pre feasibility NFDC0187 L167 Community £55,100 Scheme PENNINGTON PENNINGTON surfacing, tactile paving, seating, clocks, help points, signage scheme) scoping Transport

Upgrade of existing Bus Departure Information System (variable message screens giving Public & Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0188 L168 details of bus arrival/departure times - commonly found at bus interchanges) in line with Community £40,000 Scheme PENNINGTON PENNINGTON scoping bus station improvements – this will include bus departure screens at every bay. Transport

Public & Local Access LYMINGTON & LYMINGTON & Bus shelter on Southampton Rd (n/b) opposite 54 Southampton Road - Pole, flag and Pre feasibility NFDC0189 L169 Community £4,500 Scheme PENNINGTON PENNINGTON timetable req'd. Possibly new shelter installed. scoping Transport Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Public & Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0190 L170 Bus shelter on Priestlands Place (w/b) -new shelter. Community £4,000 Scheme PENNINGTON PENNINGTON scoping Transport Public & Local Access LYMINGTON & LYMINGTON & Repair and additions to railings and new cage markings at bus shelter on A337 Milford Pre feasibility NFDC0191 L171 Community £1,000 Scheme PENNINGTON PENNINGTON Rd near to School (north bound) scoping Transport Public & Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0192 L172 Bus shelter A337 Milford Rd (sw/b) nr to Pennington Cross - repairs. Community £1,000 Scheme PENNINGTON PENNINGTON scoping Transport Public & Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0193 L173 Bus shelters Milford Rd (between Elm Ave and South St) ne/b and sw/b - shelter repairs Community £1,000 Scheme PENNINGTON PENNINGTON scoping Transport Public & Local Access LYMINGTON & LYMINGTON & Rail station improvements at Lymington Town station- shelter, cctv, signage and cycle Pre feasibility NFDC0194 L174 Community £15,000 Scheme PENNINGTON PENNINGTON parking improvements scoping Transport Public & Local Access LYMINGTON & LYMINGTON & Deployment of journey planning kiosk and bus/ferry departure screen on Lymington High Pre feasibility NFDC0195 L175 Community £30,000 Scheme PENNINGTON PENNINGTON Street or New Street to assist people with timetable information for these services scoping Transport Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0196 L176 Provision of a footpath (0.15km) linking Highfields Avenue to Priestlands Lane. Walking £6,000 Scheme PENNINGTON PENNINGTON scoping

Ashley Lane; Madeira Walk and The Tins (ancient pedestrian route) and its continuation Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0197 L177 via School Lane; Earley Court: Environmental improvements to footpaths to enhance Walking £25,000 Scheme PENNINGTON PENNINGTON scoping their attractiveness and the experience they offer of the medieval layout of the town.

Local Access LYMINGTON & LYMINGTON & Footpath improvements along High Street and St Thomas Street to enhance walking Pre feasibility NFDC0198 L178 Walking £500,000 Scheme PENNINGTON PENNINGTON route through the town centre. scoping

Footpath improvements along Grove Road between South Grove and Captain's Row. Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0199 L179 Lack of pavement on southern side of road. Provision of footway would improve Walking £3,000 Scheme PENNINGTON PENNINGTON scoping pedestrian links along this road.

Local Access LYMINGTON & LYMINGTON & Provision of footpath around former Webb’s Food site (including railway crossing) at the Pre feasibility NFDC0200 L180 Walking £35,000 Scheme PENNINGTON PENNINGTON Quay, Bridge Road scoping

Local Access LYMINGTON & LYMINGTON & Uncontrolled crossing along A337 Milford Road south west of Haglane Copse to assist Pre feasibility NFDC0201 L181 Walking £50,000 Scheme PENNINGTON PENNINGTON pedestrians crossing near to the Right of Way footpath. scoping

Speed reduction measures along Wainsford Road, to assist cyclists using proposed route (LP/T/9) will incorporate advisory cycle lanes along both sides of the road, visually HCC Capital Local Access LYMINGTON & LYMINGTON & narrowing the road, creating a single two way traffic lane but only in sections where there NFDC0202 L182 Cycling Programme £100,000 Scheme PENNINGTON PENNINGTON is sufficient forward visibility. Therefore, when oncoming motor vehicles need to pass 2013/14 each other the vehicles, when safe to do so, will momentarily encroach upon the cycle lanes.

Local Access LYMINGTON & LYMINGTON & Replacement road closure feature to replace unsuitable domestic fence type Highway Pre feasibility NFDC0203 L183 £7,000 Scheme PENNINGTON PENNINGTON construction where Oliver Road is currently closed. Scheme scoping

Local Access LYMINGTON & LYMINGTON & Speed reduction measures along Priestlands Road and Highfield Road (flat topped Highway Pre feasibility NFDC0204 L184 £30,000 Scheme PENNINGTON PENNINGTON tables in Priestlands Road similar to Water Lane, Totton as cycle route). Scheme scoping

Local Access LYMINGTON & LYMINGTON & Advance stop lines on A337 south bound approach to A337 Southampton Road/Avenue Pre feasibility NFDC0205 L185 Cycling £30,000 Scheme PENNINGTON PENNINGTON Road traffic signals to assist cyclists. scoping

Local Access LYMINGTON & LYMINGTON & Speed reduction measures along Ramley Road between Oliver Road and Yaldhurst Pre feasibility NFDC0206 L186 Cycling £73,000 Scheme PENNINGTON PENNINGTON Lane, to assist cyclists (flat topped tables similar to Water Lane, Totton as cycle route). scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access LYMINGTON & LYMINGTON & Improved uncontrolled crossing point at junction of Gosport Street and Captain's Row, Pre feasibility NFDC0207 L187 Walking £20,000 Scheme PENNINGTON PENNINGTON incorporating raised table and tactile paving to assist pedestrians. scoping

Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0208 L188 Provision of zebra crossing on Queen Street near to junction with St Thomas Street Walking £20,000 Scheme PENNINGTON PENNINGTON scoping

HCC Capital Local Access LYMINGTON & LYMINGTON & Walking & NFDC0209 L189 Avenue Road near its junction with Lower Buckland Rd junction - Widen central refuge & Programme £35,000 Scheme PENNINGTON PENNINGTON Cycling associated road widening, earthworks and retaining wall, dropped crossings. 2012/13 Improvements will assist with cycle route link to Road with dismount sections

Local Access LYMINGTON & LYMINGTON & Feasibility NFDC0210 L190 Walking £15,000 Scheme PENNINGTON PENNINGTON Central pedestrain refuge island to be provided just west of the junction of Bridge Road complete and Undershore Road to provide a pedestrain link from the Ferry to the Town Centre

Automatic Number Plate Recognition (ANPR) : • 1 no. A337 n/b between junct with B3054 and railway bridge Local Access LYMINGTON & LYMINGTON & Highway Pre feasibility NFDC0211 L191 • 1 no. A337 s/b south of junct with B3054 £48,000 Scheme PENNINGTON PENNINGTON Scheme scoping • 1 no. A337 n/b north of junct with North Street/Lower Pennington Lane • 1 no. A337 s/b south of junct with North Street/Lower Pennington Lane

Local Access Pre feasibility NFDC0212 L192 MARCHWOOD MARCHWOOD Cracknore Hard Lane: On and off road cycle route connecting to waterfront Cycling £53,000 Scheme scoping

Local Access Pre feasibility NFDC0213 L193 MARCHWOOD MARCHWOOD Cracknore Hard Lane to Main Road: On road route via Old Cracknore Close Cycling £2,000 Scheme scoping

Local Access Twiggs Lane to Village Centre on road cycle route via Hythe Road (serves proposed Pre feasibility NFDC0214 L195 MARCHWOOD MARCHWOOD Cycling £5,000 Scheme station) scoping

Local Access Pre feasibility NFDC0215 L196 MARCHWOOD MARCHWOOD Tavell's Lane to Main Road (via Bury Road): On Road Cycle route (northern link). Cycling £9,000 Scheme scoping

Local Access Former RNAD site to Main Road: On Road Cycle route linking via Ordnance Way, Pre feasibility NFDC0216 L197 MARCHWOOD MARCHWOOD Cycling £33,000 Scheme Magazine La, Normandy Way & Old Magazine Close (linked to T/2 above) scoping

Local Access Bury Road to Main Road (via Reed Drive and Cranberry Close) On and off road cycle Feasibility NFDC0217 L198 MARCHWOOD MARCHWOOD Cycling £61,000 Scheme route through village centre complete

Local Access MARCHWOOD, MARCHWOOD, TOTTON Marchwood Road/Bury Road (from Tavell's Lane junction)- Adjacent to road cycle route Pre feasibility NFDC0218 L199 Cycling £261,000 Scheme TOTTON & ELING & ELING link to Totton cycle network scoping Public & Local Access Pre feasibility NFDC0219 L200 MARCHWOOD MARCHWOOD Bus stop improvement on Hythe Rd (Wbound) nr junction with Twiggs Lane: raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Pre feasibility NFDC0220 L201 MARCHWOOD MARCHWOOD Bus stop improvement on Hythe Rd (S-bound) nr junction with Long Lane: raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Bus stop improvement on Main Rd (SW-bound) between Mulberry Rd and Africa Drive: Pre feasibility NFDC0221 L202 MARCHWOOD MARCHWOOD Community £1,500 Scheme raised kerbs scoping Transport Public & Local Access Bus stop improvement on Main Rd (E-bound) between Mulberry Rd and Vicarage Rd: Pre feasibility NFDC0222 L203 MARCHWOOD MARCHWOOD Community £1,500 Scheme raised kerbs scoping Transport Public & Local Access Bus stop improvement on Main Rd (N-bound) between Old Cracknore Close and Moss Pre feasibility NFDC0223 L204 MARCHWOOD MARCHWOOD Community £1,500 Scheme Drive: raised kerbs scoping Transport Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Public & Local Access Bus stop improvement on Main Rd (SE-bound) nr junction with Old Magazine Close: Pre feasibility NFDC0224 L205 MARCHWOOD MARCHWOOD Community £1,500 Scheme raised kerbs scoping Transport Public & Local Access Bus stop improvement on Main Rd (W-bound) nr junction with Old Magazine Close: Pre feasibility NFDC0225 L206 MARCHWOOD MARCHWOOD Community £1,500 Scheme raised kerbs scoping Transport Public & Local Access Bus stop improvement on Tavells Lane (SW-bound) nr junction with Bury Rd: raised Pre feasibility NFDC0226 L207 MARCHWOOD MARCHWOOD Community £1,500 Scheme kerbs scoping Transport Public & Local Access Bus stop improvement on Tavells Lane (NE-bound) nr junction with Bury Rd: raised Pre feasibility NFDC0227 L208 MARCHWOOD MARCHWOOD Community £2,000 Scheme kerbs and hardstanding scoping Transport Public & Local Access Bus stop improvement on Pooksgreen (NW-bound) nr junction with Tavells Lane: raised Pre feasibility NFDC0228 L209 MARCHWOOD MARCHWOOD Community £1,500 Scheme kerbs scoping Transport Public & Local Access Bus stop improvement on Pooksgreen (SW-bound) nr junction with Tavells Lane: raised Pre feasibility NFDC0229 L210 MARCHWOOD MARCHWOOD Community £1,500 Scheme kerbs scoping Transport Local Access Highway Pre feasibility NFDC0230 L211 MARCHWOOD MARCHWOOD Junction Improvement and crossing at the junction with A326 and Twiggs Lane £350,000 Scheme Scheme scoping

