Oa" Te [Osfzozo Ln Exercise of the Power Conferred by Sections 12 and 17 of the West Bengal Panchayat Elections Act, 2003 ( West Ben

Total Page:16

File Type:pdf, Size:1020Kb

Oa FORM A [See rule 23(1)] Order N" 303 oa" te [osfzozo ln exercise of the power conferred by sections 12 and 17 of the West Bengal Panchayat Elections Act, 2003 ( West Ben. Act XXI of 2003), read with rules 22 and 23 of the West Bengal Panchayat Elections Rules, 2006 , I, the District Panchayat Election Officer and District Magistrate of the district of Darjeeling, as the prescribed authority appointed by the State Government in the Department of Panchayats & Rural Development under notification No. 5316/PN/O/1/'lA-3/20'10 DATED 01.07.20'10 for the purpose of rules 22 & 23 of the said rules, hereby publish the draft of this order to determine for the Grams specified in column(1) of the Schedule below, the total no. of members, Schedule Castes members, Schedule Tribes members, Backward Classes members and women members to be elected to such Gram Panchayats specified in the corresponding enlries in columns (2a), (2b), 2(c), (2dl and 2(e) respectively, to divide the area of the Grams into constituencies with serial numbers assigned to them specified in the corresponding entries in column (3), to allocate to each such constituency seat or seats specified in the corresponding entries in column (4), seat or seats reserved for the Schedule Castes or the Schedule Tribes or the Backward Classes persons specified in the corresponding entrres in column (5) and seat or seats reserved for women specified in the corresponding entries in column (6) of the Schedule, for information of persons likely to be affected thereby. The draft will be taken up for consideration after fifteen days from this day and any objection or suggestion with respect thereto, which may be received by the undersigned within the said period, shall be duly considered. THE SCHEDULE Block: Matioara Development Block Number of Members to be Elected in the Gram Panchayat Seat reserved Seats Seats Woriren for Scheduled reserved a llocated to MeT'bers Number, Names & Area of Castes or for women Name of Total Scheduled Sched uled Backward each constitucncies with Serial Sched u led against 6ram number of Castes Tribes Cla ss constituency numbers Tribes or serial Members Members Members Members with serial backward number of numbers Classes seats 1 (2 (2a) b) (2c) (2d ) 12el (3) (4) (s) (6) Atha-l-/1 AC P att No - 251220, 251227 JL No- 62,63,64 ATHARAKHAI 30 t4 I 0 Mouza- Lalsara Chhat, Dumrigurir SC chhat, Bataliguri '1. Lalsara,2.Tarabari, 1. Dumriguri,2. Bataliguri, Atha-l-/1 Atha-I-/2 AC Part No - 251222 JL No- 68 Atha- -/2 Mouza- Tari l.Balason Tariiole Colonv. Atha-u-/3 AC Part No - 251223 JL No' 68 5C Mou2a- Tari 1. Balason Tariiote Colony Atha- t-l3 Atha-lv-/4 AC Part No - 251224 Jt No- 66 SC Mouza- Rangia 1. Badlabhita,2. Bara Lachka, Atha-tv-/4 Atha-v-/5 ACPartNo - 25/225 & 251226 JL No 66 Mouza- Rangia 'l.Rangia Atha-V-/5 Atha-Vl-/6 