<<

CONNER CREEK GREENWAY: Existing Conditions from Jefferson Conner - E. Outer Drive to 8 Mile Conner Street- 7 Mile Road to E. Outer Drive A Existing Conditions B Existing Conditions Issues: Issues: A. 2 road, 30-50' wide A. 4 lane road, 60' wide, intermittent parking on east side B. Existing 6' on west side of road B. Existing 6' sidewalk on east side of road C. Road will be resurfaced in 2004 C. Numerous sideroads and residential driveways Opportunities: Opportunities: 1. Bike could be incorporated through the narrowing of lanes. 1. Bike lanes could be incorporated through the narrowing of lanes. 2. Conflict points make use of sidepath inappropriate.

Summary: Easy Conversion to a High Quality Bike Lane/ Sidewalk Corridor Summary: Moderately Difficult Conversion to a Low Quality Bike Lane/ Sidewalk

Distance traveled in 15 minutes It takes 3- 4.5 hours to walk from the Detroit River in Pedestrian 2-3 miles an hour Maheras Park along Conner to 8 Mile Road and 45 minutes-1.5 hours to ride the corridor on a bike.

Bicyclist travels 8-12 miles an hour

8 Mile Road-Conner E. Outer Drive-Conner Intersection Railroad-Conner Intersection The Conner Street corridor ends at the intersection of Conner Street turns north while the main Railroad tracks are wide and rough. Bicycle Conner Street Conner and 8 Mile Road. Signage that indicates the lanes continue down E. Outer Drive. E. Outer lanes/paths should meet railroad at right angle Maheras Park beginning of the Conner Creek Greenway will be Drive is 60 ft. wide with 4 lanes of traffic. to minimize tires catching in rail grooves. important at this point. There is no traffic light or crosswalk at this intersection. The nearest crosswalk is Clairepointe Street N

180 ft. away at the intersection of 8 Mile and Van Dyke St. nd Manz Playfield

J

e

f

f

e

Warren- Conner Vernor Hwy. r Kercheval St. s

Budd Industries Charlevoix St.

Shopping Center o Proposed nA

F

. Time Transfer W r t

v d Chandler eu WaterWater TTreatmentreatment PPlantlant S Station d

a a Ma e

a n Park r nu

o r

oad d oao r ilr

R e a e R R c S

H e K e nA k l t P e i oss l M r Detroit Edison i i ble eet M Bike DaimlerChrysler- Jefferson East Plant Trai M v Mack Avenue Engine d DaimlerChryslerDaimlerChrysler l rk a 8 Mile Road e 7 Mile ro ConnerConner AAvenuevenue n il a AssemblyAssembly u R

e S

8 Mile Road- Conner e

B v WCCC h

Intersection A o . Police t e e Jefferson S m n Station r r

g Village e a KL

e a v

A St.St. JJohn-ohn- Nu nern St H k i mer i o m e R

u a NortheastNortheast s e re reir e Conner Playfield

s r

l id r t

en i r

tia G p I St. Jean Street E. Outer Drive-Conner S MillbankMillbank l d . - o

rive a Shoemaker e 9 wa d t r Intersection ys h

GreenwayGreenway 4 r t r

e

R Elmo St. C New Hern Terminal e

treet s A e D l CVS Pharmacy Yard t Southeastern Terre v r C o re G e High School llll S h

P n oss Street ConC r ib re o c a G le e i u Bi Bliss S o ke t n Algonac St. t Ro e u rrai N i e PVS te a o t Lipke Recreation Re i c t ad h l ailro e RaiR M A il R ter onra Av e a v C

i e e v lroalr y St. i o nbur n r a Cano Gethsemane Cemetary u d e D r e t MouMountnt OOlivetlivet CCememetaretary u O . E.E Outer Drive Detroit City Airport