Local Access Footpath linking Bury Road (west of incinerator) to Normandy Way (via Corks Farm) and Pre feasibility NFDC0231 L212 MARCHWOOD MARCHWOOD Walking £15,000 Scheme Magazine Lane scoping

Local Access Pre feasibility NFDC0232 L213 MARCHWOOD MARCHWOOD Crossing on Normandy Way for residents of Admiralty Quay Walking £15,000 Scheme scoping

Local Access Pre feasibility NFDC0233 L214 MARCHWOOD MARCHWOOD Uncontrolled crossing on Normandy Way near Cork's Farm Walking £50,000 Scheme scoping

Local Access Pre feasibility NFDC0234 L215 MARCHWOOD MARCHWOOD Uncontrolled crossing on Normandy Way near McMullen Barracks Walking £50,000 Scheme scoping

Local Access Pre feasibility NFDC0235 L216 MARCHWOOD MARCHWOOD Footway Enhancements along Cracknore Hard Lane Walking £65,000 Scheme scoping

Local Access Pre feasibility NFDC0236 L217 MARCHWOOD MARCHWOOD Footway enhancements along Hythe Road from St Contest Way to Hythe Walking £47,000 Scheme scoping

Local Access Closed Circuit Television (CCTV) for Traffic Monitoring Highway Pre feasibility NFDC0237 L218 MARCHWOOD MARCHWOOD £35,000 Scheme • 1 no. junct of A326/C173 Twiggs Lane Scheme scoping

Proposal to make all sections of Cracknore Hard Lane a 30 mph limit zone together with Local Access Pre feasibility NFDC0238 L219a MARCHWOOD MARCHWOOD small scale traffic calming to improve road safety and assist cyclists on the proposed Road Safety £50,000 Scheme scoping cycle route (MA/T/1)

Proposal to provide footway, where missing along Long Lane together with measures HCC Capital Local Access NFDC0239 L219b MARCHWOOD MARCHWOOD aimed at assisting pedestrians cross the road and reducing traffic speeds. The footway Walking Programme £12,000 Scheme will involve piping a ditch on Southampton F.C land. 2014/15

Local Access Pre feasibility NFDC0240 L220 MILFORD ON SEA MILFORD ON SEA Seafront (Hurst Road) to High St. On road cycle route Cycling £3,000 Scheme scoping

Local Access Manor Road to Barnes Lane (Via Chaucer Drive, Keats Avenue, Wolsey Way and Pre feasibility NFDC0241 L221 MILFORD ON SEA MILFORD ON SEA Cycling £5,000 Scheme Knowland Drive). On road route scoping

Local Access Pre feasibility NFDC0242 L222 MILFORD ON SEA MILFORD ON SEA Manor Rd to Sharvell's Road (via George Rd) on road route Cycling £5,000 Scheme scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access Seafront (to connect to town centre links and T/6 below) along Whitby Road and New Pre feasibility NFDC0243 L226 MILFORD ON SEA MILFORD ON SEA Cycling £5,000 Scheme Valley Road to Milford Crescent. scoping

Local Access Keyhaven to Milford on Sea via Keyhaven Road. Strategic on road cycle route linking Pre feasibility NFDC0244 L230 MILFORD ON SEA MILFORD ON SEA Cycling £8,000 Scheme Keyhaven to Milford on Sea scoping

Local Access Milford on Sea to Downton via Blackbush Road. Strategic on road cycle route to Pre feasibility NFDC0245 L231 MILFORD ON SEA MILFORD ON SEA Cycling £14,000 Scheme Downton scoping

Local Access Pre feasibility NFDC0246 L232 MILFORD ON SEA MILFORD ON SEA School Lane to Lymore Lane (connecting to Lymington Road ) on road route Cycling £5,000 Scheme scoping

Local Access Milford Road to Keyhaven via Lymore Lane (adjacent to road section near junction with Pre feasibility NFDC0247 L233 MILFORD ON SEA MILFORD ON SEA Cycling £31,000 Scheme Milford Rd and on road route to Keyhaven. scoping

Milford Primary School / Lymington Road to Keyhaven Road via Lyndale Close and Local Access Pre feasibility NFDC0248 L234 MILFORD ON SEA MILFORD ON SEA Carrington Lane (adjacent to road section along Lymington Road and dismount section Cycling £124,000 Scheme scoping on path between Lyndale Close and Carrington Lane, on road route to Keyhaven Road)

Local Access Pre feasibility NFDC0249 L235 MILFORD ON SEA MILFORD ON SEA Provision of footway (0.2km) on the east side of Carrington Lane, Milford on Sea Walking £18,000 Scheme scoping

Local Access Pre feasibility NFDC0250 L236a MILFORD ON SEA MILFORD ON SEA Minor widening of footpath along Lymington Road between A337 and School Walking £32,000 Scheme scoping

Local Access Raised speed table across the B3058 (nr Church Hill) and other speed reduction Highway Pre feasibility NFDC0251 L236b MILFORD ON SEA MILFORD ON SEA £100,000 Scheme measures (flat topped tables on sections used by cyclists) on northern approach. Scheme scoping

Local Access Uncontrolled crossing and footway improvements along High Street and on Keyhaven Pre feasibility NFDC0252 L237 MILFORD ON SEA MILFORD ON SEA Walking £5,000 Scheme Road, west of Laundry Lane, together with speed reduction measures (flat topped table) scoping

Local Access Highway Pre feasibility NFDC0253 L238 MILFORD ON SEA MILFORD ON SEA Junction improvement at New Valley Road and Barnes Lane. £20,000 Scheme Scheme scoping

Local Access Highway Pre feasibility NFDC0254 L239 MILFORD ON SEA MILFORD ON SEA Junction improvement at Whitby Road, New Valley Road and Kivernell Road £50,000 Scheme Scheme scoping

HCC Capital Local Access High Street (B3058): existing Zebra crossing to be converted to a humped crossing, also Highway NFDC0255 L240 MILFORD ON SEA MILFORD ON SEA Programme £20,000 Scheme to include speed reducing features in advance of the suggested raised Zebra crossing. Scheme 2014/15

Local Access Caird Avenue (nr superstore) to Lower Ashley Road via Carrick Way and Andrew Lane: Pre feasibility NFDC0256 L241 NEW MILTON NEW MILTON Cycling £4,000 Scheme Cycle route linking Carrick Way to Andrew Lane scoping

Local Access Chatsworth Way - Gore Road: Cycleway linking industrial estate to residential to north of Pre feasibility NFDC0257 L242 NEW MILTON NEW MILTON Cycling £53,000 Scheme rail line (dismount section) scoping

Local Access Old Milton to Gore Road via Church Lane & Milton Mead: Cycleway linking Old Milton to Feasibility NFDC0258 L243 NEW MILTON NEW MILTON Cycling £2,000 Scheme Gore Road complete

Local Access A337/Church Lane (Old Milton) to Naish Holiday Park via A337 Christchurch Road Feasibility NFDC0259 L244 NEW MILTON NEW MILTON Cycling £53,000 Scheme service road - Way to Naish Farm. On and off road cycle Route. complete

Town Centre to Walkford along Gore Road to Gore Road Industrial Estate (inc Elm Local Access Walking & Pre feasibility NFDC0260 L245 NEW MILTON NEW MILTON Avenue): Shared cycle / pedestrian use route (eastern section utilising existing footway £150,000 Scheme Cycling scoping and to the west of the School a new route on existing verge) Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access Pre feasibility NFDC0261 L246 NEW MILTON NEW MILTON Town Centre to Stem Lane via Avenue Road and Marley Avenue cycle link Cycling £7,000 Scheme scoping

Local Access Pre feasibility NFDC0262 L247 NEW MILTON NEW MILTON New Lane (NPA boundary) to Gore Road, on and off road cycle route along Stem Lane Cycling £99,000 Scheme scoping

Local Access Pre feasibility NFDC0263 L248 NEW MILTON NEW MILTON Town Centre to Ashley Common Road via Manor Road - on road cycle route link Cycling £9,600 Scheme scoping

Local Access Manor Road to Ferndale Road/Marston Road junction; on road cycle route along Pre feasibility NFDC0264 L249 NEW MILTON NEW MILTON Cycling £3,000 Scheme Oakwood Avenue scoping

Local Access Pre feasibility NFDC0265 L250 NEW MILTON NEW MILTON Barton Court Road north to the Town Centre, on road cycle lane Cycling Scheme scoping

Local Access A337 to Ashley Road via Caird Avenue superstore: On and adjacent to road cycle route Pre feasibility NFDC0266 L251 NEW MILTON NEW MILTON Cycling £16,000 Scheme from A337 to Ashley Road scoping