AC Pan No -251227 JL No- 66 SC Mouza- Rangia 1.Rangia,2. Chhoto Lachka, Atha-vr-/6 Atha-v[-/7 ACPaftNo - 25122a & 25/229 JL No- 68 Moura- Tari 'l.Tari Balason Colony (North). Atha-v[-/7 Atha-vIr/8 AC Part No - 251230 JL No- 68 5C Mouza- Tari l.Pramodnaqar, Atha-vU/8 Atha-tx/9 AC Part No - 251231 JL No- 68 SC Moura- Tari 1. Ramkrishnajote, Atha-rx/9 Atha'X/10 AC Part No -251232 JL No- 68 5C Mouza- Tari 1. Ramkrishnajote, 2. TariJote Atha-x/10 Atha-Xl/11 AC Part No - 251233 & 251234 JL No- 69 Mouza- litu 1. Nengtichhara, 2. Shantipur Atha-xl/11 Atha-Xll/12 AC Part No - 251235 At ha -x lll12 JL No- 69 ,| Mouza- Jitu 1. Tariiote,2. Jyotirmay Coloney, Atha-Xlll/13 AC Pan No 251236 - SC lL No- 69,Moura- Jitu Atha-xt /13 1. Chaitanyapur,2. New Rangia, Atha-XlV/14 AC Part No - 251237 & 251238 .lL No- 69,70 Mouza- Jitu, Bairatisal 'l.Satyen Bose Road, .1 .Military Road,2. 3'l-No.National Highway,3.Satyajit Sarani,4 Panchayat Road, Atha-xtv/14 Atha-XV/15 AC Part No - 251239 JL No- 71,70 Moura- Baramohonsinghjote, Eairatisal 1. University Gate No-1, 2. University Gate No-2, 3. Atha-XV/15 Shibmandir 8azar, Atha-XVl/16 AC P att No - 25 /24O, 25/241 JL No- 7o,Mouza Bairatisal l.Salkabhita 1. North Bengal University Campus, 2.Shibmandir. Atha-xvu16 Atha- XVll/17 AC P a.t No - 251 242, 25 /243 JL No- 69,Mouza- Jltu 5C 1. Shyamaprasad Mukheriee Road,2. Helapakri,3.Amarpally, 1 East Sarada Pally. Atha-XVll/17 Atha-xv t/18 ACPanNo - 25/244 &2s/24s lL No- 69,Moura-Jltu 1. Netaji Pally,2. B.D.O. Quarter,3. Shyamaprasad Mukherree Road, 1. Phansidewa More,2. Chhotomohan Singh, Atha-XVlll/18 Atha-xrx/19 AC Part No - 251246 JL No- 69,Mou2a- Jltu 1. Leninpur Atha-XlX/19 Atha-xx/20 AC Part No - 251247 Atha-xx/20 .lt No- 69 & 70 Mouza- Jltu, Eairatisal 1. Leninpur,2. Shantipur Atha-XXl/21 AC Part No - 251248 .,1No- 71 SC Mouza Baramohansingh 1. Baramohan Singh Jote, Atha-xxt/21 Atha-xx[/22 AC Part No - 251249 JL No- 71 SC Mouza- Earamohansingh 1. Baramohan Singh Jote Atha-XXll/22 Atha-xxlll/23 AC Part No - 251250 .,1No- 71 Mou2a- Earamohansingh 1. Bhanu Nagar 2.Shanti Basti, Atha-xxlll/23 Atha-XXIV/24 AC P art No - 25/251,, 25/252 JL No- 71 Mouza- Baramohansingh ST 1. Chandbar Jote, DhigliJote 1. Chandbar Jole, Dhigli Jote Atha-xxrv/24 Atha-XXV/25 AC Part No - 251253 lL No- 71 Mouza- Baramohansingh 1. Saigram,2. Kadamtala,3. Tulakata, Atha XXV/25 Atha-xxvr/26 AC Pa rt No -25l254 lL No- 71 Mouza- Baramohansingh 1. Suryasen Pally,2. Shibaji Nagar,3. Nivedita Sarani Atha-xxvr/26 Atha-XXVll/27 AC Part No - 251255 .,1 No- 71 Atha- Mouza Baramohansingh 1. Vivekananda Pally xxvr/27 Atha-XXVllU28 Atha- AC Part No - 251255 xxvilr/28 SC JL No- 71 I Mou2a- Bararnohansingh I 1. Bidhan Pally Atha- xxrx/29 AC Part No -25l257 Atha- JL No- 71 Mouza- Baramohansingh xxtx/29 1. Bidhan Pally Atha- xxx,/30 AC Pan No - 251258, 251259 JL No- 71 SC Moura- Baramohansingh 1. lndira Pally 1. lndira Pally Atha-xxx/30 'fi oate : .. ..[ 8. I08 2,020. (Seal) Signature of the Prescribed ority ko,.,r,", u"f;irtrrt", Darjeeting.