Conner Street- McNichols Road to 7 Mile Road C Existing Conditions K L M N

2 1

20' Buffer-no - Exceptionally Wide Travel Lane Travel Lane Median Travel Lane Exceptionally Wide Travel Lane adjacent to cemetery adjacent to Cemetery and dense residential 110-115' neighborhood with Road Width Opportunities: numerous driveways Issues: and road intersections A. 4 through lanes, a center median, and intermittent parking lanes 1. Bike lanes could be incorporated through the narrowing of lanes. A B. No sidewalk on west side of road substantial buffer between the bike lane and the right through lane could be C. Outside travel lanes are exceptionally wide included. This buffer could be painted or a raised median. D. Road runs through Mount Olivet Cemetery. No sideroads or 2. A sidewalk or shared-use path could be added along the west side of the road, driveways entering along western edge. preferably in the road corridor to avoid the large trees in the buffer. E. Large trees in buffer along west side of road. Summary: Easy Conversion to a High Quality Bike Lane/ Sidewalk Corridor or Shared-Use Path on west side. Avenue to 8 Mile Road Conner Street- Gratiot Avenue to McNichols Road Conner Street- I-94 to Gratiot Avenue D Existing Conditions E Existing Conditions C 3 B Issues: Opportunities: 1. Very few conflict points along 13' A. 4 through lanes, 1 center turn lane, adjacent to Airport- Parking/Travel Travel LaneCenter Turn Lane Travel Lane Parking/Travel adjacent to dense width varies from 52-60'. Northbound west side road through Conner Section Varies- frequently Lane Lane residential Playfield. Sidepath could be no sidewalk 54' neighborhood arrows to 1 through lane with Road Width intermittent parking lane. 35 mph utilized. Issues: Opportunities: . 2. Improvements to Conner A. 2-4 through lanes, a center lane and 1. The Detroit City Airport runs the entire length Playfield will increase the number intermittent parking of the western side of Conner Street in B. Existing 6 ft. sidewalks on both sides of road. of mid-block crossings in this this section and varies frequently. An opportunity area. B. East side of road has numerous conflict points for a sidepath exists along the airport. See notes of intersecting and driveways. below. 3. Road could be converted to 4 C. Road is too narrow to accommodate bike lanes in 2. Connect existing sidewalks lanes with a bike lane. the street. It is problematic to create a sidewalk Summary: bikeway in this area because of the limited 3. Planting trees in buffer would substantially increase Easy Conversion to High Quality Sidepath along west side. Could also be space and frequent driveways. roadway aesthetics and pedestrian comfort. converted to a Bike Lane/ Sidewalk Corridor. Summary: Difficult Conversion to an Average Bike Lane/ Sidewalk Corridor Moderately Difficult Conversion to an Average Sidepath along the west side.

7 Mile-Conner Intersection Gratiot-Conner Intersection Second largest number of non-motorized Largest number of non-motorized crashes in study Conner Street crashes in study area. 3 pedestrian crashes area. 5 pedestrian crashes in 3 years. Pedestrians Maheras Park in 3 years. Pedestrians must cross a 52 ft. must cross a 165 ft. wide road with 8 lanes of traffic. road with 5 lanes of traffic. Existing crosswalks are set far-back from intersection and the refuge islands is not clearly Clairepointe Street N

Bessy Playground delineated. Signage will be critical at this Manz Playfield juncture to direct people along the J

greenway corridor. e

f

f

e

Warren- Conner Vernor Hwy. r Kercheval St. s

Budd Industries Charlevoix St.

Shopping Center o Proposed nA

F

. Time Transfer W r t

v d Chandler eu Water Treatment Plant S Station d

a a Ma e

a n Park r nu o r

oad d o r ilr

R e a e R R c S

H e K e nA k l e t i l M r Detroit Edison i Avenue eet M DaimlerChrysler- Jefferson East Plant M v Mack Avenue Engine d DaimlerChrysler City Park a 8 en 7 ro Conner Avenue il a Assembly u R

e S Investigate ownership of e

v WCCC h Ave A this parcel- fence may o . have to be moved. Police t e e Jefferson

S m n ne Station r r

g Village e a KL

e

a ag v

St. John- n H k i i

m e R Northeast e a e Conner Playfield

r r

l r t

i r

G p I St. Jean Street

Millbank . - S o arlem

a Shoemaker t e 9

d t r h

Greenway e 4 r t r

e C e R ElElmo St.t. Ch NewNew Hern Terminal e

r A e

t s D l CVS Pharmacy Yard t Southeastern Te S v r o re s G e High School ll s h Possible Bike Route

S i C n t l ratiotr re o c a Goe e i u t B n Algonaconac SStt. t r N i e PVS a o t Lipke Recreation i c D t ad h l ailro e R McNicholsM Rd. A il R Center onra Av e a v C i ene e v lr y St. i o nbubur n r a CanCanono Getethshsemanemane CemetCemetaaryry u d e D r 10' paved sidewalk or 10-20' grassy e t Mount Olivet Cemetary buffer directly adjacent to the airport u parking lots and service roads. O . McNichols Road-Conner E 30-50' grassy area between the western right-of- Detroitetroit Ciityty Aiirrpoortrt Intersection way and the nearest airport service road. No sideroads cross the right-of-way in this portion.