Local Access A337 Lanes Corner roundabout to town centre, including cycle lanes, adjacent to road Pre feasibility NFDC0267 L252 NEW MILTON NEW MILTON Cycling £22,000 Scheme and on road sections along Station Road. scoping

Local Access Pre feasibility NFDC0268 L253 NEW MILTON NEW MILTON Ashley Common Road/Lower Ashley Common Road: On road cycle route Cycling £6,000 Scheme scoping

Local Access Barton Sea Front (Marine Drive) to Ellingham Road via Marine Drive West and Western Pre feasibility NFDC0269 L254 NEW MILTON NEW MILTON Cycling £7,000 Scheme Avenue: On road cycle route (links to existing Naish Farm cycle route) scoping

Local Access Pre feasibility NFDC0270 L255 NEW MILTON NEW MILTON Barton Court Avenue to Penny Hedge: on road cycle route via Highlands Road Cycling £4,000 Scheme scoping

Local Access Christchurch Road to Barton Court Avenue - On road route via Park Road and Moorland Pre feasibility NFDC0271 L256 NEW MILTON NEW MILTON Cycling £3,000 Scheme Ave scoping

Local Access Gore Rd to Marley Avenue Cycle Route across bridge via Davis Field (short dismount Pre feasibility NFDC0272 L257 NEW MILTON NEW MILTON Cycling £29,000 Scheme section) scoping

Local Access Highway Feasibility NFDC0273 - NEW MILTON NEW MILTON Station Road / Manor Road Junction Improvements including junction realignment £150,000 Scheme Scheme underway

Local Access Feasibility NFDC0274 - NEW MILTON NEW MILTON Station Rd/Albert Rd: Footpath Improvements along Railway embankment Walking £48,000 Scheme complete

Local Access Provision of a footpath (0.8km) linking Dark Lane to Fernhill Lane residential area to Pre feasibility NFDC0275 - NEW MILTON NEW MILTON Walking £35,000 Scheme west of sports facilities scoping Public & Local Access Pre feasibility NFDC0276 - NEW MILTON NEW MILTON Bus stop improvement: Gore Rd (west bound) opposite Stem Lane; new shelter Community £2,000 Scheme scoping Transport Local Access Pre feasibility NFDC0277 - NEW MILTON NEW MILTON Footpath improvements along Milford Road and uncontrolled crossings over A337 Walking £25,000 Scheme scoping

Local Access Feasibility NFDC0278 - NEW MILTON NEW MILTON Footpath improvements between Pilgrim's Close and Oak Rd Walking £61,800 Scheme complete

Local Access Feasibility NFDC0279 - NEW MILTON NEW MILTON Improve uncontrolled pedestrian crossing points on Ashley Common Road Walking £28,800 Scheme complete Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access Feasibility NFDC0280 - NEW MILTON NEW MILTON Oakwood Avenue: Improve uncontrolled pedestrian crossing points Walking £16,500 Scheme complete

Local Access Highway Pre feasibility NFDC0281 - NEW MILTON NEW MILTON Junction improvements at Caird Ave and Ashley Rd £200,000 Scheme Scheme scoping

Public & Local Access Whitefield Road: Improvements to areas and facilities used by bus passengers and Pre feasibility NFDC0282 - NEW MILTON NEW MILTON Community £50,000 Scheme improved signing to railway station scoping Transport Public & Local Access Rail station improvements at New Milton station - shelter, cctv, signage and cycle parking Pre feasibility NFDC0283 - NEW MILTON NEW MILTON Community £160,000 Scheme improvements scoping Transport HCC Capital Local Access NFDC0284 - NEW MILTON NEW MILTON Footpath improvements along Highlands Road Walking Programme £12,000 Scheme 2013/14 Caird Avenue/Tesco Roundabout - Minor changes to roundabout alignment and Local Access Pre feasibility NFDC0285 - NEW MILTON NEW MILTON provision of pedestrian refuges, footway on eastern side of Caird Avenue linking into Walking £50,000 Scheme scoping proposed development site

Local Access Caird Avenue/Lymington Rd roundabout improvement. Provision of 2 lane approach to Highway Pre feasibility NFDC0286 - NEW MILTON NEW MILTON £50,000 Scheme roundabout from east and extension of 2 lane approach on Caird Ave Scheme scoping

Local Access New junction on Caird Avenue. The access point will be 180m south of roundabout and Pre feasibility NFDC0287 - NEW MILTON NEW MILTON Walking £200,000 Scheme include provision of pedestrian refuge scoping

Local Access Highway Pre feasibility NFDC0288 - NEW MILTON NEW MILTON New Milton Junior School- Traffic calming in vicinity of school on Old Milton Road £15,000 Scheme Scheme scoping

Local Access The Arnewood School- Separate ped/cycle gate and separate raised crossing across Walking & Pre feasibility NFDC0289 - NEW MILTON NEW MILTON £60,000 Scheme entrance to sports hall car park. Upgrade to Toucan Cycling scoping

Local Access Ashley Junior School- New cycle/pedestrian path from rugby club, lighting, signing, Walking & Pre feasibility NFDC0290 - NEW MILTON NEW MILTON £20,000 Scheme parking restrictions Cycling scoping

Lower Ashley Rd/Ashley Common Rd: Ashley Infant School- Crossing points/traffic Local Access Highway Pre feasibility NFDC0291 - NEW MILTON NEW MILTON calming in vicinity of school (flat topped tables as cycle route - similar to Water Lane, £100,000 Scheme Scheme scoping Totton)

Local Access Footpath from Caird Avenue to Lower Ashley Road linking to Carrick Way, Wentwood Pre feasibility NFDC0292 - NEW MILTON NEW MILTON Walking £46,000 Scheme Gardens and Glen Spey scoping

Local Access Footpath and uncontrolled crossing along Sway Road to connect caravan site to New Pre feasibility NFDC0293 - NEW MILTON NEW MILTON Walking £25,000 Scheme Milton scoping

Local Access Refurbish and upgrade the existing traffic signals at the Barton Court Road and Highway Feasibility NFDC0294 - NEW MILTON NEW MILTON £90,000 Scheme Lymington Road junction, New Milton Scheme complete

Local Access Feasibility NFDC0295 - NEW MILTON NEW MILTON Uncontrolled crossing improvements at junction of A337 and Old Milton Road. Walking £60,000 Scheme underway

HCC Capital Local Access Speed reduction measures along Ashley Common Road, between Woodside Lane and Highway NFDC0296 - NEW MILTON NEW MILTON Programme £62,000 Scheme Danesbury Meadow (flat topped tables similar to Water Lane, Totton as cycle route) Scheme 2013/14

Local Access Improved signing between bus stops in Whitefield Road/Station Road and New Milton Highway Pre feasibility NFDC0297 - NEW MILTON NEW MILTON £2,000 Scheme Railway Station Scheme scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access Provision of footway (approx 140m) on eastern side of Caird Avenue between Carrick Pre feasibility NFDC0298 - NEW MILTON NEW MILTON Walking £8,000 Scheme Way and Tesco roundabout scoping

Junction improvements linked to NM/T/41 including the possible provision of a Local Access Highway Feasibility NFDC0299 - NEW MILTON NEW MILTON roundabout at the junction of Old Milton Road and the A337 together with improved £45,000 Scheme Scheme underway pedestrian crossing facilities.

Public & Local Access To be NFDC0300 - NEW MILTON NEW MILTON Replacement Call and Go bus for coastal towns Community £50,000 Scheme Investigated Transport

Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Local Access Highway Pre feasibility NFDC0301 - NEW MILTON NEW MILTON • 1 no. A337 junct with B3058 £70,000 Scheme Scheme scoping • 1 no. B3055 junct with B3058

Automatic Number Plate Recognition (ANPR) : £12K per site • 1 no. A337 e/b east of junct with B3058 Local Access Highway Pre feasibility NFDC0302 - NEW MILTON NEW MILTON • 1 no. A337 w/b west of junct with B3058 £48,000 Scheme Scheme scoping • 2 no. A337 at county border

Ringwood Pre feasibility NFDC0303 - RINGWOOD RINGWOOD Gravel Lane to Southampton Road off road route through Orchard Mount. Cycling £156,000 TAP scoping Ringwood Kingsfield to Southampton Road via Manor Road, Green Lane, Parsonage Barn Lane, Pre feasibility NFDC0304 - RINGWOOD RINGWOOD Cycling £35,000 TAP (dismount section ) scoping

Ringwood School Lane to Cloughs Road: On road cycle route via Manor Road with short off road Pre feasibility NFDC0305 - RINGWOOD RINGWOOD Cycling £56,000 TAP section adj/through Schools scoping

Bickerley Common to Hightown Road junction (via Castleman Way): On and adjacent to Ringwood Walking & Pre feasibility NFDC0306 - RINGWOOD RINGWOOD road cycle route via Bickerley Road and Castleman Way. Includes shared cycle/footway £94,000 TAP Cycling scoping on northern side and part of southern side of Castleman Way

Ringwood Quomp to Hightown Gardens via Hightown Road: On road cycle route with traffic calming Pre feasibility NFDC0307 - RINGWOOD RINGWOOD Cycling £6,500 TAP along Hightown Road. See AP4 for traffic calming scheme scoping

Ringwood Crow Arch Lane to Moortown Lane: Cycleway across fields to Moortown Lane (including Pre feasibility NFDC0308 - RINGWOOD RINGWOOD Cycling £118,000 TAP small section on Crow Arch Lane) scoping

Ringwood Linford Road: on and off road route linking into NPA through to Linford Bottom. Signing Feasibility NFDC0309 - RINGWOOD RINGWOOD Cycling £2,000 TAP required complete