Recommended publications
  • Village & Town Directory ,Darjiling , Part XIII-A, Series-23, West Bengal
    CENSUS OF INDIA 1981 SERmS 23 'WEST BENGAL DISTRICT CENSUS HANDBOOK PART XIll-A VILLAGE & TO"WN DIRECTORY DARJILING DISTRICT S.N. GHOSH o-f the Indian Administrative Service._ DIRECTOR OF CENSUS OPERATIONS WEST BENGAL · Price: (Inland) Rs. 15.00 Paise: (Foreign) £ 1.75 or 5 $ 40 Cents. PuBLISHED BY THB CONTROLLER. GOVERNMENT PRINTING, WEST BENGAL AND PRINTED BY MILl ART PRESS, 36. IMDAD ALI LANE, CALCUTTA-700 016 1988 CONTENTS Page Foreword V Preface vn Acknowledgement IX Important Statistics Xl Analytical Note 1-27 (i) Census ,Concepts: Rural and urban areas, Census House/Household, Scheduled Castes/Scheduled Tribes, Literates, Main Workers, Marginal Workers, N on-Workers (ii) Brief history of the District Census Handbook (iii) Scope of Village Directory and Town Directory (iv) Brief history of the District (v) Physical Aspects (vi) Major Characteristics (vii) Place of Religious, Historical or Archaeological importance in the villages and place of Tourist interest (viii) Brief analysis of the Village and Town Directory data. SECTION I-VILLAGE DIRECTORY 1. Sukhiapokri Police Station (a) Alphabetical list of villages 31 (b) Village Directory Statement 32 2. Pulbazar Police Station (a) Alphabetical list of villages 37 (b) Village Directory Statement 38 3. Darjiling Police Station (a) Alphabetical list of villages 43 (b) Village Directory Statement 44 4. Rangli Rangliot Police Station (a) Alphabetical list of villages 49- (b) Village Directory Statement 50. 5. Jore Bungalow Police Station (a) Alphabetical list of villages 57 (b), Village Directory Statement 58. 6. Kalimpong Poliee Station (a) Alphabetical list of viI1ages 62 (b)' Village Directory Statement 64 7. Garubatban Police Station (a) Alphabetical list of villages 77 (b) Village Directory Statement 78 [ IV ] Page 8.
    [Show full text]
  • Iwmp - 12/2012-13
    DISTRICT: DARJEELING BLOCK: MATIGARA-NAXALBARI PROJECT: IWMP - 12/2012-13 -.,-~ ED NAME: BALASON WATERSHED West Bengal State Watershed Development Agency (WBSWDA) DPR-Part - I Details Se~tion A: PROJECT LOCATIO!\! DETAILS SI.No Particulars Details I Project Name BALASAN WATERSHED 2 Project Code Darjeeling/IWMP­ 12 /2012 - 13 3 State West Bengal 4 District DARJEELING 5 CD Block MATIGARA & NAXALBARI 6 Gram Panchayat Atharakhai, Bagdogra (lower & Upper), Gossaipur, Matigara-I, Patharghata. 7 Watershed Association / Committee Name Registration Covering Mouzas Remarks No. Baniakhari Bataliguri Batlabari Bauni Bhitar Chhat Baunibhita Bhujia Bani i Ghuji ;:; Banir Chh,lt Dhemal Dumriguri Dumriguri Chhat Fulbari Chhat Fulbari Pataner Chhat Gouri Guria Jhauguri Jhauguri Chhat Jitu Jugibhita Khaprail Khopalasi Lachka Lalsara Chhat Mayaram Nengtichhara Nimai I P~ncha k u:guri Pashchim Karai Barir Chhat Patan Patan Chhat Patan Jharer Chhat Pataner Chhat Putimari Rajajhar Rajpairi Rangia Ruhinir Chhat Rupsing Shaibhita Tarabari Tarabarir Chhat Tari Page No - 5 8 Micro watershed Descri ption Micro Block GP Mouza "Lno VIII ( ;t'OI'l'lIphklll watershed Codc An'lI (hll) (Name & SLUSI Code) - 2BID6dl MATIGARA Atharakhai, Baniakhari 55 3065:\6 - I fill and & Bagdogra Bataliguri 64 306545 B . B NAXALBARI (lower & Batlabari 88 306647 others \!,.I).IO Upper), Bauni Bhitar 82 306641 Gossaipur, Chhat )3. ' I Matigara-I, Baunibhita 87 306646 Uti" Patharghata. Bhujia Bani 98 306654 250,59 Bhujia Banir 97 306653 Chhat 18.67 Dhemal 83 306642 186.70 Dumriguri 94
    [Show full text]
  • 58 Chapter 3 Recent Trend of Urbanization and Growth Of
    CHAPTER 3 RECENT TREND OF URBANIZATION AND GROWTH OF URBAN CENTRES IN NORTH BENGAL 3.1 Introduction The process of urbanization started off rather slowly in North Bengal. Gradually with the passage of time urbanization spread its wings across various districts of North Bengal. During the last twenty years, North Bengal witnessed an unprecedented increase in not only its urban population but also in the number of urban centres. This increase in urban population and the number of urban centres however is not uniform. Some districts witnessed a rapid increase in urban population while rest of the districts was devoid of any urban growth resulting in an increase in disparity within the region. The growth of urban centres was also not uniform. Moreover, very few statutory towns emerged, with an increase taking place only in terms of census towns. Given this background it is very important to analyze the recent trends in urbanization for various parameters across North Bengal during the period 1991 to 2011 covering three census years. Although, study of urbanization exclusively for Nortrh Bengal has been very limited yet a number of scholars have tried to analyze the urbanization process in North Bengal within a broader framework of West Bengal. Chakma, N. and Ghosh, B. (2014) 1 in their study of recent trends of urbanization in West Bengal found the decadal growth rate of urban population during 2001 – 2011 to be more than 3 times that of the national average for Maldah district and to be more than 2 times that of the national average for Jalpaiguri district.