Saint Jean Street- Mack Avenue to I- 94 Saint Jean Street- Jefferson Avenue to Mack Avenue I Existing Conditions J Existing Conditions K L M N Issues: A. 4 lanes changing to 2 lanes north of Shoemaker, 40' wide road with minimal conflict points along west side. C B B. Bordered by vacated city land or Shoemaker Terminal City Yards north of Shoemaker. South of Shoemaker is Mack Avenue Engine 6' 7-25' Plant. Planted berm Travel LaneTravel Lane Center Turn Lane Travel Lane Travel Lane No sidewalk Adjacent to industrial land use Opportunities: 60' Road Width 1. Possible to utilize either a bike lane/sidewalk or a sidepath that would Issues: Opportunities: require the City to modify some of their yards A. 4 through lanes, 1 center turn lane 1. Because there are few driveways, bicycle sidepaths could be utilized effectively Summary: Difficult Conversion to a High Quality Shared Sidepath B. Existing sidewalk C. Berm with plantings on south side of road is a nice amenity Summary: Moderately Difficult Conversion to a High Quality Shared Sidepath Conner Street- Warren Avenue to I-94 Interchange F Existing Conditions

B 2

11-15' 11-15' Adjacent to ParkingTravel Lane Travel LaneTurn Lane Travel Lane Travel Lane Parking Adjacent to commercial commercial district 80' district and housing Road Width Issues: Opportunities: A. 2 lanes northbound, 3 lanes southbound, and intermittent 1. Bike lanes could be incorporated parking on both sides. through the narrowing of lanes. B. Buffer between sidewalk and road is barren of trees 2. Planting trees in buffer would substantially C. Entrance to Chandler Park along Conner lacks sidewalks increase roadway aesthetics and pedestrian comfort. 3. Improve pedestrian access to Chandler Park by adding sidewalks along Chandler Park Drive.

Summary: Moderately Difficult Conversion to a Low Quality Bike Lane/ Sidewalk Corridor.

In this section, Conner is dangerous for both pedestrians and Mack Avenue-Conner Warren-Conner Intersection bicyclists, and has signifigantly more non-motorized crashes Intersection recorded than the same section of St. Jean Street. Conner Street heavy traffic volume and high pedestrian demand make this a Mid-Block Crosswalk Maheras Park very difficult intersection. Pedestrians must cross a 200 ft. wide road with 7 lanes of traffic, which takes nearly a minute to walk across. Many motorists ignore the blinking red light that G signals the pedestrian crosswalk crossing Conner St. north of Clairepointe Street N Bessy Playground Warren.

New ball fields J

The intersection has an unexpectedly low number of e

f pedestrian and bike crashes. Pedestrians and bicyclists may be f

hesitant to use this intimidating intersection. The addition of e

Warren-Warren- CConneronner Vernor Hwy. r Kercheval St. the timed transfer station will bring an increase in the number s

BuddBudd IIndustriesndustries Charlevoix St.

of pedestrians to the intersection. This intersection need a ShoppingShopping CenterCenter o major overhaul to improve pedestrian safety. Proposed nA

The intersections of Mack F

. Time Transfer W r t Avenue with Conner and

v d Chandler eu Water Treatment Plant S Station d St. Jean are problematic

a a M e

a n Park r for pedestrians and nu o r

oad d o r lr i a bicyclists. Pedestrians

R e a e R

R S c must cross a 120 ft. wide HernH St. e K e n k l e F road with 7 lanes of traffic. t

i l r i I-94 Conner M Detroit Edison A A A high number of non- eet M DaimlerChrysler- Jefferson East Plant M Intersection v MackMack AvenueAvenue EngineEngine v motorized crashes occur d DaimlerChrysler City Park a 8 e e 7 here. ro Conner Avenue n n il a Assembly u u R

e S e e v WCCCWCCC h Warren-St. Jean

A o . Intersection Police t e e Jefferson S m n E Mid-Block Crosswalk Numerous entrances to plant Station r r g Village e a KL

e a v

St. John- n Avenue Harper k i i m e R Northeast e e C r Existing Pedestrian r

l t I i G r I-94I Path across St. Jean Street Millbank . - S o t a 9 ShoemakerShoemaker

d t West side is more appropriate for a Mack Avenue-St. Jean r h Greenway e r t

4 sidepath in this section.