Ringwood Castleman Way to Crow Lane: via Embankment Way. Adjacent to and off road cycle Pre feasibility NFDC0310 - RINGWOOD RINGWOOD Cycling £131,000 TAP route. scoping Ringwood Pre feasibility NFDC0311 - RINGWOOD RINGWOOD A31 to Mansfield Road: via West Street, strategic on road cycle route. Cycling £1,000 TAP scoping Ringwood Pre feasibility NFDC0312 - RINGWOOD RINGWOOD Gorley Road to North Road (SCR) via Poulner Infant and Junior Schools Cycling £44,500 TAP scoping Castleman Way to Town Centre via Quomp and The Close: On road (northern section) Ringwood cycle route with off road section by Victoria Gardens. New crossings in Christchurch Rd, Feasibility NFDC0313 - RINGWOOD RINGWOOD Cycling £60,000 TAP Highfield & Castleman Way and upgraded (to Toucan) crossing in Mansfield underway road(RI/T/19) Ringwood Pre feasibility NFDC0314 - RINGWOOD RINGWOOD North Poulner Road: On road cycle route linking RI/T/10 to Poulner Lake area Cycling £3,000 TAP scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Ringwood Town centre to A338 Salisbury Road: extension to shared pedestrian/cycle route Feasibility NFDC0315 - RINGWOOD RINGWOOD Cycling £50,000 TAP adjacent to Salisbury Road to path north of Ivy Lane underway

Ringwood Mansfield Road to Southampton Road via Carvers sports ground (adjacent, on and off Pre feasibility NFDC0316 - RINGWOOD RINGWOOD Cycling £68,000 TAP road sections) scoping

Ringwood Pre feasibility NFDC0317 - RINGWOOD RINGWOOD Moortown to Castleman Way via New Street on and adjacent to road sections Cycling £69,000 TAP scoping

Ringwood Pre feasibility NFDC0318 - RINGWOOD RINGWOOD Gorley Rd towards Hyde, on road route connecting north towards Hyde (SCR) Cycling £5,000 TAP scoping

Environmental and pedestrian enhancements to Southampton Rd/The Close. To include a restricted parking zone and an even level surface with no kerbs to create a balance HCC Capital Ringwood between pedestrians and motorised traffic. Environment/ NFDC0320 - RINGWOOD RINGWOOD Programme £350,000 TAP Improvement to the pedestrian route from the Furlong car park to Southampton Road, Public Realm 2012/13 including new trees and shrub planting.

Ringwood Uncontrolled crossing facilities to be provided in vicinity of war memorial roundabout, at Pre feasibility NFDC0322 - RINGWOOD RINGWOOD Walking £20,000 TAP Christchurch Road south and Bickerley Gardens utilising roundabout splitter islands scoping

Ringwood Pre feasibility NFDC0323 - RINGWOOD RINGWOOD Poulner Inf & Junior Schools- New pedestrian entrance and footpath widening Walking £30,000 TAP scoping Southampton Road (southern section to Fridays Cross). Enhanced pedestrian Ringwood Pre feasibility NFDC0324 - RINGWOOD RINGWOOD environment to make the area safe and attractive for walking and cycling. Phase 2 of the Walking £200,000 TAP scoping current Country Towns Initiative scheme described in AP1(RI/T/18) above

Footpaths between The Close and Christchurch Road: Improvements to existing Ringwood Pre feasibility NFDC0326 - RINGWOOD RINGWOOD footpaths and footways, to include removal of tree roots, new surface overlay and Walking £20,000 TAP scoping improved lighting. Ringwood Highway Pre feasibility NFDC0327 - RINGWOOD RINGWOOD Eastfield Lane/A31 slip road, junction improvement/widening £40,000 TAP Scheme scoping

Moortown to Town Centre via Quomp: Improvements to existing paths and footways, Ringwood Walking & Pre feasibility NFDC0328 - RINGWOOD RINGWOOD including footway link through Wellworthy site to connect Castleman Way and £50,000 TAP Cycling scoping Christchurch Rd required, similar route to cycle route PC15

Ringwood Southampton Rd, west of Frampton Place, footpath widening either by purchase of land Pre feasibility NFDC0329 - RINGWOOD RINGWOOD Walking £50,000 TAP or any other viable alternative to obtain the additional width to create a ‘standard’ facility. scoping

Ringwood Pre feasibility NFDC0330 - RINGWOOD RINGWOOD Uncontrolled Crossing at junction of Christchurch Road and Parkside Walking £15,000 TAP scoping Ringwood Uncontrolled Crossing at junction of Christchurch Road and access to Millstream Trading Pre feasibility NFDC0331 - RINGWOOD RINGWOOD Walking £15,000 TAP Estate scoping Ringwood Pre feasibility NFDC0332 - RINGWOOD RINGWOOD Uncontrolled Crossing near to junction of Christchurch Road (B3347) and Shires Close Walking £15,000 TAP scoping Southampton Road (cul-de-sac section north of Mansfield Road) accessibility Ringwood Pre feasibility NFDC0333 - RINGWOOD RINGWOOD improvements and enhanced pedestrian environment to make the area safe and Road Safety £300,000 TAP scoping attractive and strengthen foot/cycle path links Ringwood Highway Pre feasibility NFDC0334 - RINGWOOD RINGWOOD Clough's Road - One way traffic (eastbound) to prevent rat-running. £10,000 TAP Scheme scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Ringwood Bus Interchange Improvements; Public & Ringwood Pre feasibility NFDC0335 - RINGWOOD RINGWOOD includes: raised kerbs, bus stop clearway/boxes, pole and flags, litter bins, tactile paving, Community £70,000 TAP scoping clocks, ticket purchasing facilities, interchange layout diagrams) Transport Public & Ringwood Pre feasibility NFDC0336 - RINGWOOD RINGWOOD Deployment of journey planning kiosk and bus departure screen- Meeting House Lane Community £30,000 TAP scoping Transport Public & Ringwood Deployment of Bus departure displays inside bus shelters at Meeting House Lane bus Pre feasibility NFDC0337 - RINGWOOD RINGWOOD Community £40,000 TAP interchange scoping Transport

Ringwood Improve signing of pedestrian routes in the Town Centre from car parks to increase Pre feasibility NFDC0338 - RINGWOOD RINGWOOD Walking £30,000 TAP footfall through the town centre. scoping

Ringwood Hurst Road to Lakes: Improve surface of footpath to assist access to open Pre feasibility NFDC0339 - RINGWOOD RINGWOOD Walking £20,000 TAP space/leisure facility scoping

Ringwood Pre feasibility NFDC0340 - RINGWOOD RINGWOOD Uncontrolled crossing at junction of Hightown Road and Gardner Road Walking £15,000 TAP scoping Ringwood Extension of footpath alongside Bickerley Road to create a continuation to ‘Danny Pre feasibility NFDC0341 - RINGWOOD RINGWOOD Walking £10,000 TAP Cracknell Pocket Park’. scoping Public & Ringwood Bus stop improvement on Southampton Rd: South side (adj. 254 Southampton Road) – Pre feasibility NFDC0342 - RINGWOOD RINGWOOD Community £5,000 TAP new shelter. North side (adj. 6 Whitehart Fields). New shelter required. scoping Transport

Ringwood Southampton Road/Carvers Recreation Ground – verge parking. Improvements to verge Parking Control Pre feasibility NFDC0343 - RINGWOOD RINGWOOD £10,000 TAP to better manage car parking and reduce the level of obstruction of the footway facility. & Management scoping

Ringwood Bickerley Road at its junction with Bickerley Gardens - speed reduction measures Highway Feasibility NFDC0344 - RINGWOOD RINGWOOD £20,000 TAP (possible changed junction priority). Scheme complete

Improve facilities for pedestrians to encourage greater footfall in this part of the shopping Ringwood Environment/ Pre feasibility NFDC0345 - RINGWOOD RINGWOOD area whilst maintaining vehicle access for shopping and servicing. Includes improved £300,000 TAP Public Realm scoping pedestrian links along West Street and dropped crossings to be provided on High Street

Ringwood Gravel Lane to car park and Southampton Road -Accessibility improvements for Walking & Pre feasibility NFDC0346 - RINGWOOD RINGWOOD £30,000 TAP pedestrians and cyclists to complete route – to include signing Cycling scoping

Furlong car park to Market Place/High Street: Improved links between the car park and Ringwood Pre feasibility NFDC0347 - RINGWOOD RINGWOOD town centre. To include accessibility and pedestrian improvements to adjacent roads Walking £38,500 TAP scoping including tactile paving and dropped crossings.

Upgrade existing cycle parking facility outside Visitor Information Centre. New facilities Ringwood Pre feasibility NFDC0348 - RINGWOOD RINGWOOD required in the Market Place and Carvers Recreation Ground. New facilities at Butlers Cycling £10,000 TAP scoping Lane shopping area, Poulner.

Ringwood Improve signing of cycle routes within Ringwood to raise awareness of existing Pre feasibility NFDC0349 - RINGWOOD RINGWOOD Cycling £20,000 TAP infrastructure. scoping

Ringwood Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0350 - RINGWOOD RINGWOOD £35,000 TAP • 1 no. B3347 Mansfield Road junct with The Furlong/Southampton Road Scheme scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived)

Automatic Number Plate Recognition (ANPR) : £12K per site Ringwood Highway Pre feasibility NFDC0351 - RINGWOOD RINGWOOD • 1 no. A338 n/b north of junct with A31(T) £24,000 TAP Scheme scoping • 1 no. A338 s/b north of junct with A31(T)

Minor kerbing alterations to tighten the radius of the junction between Alderholt Road and HCC Capital Local Access Scats Lane and kerbing works at the junction between Main Road and Scats Lane, all to Highway NFDC0352 - SANDLEHEATH Programme £10,000 Scheme reduce speed of traffic using Scats Lane as a cut through road from Main Road to Scheme 2013/14 Alderholt Road.