    [Show full text]
  • SASEC Road Connectivity Investment Program – Tranche 1
    Social Safeguard Due Diligence Report July 2017 IND: SASEC Road Connectivity Investment Program – Tranche 1 Prepared by Ministry of Road Transport and Highways, Government of India for the Asian Development Bank. CURRENCY EQUIVALENTS (as of May 2017) Currency unit – Indian Rupee (Rs) INR1.00 = $ 0.01555 $1.00 = INR 64.32 ABBREVIATIONS ADB – Asian Development Bank BSR – Basic Schedule of Rates DC – District Collector DH – Displaced household DP – Displaced person EA – Executing Agency GRC – Grievance Redressal Committee IA – Implementing Agency IAY – Indira Awaas Yojana LA – Land acquisition LAA – Land Acquisition Act, 1894 L&LRO – Land and Land Revenue Office RFCT in LARR – The Right to Fair Compensation and Transparency in Land Act - 2013 Acquisition, Rehabilitation and Resettlement Act, 2013 LVC – Land Valuation Committee MORTH – Ministry of Road Transport and Highways NGO – Nongovernment organization NHA – National Highways Act, 1956 NRRP – National Rehabilitation and Resettlement Policy, 2007 PD – Project Director PIU – Project implementation unit MPWD – Manipur Public Works Department WBPWD – West Bengal Public Works (Roads) Department R&R – Resettlement and rehabilitation RF – Resettlement framework RO – Resettlement Officer ROW – Right-of-way RP – Resettlement plan SC – Scheduled caste SPS – Safeguard Policy Statement ST – Scheduled tribe NOTE In this report, "$" refers to US dollars. This social due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • State Statistical Handbook 2014
    STATISTICAL HANDBOOK WEST BENGAL 2014 Bureau of Applied Economics & Statistics Department of Statistics & Programme Implementation Government of West Bengal PREFACE Statistical Handbook, West Bengal provides information on salient features of various socio-economic aspects of the State. The data furnished in its previous issue have been updated to the extent possible so that continuity in the time-series data can be maintained. I would like to thank various State & Central Govt. Departments and organizations for active co-operation received from their end in timely supply of required information. The officers and staff of the Reference Technical Section of the Bureau also deserve my thanks for their sincere effort in bringing out this publication. It is hoped that this issue would be useful to planners, policy makers and researchers. Suggestions for improvements of this publication are most welcome. Tapas Kr. Debnath Joint Administrative Building, Director Salt Lake, Kolkata. Bureau of Applied Economics & Statistics 30th December, 2015 Government of West Bengal CONTENTS Table No. Page I. Area and Population 1.0 Administrative Units in West Bengal - 2014 1 1.1 Villages, Towns and Households in West Bengal, Census 2011 2 1.2 Districtwise Population by Sex in West Bengal, Census 2011 3 1.3 Density of Population, Sex Ratio and Percentage Share of Urban Population in West Bengal by District 4 1.4 Population, Literacy rate by Sex and Density, Decennial Growth rate in West Bengal by District (Census 2011) 6 1.5 Number of Workers and Non-workers
    [Show full text]
  • South Asia Subregional Economic Cooperation Road Connectivity Investment Program - Tranche 1
    Social Monitoring Report Project Number: 47341-002 December 2017 Period: January 2017 – June 2017 IND: South Asia Subregional Economic Cooperation Road Connectivity Investment Program - Tranche 1 Subproject: Panitanki-Bagdogra - Shivmandir More - Medical More - Fulbari Section of AH- 02 Submitted by Project Implementation Unit, Public Works Department, Government of West Bengal This report has been submitted to ADB by the Project Implementation Unit, Public Works Department, Government of West Bengal and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area Semi Annual Social Monitoring Report AH - 02(Rev - 02) January 2017 to June 2017 IND: SASEC Road Connectivity Investment Program Panitanki - Bagdogra - Shivmandir More - Medical More - Fulbari Section of Asian Highway 02 Prepared by the Ministry of Road Transport and Highways, Government of India for the Asian Development Bank. CONTENTS 1. INTRODUCTION ................................ ...............................