e R C e Elmo St. New HernHern TerminalTerminal Intersection e r e

t s City yard property would have to be D l CVS Pharmacy YardYard t Southeastern Te S used because space between r o Abandoned Railroad Bridge re s G Shoemaker and I-94 is very narrow High School ll s h S i C t l r Active Railroad Bridge r c G ee o i a t B n Algonac St. t o r N i PVSPVS Pedestrian Bridge e a o t Lipke Recreation i c t ad h l ailroadro e R M A il RailR Center railra A a v ConCon e v i e e v lr y St. i o nbur n r a Cano Gethsemane Cemetary u Abandoned Rail Corridor and Connection to Linkages between Conner and St. Jean d e D Conner Greenway r e The abandoned rail corridor is in a secluded area that leads to an Shoemaker Street: 40 ft. 2 lane road. Warren Avenue: Major arterial- Mack Avenue: 80 ft wide elevated roadway t Mount Olivet Cemetary behind abandoned buildings along Harper Avenue. Issues of Shortest linkage between St. Jean and 70 ft. wide with 6 lanes of heavy with the least amount of sideroads and u personal safety and comfort need to be addressed in the area Conner at .14 miles. Existing sidewalks traffic. Medium length linkage driveways. Existing sidewalk on north side of between I-94 and Harper Avenue. on both sides. Bike lanes could be between St. Jean and Conner at the road, nor room to add them. Bike lanes O accomodated by narrowing lanes. Many .4 miles. Many sideroads and could be accomodated by narrowing lanes. . The pedestrian bridge, although more visible and more used, is a E driveways and sideroads. Provides strong driveways. Sidewalks on both Longest linkage between St. Jean and Conner Detroit City Airport quarter-mile from St. Jean, a signifigant diversion from the main connection to Chandler Park and WCCC. sides. at .64 miles. corridor.

Jefferson Avenue- St. Jean St. to Conner Street St. Jean Street- Freud Street to Jefferson Avenue K Existing Conditions L Existing Conditions M N Issues: Issues: Opportunities: A. 6 through lanes and one center turn lane, few intersecting roads A. 4 lane road, existing sidewalk on west side. 1. Possible to utilize either a bike lane/sidewalk or a side path. B. Travel lanes can be narrowed to accommodate bike lanes B. Low volumes of traffic consisting mainly of trucks. C. Sidewalks existing on both sides of Bordered by industrial land use and vacant land. C. Room for bike lanes or sidepath. Opportunities: 1. Most viable option for linking St. Jean with Clairpointe by a bike lane/sidewalk option. Summary: Moderately Difficult Conversion to an Average 2. Center turn lane can be converted to a median for stretches Quality Bike Lane/ Sidewalk or Sidepath. Summary: Moderately Difficult Conversion to a High Quality Bike Lane/ Sidewalk Corridor Conner Street- Mack Avenue to Warren Avenue Conner Street-Jefferson Avenue to Mack Avenue G Existing Conditions H Existing Conditions

B 2

15' 15' 1 Travel LaneTravel Lane Travel Lane Travel Lane Adjacent to commercial 2 land use Adjacent to 52' commercial land use Road Width 11-15' 11-15' Shared-Use Path Travel LaneTravel Lane Travel LaneTurn Lane Travel Lane Travel Lane Travel Lane Shared-Use Path