HCC Capital Local Access Ringwood Rd to Water Lane (via Lydlynch Road and Bagber Rd) on and adjacent to road NFDC0353 - TOTTON & ELING TOTTON & ELING Cycling Programme £220,000 Scheme route 2013/14

Local Access Rumbridge Street to A336/Ringwood Road (via Brokenford Lane) on and adjacent to Pre feasibility NFDC0354 - TOTTON & ELING TOTTON & ELING Cycling £109,150 Scheme road and upgrade Brokenford Lane Railway footbridge to assist cyclists scoping

Local Access Eling Lane to Library Road (via Junction Road): on road cycle route and link to Testwood Pre feasibility NFDC0355 - TOTTON & ELING TOTTON & ELING Cycling £3,000 Scheme Lane - dismount section at A36 scoping

Local Access Pre feasibility NFDC0356 - TOTTON & ELING TOTTON & ELING Dales Way to Stonechat Drive: West Totton off road route Cycling £20,000 Scheme scoping

Local Access Pre feasibility NFDC0357 - TOTTON & ELING TOTTON & ELING Calmore Crescent: On road cyclepath link to existing routes in Calmore Cycling £1,500 Scheme scoping

Calmore to Water Lane via Hammonds Green: To reinstate priorities back to Calmore Local Access Pre feasibility NFDC0358 - TOTTON & ELING TOTTON & ELING Drive from Goodwood Gardens. Change of priority has been reviewed and suggested to Cycling £15,000 Scheme scoping be returned to original priority.

Local Access Calmore Drive to Calmore Road: Cycle route extension to above: T/6 (on and adjacent to Pre feasibility NFDC0359 - TOTTON & ELING TOTTON & ELING Cycling £23,000 Scheme road sections) scoping

Local Access Calmore Drive to Salisbury Road Roundabout: On road cycle route extension to Pre feasibility NFDC0360 - TOTTON & ELING TOTTON & ELING Cycling £25,000 Scheme proposed route on Calmore Drive scoping

Local Access Water Lane to Hazel Farm Road (via Barnsfield Crescent): Cycle route to link to Pre feasibility NFDC0361 - TOTTON & ELING TOTTON & ELING Cycling £5,000 Scheme proposed route on Water Lane and existing off road routes scoping

Local Access Water Lane to Salisbury Rd via Hammonds Lane: On Road cycle route to link proposed Pre feasibility NFDC0362 - TOTTON & ELING TOTTON & ELING Cycling £3,000 Scheme route on Water Lane and existing on road route on Salisbury Road scoping

Local Access Testwood Lane to Salisbury Road via Library Rd link: Cycle route (on-road and shared Pre feasibility NFDC0363 - TOTTON & ELING TOTTON & ELING Cycling £24,000 Scheme pedestrian/cycle route through car park and library site) scoping

Local Access Bartley Park to Brokenford Lane housing allocation via : Cycle route (off- Pre feasibility NFDC0364 - TOTTON & ELING TOTTON & ELING Cycling £216,000 Scheme road 1.7km including railway underpass) scoping

Local Access Calmore - Testwood - town centre - Redbridge cycleway: Cycle route on-road & shared Pre feasibility NFDC0365 - TOTTON & ELING TOTTON & ELING Cycling £23,000 Scheme (footway requires widening) (approx 1.5km left to build) scoping

Hamtun Gardens to Testwood Lane (via Greenfields Avenue): Cycle route extension to Local Access Pre feasibility NFDC0366 - TOTTON & ELING TOTTON & ELING proposed route on Testwood Lane and existing route on Salisbury Road. Short section Cycling £20,000 Scheme scoping of off road on footpath link. Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access Nutsey Lane to A326 Salisbury Road (via Nutsey Avenue): On road cycle route to link to Pre feasibility NFDC0367 - TOTTON & ELING TOTTON & ELING Cycling £1,000 Scheme industrial estate scoping

Jacob's Gutter Lane to Downs Park Crescent: (Hounsdown to Eling) on and off road Local Access TOTTON & ELING, TOTTON & ELING, Pre feasibility NFDC0368 - sections via A326 Marchwood Bypass (adjacent to road sections) and off road section to Cycling £181,000 Scheme MARCHWOOD MARCHWOOD scoping Downs Park Crescent.

Local Access Jacobs Gutter Lane (west) to Hounsdown Business Park: On and off road cycle route Pre feasibility NFDC0369 - TOTTON & ELING TOTTON & ELING Cycling £152,000 Scheme linking Durley Farm and A326. scoping

Local Access Hounsdown Avenue, Valley Road and part of Jacobs Gutter Lane: On road cycle route Pre feasibility NFDC0370 - TOTTON & ELING TOTTON & ELING Cycling £3,000 Scheme connecting sections of proposed route in Hounsdown scoping

Local Access Pre feasibility NFDC0371 - TOTTON & ELING TOTTON & ELING Jacobs Gutter Lane (east of A326 spur): adjacent to road cycle route. Cycling £153,000 Scheme scoping

Local Access Extension to Bartley Park (west Totton Greenroute): on road route along Ashurst Bridge Pre feasibility NFDC0372 - TOTTON & ELING TOTTON & ELING Cycling £500 Scheme Road to NPA boundary scoping HCC Capital Local Access NFDC0373 - TOTTON & ELING TOTTON & ELING Hazel Wood Infant School- Footpath improvements Walking Programme £15,000 Scheme 2014/15 Local Access Pre feasibility NFDC0374 - TOTTON & ELING TOTTON & ELING Testwood Sports College - Crossing point by school Walking £20,000 Scheme scoping

Totton Railway Station Improvements; Public & Local Access Feasibility NFDC0375 - TOTTON & ELING TOTTON & ELING Including raised kerbs, box markings, litter bins, replacement surfacing, dropped kerbs, Community £125,000 Scheme underway new footway, seating, electronic and real time information, interchange layout information Transport

Public & Local Access Bus stop improvement on Marchwood Road (W-bound) nr junction with Bury Lane: Pre feasibility NFDC0376 - TOTTON & ELING TOTTON & ELING Community £600 Scheme hardstanding scoping Transport Public & Local Access Bus stop improvement on Marchwood Road (W-bound) nr junction with Jacobs Gutter Pre feasibility NFDC0377 - TOTTON & ELING TOTTON & ELING Community £600 Scheme Lane: hardstanding scoping Transport Public & Local Access Bus stop improvement on A326 (N-bound) nr junction with Jacobs Gutter Lane: Pre feasibility NFDC0378 - TOTTON & ELING TOTTON & ELING Community £2,000 Scheme hardstanding and raised kerbs scoping Transport Public & Local Access Bus stop improvement on A326 (N-bound) south of junction with A35: hardstanding and Pre feasibility NFDC0379 - TOTTON & ELING TOTTON & ELING Community £2,000 Scheme raised kerbs scoping Transport Public & Local Access Bus stop improvement on Spicers Hill nr junction with Hounsdown Avenue (S-bound): Pre feasibility NFDC0380 - TOTTON & ELING TOTTON & ELING Community £1,500 Scheme raised kerbs scoping Transport Public & Local Access Pre feasibility NFDC0381 - TOTTON & ELING TOTTON & ELING Bus stop improvement on A35 at Spicers Hill (S-bound): raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Pre feasibility NFDC0382 - TOTTON & ELING TOTTON & ELING Bus stop improvement on A35 at Spicers Hill (N-bound): raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Pre feasibility NFDC0383 - TOTTON & ELING TOTTON & ELING Bus stop improvement on A35 (Main Rd) nr Chapel Lane (N-bound): raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Pre feasibility NFDC0384 - TOTTON & ELING TOTTON & ELING Bus stop improvement on A35 nr Rumbridge St (E-bound): raised kerbs Community £1,500 Scheme scoping Transport Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Public & Local Access Pre feasibility NFDC0385 - TOTTON & ELING TOTTON & ELING Bus stop improvement on A35 nr Rumbridge St (W-bound): raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Pre feasibility NFDC0386 - TOTTON & ELING TOTTON & ELING Bus stop improvement on Eling Lane (S-bound): raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Pre feasibility NFDC0387 - TOTTON & ELING TOTTON & ELING Bus stop improvement on Junction Road (N-bound) nr Rumbridge St: raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Pre feasibility NFDC0388 - TOTTON & ELING TOTTON & ELING Bus stop improvement on A336 (Ringwood Rd) nr Asda (W-bound): raised kerbs Community £1,500 Scheme scoping Transport Public & Local Access Bus stop improvement on Commercial Road (nr Testwood Lane) shopping precinct (E- Pre feasibility NFDC0389 - TOTTON & ELING TOTTON & ELING Community £1,500 Scheme bound): raised kerbs scoping Transport Public & Local Access Pre feasibility NFDC0390 - TOTTON & ELING TOTTON & ELING Bus stop improvement on Commercial Road opp Beaumont Rd (W-bound): raised kerbs Community £1,500 Scheme scoping Transport

A36 Commercial Rd/Salisbury Rd/Ringwood Rd/Library Rd Junction: Central Roundabout Reduce scale of roundabout, widen footways and provide improved uncontrolled crossing where Salisbury Road joins roundabout. A36 Commercial Road: Local Access Reduce Commercial Road to single carriageway (except on final approach to Highway Feasibility NFDC0391 - TOTTON & ELING TOTTON & ELING £350,000 Scheme roundabout), pavement widening, improved bus stops with shelters, replace pelican Scheme underway crossing with raised flat top zebra crossing (and replace central reserve with at grade feature) and flat top table at Beaumont Rd junction to create a gateway to the town centre and slow traffic speeds

Local Access Improved crossing point on A36 between its junction with Station Road North and Walking & Pre feasibility NFDC0392 - TOTTON & ELING TOTTON & ELING £60,000 Scheme Redbridge Causeway to assist pedestrians and cyclists Cycling scoping

Local Access Water Lane/Westfield Car Park: Pedestrian Link between Car Park/rear service area Pre feasibility NFDC0393 - TOTTON & ELING TOTTON & ELING Walking £40,000 Scheme and eastern end of Water Lane scoping

Local Access Calmore Road including Michigan Way Junction: Speed reduction features where Walking & Pre feasibility NFDC0394 - TOTTON & ELING TOTTON & ELING £250,000 Scheme pedestrians/cyclists cross and junction improvement/modification Cycling scoping

Local Access Environment/ To be NFDC0395 - TOTTON & ELING TOTTON & ELING Air quality management area: Proposals set out in AQMA plan & LTP £300,000 Scheme Public Realm Investigated

Local Access Uncontrolled crossing across A326 to assist crossing of A326 to/from Eling and Pre feasibility NFDC0396 - TOTTON & ELING TOTTON & ELING Walking £70,000 Scheme Hounsdown areas scoping