    [Show full text]
  • 266 CHAPTER 6 PROBLEMS of URBANIZATION in NORTH BENGAL 6.1 Introduction the Process of Urbanization in Developing Countries Is A
    CHAPTER 6 PROBLEMS OF URBANIZATION IN NORTH BENGAL 6.1 Introduction The process of urbanization in developing countries is associated with their own problems. The problems range from proliferation of slums, drinking water problems, housing problems, sanitation problems and urban environmental problems and pollution. With rapid urbanization taking place in most of the districts of North Bengal, the urban centres of this region are facing their own problems which are quite similar to those being faced in other parts of the country. In this chapter the main objective will be to analyze the problems related to proportion of slum households, access to safe drinking water, availability of electricity facility, availability of latrine facility, availability of bathroom within house, availability of drainage facility and availability of separate kitchen within house. All these parameters will be analyzed for individual urban centres of North Bengal for 2001 and 2011 respectively. Moreover, their change during this period will also be analyzed for individual urban centre. To analyze the change in the percentage of households without access to any facility across the urban centres of North Bengal during 2001 – 2011, only those urban centres which existed during 2001 and 2011 i.e. in both the census years have been taken into consideration. Therefore, although there were 48 urban centres in 2001 and 131 urban centres in 2011, only 47 urban centres which were common in both the census years have been taken into consideration to analyze the temporal change in their share of households without access to any facility. The decadal variation in the percentage of household without access to facility „x‟ of any urban centre has been calculated by the formula as under.
    [Show full text]
  • As Per Annexure Division, P.H.E
    Government of West Bengal Office of the Executive Engineer, Northern Mechanical Division Public Health Engineering Directorate Sukanta Sarani, Paresh Nagar, Siliguri, Dist- Jalpaiguri Memo No. 1745/ NMD Dated Siliguri the 06.07.2015 NOTICE INVITING QUOTATION NO: 07 of 2015-16 Sealed Quotation for the following works are invited by the Executive Engineer, Northern Mechanical Division P.H.Engineering Dte. Siliguri, on be-half of the Governor of West Bengal for the under noted works exclusively from the working Electrical /Mechanical Contractors of this Directorate having sufficient experience and back ground in similar type of work during last 3 ( three) years. Sl. Description of work Estimated cost Earnest Money Time of completion No. 01 Operation & guarding of different W/S Schemes within the district of Darjeeling under Northern Mechanical As per Annexure Division, P.H.E. Dte. [ As per Annexure ]. The intending quotationers will have to produce the following information/data etc.to the undersigned along with the prayer for obtaining permission to participate as a quotationer. 1) Copy of valid PAN Card. 2) Copy of valid Sales Tax Clearance Certificate/ VAT registration No. 3) Copy of valid Professional Tax Clearance Certificate. 4) Copy of valid Electrical License as well as Supervisor’s License. 5) Financial capacity to maintain the work properly throughout the working period. 6) Documentary evidence in respect of Credential/ Experience for execution of similar type of work. The documents as above will be examined in order to assess the eligibility of the applicant for allowing to participate as a quotationer.. Documents may be had from the office of the undersigned between 11A.M.