Issues: Opportunities: Adjacent to Adjacent to vacant industrial land use 80' land and parking Road Width A. 4 through lanes 1. Sufficient width for travel lanes to be Issues: Opportunities: narrowed to accommodate bikes in the roadway B. Buffer between sidewalk and road A. 6 through lanes and one center turn lane 1. Because there are few driveways and sideroads, is barren of trees 2. Planting trees in buffer would substantially B. Difficult to narrow travel lanes any further bike lane could be on top of between trees C. The in this section of Conner are increase roadway aesthetics and pedestrian to accommodate bike lanes. and sidewalk. scheduled to be straightened. comfort. C. Sidewalks generally 11-15 feet wide where 2. Center turn lane can be converted to a median for 3. Scheduled straightening of curbs provides they exist opportunity to widen roads for bike lane. long stretches. D. Plantings are in tree pits spaced intermittently in the middle of the sidewalk. Summary: Moderately Difficult Conversion to a Low Quality Bike Lane/ Sidewalk Corridor Summary: Moderately Difficult Conversion to a High Quality Shared Sidepath

Conner Street Mid-Block Crosswalk rk . . . t t y

S Clairpointe Street N S l Bessy Playground Manz Playfield w H x a i H

v J o r

e v e o h

e

n f

l c

r f

r r

e e a e

Warren- Conner V r h K s

Budd Industries C Shopping Center o Too tight for sidepath along this curve.

Proposed Jefferson Avenue is the most viable option for n Interim solution is bike lane/ sidewalk. Long

term solution is to build a sidepath along the

F a link. Can be converted to bike lane/ A

. Time Transfer W r canal. t sidewalk. Existing sidewalks on both sides.

v d Chandler e

Water Treatment Plant S Station d a Possible Rail- wiith Trail Route e a Mack Avenue u

a n Park r n o r

oad d o r ilr

e

R a u e R

R S

H

e K e Avenue n l e t

i l r i M DetroitDetroit EdisonEdison

e M DaimlerChrysler-DaimlerChrysler- JeffersonJefferson EastEast PlantPlant M Mack Avenue Engine d e DaimlerChrysler City Park a 8 t 7 ro Conner Avenue il a Assembly R Not a viable option for a sidepath. ROW is e S very tight, hemmed in by industrial land use v ho

WCCC on North side of Freud St. A . J PolicePolice t e e JeffersonJefferson S m n Crosswalks needed for bus stop locations StationStation r r g VillageVillage e a KL

e a v

St. John- n H k i i m e R Northeast e a e Conner Playfield

r r

l r t

i r

G p I St. Jean Street Millbank . - Str o

a Shoemaker e 9 t d r

Greenway e h 4 t r

e e R Elmo St. C New Hern Terminal e

r A e

t s DetroitD River l CVS Pharmacy Yard t SoutheasternSoutheastern Te S v r o re s G e HighHigh SSchoolchool ll s h

S i C n t l r re o c a Goe e i u t B n Algonac St. t r N i e PVS a o t Lipke Recreation c t d he il ailroa Prepared by: R M A il R Legend Center onra Av e a v C i e e v lr y St. Stoplight Major intersection i o nbur n r a Cano Gethsemane Cemetary u D d e Conflict point- sideroad Existing r NORTH Greenspace e Conflict point- t Mount Olivet Cemetary u residential 0 1/4 1/2 Potential bike route O Midblock crosswalk . E Existing greenway Detroit City Airport Mile January 30, 2002

Freud Street- St. Jean St. to Clairpointe St. Clairpointe Street- Maheras Park to Jefferson Avenue K L M Existing Conditions N Existing Conditions Issues: Opportunities: A. 2 lanes, 37' wide. 1. Road can be narrowed to accommodate bike lanes. B. The south side of the road has few formal driveways with Low volumes 2. Possible to utilize either a of traffic consisting mainly of trucks. bike lane/sidewalk or a sidepath. B C. No existing sidewalks on either side of the road. Very narrow ROW, no room 35' Travel Lane Travel Lane 16' Service Road for residential to add sidewalks. 35' neighborhood Issues: Road Width D. Industrial development is setback along Opportunities: the riverfront, giving the road a rural feeling. A. 2 through lanes and low volumes of traffic. 1. Possible to narrow travel lanes to accommodate Widens to 4 lanes north of Freud St. 25 mph. bike lanes and create pedestrian sidepath along creek until Bayview Marina. Summary: Moderately Difficult Conversion to an Average Quality B. Conner Creek runs along west side of road. Few driveways or sideroads along western edge Bike Lane/ Sidewalk or Sidepath. Summary: Easy Conversion to a High Quality C. ROW is too tight for sidepath at Bayview Marina. Bike Lane/ Sidewalk Corridor