Local Access Uncontrolled crossing across Maynard Road near junction with A336/A36 to assist Pre feasibility NFDC0397 - TOTTON & ELING TOTTON & ELING Walking £50,000 Scheme crossing of Ringwood Rd scoping

Footpath improvements / cycle route linking to existing cycle routes and paths in West Local Access Walking & Pre feasibility NFDC0398 - TOTTON & ELING TOTTON & ELING Totton, Greenroute (extended) to Tatchbury Lane. The route continues into the NPA £7,000 Scheme Cycling scoping area

Local Access Pre feasibility NFDC0399 - TOTTON & ELING TOTTON & ELING Controlled crossing on Commercial Rd near junction with Station Rd North Walking £70,000 Scheme scoping

Local Access Pre feasibility NFDC0400 - TOTTON & ELING TOTTON & ELING Uncontrolled crossing on Rose Rd near junction with Eling Lane Walking £50,000 Scheme scoping

Local Access Traffic Information Variable Message Signs (VMS) : 160mm Character height Highway Pre feasibility NFDC0401 - TOTTON & ELING TOTTON & ELING £15,000 Scheme • 1 no. s/b on A326 approach to junct with A336 Scheme scoping Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access Traffic Information Variable Message Signs (VMS) : 160mm Character height Highway Pre feasibility NFDC0402 - TOTTON & ELING TOTTON & ELING £15,000 Scheme • 1 no. n/b on A326 approach to junct with A336 Scheme scoping

Local Access Traffic Information Variable Message Signs (VMS) : 240mm Character height Highway Pre feasibility NFDC0403 - TOTTON & ELING TOTTON & ELING £25,000 Scheme • 1 no. w/b on A35 Totton Bypass approach to Rushington R/abt Scheme scoping

Local Access Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0404 - TOTTON & ELING TOTTON & ELING £35,000 Scheme • 1 no. A35 e/b approach to Rushington Roundabout Scheme scoping

Local Access Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0405 - TOTTON & ELING TOTTON & ELING £35,000 Scheme • 1 no. A35 w/b approach to Rushington Roundabout Scheme scoping

Local Access Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0406 - TOTTON & ELING TOTTON & ELING £35,000 Scheme • 1 no. A326 (spur) s/b at junct with Jacobs Gutter Lane Scheme scoping

Local Access Automatic Number Plate Recognition (ANPR) : £12K per site Highway Pre feasibility NFDC0407 - TOTTON & ELING TOTTON & ELING £12,000 Scheme • 1 no. A35 w/b between A326 intersection and junct with C63 Scheme scoping

Local Access Automatic Number Plate Recognition (ANPR) : £12K per site Highway Pre feasibility NFDC0408 - TOTTON & ELING TOTTON & ELING £24,000 Scheme • 2 no. A35 e/b east of A326 intersection Scheme scoping

Local Access Automatic Number Plate Recognition (ANPR) : £12K per site Highway Pre feasibility NFDC0409 - TOTTON & ELING TOTTON & ELING £24,000 Scheme • 2 no. A326(Spur) south of Rushington R/abt Scheme scoping

Automatic Number Plate Recognition (ANPR) : £12K per site • 2 no. A326 south of junct with A336 Local Access Highway Pre feasibility NFDC0410 - TOTTON & ELING TOTTON & ELING • 2 no. A336 west of junct with A326 £96,000 Scheme Scheme scoping • 2 no. A326 north of junct with A336 • 2 no. A336 east of junct with A326

Local Access Automatic Number Plate Recognition (ANPR) : £12K per site Highway Pre feasibility NFDC0411 - TOTTON & ELING TOTTON & ELING £24,000 Scheme • 2 no. A326 south of M27 J2 Scheme scoping

Local Access Stonechat Drive - Speed reduction feature (raised table) at uncontrolled cycle/crossings Pre feasibility NFDC0412 - TOTTON & ELING TOTTON & ELING Road Safety £20,000 Scheme between Alder Hill Drive & Aspen Walk scoping

Local Access Controlled crossing (possibly Toucan) on Maynard Rd between junction with Ringwood Pre feasibility NFDC0414 - TOTTON & ELING TOTTON & ELING Walking £100,000 Scheme Road and Superstore access point. Including work required to achieve visibility scoping Public & Local Access Provision of a section of bus lane on Commercial Road, Totton; to the east of the Red Pre feasibility NFDC0415 - TOTTON & ELING TOTTON & ELING Community £12,000 Scheme Lion public house site to the Redbridge Causeway. scoping Transport Public & Local Access Pre feasibility NFDC0416 - TOTTON & ELING TOTTON & ELING Provision of Real Time Passenger Information for bus services in . Community £92,000 Scheme scoping Transport Local Access Footpath widening to improve the existing cycle route opposite the garage near Walking & Pre feasibility NFDC0417 - TOTTON & ELING TOTTON & ELING £1,000 Scheme Rushington Roundabout (on A35 westbound side at junction with A326) . Cycling scoping

Implementation of a central refuge on Jacobs Gutter Lane near junction with Trotts Lane Local Access Pre feasibility NFDC0418 - TOTTON & ELING TOTTON & ELING to help cyclists cross the road in two halves. This is likely to involve localised widening of Cycling £100,000 Scheme scoping the main road to accomodate the refuge and to maintain sight lines

Ringwood Road between junction with Calmore Road and opposite junction with Southern Gardens - Environmental improvements to address verge parking issues, HCC Capital Local Access Environment/ NFDC0419 - TOTTON & ELING TOTTON & ELING including reinstatement of damaged verges, measures to deter verge parking (possibly Programme £50,000 Scheme Public Realm including footway and verge parking restrictions) plus possible verge reinforcement to 2013/14 provide parking without obstructing private accesses Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Toucan crossing phase and facility of Calmore Rd/Ringwood Rd signalised junction and; Local Access Puffin crossing phase and facility of Ringwood Rd arm of the Feasibility NFDC0420 - TOTTON & ELING TOTTON & ELING Walking £70,000 Scheme Calmore/Ringwood/Testbourne signalised junction. underway

Local Access Hanger Farm Arts Centre to Spruce Drive: Off road route across Hanger Farm to Pre feasibility NFDC0421 - TOTTON & ELING TOTTON & ELING Cycling £60,000 Scheme improve linkages to supermarket and existing routes in the area. scoping HCC Capital Local Access West Totton Cycle Routes: Improvement of lines, signs and staggered barriers so that NFDC0422 - TOTTON & ELING TOTTON & ELING Cycling Programme £40,000 Scheme these consistent with Department for Transport guidance (LTN 2/08) 2014/15

Local Access Salisbury Road adjacent to and off road shared pedestrian/cycle route between Walking & Feasibility NFDC0423 - TOTTON & ELING TOTTON & ELING Scheme Testwood Park site and southside of Brunel roundabout. and footway improvements. Cycling complete

Local Access Salisbury Road (eastern side) provision of footway between site and bus stop to the Feasibility NFDC0424 - TOTTON & ELING TOTTON & ELING Walking Scheme south of the site. (Outside Little Testwood Farmhouse and Little Testwood Farm) complete TOTTON & ELING, TOTTON & ELING, Public & Local Access Pre feasibility NFDC0425 - MARCHWOOD, HYTHE MARCHWOOD, HYTHE Community Transport (15 seater bus) provision to serve the Waterside area Community £60,000 Scheme scoping AND FAWLEY AND FAWLEY Transport Local Access Access to Eling Wharf: Junction improvements (Direct access off the A35) to relieve the Highway Pre feasibility NFDC0426 - TOTTON & ELING TOTTON & ELING Scheme High Street Scheme scoping Public & Local Access Community Transport: Replacement Mopeds for shared moped/wheels to work scheme Pre feasibility NFDC0427 - ALL ALL Community £6,000 Scheme for whole plan Area (based on six mopeds) scoping Transport Public & Local Access Rail station improvements at Ashurst New Forest- shelter, cctv, signage and cycle Pre feasibility NFDC0428 - ASHURST & ASHURST & COLBURY Community £15,000 Scheme parking improvements scoping Transport Service 56 and 56A high frequency bus routes: Ashurst - Lyndhurst - Goose Green - Public & Local Access Clayhill - Balmer Lawn - - South Weirs - Setley - - Battramsley Pre feasibility NFDC0429 - ASHURST & COLBURY ASHURST & COLBURY Community £25,000 Scheme Cross - - St Austins - Lower Buckland - Lymington : Bus stop infrastructure scoping Transport including shelters, raised kerbs and hardstandings. Public & Local Access Bus stop improvements along Totton to Lyndhurst bus corridor including: new shelters, Pre feasibility NFDC0430 - ASHURST & COLBURY ASHURST & COLBURY Community £15,000 Scheme kerb works, solar lit poles, new poles etc scoping Transport Public & Local Access Pre feasibility NFDC0431 - BEAULIEU BEAULIEU infrastructure Community £15,000 Scheme scoping Transport Public & Local Access Pre feasibility NFDC0432 - BEAULIEU BEAULIEU Rail station works in conjunction with operator including - cycle parking, signage Community £15,000 Scheme scoping Transport Local Access Highway Pre feasibility NFDC0433 - BEAULIEU BEAULIEU Footpath and traffic management at edge of village £45,000 Scheme Scheme scoping