    [Show full text]
  • OFFICE of the COMMISSIONER of POLICE SPECIAL BRANCH Slliguri POLICE COMMISSIONERATE Memo No
    Election Urgent GOVT. OF WEST BENGAL OFFICE OF THE COMMISSIONER OF POLICE SPECIAL BRANCH SlLIGURI POLICE COMMISSIONERATE www.siliguripolice.org Memo no. 104/Election Cell, SPC Dated 28/02/2021. From The Commissioner of Police, Siliguri Police Commissionerate, Siliguri To The D.M. & DEO, Darjeeling, Sub Area Domination Schedule in Siliguri Police station, Pradhannagar Police Station, Matigara Police Station, Bagdogra Police Station, Dist. Darjeeling under Siliguri Police Commissionerate regarding In sending herewith the Area Domination Schedule of SSB 72 BN G. Company w.e.f. 01.03.2021 to 07/03/2021 in the area of Siliguri Police station, Pradhannagar Police Station, Matigara Police Station, Bagdogra Police Station under 25, 26, 27 AC, Dist. Darjeeling under Siliguri Police Commissionerate, Siliguri. This is for information please. Encl: As stated. Commissioner of Police, Siliguri Police Commissionerate, Siliguri Distict Darjeeling Darjeeling Darjeeling Darjeeling Darjeeling Darjeeling 1 3/3/2021 3/2/2021 3/1/2021 2 Date of Route March Siliguri Police station, Pradhannagar Police Station, Matigara Police Station, Bagdogra Police Station under 25, 26, 27 AC, Dist. Darjeeling under under Siliguri Police Commissionerate. Police under under Siliguri Darjeeling Dist. AC, 27 26, under 25, Station Bagdogra Police Station, Police Matigara Station, Pradhannagar Police station, Police Siliguri SLG SLG SLG SLG SLG SLG 3 Sub-Division Municipality Municipality Municipality Matigara Matigara Matigara Matigara Block Block Block 4 Block/Municipality PDN PS PDN PS Siliguri Siliguri MTG MTG 5 Police Station Morning shift Morning shift Morning shift Morning Evening shift Evening shift Evening shift 15.00 hrs to to 15.00 hrs to 15.00 hrs to 15.00 hrs 08.00 hrs to to hrs 08.00 to hrs 08.00 to hrs 08.00 20.00 20.00 hrs 20.00 hrs 20.00 hrs 13.00 hrs 13.00 hrs 13.00 hrs 13.00 Time 6 Dangipara, Dangipara, Sukna T.G, Sukna T.G, Cha Bagan Cha Bagan Siliguri Jn.
    [Show full text]
  • Darjeeling 2020-21
    DISTRICT DISASTER MANAGEMENT PLAN DARJEELING 2020-21 Government of West Bengal Office of District Magistrate, Darjeeling Department Of Disaster Management Tel/Fax No. : 0354-2255749 Email id.: [email protected] INDEX PAGE NOS. NOS. CONTENTS Emergency Control Numbers 1. CHAPTER I – INTRODUCTION 1-4 1.1 AIMS AND OBJECTIVES 1 1.2 AUTHORITY FOR DDMP 1 1.3 EVOLUTION OF DDMP 2 1.4 STAKEHOLDERS AND THEIR RESPONSIBILITIES 3 1.5 HOW TO USE DDMP 3 1.6 APPROVAL MECHANISM OF DDMP 4 1.7 REVIEW AND UPDATEN OD D.D.M.P 4 2. CHAPTER II – DISTRICT HAZARD RISK VULNERABILITY AND CAPACITY ASSESSMENT 5-27 (HRVCA) 2.1 DISTRICT PROFILE (GEOGRAPHICAL, ADMINISTRATIVE AND DEMOGRAPHIC) 5 a District Landuse/Landcover Map 7 b District Geological Map 8 c District Administrative Map 9 d District Mp of Transpot Lines 10 e District Map of Settlements 11 2.2 HAZARD PROFILE 12 2.3 (i) AREAS AFFECTED BY CALAMITY (2019) 13-15 Monsoon Calamity Assessment Report (2019) 16 2.3 (ii) AREAS AFFECTED BY CALAMITY (2018) 17-21 2.4 INVENTORY OF PAST DISASTERS 20-23 2.5 HVRCA ACROSS THE FOUR SUBDIVISIONS 26-27 3. CHAPTER III - INSTITUTIONAL ARRANGEMENTS FOR DISASTER MANAGEMENT 28-32 3.1 ORGANIZATIONAL STRUCTURE OF DISTRICT DISASTER MANAGEMENT AUTHORITY 28 3.2 FUNCTIONAL FLOW AND HIERARCHICAL STRUCTURE OF AUTHORITIES AND COMMITTEES 29 3.3 POWERS AND FUNCTIONS OF DDMA 29-31 3.4 STRENGTHENING DDMA 32 4. CHAPTER IV - PREVENTIVE MITIGATION MEASURES 33-34 4.1 PREVENTIVE MEASURES ADOPTED AT EACH BLOCK 33 4.2 DISTRICT LEVEL MITIGATION PROJECTS UNDER NATIONAL LEVEL 34 4.3 PREVENTIVE GUIDELINES OF N.D.M.A FOR HEALTH EMERGENCIES – COVID-19 PANDEMIC 34 5.