Service 56 and 56A high frequency bus routes: Ashurst - Lyndhurst - Goose Green - Public & Local Access Clayhill - Balmer Lawn - Brockenhurst - South Weirs - Setley - Battramsley - Battramsley Pre feasibility NFDC0434 - BOLDRE BOLDRE Community £5,000 Scheme Cross - Boldre - St Austins - Lower Buckland - Lymington : Bus stop infrastructure scoping Transport including shelters, raised kerbs and hardstandings. Public & Local Access Brockenhurst Rail Station Improvements; (Includes shelter, cctv, signage and cycle Pre feasibility NFDC0435 - BROCKENHURST BROCKENHURST Community £45,000 Scheme parking improvements). scoping Transport Service 56 and 56A high frequency bus routes: Ashurst - Lyndhurst - Goose Green - Public & Local Access Clayhill - Balmer Lawn - Brockenhurst - South Weirs - Setley - Battramsley - Battramsley Pre feasibility NFDC0436 - BROCKENHURST BROCKENHURST Community £20,000 Scheme Cross - Boldre - St Austins - Lower Buckland - Lymington : Bus stop infrastructure scoping Transport including shelters, raised kerbs and hardstandings. Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Public & Local Access Bus stop improvements along Lyndhurst to Milford-on-Sea corridor including: new Pre feasibility NFDC0437 - BROCKENHURST BROCKENHURST Community £45,000 Scheme shelters, kerb works, solar lit poles, new poles etc scoping Transport Traffic Information Variable Message Signs (VMS) : 160mm Character height Local Access Highway Pre feasibility NFDC0438 - BROCKENHURST BROCKENHURST • 1 no. s/b on A337 approach to junct with C53 (Balmer Lawn) £30,000 Scheme Scheme scoping • 1 no. n/b on A337 approach to junct with B3055

Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Local Access Highway Pre feasibility NFDC0439 - BROCKENHURST BROCKENHURST • 1 no. A337 junct with C53 (Balmer Lawn) £70,000 Scheme Scheme scoping • 1 no. A337 junct with B3055 Automatic Number Plate Recognition (ANPR) : £12K per site Local Access • 1 no. A337 n/b north of junct with B3055 Highway Pre feasibility NFDC0440 - BROCKENHURST BROCKENHURST £25,000 Scheme • 1 no. A337 s/b south of junct with B3055 Scheme scoping

Local Access Burley Village Centre Improvements. Traffic calming and improvements for pedestrian Highway Pre feasibility NFDC0441 - BURLEY BURLEY £180,000 Scheme safety. Scheme scoping

Local Access CALSHOT - B3053 CALSHOT B3053 (Northern Section adjacent to public car park) – Replacement of all or Pre feasibility NFDC0442 - CALSHOT Walking £1,500 Scheme adjacent to the car park part of virtual footway# with kerbed footway. scoping

Local Access Highway Pre feasibility NFDC0443 - COPYTHORNE Bartley Junior School- Improve road markings £10,000 Scheme Scheme scoping Service 10 and 11 high frequency bus routes: Bartley - - Winsor - - Public & Local Access Pre feasibility NFDC0444 - COPYTHORNE COPYTHORNE Woodlands - Tatchbury : Bus stop infrastructure including shelters, raised kerbs and Community £20,000 Scheme scoping hardstandings. Transport Traffic Information Variable Message Signs (VMS) : 160mm Character height Local Access • 1 no. w/b on A31 approach to junct with A336/A337 Highway Pre feasibility NFDC0445 - COPYTHORNE COPYTHORNE £45,000 Scheme • 1 no. w/b on A336 approach to junct with A31/A337 Scheme scoping • 1 no. e/b on A31 approach to junct with A31/A336/A337

Local Access Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0446 - COPYTHORNE COPYTHORNE £35,000 Scheme • 1 no. A31 junction with A336/A337 Scheme scoping Automatic Number Plate Recognition (ANPR) : £12K per site • 1 no. A31 e/b east of junct with A336/A337 Local Access Highway Pre feasibility NFDC0447 - COPYTHORNE COPYTHORNE • 1 no. A336 e/b east of junct with A31/A337 £48,000 Scheme Scheme scoping • 2 no. A337 south of junct with A336/A31

Public & Local Access Bus stop improvements along Totton to Lyndhurst bus corridor including: new shelters, Pre feasibility NFDC0448 - DENNY LODGE Community £15,000 Scheme kerb works, solar lit poles, new poles etc scoping Transport Public & HCC Capital Local Access ELLINGHAM, ELLINGHAM, Service X3 high frequency bus route. Bus stop infrastructure including shelters, raised NFDC0449 - Community Programme £10,000 Scheme HARBRIDGE & & IBSLEY kerbs and hardstandings. Transport 2014/15 Local Access Pre feasibility NFDC0450 - LYNDHURST LYNDHURST St Michael & All Angels School- Gravel cycle paths accessing rear of school Cycling £25,000 Scheme scoping

Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site • 1 no. A337 north of centre Local Access • 1 no. A35 nr junct with B3056 Highway Pre feasibility NFDC0451 - LYNDHURST LYNDHURST £175,000 Scheme • 1 no. A35 link to A337 Scheme scoping • 1 no. A35 to s/w of centre • 1 no. A35 between Northerwood Ave and Chapel Lane Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Automatic Number Plate Recognition (ANPR) : £12K per site • 1 no. A35 west of junct with B3056 • 1 no. A35 s/b south of centre Local Access Highway Pre feasibility NFDC0452 - LYNDHURST LYNDHURST • 1 no. A35 w/b west of centre £60,000 Scheme Scheme scoping • 1 no. A35 e/b east of junct with C17 • 1 no. A337 n/b north of centre

Local Access Highway Pre feasibility NFDC0453 - LYNDHURST LYNDHURST Lyndhurst Traffic Management £75,000 Scheme Scheme scoping

Local Access Highway Pre feasibility NFDC0454 - LYNDHURST LYNDHURST Lyndhurst Cycles - Village centre £100,000 Scheme Scheme scoping

Service 56 and 56A high frequency bus routes: Ashurst - Lyndhurst - Goose Green - Public & Local Access Pre feasibility NFDC0456 - LYNDHURST LYNDHURST Clayhill - Balmer Lawn - Brockenhurst - South Weirs - Setley - Battramsley - Battramsley Community £10,000 Scheme scoping Cross - Boldre - St Austins - Lower Buckland - Lymington: Bus stop infrastructure in Transport

Service 10 and 11 high frequency bus routes: Bartley - Netley Marsh - Winsor - Cadnam - Public & Local Access Pre feasibility NFDC0457 - NETLEY MARSH NETLEY MARSH Woodlands - Tatchbury: Bus stop infrastructure including shelters, raised kerbs and Community £50,000 Scheme scoping hardstandings. Transport Local Access Closed Circuit Television (CCTV) for Traffic Monitoring : £35K per site Highway Pre feasibility NFDC0458 - NETLEY MARSH NETLEY MARSH £35,000 Scheme • 1 no. A36 junction with A31 Scheme scoping Controlled Crossing on the A336 from Woodlands Road to provide improved access to Local Access Pre feasibility NFDC0459 - NETLEY MARSH NETLEY MARSH the First School Walking £80,000 Scheme scoping

Local Access Improve pedestrian crossing opportunities across the A326 at the junction with the A336 Pre feasibility NFDC0460 - NETLEY MARSH NETLEY MARSH Walking £70,000 Scheme roundabout. scoping

Local Access Footway on southbound one way section of the B3347 between its junctions with Priest Pre feasibility NFDC0461 - SOPLEY Walking £25,000 Scheme Lane and Derritt Lane scoping Public & Local Access Cango bus stop infrastructure replacement works and refreshing of existing Pre feasibility NFDC0462 - SWAY SWAY Community £15,000 Scheme infrastructure scoping Transport

Public & Local Access LYMINGTON & LYMINGTON & Pre feasibility NFDC0463 - Upgrade of bus stops with Real Time Information (RFI) system. Community Scheme PENNINGTON PENNINGTON scoping Transport

Local Access Salisbury Road A36 (nr Cooks Lane) Provision of centre island together with speed Feasibility NFDC0464 - TOTTON & ELING TOTTON & ELING Walking £20,000 Scheme reduction measures to assist crossing for pedestrians accessing the football stadium. underway

Sea Road/Byron Road: improvement and widening of footways adjacent to garage HCC Capital Local Access NFDC0465 - NEW MILTON NEW MILTON (improve pedestrian facilities, particularly for those with impaired mobility, as well as Walking Programme £10,000 Scheme preventing parking of vehicles on highway land) 2014/15

Local Access Station Road junction with Osborne Road, improved pedestrian facilities and lorry loading Pre feasibility NFDC0466 - NEW MILTON NEW MILTON Walking Scheme bay. scoping

Local Access Green Lane: section of footway from Greenfield Garden to Becton Lane on the southern Pre feasibility NFDC0467 - NEW MILTON NEW MILTON Walking £30,000 Scheme side scoping

Local Access C E Smarter To be NFDC0468 - BROCKENHURST See School Travel Plan March 2006 £15,000 Scheme PRIMARY SCHOOL Choices Investigated

Local Access BROCKENHURST C E Smarter To be NFDC0469 - BROCKENHURST See School Travel Plan £15,000 Scheme PRIMARY SCHOOL Choices Investigated Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) Local Access BEAULIEU VILLAGE Smarter To be NFDC0470 - BROCKENHURST See School Travel Plan March 2007 £15,000 Scheme PRIMARY SCHOOL Choices Investigated

Local Access ST LUKE'S C E PRIMARY Smarter To be NFDC0471 - BROCKENHURST See School Travel Plan June 2001 £15,000 Scheme SCHOOL Choices Investigated

Local Access WILLIAM GILPIN C E Smarter To be NFDC0472 - BROCKENHURST See School Travel Plan March 2007 £15,000 Scheme PRIMARY SCHOOL Choices Investigated

Local Access ORCHARD INFANT Smarter To be NFDC0473 - HYTHE & DIBDEN See School Travel Plan March 2005 £15,000 Scheme SCHOOL Choices Investigated

Local Access Smarter To be NFDC0474 - HYTHE & DIBDEN OAK LODGE SCHOOL See School Travel Plan £15,000 Scheme Choices Investigated

Local Access WILDGROUND INFANT Smarter To be NFDC0475 - HYTHE & DIBDEN See School Travel Plan March 2010 £15,000 Scheme SCHOOL Choices Investigated

Local Access WILDGROUND INFANT Smarter To be NFDC0476 - HYTHE & DIBDEN See School Travel Plan March 2010 £15,000 Scheme SCHOOL Choices Investigated

Local Access Smarter To be NFDC0477 - HYTHE & DIBDEN APPLEMORE COLLEGE See School Travel Plan March 2008 £15,000 Scheme Choices Investigated