    [Show full text]
  • District Survey Report of Darjeeling District
    DISTRICT SURVEY REPORT OF DARJEELING DISTRICT (For Mining of Minor Minerals) As per Notification No. S.O.3611 (E) New Delhi Dated 25th of July 2018 and Enforcement & Monitoring Guidelines for Sand Mining (EMGSM) January 2020, Issued by Ministry of Environment, Forest and Climate Change (MoEF&CC) Government of West Bengal (Work Order No: MDTC/PM-5/160/66, Dated: 20.01.2020) August, 2021 CONSULTANT District Survey Report Darjeeling, West Bengal Table of Content Chapter No Subject Page No 1 Preface 1-2 2 Introduction 3-15 3 General Profile of The District 16-40 a. General Information 16-18 b. Climate Condition 18-19 c. Rainfall and humidity 19-20 d. Topography & Terrain 21-22 e. Water courses and Hydrology 23-24 f. Ground water Development 25 g. Drainage System 25-27 h. Demography 28-30 i. Cropping pattern 31 j. Land Form and Seismicity 31-35 k. Flora 36-38 l. Fauna 38-40 4 Physiography Of The District 41-45 4.1 General Landforms 41-42 4.2 Soil and rock pattern 42-44 4.3 Different geomorphology units 44-45 5 Land Use Pattern Of The District 46-53 5.1 Forest 48-49 5.2 Agriculture and Irrigation 49-51 Work Order No: MDTC/PM-5/160/66, Dated: 20.01.2020 District Survey Report Darjeeling, West Bengal 5.3 Horticulture 52-53 5.4 Mining 53 6 Geology 54-55 7 Mineral Wealth 56-82 7.1 Overview of mineral resources 56 7.2 Details of Resources 56-81 7.2.1 Sand and other riverbed minerals 56-78 I.
    [Show full text]
  • Size Distribution of Urban Centres Across North Bengal During 1991 to 2011
    [VOLUME 6 I ISSUE 2 I APRIL – JUNE 2019] e ISSN 2348 –1269, Print ISSN 2349-5138 http://ijrar.com/ Cosmos Impact Factor 4.236 Rank – Size Distribution of Urban Centres across North Bengal during 1991 to 2011 Dr. Arindam Basak Assistant Professor, Department of Geography & Applied Geography, University of North Bengal Received: February 05, 2019 Accepted: March 28, 2019 ABSTRACT: North Bengal has witnessed lack luster urbanization and growth of urban centres till 2011. Given its geographical coverage, the number of urban centres in North Bengal was only 45 in 1991 and 48 in 2001. However, in 2011 the number of urban centres in North Bengal suddenly increased to 131 which is quite stupendous compared to previous years. This sudden increase in the number of urban centres affected the rank-size distribution of urban centres across North Bengal. In this paper an attempt has been made to calculate the rank-size distribution of urban centres across North Bengal during 1991, 2001 and 2011 and to analyze the effect of a huge increase in the number of urban centres over the system of city-size distribution in this region. Key Words: North Bengal, Urbanization, Urban Centres, Rank-Size distribution. Introduction If urban centres are arranged according to their population size in a particular region they are related to one another. The population of the second largest urban centre will have half the population of the largest or primate city, the third largest urban centre will have 1/3rd population of the largest urban centre of the region. This relationship between the population of any urban centre and its rank in a set of urban centres of a region is called the rank-size rule.
    [Show full text]