Local Access WILDGROUND JUNIOR Smarter To be NFDC0478 - HYTHE & DIBDEN See School Travel Plan March 2010 £15,000 Scheme SCHOOL Choices Investigated

Local Access HYTHE PRIMARY Smarter To be NFDC0479 - HYTHE & DIBDEN See School Travel Plan March 2010 £15,000 Scheme SCHOOL Choices Investigated

Local Access ORCHARD JUNIOR Smarter To be NFDC0480 - HYTHE & DIBDEN See School Travel Plan March 2005 £15,000 Scheme SCHOOL Choices Investigated

Local Access FORDINGBRIDGE INFANT Smarter To be NFDC0481 - FORDINGBRIDGE See School Travel Plan March 2005 £15,000 Scheme SCHOOL Choices Investigated

Local Access COPYTHORNE C E Smarter To be NFDC0482 - FORDINGBRIDGE See School Travel Plan May 2001 £15,000 Scheme INFANT SCHOOL Choices Investigated

Local Access HYDE C E PRIMARY Smarter To be NFDC0483 - FORDINGBRIDGE See School Travel Plan November 2005 £15,000 Scheme SCHOOL Choices Investigated WESTERN DOWNLAND C Local Access Smarter To be NFDC0484 - FORDINGBRIDGE E AIDED PRIMARY See School Travel Plan March 2005 £15,000 Scheme Choices Investigated SCHOOL THE BURGATE SCHOOL Local Access Smarter To be NFDC0485 - FORDINGBRIDGE AND SIXTH FORM See School Travel Plan March 2010 £15,000 Scheme Choices Investigated CENTRE Local Access FORDINGBRIDGE JUNIOR Smarter To be NFDC0486 - FORDINGBRIDGE See School Travel Plan March 2005 £15,000 Scheme SCHOOL Choices Investigated

Local Access Smarter To be NFDC0487 - FORDINGBRIDGE HALE PRIMARY SCHOOL See School Travel Plan £15,000 Scheme Choices Investigated

Local Access LYMINGTON & PENNINGTON C E Smarter To be NFDC0488 - See School Travel Plan December 2004 £15,000 Scheme PENNINGTON JUNIOR SCHOOL Choices Investigated

Local Access LYMINGTON & LYMINGTON JUNIOR Smarter To be NFDC0489 - See School Travel Plan March 2008 £15,000 Scheme PENNINGTON SCHOOL Choices Investigated Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) OUR LADY & ST JOSEPH Local Access LYMINGTON & Smarter To be NFDC0490 - CATHOLIC PRIMARY See School Travel Plan March 2006 £15,000 Scheme PENNINGTON Choices Investigated SCHOOL Local Access LYMINGTON & Smarter To be NFDC0491 - PRIESTLANDS SCHOOL See School Travel Plan March 2005 £15,000 Scheme PENNINGTON Choices Investigated

Local Access LYMINGTON & PENNINGTON INFANT Smarter To be NFDC0492 - See School Travel Plan December 2004 £15,000 Scheme PENNINGTON SCHOOL Choices Investigated

Local Access LYMINGTON & LYMINGTON C E INFANT Smarter To be NFDC0493 - See School Travel Plan March 2010 £15,000 Scheme PENNINGTON SCHOOL Choices Investigated

Local Access FOXHILLS JUNIOR Smarter To be NFDC0494 - LYNDHURST See School Travel Plan February 2005 £15,000 Scheme SCHOOL Choices Investigated

Local Access BURLEY PRIMARY Smarter To be NFDC0495 - LYNDHURST See School Travel Plan March 2010 £15,000 Scheme SCHOOL Choices Investigated

Local Access FOXHILLS INFANT Smarter To be NFDC0496 - LYNDHURST See School Travel Plan February 2005 £15,000 Scheme SCHOOL Choices Investigated

Local Access NETLEY MARSH C E Smarter To be NFDC0497 - LYNDHURST See School Travel Plan July 2002 £15,000 Scheme INFANT SCHOOL Choices Investigated

Local Access TIPTOE PRIMARY Smarter To be NFDC0498 - HORDLE See School Travel Plan March 2004 £15,000 Scheme SCHOOL Choices Investigated

Local Access HORDLE C E PRIMARY Smarter To be NFDC0499 - HORDLE See School Travel Plan March 2009 £15,000 Scheme SCHOOL Choices Investigated

Local Access DURLSTON COURT Smarter To be NFDC0500 - NEW MILTON See School Travel Plan £15,000 Scheme SCHOOL Choices Investigated

Local Access NEW MILTON INFANT Smarter To be NFDC0501 - NEW MILTON See School Travel Plan March 2007 £15,000 Scheme SCHOOL Choices Investigated

Local Access SOPLEY PRIMARY Smarter To be NFDC0502 - RINGWOOD See School Travel Plan April 2009 £15,000 Scheme SCHOOL Choices Investigated

Local Access Smarter To be NFDC0503 - RINGWOOD RINGWOOD SCHOOL See School Travel Plan March 2007 £15,000 Scheme Choices Investigated

Local Access RINGWOOD JUNIOR Smarter To be NFDC0504 - RINGWOOD See School Travel Plan December 2007 £15,000 Scheme SCHOOL Choices Investigated

Local Access RINGWOOD C E INFANT Smarter To be NFDC0505 - RINGWOOD See School Travel Plan March 2007 £15,000 Scheme SCHOOL Choices Investigated

Local Access Smarter To be NFDC0506 - FAWLEY NEW FOREST ACADEMY See School Travel Plan March 2010 £15,000 Scheme Choices Investigated

Local Access FAWLEY INFANT Smarter To be NFDC0507 - FAWLEY See School Travel Plan March 2006 £15,000 Scheme SCHOOL Choices Investigated

Local Access CADLAND PRIMARY Smarter To be NFDC0508 - FAWLEY See School Travel Plan March 2008 £15,000 Scheme SCHOOL Choices Investigated

Local Access WATERSIDE PRIMARY Smarter To be NFDC0509 - FAWLEY See School Travel Plan March 2007 £15,000 Scheme SCHOOL Choices Investigated Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived) MANOR CHURCH OF Local Access Smarter To be NFDC0510 - FAWLEY INFANT See School Travel Plan March 2006 £15,000 Scheme Choices Investigated SCHOOL Local Access BLACKFIELD PRIMARY Smarter To be NFDC0511 - FAWLEY See School Travel Plan March 2006 £15,000 Scheme SCHOOL Choices Investigated

Local Access CALMORE JUNIOR Smarter To be NFDC0512 - TOTTON & ELING See School Travel Plan March 2008 £15,000 Scheme SCHOOL Choices Investigated

Local Access CALMORE INFANT Smarter To be NFDC0513 - TOTTON & ELING See School Travel Plan March 2008 £15,000 Scheme SCHOOL Choices Investigated

Local Access ABBOTSWOOD JUNIOR Smarter To be NFDC0514 - TOTTON & ELING See School Travel Plan March 2006 £15,000 Scheme SCHOOL Choices Investigated

Local Access LYDLYNCH INFANT Smarter To be NFDC0515 - TOTTON & ELING See School Travel Plan February 2003 £15,000 Scheme SCHOOL Choices Investigated

Local Access Smarter To be NFDC0516 - TOTTON & ELING FOREST PARK SCHOOL See School Travel Plan March 2010 £15,000 Scheme Choices Investigated

Local Access Smarter To be NFDC0517 - TOTTON & ELING ELING INFANT SCHOOL See School Travel Plan March 2006 £15,000 Scheme Choices Investigated

Local Access MARCHWOOD JUNIOR Smarter To be NFDC0518 - TOTTON & ELING See School Travel Plan £15,000 Scheme SCHOOL Choices Investigated

Local Access Smarter To be NFDC0519 - TOTTON & ELING See School Travel Plan June 2002 £15,000 Scheme Choices Investigated

Local Access OAKFIELD PRIMARY Smarter To be NFDC0520 - TOTTON & ELING See School Travel Plan March 2007 £15,000 Scheme SCHOOL Choices Investigated

Local Access MARCHWOOD C E Smarter To be NFDC0521 - TOTTON & ELING See School Travel Plan March 2006 £15,000 Scheme INFANT SCHOOL Choices Investigated

Local Access 100 metre section of off road cycleway along the A337 opposite the Cox Hound Kennels To be NFDC0522 - LYNDHURST LYNDHURST Cycling Scheme connecting footpath 7 on the western side and quieter routes on the eastern side. Investigated

HCC Capital Local Access Footway improvements on Shrubbs Hill Road. Providing links to the school and village NFDC0455 - LYNDHURST LYNDHURST Walking Programme £150,000 Scheme centre. 2012/13 Local Access NFDC0523 LONGDOWN ACTIVITY Crossing improvements as advised by the NPA on Deerleap Lane to assist crossing from To be Scheme ASHURST & COLBURY FARM DEERLEAP LANE car park. Walking Investigated £15,000

Pedestrian crossing improvements at Langdown Lawn, including: Pedestrian refuge, HCC Capital Local Access dropped crossing including tactile paving and reflective bollards south of Deerleap Lane NFDC0140 L122 HYTHE & DIBDEN HYTHE & DIBDEN Walking Programme £15,000 Scheme near The Croft public house 2014/15

BETWEEN ASH ROAD Walking and To be NFDC0141 ASHURST & COLBURY Remove existing segregation bollards and redesignate as a shared pedestrian/cycle path £5,000 AND HOLLY ROAD Cycling Investigated Original TS Scheme Estimated TS Reference Reference Area Location Scheme Proposal Scheme Type Scheme Status Category Cost £'000 (Archived)

A35 - LINK TO COLBURY Provide a shared pedstrian and cycle route from toucan crossing at shopping pararde to To be NFDC0142 ASHURST & COLBURY MEMORIAL HALL FROM Cycling £100,000 link to the existing route at Colbury Memorial Hall Investigated SHOPPING PARADE

ENTRANCE TO ASHURST Provide a shared pedestrian/cycle path linking between existing cycle path and the To be NFDC0143 ASHURST & COLBURY Cycling £20,000 CAMPSITE entrance to Ashurst campsite. Investigated